CN105375340A CN201510759525.8A CN201510759525A CN105375340A CN 105375340 A CN105375340 A CN 105375340A CN 201510759525 A CN201510759525 A CN 201510759525A CN 105375340 A CN105375340 A CN 105375340A
Authority
CN
China
Prior art keywords
fuse
combined
power generation
pressing plate
wind power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510759525.8A
Other languages
Chinese (zh)
Inventor
高德义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HENAN HAORUI ELECTRIC Co Ltd
Original Assignee
HENAN HAORUI ELECTRIC Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENAN HAORUI ELECTRIC Co Ltd filed Critical HENAN HAORUI ELECTRIC Co Ltd
Priority to CN201510759525.8A priority Critical patent/CN105375340A/en
Publication of CN105375340A publication Critical patent/CN105375340A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B1/00Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
    • H02B1/18Disposition or arrangement of fuses
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B1/00Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
    • H02B1/26Casings; Parts thereof or accessories therefor
    • H02B1/28Casings; Parts thereof or accessories therefor dustproof, splashproof, drip-proof, waterproof or flameproof
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B1/00Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
    • H02B1/26Casings; Parts thereof or accessories therefor
    • H02B1/30Cabinet-type casings; Parts thereof or accessories therefor
    • H02B1/306Accessories, e.g. windows
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B3/00Apparatus specially adapted for the manufacture, assembly, or maintenance of boards or switchgear

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Fuses (AREA)

Abstract

The invention discloses a combined wind power generation transformer station. The combined wind power generation transformer station comprises a combined transformer station casing, wherein an inner side wall of the combined transformer station casing is fixedly provided with a fuse seat, a fuse body is fixed on the fuse seat through a fuse body fixing structure, an upper left cover is arranged above the combined transformer station casing, and the upper left cover is provided with a mounting maintenance observation device. The combined wind power generation transformer station is convenient and reliable to mount, cost of a fuse assembly is reduced by two thirds, high safety is realized, for fusing a fuse, the fuse body is dipped in about 2000kg transformer oil, rapid arc quenching can be realized, no blast occurs, personal injury is further prevented, reliable operation is realized, the fuse body is connected through a bolt, firmness and reliability are realized, for traditional design, reliability is poor as contact is realized through a conductive spring; through the combined wind power generation transformer station, observation is convenient, the fuse assembly can be seen through a glass window formed by thickened glass, so abnormality can be observed.

