CN105371483B - Unfired tube is without brick atmospheric pressure water heating coal boiler - Google Patents

Unfired tube is without brick atmospheric pressure water heating coal boiler Download PDF

Info

Publication number
CN105371483B
CN105371483B CN201510844907.0A CN201510844907A CN105371483B CN 105371483 B CN105371483 B CN 105371483B CN 201510844907 A CN201510844907 A CN 201510844907A CN 105371483 B CN105371483 B CN 105371483B
Authority
CN
China
Prior art keywords
water
coal
combustion chamber
brick
boiler
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510844907.0A
Other languages
Chinese (zh)
Other versions
CN105371483A (en
Inventor
刘传祥
卢岩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dandong Chuan Xiang Environmental Protection Boiler Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510844907.0A priority Critical patent/CN105371483B/en
Publication of CN105371483A publication Critical patent/CN105371483A/en
Application granted granted Critical
Publication of CN105371483B publication Critical patent/CN105371483B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H1/00Water heaters, e.g. boilers, continuous-flow heaters or water-storage heaters
    • F24H1/22Water heaters other than continuous-flow or water-storage heaters, e.g. water heaters for central heating
    • F24H1/44Water heaters other than continuous-flow or water-storage heaters, e.g. water heaters for central heating with combinations of two or more of the types covered by groups F24H1/24 - F24H1/40 , e.g. boilers having a combination of features covered by F24H1/24 - F24H1/40
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/18Arrangement or mounting of grates or heating means
    • F24H9/1809Arrangement or mounting of grates or heating means for water heaters

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Solid-Fuel Combustion (AREA)

Abstract

The unfired tube that the present patent application provides is separated to form air compartment without brick atmospheric pressure water heating coal boiler, boiler body bottom air compartment space by wind dividing plate;Independent combustion apparatus is made up of longitudinal plate rail of multiple crossbeam holdings with type coal holding raft;It is the tube bank case of arrangement horizontal water tube above top of combustion chamber water interlayer, restrains and be provided with supply water injector device and even sucking-off water installations in water interlayer on case;Combustion chamber and tube bank case heating surface and all around between steel plate Side fascia etc., are all interconnected water layer;There is the radiation closing such as heat shield and cover of slagging tap by lock gate hatch, the rear wall of circulating water before combustion chamber;Quick-action furnace air compartment fore side has board plug type air register, stepless to control moulded coal clean combustion speed in burner hearth.The technical program thermal efficiency may be up to 84.9%, and energy-conservation, two big technical performance of emission reduction all reach and be up to more than 10 years better than national current standard, main frame service life, run fault-free.

