CN105373858B - A kind of active power of wind power field optimization method decomposed based on wind speed timing - Google Patents

A kind of active power of wind power field optimization method decomposed based on wind speed timing Download PDF

Info

Publication number
CN105373858B
CN105373858B CN201510843636.7A CN201510843636A CN105373858B CN 105373858 B CN105373858 B CN 105373858B CN 201510843636 A CN201510843636 A CN 201510843636A CN 105373858 B CN105373858 B CN 105373858B
Authority
CN
China
Prior art keywords
unit
wind
active power
wind speed
value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510843636.7A
Other languages
Chinese (zh)
Other versions
CN105373858A (en
Inventor
苏永新
李启航
段斌
易灵芝
谭貌
吴亚联
姚子力
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiangtan University
Original Assignee
Xiangtan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiangtan University filed Critical Xiangtan University
Priority to CN201510843636.7A priority Critical patent/CN105373858B/en
Publication of CN105373858A publication Critical patent/CN105373858A/en
Application granted granted Critical
Publication of CN105373858B publication Critical patent/CN105373858B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Development Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Wind Motors (AREA)

Abstract

The invention discloses a kind of active power of wind power field optimization methods decomposed based on wind speed timing, comprising the following steps: step 1: the forecasting wind speed Curve transform by wind power plant next control period is discrete wind series;Step 2: being considered as constant natural wind speed for the corresponding air speed value of discrete wind series each element, calculates separately under these constant natural wind speed effects, the active power reference value and its initial time of each unit;Step 3: by each unit active power reference value and its initial time, each unit active power reference value controlling curve under wind series effect is generated, each unit is run according to this controlling curve.The lower calculation amount of this optimization method, less hardware resource realize that active power of wind power field optimizes under Dynamic Wind Speed, and forming one kind has practical value scheme, promotes wind power plant generated energy, improves wind power plant gene-ration revenue.