Description

A kind of wind power generation prefabricated substation and installation and application thereof
Technical field
The present invention relates to wind power generation prefabricated substation field, be specially that a kind of fail safe is high, operating temperature is reliable, and wind power generation prefabricated substation with low cost and installation and application thereof.
Background technology
Wind power generation is green energy resource, that the whole world is all at the environmental protection energy of popularization, sustainable development, the electricity that wind-driven generator sends is delivered on electrical network through wind power generation prefabricated substation, each power consumer is transported to again by electrical network, wind power generation prefabricated substation is one of capital equipment of wind power generation, plays an important role in wind power generation power transmission and transformation field.
Current wind power generation prefabricated substation equipment is in use easily out of order, and subject matter concentrates on fuse leakage of oil, and fuse explodes.Fuse leakage of oil or fuse blows blast are changed, and need the oil in box-like for wind-force generating set transformer station fuel tank to release, and the weight of oil in fuel tank, at about 2000 kilograms, also will ensure that clean, the drying of oil is very difficult in the wild.Fuse is arranged in fuse outer sleeve, fuse outer sleeve narrow space, the gas that fuse instant of detonation produces produces immense pressure in fuse outer sleeve small space, and fuse carries melt bar to be gone out by air blast instantaneously, easily causes maintainer's injures and deaths.
Shown in the fuse assembly structural representation of wind power generation prefabricated substation of the prior art as described in Figure 1, fuse outer sleeve main member is rear conductive tube a, rear insulating cylinder c, front conductive tube d, front insulating cylinder e and flange g form, carry melt bar f and fix fuse 3, insert in fuse outer sleeve from flange g, contacted with front conductive tube d with rear conductive tube a respectively by the power spring b be fixed on fuse two ends and conduct electricity; In above-mentioned prior art, to be fuse outer sleeve be critical defect that two insulation resin cylinders carry out being connected with three metalworks seals.Because wind power plant overwhelming majority equipment is in the desert of open country, day and night temperature is very large, because the coefficient of expansion of resin and metal is inconsistent, often cause resin and the leakage of oil of corrupt split place, spot replace fuse assembly is very complicated, if the explosion gas that fuse blows and leakage of oil produce directly can penetrate the door-plate of 2.5 millimeters, if get to it maintainer, consequence is hardly imaginable.
Therefore, change the structure of existing wind power generation prefabricated substation, better can adapt to the environment of its work, improving device reliability, safe operation, and greatly reduce its operating cost, has been a good problem to study.
Summary of the invention
In order to overcome above-mentioned deficiency of the prior art, the invention provides one to redesign fuse mounting means, fuse redesigns, fuse outer sleeve redesigns into fuse base, the leakage of oil of thorough solution fuse outer sleeve, blast, and significantly can reduce production cost, provide wind power generation prefabricated substation and the installation and application thereof of the safe and reliable operation of wind power generation prefabricated substation.
The object of the present invention is achieved like this:
Wind power generation prefabricated substation, comprise Combined-type substation cabinet body 1, described Combined-type substation cabinet body 1 internal side wall is fixedly installed fuse base 2, and fuse 3 is fixed on fuse base 2 by fuse fixed structure by described fuse base 2; The top of described Combined-type substation cabinet body 1 is provided with left cover 12, upper left cover 12 is provided with installation and repairing inspection hole device;
Described fuse fixed structure comprises the spring clip 11 being arranged on fuse base 2 bottom, one end of fuse 3 is inserted and is fixed in spring clip 11, and the other end of fuse 11 is fixed on the top of fuse base 2 by fuse set bolt 9;
Described installation and repairing inspection hole device comprise be arranged on Combined-type substation cabinet body 1 upper left cover 12 on installation and repairing inspection hole, installation and repairing inspection hole is provided with and adds heavy sheet glass 7, the two ends adding heavy sheet glass 7 are provided with sealing ring 5, sealing ring 5 is provided with pressing plate 10, pressing plate 10 is provided with the pressing plate set bolt 4 be fixedly connected with upper left cover 12; Described pressing plate 10 is connected with one side of removable cover 8 by hinge 6, being arranged on of removable cover 8 adds heavy sheet glass 7;
Described wind power generation prefabricated substation install and use mode, its concrete steps are as follows:
First, fuse base 2 is fixed on the sidewall of Combined-type substation cabinet body 1, inserted in the spring clip 11 being fixed on and being arranged on fuse base 2 bottom one end of fuse 3, the other end of fuse 11 is fixed on the top of fuse base 2 by fuse set bolt 9;
Secondly, in Combined-type substation cabinet body 1, add the transformer oil of about 2000 kilograms, make fuse be immersed in transformer oil;
Again, be fixed on installation and repairing inspection hole that upper left cover 12 has by sealing ring 5, pressing plate 3 and pressing plate set bolt 4 by adding heavy sheet glass 7, pressing plate 3 is by hinge 6, and be provided with removable cover 8 adding above heavy sheet glass 7, equipment is installed and terminated;