Description

Unfired tube is without brick atmospheric pressure water heating coal boiler
Technical field
The present application relates to be molded coal constant-pressure boiler.
Background technology
China, be producing coal and with coal big country in the world, due to coal facies to electricity, gas, oily energy several times it is cheap, be middle-size and small-size Normal-pressure fire coal environment-protection boiler produces and the most country of usage amount.To promote China's energy to be developed in harmony with environmental protection, national environmental protection Hereafter popularization and application meet the molded coal boiler of national energy-saving emission reduction requirement before more than ten years for general bureau.Operative practice proves, upper combustion Formula technique for smoke makes molded coal boiler have extraordinary environmental-protecting performance, and molded coal constant-pressure boiler is greatly to 10.5MW.
But the operative practice of more than ten years, existing molded coal boiler expose many technical deficiencies:Due to unreasonable products structure, Cause that itself multinomial heat loss is very big, BTHE is low, energy-conservation is not remote up to standard;Because flue gas flow and heating surface arrangement are unreasonable etc. Many reasons, cause acid corrosion serious, the service life of most products only has 5~6 years, and some uses 4 years are i.e. because acid etching is permeable And scrap;Some in a heating period because of acid etching etc. therefore leak and blowing out is rushed to repair twice;Unreasonable structure, cause heat Work technical performance is low, and actual thermal power is well below rated value, it is impossible to meets actual heating needs, causes indoor heating temperature low In standard min,AlsoCause boiler operatiopn unreliable, cause that the quantities of after-sales service is very big, maintenance cost is very high, whenever heating Before, many times, manpower and financial resources to field maintenance will be put into.Also quite a lot pendulum coals that must open the door, cause have because Moment, occasionally the jet out flames accident of burn fireman's face of raw malleation occurred in burner hearth.
In existing molded coal boiler, body of heater box-shaped, pot water flow velocity is very low, even local stagnation, is both unfavorable for heat transfer, Cause that part " subcooled boiling " must be produced in operation, the body of heater temperature difference is very big and produces powerful bursting stress superposition, leads to flue Ftracture especially short-lived disastrous effect that is permeable and scrapping, suffers heavy losses, can not estimate, and causes box-shaped molded coal boiler praise or blame to break one's promise negative Face rings to be remained so far.
By taking the CDZH type normal pressure water-fire tube coal burning boilers of instructions for the use of an article sold drum longitudinal Industrial Boiler profile as an example, its combustion apparatus Longitudinal plate rail be the water pipe structure connected with pot water, exist by dirt corrosion and the blowing out accident potential of leak.Type coal holding raft Unreasonable structure so that the moulded coal fragmentation that contacts and there is small coal to drain to air compartment, especially cast iron type coal holding raft tensile strength Only it is 1/3rd of its compression strength, along with stress concentration caused by unreasonable structure, causes in the frangible breakdown of primary zone section It is bad, the accident that moulded coal leaks down in heaps often occurs, and heat loss of imperfect solid combustion is added at least more than 3%, one As in a heating period, existing cast iron type coal holding raft damage scrap up to as many as four one-tenth;Using the fire tube conduct pair being longitudinally arranged Flow heating surface, can not deashing at any time, all increasing the several of itself for the have to unreasonable structure of overstriking latus rectum etc. of anti-clogging Heat loss, it is resolved that its BTHE does not reach nominal 78% on its drawing, and the national energy-saving far below molded coal boiler refers to Mark, and because of acid corrosion etc. therefore make main frame service life short.
From the molded coal boiler of the CDZL types of the traveling-grate stoker combustion apparatus of sizing, the complete chain fire-gate price of outsourcing is held high It is expensive, cause the cost of molded coal boiler double, the pernicious blowing out accident potential for blowing chain also be present.
In addition, the tube bank case of vertical water pipe, deashing is inconvenient, and dust stratification is removed, is unfavorable for heating surface heat conduction and drops not in time The low boiler operatiopn thermal efficiency.
The content of the invention
The goal of the invention of the present patent application is that providing one kind uses Natural Ventilation Technology In One Green specification, two big technology of energy-saving and emission-reduction Excellent performance, the thermal efficiency is up to 84.9% > 78%, and guarantee is safe for operation, reliable, and the unfired tube of main frame service life length is without brick normal Press hot water coal boiler.