Description

A kind of active power of wind power field optimization method decomposed based on wind speed timing
Technical field
The present invention relates to wind power plant control technology field, in particular to a kind of wind power plant decomposed based on wind speed timing is active Power optimization method.
Background technique
In recent years, the Wind Power Generation Industry in China remains strong growth, with the development of wind-powered electricity generation, there is good wind energy Land resources are fewer and fewer, further develop for support Wind Power Generation Industry, extensive development marine wind electric field becomes inexorable trend.When Preceding marine wind electric field construction cost is higher, improves the generating efficiency of marine wind electric field, increases the economic benefit of wind-powered electricity generation owner, is sea One of the critical issue of upper wind power plant operation.
Compared with landwid electric field, marine wind electric field is extremely violent by wake effect, and traditional separate unit Wind turbines are maximum Wind energy extraction will lead to upwind unit and absorb biggish wind energy, and lower wind direction unit input wind speed reduces, to lose wind power plant Active power, studies have shown that traditional single machine maximal wind-energy capture scheme, the marine wind electric field as caused by wake effect are active Power loss may be up to 30%, although wake effect can be effectively reduced by wind power plant microcosmic structure, Wind turbines layout optimization Influence, but due to the factors such as wind power plant place and construction cost restrict, the distance between Wind turbines are generally in impeller diameter 5 to 7 times between, influence of the wake effect to active power of wind power field is still obvious.
Domestic and international some scholars are based on wake effect and have carried out a series of researchs to active power of wind power field optimization, form A variety of wake models, existing research concentrate on substantially wind speed it is constant when, influence of the wake effect to active power of wind power field and its In terms of ameliorative way.But in wind speed dynamic change, the research of the active power optimization aspect of wind power plant is still immature, main The reason is that Wind turbines have it is very strong non-linear, by traditional method of thinking, using the wind speed of longer period of time as one Entirety is investigated, and active power of wind power field optimization method is established, and since the possibility combination of time dimension is extremely more, makes equation solution Computationally intensive, corresponding control strategy realizes difficulty, is unfavorable for practical application.
Summary of the invention
That in order to solve the above technical problem, the present invention provides a kind of calculation amounts is small, at low cost, practical value is high based on wind The active power of wind power field optimization method that fast timing is decomposed.
Technical proposal that the invention solves the above-mentioned problems is: a kind of active power of wind power field decomposed based on wind speed timing is excellent Change method, comprising the following steps:
Step 1: the forecasting wind speed curve in wind power plant next control period is chronologically converted into the discrete of 30 elements Wind series;
Step 2: being considered as constant natural wind speed for the corresponding air speed value of discrete wind series each element, is based on wake effect, It calculates separately under each constant natural wind speed effect, the active power reference value of each unit;Meanwhile it being based on wake flow propagation delay, It calculates separately under each constant natural wind speed effect, at the time of each unit active power reference value starts effect;
Step 3: by each unit active power reference value and its act at the time of, generate the effect of discrete wind series Under each unit active power reference value controlling curve, each unit according to this controlling curve run.
The above-mentioned active power of wind power field optimization method decomposed based on wind speed timing, in the step 1, discrete wind speed sequence Arrange the conversion formula of s (m) are as follows:
Wherein, m is natural number, and value range is 1≤m≤31, scIt (t) is t moment predicting wind speed of wind farm value, tNTable Show that the initial time in next control period, T indicate one control period corresponding duration of wind power plant, TsIt is between wind speed discretization Every the time, Ts=T/30.
The above-mentioned active power of wind power field optimization method decomposed based on wind speed timing, in the step 2, each unit has Steps are as follows for the calculating of function value and power reference:
1) with the axial inducible factor a of unit iiFor variable, then the power coefficient of unit iAnd its thrust coefficientAre as follows:
2) m in discrete wind series s (m) takes occurrence n, enables n=1;
3) it sets wind power plant to be acted on by constant natural wind speed s (n), uses viThe input wind speed for indicating unit i, if v1It is upwind Boundary unit, unit i+1 are the upward First units of unit i leeward, 4. 5. calculate the input wind speed of unit i+1 with formula by formula:
v1=s (n) is 4.
Wherein, k is wind power plant terrain rough factor, riFor unit i impeller radius, x is unit i hub centre and unit The distance that i+1 hub centre projects on wind direction;
4) each unit active power is calculated as follows:
Wherein, PiIndicate the active power of unit i, vratedIndicate unit rated wind speed, vin、vcutThe incision of expression unit, Cut-out wind speed;ρ indicates atmospheric density,Indicate the rated power of unit i;
5) it is as follows to establish active power of wind power field Optimized model:
Wherein, PallIndicate that active power of wind power field, i.e. the sum of each unit active power of wind power plant, N indicate machine in wind power plant Group sum,It indicates through optimization aiThe formula in bracket is set to obtain maximum value;
6) solution procedure 5) given by equation, obtain the optimization solution of unit i inducible factor, and substituted into formula 2.- 5. obtaining unit i power coefficient, thrust coefficient, the specific value for inputting wind speed;
7) by unit i power coefficient value substitute into following formula, then obtain natural wind speed be s (n) when, the wattful power of unit i Rate reference value
Make i value traverse each unit of wind power plant, then obtain natural wind speed be s (n) when, the active power reference of each unit Value;
8) judge that the value size of n enables n=n+1 if n≤30, jump to step 3), otherwise terminate operation.
The above-mentioned active power of wind power field optimization method decomposed based on wind speed timing, in the step 2, each unit has Calculation method at the time of function value and power reference starts effect is as follows: when the m in discrete wind series s (m) takes occurrence n, counting Calculate the time delay D that wind speed s (n) travels to unit i from wind power plant upwind boundary uniti,n, then when wind speed is s (n), unit i's has Function value and power referenceThe initiation momentFor
⑨。
The above-mentioned active power of wind power field optimization method decomposed based on wind speed timing, the active power reference value of each unit Start at the time of effect in calculation method, wind speed s (n) travels to the time delay D of unit i from wind power plant upwind boundary uniti,n's Calculation method is as follows:
1) wind is propagated by wind direction, on wind speed propagation path, seeks wind power plant upwind boundary unit impeller center and machine The distance of subpoint of the group i impeller center on wind direction, is denoted as L;
2) D is calculated as followsi,n, and i value is made to traverse each unit of wind power plant, n value traverses each nature in 1≤n≤31 Number,
⑩。
The above-mentioned active power of wind power field optimization method decomposed based on wind speed timing, in the step 3, unit wattful power The generating mode of rate reference value controlling curve is as follows: by i value, n value difference is identicalWithComposition control amount It is meant thatThe active power reference value at moment, unit i isIt, will to determining i valueValue by n by it is small to Longer spread,It arrivesBetween time, the active power reference value of unit i maintainsIt is constant, to obtain unit i Active power reference value controlling curve;I value is set to traverse each unit of wind power plant, m value traverses each natural number in 1≤m≤31, To obtain each unit active power reference value controlling curve of wind power plant.
The beneficial effects of the present invention are: the prediction of wind speed Curve transform in wind power plant next control period is by the present invention Discrete wind series calculate constant nature after the corresponding air speed value of discrete wind series each element is considered as constant natural wind speed Wind speed effect under each unit active power reference value and its start effect at the time of, and then generate wind series effect under each unit Active power reference value controlling curve, each unit are run according to this controlling curve;It is the lower calculation amount of this optimization method, less Hardware resource, realize that active power of wind power field optimizes under Dynamic Wind Speed, formed it is a kind of there is practical value scheme, promote wind-powered electricity generation Field generated energy, improves wind power plant gene-ration revenue.
Detailed description of the invention
Fig. 1 is general flow chart of the invention.
Fig. 2 is the flow chart of step 3 of the present invention.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
As shown in Figure 1, 2, the present invention the following steps are included:
Step 1: the forecasting wind speed curve in wind power plant next control period is chronologically converted into the discrete of 30 elements Wind series.
The conversion formula of discrete wind series s (m) are as follows:
Wherein, m is natural number, and value range is 1≤m≤31, scIt (t) is t moment predicting wind speed of wind farm value, tNTable Show that the initial time in next control period, T indicate one control period corresponding duration of wind power plant, TsIt is between wind speed discretization Every the time, Ts=T/30.
