CN105372592A - 负载测试装置 - Google Patents

负载测试装置 Download PDF

Info

Publication number
CN105372592A
CN105372592A CN201510827355.2A CN201510827355A CN105372592A CN 105372592 A CN105372592 A CN 105372592A CN 201510827355 A CN201510827355 A CN 201510827355A CN 105372592 A CN105372592 A CN 105372592A
Authority
CN
China
Prior art keywords
low
switch cabinet
testing device
load testing
tension switch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510827355.2A
Other languages
English (en)
Inventor
方小红
周海明
王利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Push Mechanism Co Ltd
Original Assignee
Chongqing Push Mechanism Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Push Mechanism Co Ltd filed Critical Chongqing Push Mechanism Co Ltd
Priority to CN201510827355.2A priority Critical patent/CN105372592A/zh
Publication of CN105372592A publication Critical patent/CN105372592A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Tests Of Circuit Breakers, Generators, And Electric Motors (AREA)

Abstract

本发明公开一种负载测试装置,包括发电机组(1)以及与该发电机组(1)依次连接的中压开关柜(2)、降压变压器(3)、低压开关柜(4)、低压干电阻负载箱(5),所述发电机组(1)通过高压线缆(6)连接到所述中压开关柜(2),所述中压开关柜(2)通过高压线缆(6)连接到降压变压器(3),所述降压变压器(3)通过铜排(7)与所述低压开关柜(4)连接,所述低压开关柜(4)通过铜排(7)与低压干电阻负载箱(5)连接。其效果是:结合原有的低压负载测试装置,在不影响原有的低压负载测试系统的技术上,进行了改进,中压机组满足了市场的需求,降低了设备的成本,节约了资源。

Description

负载测试装置
技术领域
本发明涉及负载测试技术领域,具体地说,是一种负载测试装置。
背景技术
国内发电机组负载测试实验,基本采用低压0.4KV的干电阻或者水电阻负载进行实验,但是由于客户对电的需求增大,现有的低压机组实验负载系统远远不能满足实际生产的需要,针对上述问题,一些厂商为了扩展业务、提升公司市场竞争力,设计了中压机组试验的负载系统组件,重新设计试验系统,以满足需求,但是新的系统成本高,且原有的系统不被利用,造成资源的浪费。
发明内容
为了解决上述问题,本发明提出一种负载测试装置,结合了原有低压负载测试装置,在不影响原有的低压负载测试系统的基础上可以进行中压发电机组的试验要求,降低设备的制造成本,满足市场的需求。
为达到上述目的,本发明采用的具体技术方案如下:
一种负载测试装置,包括发电机组以及与该发电机组依次连接的中压开关柜、降压变压器、低压开关柜、低压干电阻负载箱,所述发电机组通过高压线缆连接到所述中压开关柜,所述中压开关柜通过高压线缆连接到降压变压器,所述降压变压器通过铜排与所述低压开关柜连接,所述低压开关柜通过铜排与低压干电阻负载箱连接。
其中,所述发电机组包括燃气发电机组和柴油发电机组,所述燃气发电机组所述燃气发电机组的燃气包括纯天然气、瓦斯以及沼气;所述降压变压器为油浸式变压器,分别满足将10.5KV降为400V,将6.3KV降为400V;所述低压开关柜内设置有主断路器、电压互感器、电流互感器,用于主线路通断、过流、速断保护、采集低压侧电压、电流、功率信号并远传;所述低压干电阻负载箱功率为2220KW,工作电压为400V;所述发电机组通过高压线缆连接到所述中压开关柜,所述中压开关柜通过高压线缆连接到降压变压器。
再进一步描述,为了隔离小车的作用,所述中压开关柜为抽出式真空断路器,包括微机保护、变压器保护、远程控制、并网等功能;在所述中压开关柜周围设置有防护网,用于安全操作提示。
再进一步描述,所述降压变压器与所述低压开关柜之间的每相线路包括3根铜排,且3根铜排并列连接。所述低压开关柜与所述低压干电阻负载箱之间的每相线路也包括3根铜排,且3根铜排并列连接。
再进一步描述,所述发电机组与所述中压开关柜之间设置有多个桥架,用于支撑高压线缆,所述低压开关柜和所述低压干电阻负载箱之间设置有多个桥架,用于支撑铜排。
本发明的有益效果:结合原有的低压负载测试装置,在不影响原有的低压负载测试系统的技术上,进行改进,中压机组满足了市场的需求,降低了设备的成本,节约了资源。
附图说明
下面结合附图和实施例对本发明进一步说明。
图1是本发明的结构示意图;
图中1.发电机组,2.中压开关柜,3.降压变压器,4.低压开关柜,5.低压干电阻负载箱,6、高压线缆,7、铜排、8、桥架。
具体实施方式
下面结合附图对本发明的具体实施方式以及工作原理作进一步详细说明。
实施例:
从图1可以看出,一种负载测试装置,包括发电机组1以及与发电机组1依次连接的中压开关柜2、降压变压器3、低压开关柜4、低压干电阻负载箱5;发电机组1通过高压线缆6连接到所述中压开关柜2,中压开关柜2通过高压线缆6连接到降压变压器3;降压变压器3通过铜排7与低压开关柜4连接,低压开关柜4通过铜排7与低压干电阻负载箱5连接,且每相线路包括3根铜排7,且3根铜排7并列连接;发电机组1与中压开关柜2之间设置有多个桥架8,用于支撑高压线缆6,低压开关柜4和低压干电阻负载箱5之间设置有多个桥架8,用于支撑铜排7。
优选地,中压开关柜2为抽出式真空断路器,在中压开关柜2周围设置有防护网;
在本实施例中,发电机组1包括燃气发电机组和柴油发电机组,燃气发电机组的燃气为纯天然气;降压变压器3为油浸式变压器,分别满足将10.5KV降为400V,将6.3KV降为400V;低压开关柜4内设置有主断路器、电压互感器、电流互感器;低压干电阻负载箱5功率为2220KW,工作电压为400V。

Claims (4)

1.一种负载测试装置,其特征在于:包括发电机组(1)以及与该发电机组(1)依次连接的中压开关柜(2)、降压变压器(3)、低压开关柜(4)、低压干电阻负载箱(5),所述发电机组(1)通过高压线缆(6)连接到所述中压开关柜(2),所述中压开关柜(2)通过高压线缆(6)连接到降压变压器(3),所述降压变压器(3)通过铜排(7)与所述低压开关柜(4)连接,所述低压开关柜(4)通过铜排(7)与低压干电阻负载箱(5)连接。
2.根据权利要求1所述的负载测试装置,其特征在于:所述中压开关柜(2)为抽出式真空断路器,在所述中压开关柜(2)周围设置有防护网。
3.根据权利要求1所述的负载测试装置,其特征在于:所述降压变压器(3)与所述低压开关柜(4)之间的每相线路包括3根铜排(7),且3根铜排(7)并列连接。所述低压开关柜(4)与所述低压干电阻负载箱(5)之间的每相线路也包括3根铜排(7),且3根铜排(7)并列连接。
4.根据权利要求1所述的负载测试装置,其特征在于:所述发电机组(1)与所述中压开关柜(2)之间设置有多个桥架(8),用于支撑所述高压线缆(6),所述低压开关柜(4)和所述低压干电阻负载箱(5)之间设置有多个桥架(8),用于支撑所述铜排(7)。
CN201510827355.2A 2015-11-25 2015-11-25 负载测试装置 Pending CN105372592A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510827355.2A CN105372592A (zh) 2015-11-25 2015-11-25 负载测试装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510827355.2A CN105372592A (zh) 2015-11-25 2015-11-25 负载测试装置

Publications (1)

Publication Number Publication Date
CN105372592A true CN105372592A (zh) 2016-03-02

Family

ID=55374952

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510827355.2A Pending CN105372592A (zh) 2015-11-25 2015-11-25 负载测试装置

Country Status (1)

Country Link
CN (1) CN105372592A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106093801A (zh) * 2016-05-27 2016-11-09 湖南福德电气有限公司 一种高功率密度负载箱
CN109298401A (zh) * 2018-10-23 2019-02-01 中国气象局气象探测中心 一种气象雷达组件测试用大功率软启动电子负载

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5760270A (en) * 1980-09-30 1982-04-12 Teikoku Sekiyu Kk Load testing method for generator
DE3622570A1 (de) * 1986-07-04 1988-01-14 Bernd Dipl Ing Sommer Stellaggregat fuer wechselspannungs-pruefanlagen
CN202522681U (zh) * 2012-02-23 2012-11-07 中国海洋石油总公司 高低压组合电站负载测试装置
TW201326860A (zh) * 2011-12-23 2013-07-01 Delta Electronics Shanghai Co 變頻器負載測試系統
CN204177934U (zh) * 2014-11-10 2015-02-25 上海马拉松·革新电气有限公司 同轴反馈式多电压发电机测试装置
CN204330826U (zh) * 2014-12-26 2015-05-13 上海科泰电源股份有限公司 一种移动式高低压柴油发电机组负载试验方舱

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5760270A (en) * 1980-09-30 1982-04-12 Teikoku Sekiyu Kk Load testing method for generator
DE3622570A1 (de) * 1986-07-04 1988-01-14 Bernd Dipl Ing Sommer Stellaggregat fuer wechselspannungs-pruefanlagen
TW201326860A (zh) * 2011-12-23 2013-07-01 Delta Electronics Shanghai Co 變頻器負載測試系統
CN202522681U (zh) * 2012-02-23 2012-11-07 中国海洋石油总公司 高低压组合电站负载测试装置
CN204177934U (zh) * 2014-11-10 2015-02-25 上海马拉松·革新电气有限公司 同轴反馈式多电压发电机测试装置
CN204330826U (zh) * 2014-12-26 2015-05-13 上海科泰电源股份有限公司 一种移动式高低压柴油发电机组负载试验方舱

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106093801A (zh) * 2016-05-27 2016-11-09 湖南福德电气有限公司 一种高功率密度负载箱
CN109298401A (zh) * 2018-10-23 2019-02-01 中国气象局气象探测中心 一种气象雷达组件测试用大功率软启动电子负载
CN109298401B (zh) * 2018-10-23 2024-01-09 中国气象局气象探测中心 一种气象雷达组件测试用大功率软启动电子负载

Similar Documents

Publication Publication Date Title
Emhemed et al. The effectiveness of using IEC61660 for characterising short-circuit currents of future low voltage DC distribution networks
CN103354354B (zh) 适用于微电网的阻抗保护方法与装置
CN102593741A (zh) 一种光伏发电用组合式变压器
CN105372592A (zh) 负载测试装置
CN104051972B (zh) 一种用于光伏发电的35kV组合式变压器
CN202454946U (zh) 双分裂箱式变电站
CN101995557B (zh) 一种大功率变流器短路故障承受能力测试方法
CN205374689U (zh) 内燃机发电机组负载测试装置
CN103812086A (zh) 一种高压电动机保护系统
CN201853820U (zh) 金属铠装中置式开关柜的柜顶小母线连接机构
CN201830134U (zh) 一种带旁路的变频器
CN105071439A (zh) 光伏逆变单相交流并网箱
CN204615638U (zh) 一种高压级联变频器的软启电路
CN202423931U (zh) 一种改进的箱式变电站
CN204928738U (zh) 一种集成式光伏逆变器
CN204905742U (zh) 一种中压环网真空断路器柜
CN212726900U (zh) 核电厂励磁系统、励磁调节器工作电源以及电源输出电路
CN202534944U (zh) 无备品低压开关上并联连接有旁路开关的变电系统
CN210927126U (zh) 一种智慧能源站用交直流微电网系统
CN212517943U (zh) 一种电池储能电站单元模块
CN203166444U (zh) 带有分界负荷开关的架空输电线路
CN201821025U (zh) 风力发电用美式箱式变电站
CN203707792U (zh) 一种风电机组接线结构
Ježek Perspective generator circuit breaker
CN104714138A (zh) 特高压直流融冰装置升流升压试验系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160302

RJ01 Rejection of invention patent application after publication