The unfired tube that present patent application provides is without brick atmospheric pressure water heating coal boiler technical scheme, in its major technique Rong Shi:For a kind of unfired tube without brick atmospheric pressure water heating coal boiler, boiler body outer surface is provided with heat-insulation layer, and body bottom portion air compartment is empty In, by crossbeam, longitudinal plate rail of crossbeam holding and in the type coal holding raft that longitudinal plate rail moves above, form independent burning and set Standby, longitudinal plate rail is mutually connected with to coal platform, and longitudinal plate rail superjacent air space is combustion chamber, combustion chamber by combustion chamber top plate, all around The heat-insulation layer of radiation heating-surface and top plate and all around heating surface is formed, and the top of top of combustion chamber water interlayer is tube bank case, is burnt Room and to restrain the heating surface of case and be all around interconnected water interlayer between Side fascia, combustion chamber coal feed point is provided with lock gate hatch, Wall slag notch is provided with slag tap cover and water seal cylinder afterwards, and wall is provided with out smoke box after restraining case;Top of combustion chamber water interlayer front end be provided with Tube bank case fires the aditus laryngis that fiery stream communicates, and restrains in case exhaust gases passes and is disposed with horizontal water tube convection heating surface, restrains water interlayer on case In be provided with supply water injector device and even sucking-off water installations;Type coal holding raft is not less than 17mm, moulded coal support with moulded coal surrounding contact width Gap between row and combustion chamber both sides control rail is the 3%~4.2% of moulded coal support arrangement length, and row are long then double using each column more than 0.9m And type coal holding raft bearing capacity is not less than 23 times to kerosene cylinder startup thrust;In air compartment space, by away from preceding Side fascia 0.8m ~1.38m wind dividing plate is separated to form air compartment, and all around inwall is provided with heat-insulation layer in air compartment space, and the operation side wall of air compartment is provided with plate Formula air register, the area of section of air intake altogether of this air register is 0.07m2~0.11m2/0.7MW;Combustion chamber longitudinal length and moulded coal The ratio between support arrangement length is 5.67~8.98:1, maximum coal containing quantity >=2.3t/0.7MW in combustion chamber, moulded coal coal seam maximum height≤ 720mm, the pyrotechnics flow cross-section areas in coal seam during maximum height are 0.22m2~0.37m2/0.7MW.Wherein, described row length For the fire grate width of combustion apparatus, described bearing capacity refers to allowable bear and bearing capacity.
In above-mentioned overall technical architecture, combustion chamber top plate and left and right sides heated sheet, tube bank case is upper and lower and both sides are heated Plate is equipped with expansion bends, and the spacing of two adjacent expansion bends is no more than 2.9m, for produced by dissolving and being expanded with heat and contract with cold in boiler operatiopn Bursting stress, so that it is guaranteed that boiler main frame is safe for operation, reliable;Expansion bends are using wall thickness and heated flue flat board uniform thickness Seamless steel pipe is formed with heated flue steel plate with cutting off seamless steel pipe redundance after two-sided fillet water shutoff weld seam solid welding, is ensured strong Degree is enough, and is simple to manufacture.
In above-mentioned overall technical architecture, the even hot water fairlead for inhaling device of described water outlet and tube bank case are isometric, heat Some even suckers are evenly equipped with above water fairlead;Described supply water injector device includes backwater supervisor, is responsible for what is connected with backwater The supply water injector nozzle and decline groove that some return branch are formed, return branch leads to two along tube bank box top water interlayer vertical Wing furnace wall water interlayer, supply water injector nozzle are fixed on the furnace wall water interlayer Side fascia of both sides with declining groove notch centering, decline groove, And there is water layer to separate heating surface.
In above-mentioned overall technical architecture, described lock gate hatch, provided with the forced circulation water cooling system connected with pot water Unite cooling sandwith layer, it is ensured that lock gate hatch burnt it is indeformable, do not leak out, close it is reliable, do not fail, guarantee boiler operatiopn stable conditions, Well, also prevent to steam in lock gate hatch, it is ensured that safety.
Unfired tube disclosed in the present patent application is without brick atmospheric pressure water heating coal boiler technical scheme, its combustion apparatus, burning The boiler overall structure that room, radiation heating-surface, convection heating surface and flame flow comprehensive and reasonable are arranged and established, ensure that moulded coal High temperature, abundant oxygen supply and the sufficiently long burning time that completely burned must have, acid corrosion, and supply water injector dress are thoroughly eradicated Put makes a pot raising for velocity of water circulation several times with the combined-circulation technology of even sucking-off water installations, is advantageous to heat transfer, does not produce office Portion's " subcooled boiling ", ensure greatly to reduce the body of heater temperature difference without slag dirt deposition dead angle in body of heater and break as caused by the temperature difference Bad stress, its thermal property is excellent, realizes energy-conservation purpose, and the boiler body surface of the technical program steel plate folder water furnace wall can use Polystyrene board heat-insulatation, so as to reduce heat loss comprehensively, ensure that the thermal efficiency reaches 84.9%>78%, ensure that boiler operatiopn is safe and reliable, it is main Machine failure-free operation more than 10 years;Stoker's safe operation is again convenient and saves worry, be laborsaving.Coal platform, rear portion smoke are given in body of heater front portion Case and cover is slagged tap together with boiler body solid welding, combustion apparatus is independent, is Quick setting mould coal boiler, compared to showing for brickwork There is technology, reduction Over-size transport amount at double, and stoker is easy to operate, saves worry, be laborsaving.