Step 2: being considered as constant natural wind speed for the corresponding air speed value of discrete wind series each element, is based on wake effect, It calculates separately under each constant natural wind speed effect, the active power reference value of each unit;Meanwhile it being based on wake flow propagation delay, It calculates separately under each constant natural wind speed effect, at the time of each unit active power reference value starts effect.
Steps are as follows for the calculating of the active power reference value of each unit:
1) with the axial inducible factor a of unit iiFor variable, then the power coefficient of unit iAnd its thrust coefficientAre as follows:
2) m in discrete wind series s (m) takes occurrence n, enables n=1;
3) it sets wind power plant to be acted on by constant natural wind speed s (n), uses viThe input wind speed for indicating unit i, if v1It is upwind Boundary unit, unit i+1 are the upward First units of unit i leeward, 4. 5. calculate the input wind speed of unit i+1 with formula by formula:
v1=s (n) is 4.
Wherein, k is wind power plant terrain rough factor, riFor unit i impeller radius, x is unit i hub centre and unit The distance that i+1 hub centre projects on wind direction;
4) each unit active power is calculated as follows:
Wherein, PiIndicate the active power of unit i, vratedIndicate unit rated wind speed, vin、vcutThe incision of expression unit, Cut-out wind speed;ρ indicates atmospheric density,Indicate the rated power of unit i;
5) it is as follows to establish active power of wind power field Optimized model:
Wherein, PallIndicate that active power of wind power field, i.e. the sum of each unit active power of wind power plant, N indicate machine in wind power plant Group sum,It indicates through optimization aiValue makes the formula in bracket obtain maximum value;
6) solution procedure 5) given by equation, obtain the optimization solution of unit i inducible factor, and substituted into formula 2.- 5. obtaining unit i power coefficient, thrust coefficient, the specific value for inputting wind speed;
7) by unit i power coefficient value substitute into following formula, then obtain natural wind speed be s (n) when, the wattful power of unit i Rate reference value
Make i value traverse each unit of wind power plant, then obtain natural wind speed be s (n) when, the active power reference of each unit Value;
8) judge that the value size of n enables n=n+1 if n≤30, jump to step 3), otherwise terminate the partial arithmetic.
It is as follows that the active power reference value of each unit starts calculation method at the time of effect:
When m in discrete wind series s (m) takes occurrence n, calculation of wind speed s (n) is passed from wind power plant upwind boundary unit It is multicast to the time delay D of unit ii,n, then when wind speed is s (n), the active power reference value of unit iThe initiation momentFor
Wind speed s (n) travels to the time delay D of unit i from wind power plant upwind boundary uniti,nCalculation method it is as follows:
1) wind is propagated by wind direction, on wind speed propagation path, seeks wind power plant upwind boundary unit impeller center and machine The distance of subpoint of the impeller center of group i on wind direction, is denoted as L;
2) D is calculated as followsi,n, and i value is made to traverse each unit of wind power plant, n value traverses each nature in 1≤n≤31 Number,
Step 3: by each unit active power reference value and its act on the moment, generate under the effect of discrete wind series Each unit active power reference value controlling curve, each unit are run according to this controlling curve.
The generation method of unit active power reference value controlling curve is as follows: by i value, n value difference is identicalWithGroup At control amountIt is meant thatThe active power reference value at moment, unit i isIt, will to determining i valueValue press the ascending arrangement of n,It arrivesBetween time, the active power reference value of unit i maintainsIt is constant, so that i value is traversed each unit of wind power plant, m value traverses each natural number in 1≤m≤31, to obtain wind-powered electricity generation Each unit active power reference value controlling curve in field.It can specifically carry out as follows:
1) if wind power plant unit sum is N, the bivariate table of three N rows 30 column is constructed, TableT is respectively designated as, TableP and TalblePandT;
2) the possibility value of i and n is traversed, it willFill out the i-th row n-th column in TableT;
3) the possibility value of i and n is traversed, it willFill out the i-th row n-th column in TableP;
4) i-th the n-th column element of row of TableT and i-th the n-th column element of row of TableP are complex asAnd by its Write on the i-th row n-th column of TalblePandT;
5) using the time as abscissa, active power reference value is that ordinate constitutes coordinate system, takes the i-th of TalblePandT Row data, by row number, sequence is successively fetched evidence from small to large, and is demarcated on coordinate system each Point, also, It arrivesBetween time, the active power reference value of unit i is maintainedIt is constant, to obtain the wattful power of unit i Rate reference value controlling curve;All possible values of i traversal, repeat the step, obtain the next control period active power of each unit Reference value controlling curve.