When observing fuse assembly, digging removable cover 8 can see fuse assembly; After observation fuse assembly terminates, put down removable cover 8; When changing fuse 3, lay down pressing plate set bolt 4, remove pressing plate 3 and add heavy sheet glass 7, by being arranged on the installation and repairing inspection hole in upper left cover 12, replacing is removed and installed to the fuse 3 being arranged on Combined-type substation cabinet body 1, after replacing terminates, carry out the installation of installation and repairing inspection hole device according to mounting means.
positive beneficial effect:the present invention installs simple and reliable, and fuse assembly cost only has original 1/3rd; Fail safe is high, fuse blows, and fuse is immersed in about 2000 kilograms transformer oil, and arcing is extinguished rapidly, can not explode, and more can not injure the person; Reliable, fuse is bolted, solid and reliable, traditional design by conductive spring contacts, poor reliability; Convenient observation, the windowpane formed by adding heavy sheet glass can see fuse assembly, can observe and whether have abnormal conditions.
Accompanying drawing explanation
Fig. 1 is the fuse assembly structural representation of wind power generation prefabricated substation of the prior art;
Fig. 2 is structural representation of the present invention;
In figure be: rear conductive tube a, power spring b, rear insulating cylinder c, front conductive tube d, front insulating cylinder e, carry melt bar f, flange g, Combined-type substation cabinet body 1, fuse base 2, fuse 3, pressing plate set bolt 4, sealing ring 5, hinge 6, add heavy sheet glass 7, removable cover 8, fuse set bolt 9, pressing plate 10, spring clip 11, upper left cover 12.
Embodiment
Below in conjunction with accompanying drawing, invention is described further:
As shown in Figure 2, wind power generation prefabricated substation, comprise Combined-type substation cabinet body 1, described Combined-type substation cabinet body 1 internal side wall is fixedly installed fuse base 2, and fuse 3 is fixed on fuse base 2 by fuse fixed structure by described fuse base 2; The top of described Combined-type substation cabinet body 1 is provided with left cover 12, upper left cover 12 is provided with installation and repairing inspection hole device;
Described fuse fixed structure comprises the spring clip 11 being arranged on fuse base 2 bottom, one end of fuse 3 is inserted and is fixed in spring clip 11, and the other end of fuse 11 is fixed on the top of fuse base 2 by fuse set bolt 9;
Described installation and repairing inspection hole device comprise be arranged on Combined-type substation cabinet body 1 upper left cover 12 on installation and repairing inspection hole, installation and repairing inspection hole is provided with and adds heavy sheet glass 7, the two ends adding heavy sheet glass 7 are provided with sealing ring 5, sealing ring 5 is provided with pressing plate 10, pressing plate 10 is provided with the pressing plate set bolt 4 be fixedly connected with upper left cover 12; Described pressing plate 10 is connected with one side of removable cover 8 by hinge 6, being arranged on of removable cover 8 adds heavy sheet glass 7;
Described wind power generation prefabricated substation install and use mode, its concrete steps are as follows:
First, fuse base 2 is fixed on the sidewall of Combined-type substation cabinet body 1, inserted in the spring clip 11 being fixed on and being arranged on fuse base 2 bottom one end of fuse 3, the other end of fuse 11 is fixed on the top of fuse base 2 by fuse set bolt 9;
Secondly, in Combined-type substation cabinet body 1, add the transformer oil of about 2000 kilograms, make fuse be immersed in transformer oil;
Again, be fixed on installation and repairing inspection hole that upper left cover 12 has by sealing ring 5, pressing plate 3 and pressing plate set bolt 4 by adding heavy sheet glass 7, pressing plate 3 is by hinge 6, and be provided with removable cover 8 adding above heavy sheet glass 7, equipment is installed and terminated;
When observing fuse assembly, digging removable cover 8 can see fuse assembly; After observation fuse assembly terminates, put down removable cover 8; When changing fuse 3, lay down pressing plate set bolt 4, remove pressing plate 3 and add heavy sheet glass 7, by being arranged on the installation and repairing inspection hole in upper left cover 12, replacing is removed and installed to the fuse 3 being arranged on Combined-type substation cabinet body 1, after replacing terminates, carry out the installation of installation and repairing inspection hole device according to mounting means.
The present invention installs simple and reliable, and fuse assembly cost only has original 1/3rd; Fail safe is high, fuse blows, and fuse is immersed in about 2000 kilograms transformer oil, and arcing is extinguished rapidly, can not explode, and more can not injure the person; Reliable, fuse is bolted, solid and reliable, traditional design by conductive spring contacts, poor reliability; Convenient observation, the windowpane formed by adding heavy sheet glass can see fuse assembly, can observe and whether have abnormal conditions.
Above execution mode is only for illustration of the preferred embodiment of the present invention; but the present invention is not limited to above-mentioned execution mode; in the ken that described exercising ordinary skill possesses; the any amendment done within the spirit and principles in the present invention, equivalent to substitute and improvement etc., it all should be encompassed within the technical scheme scope of request of the present invention protection.