Brief description of the drawings
Fig. 1 is the three-dimensional total figure of patent application.
Fig. 2 display combustion chamber, restrains case and supply water injector device and the even knot for suctioning out water installations to remove right side Side fascia Composition.
Fig. 3 is removes external wall panel structure, shows combustion chamber and tube bank case heating surface lining and supply water injector device and even Suction out the tomograph of water installations.
Fig. 4 is Fig. 2 transverse direction sectional structure charts.
Fig. 5 is to give coaly state graphics to the moulded coal of coal platform.
Fig. 6 is supply water injector structure drawing of device.
Fig. 7 is even sucking-off water installations structure chart.
Embodiment
Unfired tube disclosed in the present patent application is without brick atmospheric pressure water heating coal boiler, the air compartment space of boiler body bottom It is interior, by crossbeam 1, the holding longitudinal direction plate rail 2 of crossbeam 1 and the type coal holding raft 3 moved above in longitudinal plate rail 2, collectively constitute it is independent, Full steel structure combustion apparatus.Longitudinal superjacent air space of plate rail 2 is combustion chamber 6, and combustion chamber 6 radiates heated by combustion chamber top plate, all around Face and heat-insulation layer thereon are formed.The top of top of combustion chamber water interlayer 13 is tube bank case 7, and the front portion of top of combustion chamber water interlayer 13 is set Have and fire the aditus laryngis 5 that fiery stream communicates, combustion chamber 6 and the tube bank heating surface of case 7 with tube bank case 7 and between Side fascia be all around interconnected Water interlayer.Horizontal water tube is disposed with the tube bank exhaust gases passes of case 7, forms convection heating surface, horizontal water tube both ends and both sides water interlayer Communicate, fork arrangement is placed in the exhaust gases passes of tube bank case 7, and is 4.8 °~8.8 ° with horizontal sextant angle, beneficial to pot water circulation, is improved Pyroconductivity, boiler body outer surface are provided with polystyrene board heat-insulatation layer.The front wall coal feed point of combustion chamber 6 is fixedly welded on to coal platform 40 Place, coal feed point are provided with lock gate hatch 36, and this lock gate hatch 36 is provided with the cooling folder of the forced circulation water cooling system connected with pot water Layer, the water inlet of lock gate hatch 36 come from the fairlead on backwater base 106, and fairlead is provided with fast valve;The outlet pipe of lock gate hatch 36 leads to Enter to restrain box top water interlayer 18, fast valve also is provided with pipeline, to avoid combustion chamber high temperature from deforming lock gate hatch 36, ensure burning Room 6 is not leaked out, and the dynamic operation of door is not failed.In the state of lock gate hatch 36 is closed tight, fireman can unhurriedly press code requirement Moulded coal is put on type coal holding raft 3, lock gate hatch 36 is opened, promoted by pushing away kerosene cylinder 4 to coal, turns off the time of flashboard 36 20 Within second, compared to existing door structure, more times shorten the time that coal feed point is open, makes cold wind enter combustion chamber 6, burning Stable conditions, it is substantially unaffected, while has prevented the accident potential that fireman is burnt, it is ensured that the person operation peace of fireman Entirely, there is gap between moulded coal, fully supplied oxygen beneficial to Combustion of Mould Coal.Wall slag notch is externally provided with slag tap cover 24 and water seal cylinder 27 afterwards, goes out Cinder notch is closed by the radiation heat shield 21 for being articulated with rear wall plate, the radiant heat in block resistance combustion chamber 6, beneficial in holding combustion chamber 6 High temperature, in being open in a flash for deslagging, i.e. deadweight vertical blocks radiant heat after the slag that inclines.Tube bank case 7 rear end sets out smoke box 28, It is connected with smoke drag reduction elbow 29.The fore side of tube bank case 7 has the shoot door for closing of conducting oneself with dignity with vertical guide oblique angle in 8 °~12 ° 32, for easily removing the dust stratification in tube bank case 7 at any time, keep the boiler operatiopn thermal efficiency not reduce, save coal.
Crossbeam 1, longitudinal plate rail 2 and the type coal holding raft 3 of combustion apparatus are from the good common low carbon structure steel making of plasticity. By taking 1.4MW standard briquet normal-pressure boilers as an example, the long 0.9m that is more than is arranged using the double long 1200mm of row simultaneously of each column, every piece of type of orlop The contact width of coal bottom surface surrounding and type coal holding raft 3 is not less than 17mm, total between type coal holding raft 3 and combustion chamber both sides control rail 12 Gap is long 3%~4.2% of moulded coal support arrangement, specifically, each moulded coal support re-scheduling amount is 11Kg≤14Kg, only prior art The half of cast iron type coal holding raft weight.Two supports are arranged and are a row, and the bearing capacity under its normal temperature is 80,000Kg, is to push away coal Oil cylinder 4 starts 34 times of thrust 2,340Kg>23 times, with ensure its heated up in stove after remitted its fury, especially plus unbalance loading It under extreme operating condition, can ensure its enough bearing strength, not damage ring, combustion apparatus operation fault-free, do not leak coal.Described holds Loading capability refers to allowable bear and bearing capacity.This formed coal stove row is in light weight, and manufacturing cost reduces at double.
It is 5.67~8.98 that the length of combustion chamber 6 arranges the ratio between long with moulded coal support:1, the maximum coal containing quantity of combustion chamber 6 >= 2.3t/0.7MW, the maximum height≤720mm in moulded coal coal seam, the pyrotechnics actual internal area in stove during the maximum height of coal seam are 0.22~0.37m2/0.7MW.Still by taking 1.4MW standard briquet normal-pressure boilers as an example, combustion chamber 6 is indulged Gou length and arranged with moulded coal support The ratio between long is 5.67:1, ensure that each column moulded coal average residence time in combustion chamber is up to 35 hours>23 hours;Maximum coal containing quantity For 5.4t >=4.6t/1.4MW, the maximum height in moulded coal coal seam is 640mm<720mm, when coal seam maximum height is 640mm in stove Pyrotechnics actual internal area be 0.45m2/ 1.4MW, ensure that boiler thermal technology's technical performance is excellent, contribute enough.Combustion chamber 6 is all around Radiation heating-surface is provided with fire resisting profit combustion heat-insulation layer 31, and the top board surface of combustion chamber 6 is fixed with fire resisting profit combustion heat-insulation layer through grasping nail 30, fire resisting profit combustion heat-insulation layer 30 is the thin rear end progressive additive fire resisting profit combustion heat-insulation layer in front end, suitably reduces fractional cold, keeps Combustion chamber high temperature, be advantageous to moulded coal completely burned.
Generally, the cinder of combustion chamber is pushed out, hand, which is touched, not bery to scald, and can take out type coal holding raft 3 out of slag tap cover 24 with hand, Prove that heat loss of imperfect solid combustion and heat loss due to sensible heat in slag be not exceeded, combustion chamber can keep combustion high temperature, have and fill Foot oxygen supply etc. is beneficial to the good condition of moulded coal completely burned, ensures that gas incomplete combustion loss is not also exceeded.
Air compartment 100 is separated to form by the wind dividing plate 23 away from 0.8~1.38m of preceding Side fascia inner surface, and air compartment 100 operates Framed side wallboard is provided with board plug type air register 22, realizes that oxygen supply is quantity stepless regulated, controls the burning velocity of moulded coal clean combustion, reach Stepless regulated boiler output, the purpose that the heating up to standard of indoor 24 hours round the clock constant temperature saves again is realized, this air register 22 always enters Wind sectional area is 0.07~0.11m2/0.7MW.The setting of wind dividing plate 23 makes burning air feed, oxygen supply not walk the short circuit of aditus laryngis 5 directly, The curtain wall penel inwall of air compartment 100 4 is provided with fire resisting profit combustion heat-insulation layer, and its thickness is 80~100mm, to reduce heat loss, is advantageous to protect Combustion chamber high temperature is held, beneficial to moulded coal completely burned.The thermal-flame stream of Combustion of Mould Coal enters tube bank case 7, transversal flow by aditus laryngis 5 Horizontal water tube, the horizontal water tube that fork arrangement is put make flame flow mazeflo, extend heat exchange process, and control exhaust gas temperature is slightly below stagnation temperature Degree, heat loss due to exhaust gas is reduced, be 6.34% or so, avoid restraining box back generation acid corrosion again.
The top plate of combustion chamber 6 and left and right sides heated sheet, the tube bank upper and lower plates of case 7 and both sides tube sheet heated sheet are equipped with expansion bends 37.Described expansion bends 37 use the seamless steel pipe of wall thickness and heated flue flat board uniform thickness with heated flue steel plate with two-sided fillet Cut off seamless steel pipe redundance after water shutoff weld seam solid welding to form, manufacturing process is structural good;There is no the techniques such as press device Equipment small factory can it is high-quality by construction drawing, be efficiently made.The spacing of adjacent twice expansion bends is no more than 2.9m, So that it is guaranteed that boiler main frame is safe for operation, reliable.
Supply water injector device and even sucking-off water installations, the effectively setting of stream oriented device, contracting are provided with tube bank case in water interlayer 18 Port body temperature is poor, makes the more times of raisings of pot water circulation multiplying power and flow velocity, eliminates body of heater slag dirt deposition dead angle, guarantee is safe for operation can Lean on, be advantageous to heat transfer, heat exchange efficiency greatly improves.As shown in figure 3, supply water injector device includes returning along body of heater Longitudinal extending Water supervisor 16, lead to both sides furnace wall along the tube bank vertical of box top water interlayer 18 with some return branch 17 that backwater supervisor 16 connects Water interlayer, supply water injector nozzle 34 are fixed on the furnace wall water interlayer Side fascia of both sides with declining the notch centering of groove 35, decline groove 35, And there is water layer to separate heating surface.Boiler blow-down water is responsible for 16 lease making return branch 17 by backwater, by supply water injector nozzle 34 with about 2 The flow velocity of meter per second is sprayed, and volume inhales hot water composition fluid-mixing in pot, and the stove that pot bottom layer and water layer separate is brought into along groove 35 is declined Courage is heated space of planes.Be connected the lateral jet pipe 10 being connected with backwater supervisor 16, and its horizontal ejiction opening 11 is arranged at top of combustion chamber The side of water interlayer 13, the injection flow velocity of its horizontal ejiction opening 11 is the 2m/ seconds, is coordinated with supply water injector device, and lateral jet pipe 10 pushes away The water flowing of dynamic top of combustion chamber water interlayer 13, increases the flowing velocity that the water interlayer participates in pot water circulation, is advantageous to combustion chamber The heat transfer of top plate hyperthermia radiation heating surface and tube bank case lower plate heating surface, while improving the thermal efficiency, reduce the top plate of combustion chamber 6 With the temperature of front end water shutoff plate, ensure not by burning bulge, crumple, guarantee is not ftractureed.The even hot water for inhaling device of described water outlet Case 7 is isometric is longitudinally arranged with tube bank for fairlead 19, and the top of hot water fairlead 19 is uniformly provided with some even suckers 109, even sucker 109 Suction flow velocity is 0.5 meter per second, water interlayer body of heater top layer, that is, the hot water for restraining the top water interlayer 18 of case 7 passes through hot water fairlead 19 On arrangement even sucker 109 concentrate be delivered to outdoor heating networks system.
Supply water injector device and even both the devices of inhaling of water outlet act synergistically, and not only increase circular flow, improve to several times The flow velocity of " water-cooling wall " reclaimed water, while avoiding producing the destruction of " subcooled boiling " to body of heater, the body of heater temperature difference is reduced, Bursting stress is kept to very little, the heat for being advantageous to combustion fire is conducted to a pot water by heating surface, increases the heat exchange amount of heating surface, favorably In improving the thermal efficiency, reducing heat loss due to exhaust gas, for the longer molded coal boiler of boiler furnace, again without slag dirt in body of heater Dead angle is deposited, so as to ensure that boiler operatiopn is safe and reliable, heat exchange efficiency is high, heat loss is low, ensures boiler main frame service life length Up to more than 10 years, an essential, vital technological means.
Benzene plate can be used as heat-insulation layer by having the folder water wall type boiler body outer surface of this programme only, you can reached and made us Satisfied heat insulation effect, environment temperature in several same boiler rooms of hull-skin temperature is surveyed, hand, which is touched, feels cool, body of heater surface heat radiating loss It is minimum, it is≤2%, year-on-year prior art, such as the molded coal boiler of CDZH types, hand, which touches its outer packing colored steel outer surface, can feel awfully hot Even a little scald, the body of heater surface heat radiating loss of the body of heater surface heat radiating loss of prior art CDZH types apparently higher than this programme.
Slag tap cover 24 and the water seal cylinder 27 in its lower insertion water, it is ensured that control wind is reliable, is to ensure boiler normal operation In indispensable two parts.Slagging tap has the slag swash plate that inclines for tilting 45 ° in cover 24, and longitudinal tail end of plate rail 2 is pushed away from holding A type coal holding raft 3 simultaneously, the coal briquete slag on type coal holding raft 3 is all poured into and slagged tap in cover 24, through the water seal cylinder under cover 27 discharge out of the furnace, it is ensured that deslagging is smooth, does not block;Slag tap cover 24 fore side be provided with vertical guide oblique angle be 8 °~12 ° from Enclosed support row in series of fortified passes takes out door 25, behind be provided with and smash door 26 to pieces with slag Jiao for the deadweight closing type that vertical guide oblique angle is 8 °~12 °, Opening slag Jiao, which smashs door 26 to pieces, can easily smash the clinker for the bulk coking being stuck on slag beam to pieces.
In summary, this unfired tube is without brick atmospheric pressure water heating coal boiler technical scheme, in practice it has proved that:The smoke evacuation of the present invention Heat waste disability control 6.34% or so, solid incomplete combustion loss≤5.00%, body of heater surface heat radiating loss≤2.00%, Gas incomplete combustion loss≤1.00%, heat loss due to sensible heat in slag≤0.76%, five heat loss of the above add up to 15.10%, realize that the thermal efficiency is up to 84.90 ﹪ energy-saving index, and main frame is safe for operation, reliable, service life is up to 10 years Above fault-free.
With the CDZH1.4MW of the prior art instructions for the use of an article sold drum longitudinal Industrial Boiler profile year-on-year coal consumption of molded coal boiler, It is all 15,960KJ/Kg by the actual caloric value of moulded coal, market price calculates with by 600 yuan/t, with by 151 days in a heating period Meter, this programme save coal 34.28t, allow user to save coal money 20 compared with the CDZH1.4MW molded coal boilers of the upper nominal thermal efficiency 78% of figure, It is 568 yuan, interior per mono- heating period of 0.7MW to save as many as coal Qian Dawan members.
Without brick atmospheric pressure water heating coal boiler, the combustion fire in combustion chamber flows through aditus laryngis and enters tube bank case convection current to be changed unfired tube Heat, tube bank case reasonable Arrangement have enough convection heating surfaces, and it is 154C ° to control exhaust gas temperature, slightly below critical-temperature, avoids pipe Beam case tail end produces acid corrosion, the general structure of two backhaul, it is ensured that without heat exchange dead band, does not produce the low temperature of acid corrosion Position and thoroughly away from acid corrosion, ensure that boiler main frame service life is up to more than 10 years.

Claims (10)

1. a kind of unfired tube is provided with heat-insulation layer without brick atmospheric pressure water heating coal boiler, boiler body outer surface;Body bottom portion air compartment In space, by crossbeam(1), crossbeam(1)Longitudinal plate rail of holding(2)And in longitudinal plate rail(2)The type coal holding raft moved above (3), independent combustion apparatus is formed, longitudinal plate rail is with giving coal platform(40)Mutually it is connected, longitudinal plate rail(2)Superjacent air space is burning Room(6), combustion chamber(6)By combustion chamber top plate, all around radiation heating-surface and top plate and all around the heat-insulation layer of heating surface is formed, burning Ceiling portion water interlayer(13)Top for tube bank case(7), it is phase between combustion chamber and the heating surface and all around Side fascia of restraining case Intercommunicated water interlayer, combustion chamber coal feed point are provided with lock gate hatch(36), rear wall slag notch is provided with cover of slagging tap(24)With water seal cylinder (27), restrain box back and be provided with out smoke box(28);Top of combustion chamber water interlayer(13)Front end is provided with restraining case(7)Combustion fire stream phase Logical aditus laryngis(5), it is characterised in that tube bank case(7)Horizontal water tube convection heating surface is disposed with exhaust gases passes, restrains water folder on case Layer(18)In be provided with supply water injector device and even sucking-off water installations;Type coal holding raft(3)It is not less than with moulded coal surrounding contact width 17mm, type coal holding raft(3)Rail is controlled with combustion chamber both sides(12)Between gap for the arrangement of moulded coal support it is long 3%~4.2%, arrange long super 0.9m then and hold in the palm rows double using each column is crossed, type coal holding raft bearing capacity is not less than 23 times to kerosene cylinder startup thrust;Air compartment is empty In, by the wind dividing plate away from preceding Side fascia 0.8m~1.38m(23)It is separated to form air compartment(100), all around inwall is set in air compartment space There are heat-insulation layer, air compartment(100)Operation side wall be provided with board plug type air register(22), this air register(22)The section of air intake altogether face Product is 0.07m2~0.11m2/0.7MW;Combustion chamber(6)It is 5.67~8.98 that longitudinal length arranges the ratio between long with moulded coal support:1, combustion Burn indoor maximum coal containing quantity >=2.3t/0.7MW, moulded coal coal seam maximum height≤720mm, the pyrotechnics stream in coal seam during maximum height Logical area of section is 0.22m2~0.37m2/0.7MW。
2. unfired tube according to claim 1 is without brick atmospheric pressure water heating coal boiler, it is characterised in that combustion chamber(6)Top plate With left and right sides heated sheet, tube bank case(7)Upper and lower plates and both sides tube sheet are equipped with expansion bends(37).
3. unfired tube according to claim 2 is without brick atmospheric pressure water heating coal boiler, it is characterised in that described expansion bends (37)Use the seamless steel pipe of wall thickness and heated flue flat board uniform thickness with heated flue steel plate with two-sided fillet water shutoff weld seam solid welding Excision seamless steel pipe redundance forms afterwards.
4. unfired tube according to claim 1 is without brick atmospheric pressure water heating coal boiler, it is characterised in that tube bank box top water Supply water injector device is provided with interlayer, supply water injector device is responsible for including backwater(16)And backwater is responsible for(16)What is connected is some Return branch(17)The supply water injector nozzle formed(34)With decline groove(35), return branch(17)Along tube bank box top water folder Layer vertical leads to both sides furnace wall water interlayer, supply water injector nozzle(34)With declining groove(35)Notch centering, decline groove and be fixed on two On wing furnace wall water interlayer Side fascia, and there is water layer to separate heating surface.
5. unfired tube according to claim 4 is without brick atmospheric pressure water heating coal boiler, it is characterised in that is responsible for backwater (16)It is connected and is connected with lateral jet pipe(10), its horizontal ejiction opening(11)It is arranged at top of combustion chamber water interlayer(13)One Side.
6. unfired tube according to claim 5 is without brick atmospheric pressure water heating coal boiler, it is characterised in that horizontal ejiction opening (11)Injection flow velocity be the 2m/ seconds.
7. unfired tube according to claim 1 is without brick atmospheric pressure water heating coal boiler, it is characterised in that described water outlet is even Inhale the hot water fairlead of device(19)Isometric, the hot water fairlead with tube bank case(19)Top is evenly equipped with some even suckers(109).
8. unfired tube according to claim 1 is without brick atmospheric pressure water heating coal boiler, it is characterised in that described lock gate hatch (36)Provided with the circulating water interlayer connected with pot water.
9. unfired tube according to claim 1 or 2 is without brick atmospheric pressure water heating coal boiler, it is characterised in that horizontal water tube fork row It is arranged in tube bank case(7)Exhaust gases passes in, with horizontal sextant angle be 4.8 °~8.8 °.
10. unfired tube according to claim 1 or 2 is without brick atmospheric pressure water heating coal boiler, it is characterised in that slag notch is set There is radiation heat shield(21), cover of slagging tap(24)Bottom is water seal cylinder(27), accept moulded coal guide rail(2)Provided with inclining for inclination 45° angle Slag swash plate(38), cover of slagging tap(24)Fore side be provided with vertical guide oblique angle be 8 °~12 ° deadweight closing type support row take out door (25), it is provided with smash door to pieces with slag Jiao for the deadweight closing type that vertical guide oblique angle is 8 °~12 ° afterwards(26).
CN201510844907.0A 2015-11-25 2015-11-25 Unfired tube is without brick atmospheric pressure water heating coal boiler Expired - Fee Related CN105371483B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510844907.0A CN105371483B (en) 2015-11-25 2015-11-25 Unfired tube is without brick atmospheric pressure water heating coal boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510844907.0A CN105371483B (en) 2015-11-25 2015-11-25 Unfired tube is without brick atmospheric pressure water heating coal boiler

Publications (2)

Publication Number Publication Date
CN105371483A CN105371483A (en) 2016-03-02
CN105371483B true CN105371483B (en) 2017-12-29

Family

ID=55373909

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510844907.0A Expired - Fee Related CN105371483B (en) 2015-11-25 2015-11-25 Unfired tube is without brick atmospheric pressure water heating coal boiler

Country Status (1)

Country Link
CN (1) CN105371483B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112833383A (en) * 2021-01-06 2021-05-25 刘传祥 Vertical biomass briquetting solid fuel boiler

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5752707A (en) * 1980-09-16 1982-03-29 Babcock Hitachi Kk Multi-stage fluidized boiler
CN2251114Y (en) * 1996-02-05 1997-04-02 山东工业大学 Clean burning boiler using soft coal and briquette
JPH10332128A (en) * 1997-06-02 1998-12-15 Ishikawajima Harima Heavy Ind Co Ltd Ash treatment equipment of coal fired boiler
CN2359571Y (en) * 1998-10-27 2000-01-19 宋传泰 Coal-feed and cinder-discharging push-and-pull device for honeycomb briquette boiler
CN2662142Y (en) * 2003-11-06 2004-12-08 刘沛宪 Multi-function briquette heat-pipe boiler
CN1975279A (en) * 2005-12-02 2007-06-06 王森 Non-closed high-temperature hot water boiler
CN201093710Y (en) * 2007-04-14 2008-07-30 刘传祥 Mechanical grate gas integrated atmospheric hot water boiler

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5752707A (en) * 1980-09-16 1982-03-29 Babcock Hitachi Kk Multi-stage fluidized boiler
CN2251114Y (en) * 1996-02-05 1997-04-02 山东工业大学 Clean burning boiler using soft coal and briquette
JPH10332128A (en) * 1997-06-02 1998-12-15 Ishikawajima Harima Heavy Ind Co Ltd Ash treatment equipment of coal fired boiler
CN2359571Y (en) * 1998-10-27 2000-01-19 宋传泰 Coal-feed and cinder-discharging push-and-pull device for honeycomb briquette boiler
CN2662142Y (en) * 2003-11-06 2004-12-08 刘沛宪 Multi-function briquette heat-pipe boiler
CN1975279A (en) * 2005-12-02 2007-06-06 王森 Non-closed high-temperature hot water boiler
CN201093710Y (en) * 2007-04-14 2008-07-30 刘传祥 Mechanical grate gas integrated atmospheric hot water boiler

Also Published As

Publication number Publication date
CN105371483A (en) 2016-03-02

Similar Documents

Publication Publication Date Title
CN102374658B (en) Angular pipe water circulating structure with complete forced upward flowing on heating surface
CN102183013B (en) Pure garbage-burning fluidized bed boiler
CN105371483B (en) Unfired tube is without brick atmospheric pressure water heating coal boiler
CN207049910U (en) Biomass and natural gas double-fuel boiler
CN206556062U (en) A kind of boiler setting expansion joint structure
WO2021243586A1 (en) Water-cooled furnace wall of waste incinerator
CN202945289U (en) Dual-purpose furnace for decontaminating, heating and tempering oil pipe
CN105485673A (en) Slag discharging device of circulating fluidized bed boiler
CN207378821U (en) A kind of multistage combustion energy conservation and environmental protection burner
CN206682953U (en) A kind of waste incinerator furnace wall cooling air system
CN206831817U (en) A kind of energy-saving environmental protection device
CN205481766U (en) High -efficient energy -saving pot stove of condensing
CN205535902U (en) Water -cooled whirl mixing chamber
CN205316309U (en) Deslagging device of circulating fluidized bed boiler
CN205824983U (en) A kind of gas fired-boiler
CN2837685Y (en) Semi-gas combustion stove
CN215523742U (en) Forced circulation hot water boiler for SCR denitration
CN203364099U (en) O-shaped combustion chamber and shell smoke tube drum combination horizontal type pulverized coal boiler
CN215808499U (en) Novel incinerator
CN213207931U (en) Novel heating stove
CN203731389U (en) Blast furnace gas and coke furnace gas mixed burning boiler
CN221296795U (en) Coke oven regenerator capable of preventing gas from leaking
CN215336457U (en) Boiler slope type water-cooled wall grid film type abrasion-proof and smashing-proof device
CN202484960U (en) Boiler-shell-type water-fire tube boiler
CN203824072U (en) Superconducting, energy-saving and multi-return-stroke coal gasification normal-pressure boiler

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Liu Chuanxiang

Inventor after: Lu Yan

Inventor before: Liu Chuanxiang

CB03 Change of inventor or designer information
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180321

Address after: 118100 Fengshan Road East Transportation Bureau of Fenghuang City, Fengcheng City, Liaoning Province, No. 204

Patentee after: Dandong Chuan Xiang environmental protection boiler Co.,Ltd.

Address before: 118003 room 31, Tongchun street, revitalization area, Dandong, Liaoning Province, room 603

Patentee before: Liu Chuanxiang

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171229