Claims (6)

1. a kind of active power of wind power field optimization method decomposed based on wind speed timing, comprising the following steps:
Step 1: the forecasting wind speed curve in wind power plant next control period is chronologically converted to the discrete wind speed of 30 elements Sequence;
Step 2: being considered as constant natural wind speed for the corresponding air speed value of discrete wind series each element, is based on wake effect, respectively It calculates under each constant natural wind speed effect, the active power reference value of each unit;Meanwhile it being based on wake flow propagation delay, respectively It calculates under each constant natural wind speed effect, at the time of each unit active power reference value starts effect;
Step 3: by each unit active power reference value and its act at the time of, generate each under the effect of discrete wind series Unit active power reference value controlling curve, each unit are run according to this controlling curve.
2. the active power of wind power field optimization method according to claim 1 decomposed based on wind speed timing, it is characterised in that: In the step 1, the conversion formula of discrete wind series s (m) are as follows:
Wherein, m is natural number, and value range is 1≤m≤31, scIt (t) is t moment predicting wind speed of wind farm value, tNUnder expression The initial time in one control period, T indicate one control period corresponding duration of wind power plant, TsWhen being wind speed discretization interval Between, Ts=T/30.
3. the active power of wind power field optimization method according to claim 2 decomposed based on wind speed timing, it is characterised in that: In the step 2, steps are as follows for the calculating of the active power reference value of each unit:
1) with the axial inducible factor a of unit iiFor variable, then the power coefficient of unit iAnd its thrust coefficientAre as follows:
2) m in discrete wind series s (m) takes occurrence n, enables n=1;
3) it sets wind power plant to be acted on by constant natural wind speed s (n), uses viThe input wind speed for indicating unit i, if v1It is upwind boundary Unit, unit i+1 are the upward First units of unit i leeward, 4. 5. calculate the input wind speed of unit i+1 with formula by formula:
v1=s (n) is 4.
Wherein, k is wind power plant terrain rough factor, riFor unit i impeller radius, x is that unit i hub centre and unit i+1 take turns The distance that hub center projects on wind direction;
4) each unit active power is calculated as follows:
Wherein, PiIndicate the active power of unit i, vratedIndicate unit rated wind speed, vin、vcutIt indicates the incision of unit, cut out Wind speed;ρ indicates atmospheric density,Indicate the rated power of unit i;
5) it is as follows to establish active power of wind power field Optimized model:
s.t.
v1=s (n)
Wherein, PallIndicate that active power of wind power field, i.e. the sum of each unit active power of wind power plant, N indicate that unit is total in wind power plant Number,It indicates through optimization aiThe formula in bracket is set to obtain maximum value;
6) solution procedure 5) given by equation, obtain the optimization solution of unit i inducible factor, and substituted into formula 2. -5., obtain Unit i power coefficient, thrust coefficient, the specific value for inputting wind speed out;
7) by unit i power coefficient value substitute into following formula, then obtain natural wind speed be s (n) when, unit i active power ginseng Examine value
Make i value traverse each unit of wind power plant, then obtain natural wind speed be s (n) when, the active power reference value of each unit;
8) judge that the value size of n enables n=n+1 if n≤30, jump to step 3), otherwise terminate operation.
4. the active power of wind power field optimization method according to claim 3 decomposed based on wind speed timing, it is characterised in that: In the step 2, the calculation method that the active power reference value of each unit starts at the time of acting on is as follows: discrete wind series s (m) when the m in takes occurrence n, calculation of wind speed s (n) travels to the time delay D of unit i from wind power plant upwind boundary uniti,n, then When wind speed is s (n), the active power reference value of unit iThe initiation momentFor
⑨。
5. the active power of wind power field optimization method according to claim 4 decomposed based on wind speed timing, it is characterised in that: The active power reference value of each unit starts at the time of effect in calculation method, and wind speed s (n) is from wind power plant upwind boundary machine Group travels to the time delay D of unit ii,nCalculation method it is as follows:
1) wind is propagated by wind direction, on wind speed propagation path, seeks wind power plant upwind boundary unit impeller center and unit i leaf The distance of subpoint of the wheel center on wind direction, is denoted as L;
2) D is calculated as followsi,n, and i value is made to traverse each unit of wind power plant, n value traverses each natural number in 1≤n≤31,
⑩。
6. the active power of wind power field optimization method according to claim 5 decomposed based on wind speed timing, it is characterised in that: In the step 3, the generating mode of unit active power reference value controlling curve is as follows: by i value, n value difference is identical WithComposition control amountIt is meant thatThe active power reference value at moment, unit i isTo determining i Value, willValue press the ascending arrangement of n,It arrivesBetween time, the active power reference value of unit i maintainsIt is constant, to obtain the active power reference value controlling curve of unit i;I value is set to traverse each unit of wind power plant, m takes Each natural number in value traversal 1≤m≤31, to obtain each unit active power reference value controlling curve of wind power plant.
CN201510843636.7A 2015-11-26 2015-11-26 A kind of active power of wind power field optimization method decomposed based on wind speed timing Active CN105373858B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510843636.7A CN105373858B (en) 2015-11-26 2015-11-26 A kind of active power of wind power field optimization method decomposed based on wind speed timing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510843636.7A CN105373858B (en) 2015-11-26 2015-11-26 A kind of active power of wind power field optimization method decomposed based on wind speed timing