Claims (4)

1. a kind ofwind power generation prefabricated substation, comprise Combined-type substation cabinet body (1), it is characterized in that: described Combined-type substation cabinet body (1) internal side wall is fixedly installed fuse base (2), fuse (3) is fixed on fuse base (2) by fuse fixed structure by described fuse base (2); The top of described Combined-type substation cabinet body (1) is provided with left cover (12), upper left cover (12) is provided with installation and repairing inspection hole device.
2. according to claim 1 a kind ofwind power generation prefabricated substation, it is characterized in that: described fuse fixed structure comprises the spring clip (11) being arranged on fuse base (2) bottom, one end of fuse (3) is inserted and is fixed in spring clip (11), and the other end of fuse (11) is fixed on the top of fuse base (2) by fuse set bolt (9).
3. according to claim 1 a kind ofwind power generation prefabricated substation, it is characterized in that: described installation and repairing inspection hole device comprises the upper installation and repairing inspection hole of the upper left cover (12) being arranged on Combined-type substation cabinet body (1), installation and repairing inspection hole is provided with and adds heavy sheet glass (7), the two ends adding heavy sheet glass (7) are provided with sealing ring (5), sealing ring (5) is provided with pressing plate (10), pressing plate (10) is provided with the pressing plate set bolt (4) be fixedly connected with upper left cover (12); Described pressing plate (10) is connected with one side of removable cover (8) by hinge (6), being arranged on of removable cover (8) adds heavy sheet glass (7).
4. as claimed in claim 1 a kind ofwind power generation prefabricated substation install and use mode, it is characterized in that, its concrete steps are as follows:
First, fuse base (2) is fixed on the sidewall of Combined-type substation cabinet body (1), being inserted to be fixed in one end of fuse (3) is arranged in the spring clip (11) of fuse base (2) bottom, and the other end of fuse (11) is fixed on the top of fuse base (2) by fuse set bolt (9);
Secondly, in Combined-type substation cabinet body (1), add the transformer oil of about 2000 kilograms, make fuse be immersed in transformer oil;
Again, to add heavy sheet glass (7) by sealing ring (5), pressing plate (3) and pressing plate set bolt (4) is fixed on installation and repairing inspection hole that upper left cover (12) has, pressing plate (3) is by hinge (6), add heavy sheet glass (7) top be provided with removable cover (8), equipment install terminate;
When observing fuse assembly, digging removable cover (8) can see fuse assembly; After observation fuse assembly terminates, put down removable cover (8); When changing fuse (3), lay down pressing plate set bolt (4), remove pressing plate (3) and add heavy sheet glass (7), by being arranged on the installation and repairing inspection hole in upper left cover (12), replacing is removed and installed to the fuse (3) being arranged on Combined-type substation cabinet body (1), after replacing terminates, carry out the installation of installation and repairing inspection hole device according to mounting means.
CN201510759525.8A 2015-11-10 2015-11-10 Combined wind power generation transformer station and mounting and use method thereof Pending CN105375340A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510759525.8A CN105375340A (en) 2015-11-10 2015-11-10 Combined wind power generation transformer station and mounting and use method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510759525.8A CN105375340A (en) 2015-11-10 2015-11-10 Combined wind power generation transformer station and mounting and use method thereof

Publications (1)

Publication Number Publication Date
CN105375340A true CN105375340A (en) 2016-03-02

Family

ID=55377259

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510759525.8A Pending CN105375340A (en) 2015-11-10 2015-11-10 Combined wind power generation transformer station and mounting and use method thereof

Country Status (1)

Country Link
CN (1) CN105375340A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201111318Y (en) * 2007-10-09 2008-09-03 新疆时代石油工程有限公司 Overhead combined box type transformer station
CN201345276Y (en) * 2009-01-21 2009-11-11 山东泰开箱变有限公司 Combined type transformer for separating box type wind power generation
CN201374514Y (en) * 2009-03-07 2009-12-30 山东泰开箱变有限公司 Functional type wind power combined box substation structured like a Chinese character 'pin'
WO2011001956A1 (en) * 2009-06-30 2011-01-06 パナソニック電工株式会社 Direct current circuit breaker
CN202384689U (en) * 2011-12-20 2012-08-15 青岛特锐德电气股份有限公司 Observation window structure of insolated fracture
CN202423945U (en) * 2011-12-07 2012-09-05 正泰电气股份有限公司 Electric protecting device utilizing full-range air-insulated protecting fuse for American box transformer
CN205081356U (en) * 2015-11-10 2016-03-09 河南昊锐电气有限公司 Wind power generation combination formula transformer substation

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201111318Y (en) * 2007-10-09 2008-09-03 新疆时代石油工程有限公司 Overhead combined box type transformer station
CN201345276Y (en) * 2009-01-21 2009-11-11 山东泰开箱变有限公司 Combined type transformer for separating box type wind power generation
CN201374514Y (en) * 2009-03-07 2009-12-30 山东泰开箱变有限公司 Functional type wind power combined box substation structured like a Chinese character 'pin'
WO2011001956A1 (en) * 2009-06-30 2011-01-06 パナソニック電工株式会社 Direct current circuit breaker
CN202423945U (en) * 2011-12-07 2012-09-05 正泰电气股份有限公司 Electric protecting device utilizing full-range air-insulated protecting fuse for American box transformer
CN202384689U (en) * 2011-12-20 2012-08-15 青岛特锐德电气股份有限公司 Observation window structure of insolated fracture
CN205081356U (en) * 2015-11-10 2016-03-09 河南昊锐电气有限公司 Wind power generation combination formula transformer substation

Similar Documents

Publication Publication Date Title
CN103545154B (en) Fuse
EP2863053A1 (en) Single piece electric assembly for connecting an off-shore wind turbine with an electric subsea cable and mounting method therefor
CN113691014A (en) Intelligent video identification monitoring alarm system for power equipment
CN204668154U (en) A kind of capacitor from explosion cover plate assembly
CN102798757A (en) Method and system for detecting contact resistance of bus joint of GIS (Geographic Information System)
CN205081356U (en) Wind power generation combination formula transformer substation
CN201170797Y (en) Apparatus for detecting contact corona and arc-drawing of high voltage switch cabinet
CN105954658A (en) High-voltage cable GIS terminal test apparatus
CN105375340A (en) Combined wind power generation transformer station and mounting and use method thereof
CN208045256U (en) Separate-box type combined type transformer for photovoltaic generation
CN202940188U (en) Fire protection device for photovoltaic confluence box
CN105720564A (en) Non-unit self-adjoint impedance protection method applicable to half-wavelength power transmission line
CN205411977U (en) Electric power cable is with novel fire prevention fire control unit
CN108764598A (en) A kind of low-pressure metering box failure risk appraisal procedure
CN203929937U (en) A kind of loose contact electrical discharge arc generating means
CN204214549U (en) Online portable far infrared temperature measurement device
CN206712437U (en) A kind of cable branch box
CN205786928U (en) It is connected the cover plate assay device of air chamber with GIS for oil-gas type transformator
CN205960499U (en) Special transformer substation of wind -force or photovoltaic power generation
CN205376299U (en) Power capacitor explosion -proof cover assembly
CN105162084B (en) A kind of method that Wind turbines realize electric security protector
CN109398273A (en) Automobile occurs spontaneous combustion and automatically cuts off battery feed structure
CN213425593U (en) Box-type substation
CN205355630U (en) Electrified prosthetic group trap piece of SF6 combined electrical apparatus gas leakage
CN204144212U (en) A kind of 40.5kV fuse switch

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160302

RJ01 Rejection of invention patent application after publication