Publications (2)

Publication Number Publication Date
CN105373858A CN105373858A (en) 2016-03-02
CN105373858B true CN105373858B (en) 2019-05-07

Family

ID=55376037

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510843636.7A Active CN105373858B (en) 2015-11-26 2015-11-26 A kind of active power of wind power field optimization method decomposed based on wind speed timing

Country Status (1)

Country Link
CN (1) CN105373858B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105868848B (en) * 2016-03-25 2019-05-21 湘潭大学 The wind power plant synergisting method of yaw and active power comprehensive coordination between a kind of unit
CN106203695B (en) * 2016-07-07 2020-01-14 华北电力大学 Optimal scheduling method for reducing wake effect in wind power plant
CN109409596B (en) * 2018-10-22 2021-04-13 东软集团股份有限公司 Processing method, device, equipment and computer-readable storage medium for predicting wind speed
CN109274121B (en) * 2018-11-15 2021-03-23 山东中车风电有限公司 Wind power plant control parameter optimization method and system
CN110321632B (en) * 2019-07-02 2021-03-16 华北电力大学 Method for calculating equivalent roughness of fully developed wind power plant
CN113708386B (en) * 2021-08-26 2023-08-18 广东电网有限责任公司 Method, device, equipment and medium for determining stability domain of offshore wind power network
CN116123028A (en) * 2022-12-20 2023-05-16 中国华能集团清洁能源技术研究院有限公司 Wind power plant level MPPT prediction model control method and device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102663251A (en) * 2012-04-09 2012-09-12 华北电力大学 Physical prediction method for wind power station power based on computational fluid mechanics model
CN102767474A (en) * 2012-08-06 2012-11-07 广东电网公司电力科学研究院 Real-time assessment method and system for active power for wind power
CN103745024A (en) * 2013-11-26 2014-04-23 沈阳工业大学 Power characteristic evaluation method for correcting tail wind speed of wind turbine generator based on three-dimensional wake flow model
CN103942608A (en) * 2014-03-28 2014-07-23 华北电力大学 Optimized dispatching method for wind power farm based wake flow models
CN104201686A (en) * 2014-07-24 2014-12-10 清华大学 Wind power plant reactive power control method by taking mountain earth wind resource characteristics into account

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102663251A (en) * 2012-04-09 2012-09-12 华北电力大学 Physical prediction method for wind power station power based on computational fluid mechanics model
CN102767474A (en) * 2012-08-06 2012-11-07 广东电网公司电力科学研究院 Real-time assessment method and system for active power for wind power
CN103745024A (en) * 2013-11-26 2014-04-23 沈阳工业大学 Power characteristic evaluation method for correcting tail wind speed of wind turbine generator based on three-dimensional wake flow model
CN103942608A (en) * 2014-03-28 2014-07-23 华北电力大学 Optimized dispatching method for wind power farm based wake flow models
CN104201686A (en) * 2014-07-24 2014-12-10 清华大学 Wind power plant reactive power control method by taking mountain earth wind resource characteristics into account

Also Published As

Publication number Publication date
CN105373858A (en) 2016-03-02

Similar Documents

Publication Publication Date Title
CN105373858B (en) A kind of active power of wind power field optimization method decomposed based on wind speed timing
Wu et al. Modeling turbine wakes and power losses within a wind farm using LES: An application to the Horns Rev offshore wind farm
Ciri et al. Model-free control of wind farms: A comparative study between individual and coordinated extremum seeking
CN106499581B (en) A kind of adaptive method for controlling torque of wind energy conversion system considering variation turbulent flow wind regime
Lee et al. Performance study on a counter-rotating tidal current turbine by CFD and model experimentation
Kaldellis et al. Critical evaluation of Wind Turbines’ analytical wake models
Mohamed et al. Optimization of blade pitch angle of an axial turbine used for wave energy conversion
Barnes et al. Determining the impact of VAWT farm configurations on power output
CN106203695A (en) Optimization Scheduling in a kind of wind energy turbine set reducing wake effect
Li et al. Numerical study on the performance effect of solidity on the straight-bladed vertical axis wind turbine
CN103106314B (en) The sequential modelling method of probabilistic of solar photovoltaic power output power
CN105868848B (en) The wind power plant synergisting method of yaw and active power comprehensive coordination between a kind of unit
CN103617308B (en) A kind of construction method of wind power plant frequency domain equivalent model
CN106992541A (en) It is a kind of to reduce the method and apparatus that wind-powered electricity generation abandons wind
CN106529706A (en) Support-vector-machine-regression-based method for predicting wind speed of wind power plant
WO2023087521A1 (en) Wind power plant layout optimization method based on mathematical programming
CN115544884A (en) Large wind power plant wake flow rapid calculation method and system based on data driving
CN103500370B (en) Dynamic wind power plant wind direction coordinate precomputation system method for building up
Liu et al. Wind farm optimization considering non-uniformly distributed turbulence intensity
Lanzilao et al. Effects of self-induced gravity waves on finite wind-farm operations using a large-eddy simulation framework
CN114421468A (en) Primary frequency modulation capacity planning method considering wind power cluster shared energy storage joint participation
Song et al. A novel wind turbine control strategy to maximize load capacity in severe wind conditions
CN106485603A (en) A kind of short-term wind speed forecasting method being applied to wind-power electricity generation
Ye et al. Status of large scale wind turbine technology development abroad
CN109766611A (en) A kind of simplified prediction technique of the wind power considering terrain slope

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant