CN105350552A - 回填夹渣土层的地下水控制方法 - Google Patents
回填夹渣土层的地下水控制方法 Download PDFInfo
- Publication number
- CN105350552A CN105350552A CN201510618866.3A CN201510618866A CN105350552A CN 105350552 A CN105350552 A CN 105350552A CN 201510618866 A CN201510618866 A CN 201510618866A CN 105350552 A CN105350552 A CN 105350552A
- Authority
- CN
- China
- Prior art keywords
- dam body
- excavation
- foundation pit
- underground water
- control method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/06—Restraining of underground water
- E02D19/10—Restraining of underground water by lowering level of ground water
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Hydrology & Water Resources (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
本发明涉及土木工程领域,具体是一种回填夹渣土层的地下水控制方法;其特征是:包括下述步骤:步骤1、在基坑开挖区域外围测量定位,设置地下水控制坝体开挖标记,进行放线;步骤2、开挖坝体;步骤3、在开挖坝体的同时,在坝体旁侧预埋降水管井,其中,回填坝体时在降水管井周边设置回填滤料;步骤4、按设计重复步骤2、步骤3直至形成整个坝体,采用降水管井使基坑开挖区域内积水排除,基坑开挖后进行内部结构施工。本地下水控制方法工艺原理简单,便于操作并且其适用范围广,可用于江、海滩涂区域,缓解了建设用地紧张的问题。
Description
技术领域
本发明涉及土木工程领域,具体是一种回填夹渣土层的地下水控制方法。
背景技术
随着我国建设事业蓬勃发展,建设用地日益紧张,许多新建项目选地会选择在回填区域,回填区域在先期建设或其他用途回填时,回填物大都有大量的块状物体或建筑垃圾,此类渣土土层具有透水性强、障碍物多、预先设置围护及地下降排水设施困难等特点,使基坑开挖时会有大量地下水持续涌入,造成该区域基坑开挖及施工无法进行。
发明内容
本发明的目的在于,提供一种控制地下水涌入的方法。
为了达到上述目的,本发明是这样实现的:
一种回填夹渣土层的地下水控制方法,包括下述步骤:
步骤1、在基坑开挖区域外围测量定位,设置地下水控制坝体开挖标记,进行放线;
步骤2、开挖坝体;
具体地,
步骤2.1、将坝体沿预定位置开挖一段,
步骤2.2、开挖段内的一端设置排水泵,将该坝体开挖段内的集水排除;
步骤2.3、在开挖段内的另一端陆续填入粘土压实,如此类推将整个坝体形成;
步骤3、在开挖坝体的同时,在坝体旁侧预埋降水管井,其中,回填坝体时在降水管井周边设置回填滤料;
步骤4、按设计重复步骤2、步骤3直至形成整个坝体,采用降水管井使基坑开挖区域内积水排除,基坑开挖后进行内部结构施工。
本地下水控制方法工艺原理简单,便于操作并且其适用范围广,可用于江、海滩涂区域,缓解了建设用地紧张的问题。
附图说明
图1为本发明施工结构示意图之俯视图。
图2为图1中A-A向剖视图。
具体实施方式
以下通过具体实施例进一步说明本发明。
如图1、图2所示,一种回填夹渣土层的地下水控制方法,包括下述步骤:
步骤1、在基坑开挖区域外围测量定位,设置地下水控制坝体开挖标记,进行放线;
步骤2、开挖坝体;
具体地,
步骤2.1、将坝体沿预定位置开挖一段,
步骤2.2、开挖段内的一端设置排水泵,将该坝体开挖段内的集水排除;
步骤2.3、在开挖段内的另一端陆续填入粘土压实,如此类推将整个坝体1形成;
步骤3、在开挖坝体1的同时,在坝体旁侧预埋降水管井2,其中,回填坝体1时在降水管井2周边设置回填滤料;
步骤4、按设计重复步骤2、步骤3直至形成整个坝体1,采用降水管井2使基坑开挖区域内积水排除,基坑开挖后进行内部结构施工。
本地下水控制方法工艺原理简单,便于操作并且其适用范围广,可用于江、海滩涂区域,缓解了建设用地紧张的问题。
Claims (1)
1.一种回填夹渣土层的地下水控制方法,其特征是:包括下述步骤:
步骤1、在基坑开挖区域外围测量定位,设置地下水控制坝体开挖标记,进行放线;
步骤2、开挖坝体;
具体地,
步骤2.1、将坝体沿预定位置开挖一段,
步骤2.2、开挖段内的一端设置排水泵,将该坝体开挖段内的集水排除;
步骤2.3、在开挖段内的另一端陆续填入粘土压实,如此类推将整个坝体形成;
步骤3、在开挖坝体的同时,在坝体旁侧预埋降水管井,其中,回填坝体时在降水管井周边设置回填滤料;
步骤4、按设计重复步骤2、步骤3直至形成整个坝体,采用降水管井使基坑开挖区域内积水排除,基坑开挖后进行内部结构施工。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510618866.3A CN105350552A (zh) | 2015-09-25 | 2015-09-25 | 回填夹渣土层的地下水控制方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510618866.3A CN105350552A (zh) | 2015-09-25 | 2015-09-25 | 回填夹渣土层的地下水控制方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105350552A true CN105350552A (zh) | 2016-02-24 |
Family
ID=55326604
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510618866.3A Pending CN105350552A (zh) | 2015-09-25 | 2015-09-25 | 回填夹渣土层的地下水控制方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105350552A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109025912A (zh) * | 2018-09-13 | 2018-12-18 | 河南工程学院 | 煤层气排水采气装置 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002364006A (ja) * | 2001-06-06 | 2002-12-18 | Ohbayashi Corp | 水中基礎の構築工法 |
CN101672026A (zh) * | 2009-09-18 | 2010-03-17 | 中国水电顾问集团华东勘测设计研究院 | 合理利用砂砾石料的面板堆石坝结构及其施工方法 |
CN201436323U (zh) * | 2009-06-12 | 2010-04-07 | 广东省第一建筑工程有限公司 | 一种强夯地基中的疏排水构造 |
CN102162250A (zh) * | 2010-02-24 | 2011-08-24 | 中国二十冶集团有限公司 | 流沙承压水土层大面积深基坑开挖围护施工方法 |
CN102535488A (zh) * | 2012-03-13 | 2012-07-04 | 广东中城建设集团有限公司 | 一种高水位地下室底板防水施工方法及其系统 |
CN103343544A (zh) * | 2013-07-16 | 2013-10-09 | 江西建工第一建筑有限责任公司 | 一种大型沉井的施工方法 |
-
2015
- 2015-09-25 CN CN201510618866.3A patent/CN105350552A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002364006A (ja) * | 2001-06-06 | 2002-12-18 | Ohbayashi Corp | 水中基礎の構築工法 |
CN201436323U (zh) * | 2009-06-12 | 2010-04-07 | 广东省第一建筑工程有限公司 | 一种强夯地基中的疏排水构造 |
CN101672026A (zh) * | 2009-09-18 | 2010-03-17 | 中国水电顾问集团华东勘测设计研究院 | 合理利用砂砾石料的面板堆石坝结构及其施工方法 |
CN102162250A (zh) * | 2010-02-24 | 2011-08-24 | 中国二十冶集团有限公司 | 流沙承压水土层大面积深基坑开挖围护施工方法 |
CN102535488A (zh) * | 2012-03-13 | 2012-07-04 | 广东中城建设集团有限公司 | 一种高水位地下室底板防水施工方法及其系统 |
CN103343544A (zh) * | 2013-07-16 | 2013-10-09 | 江西建工第一建筑有限责任公司 | 一种大型沉井的施工方法 |
Non-Patent Citations (3)
Title |
---|
于英武等: "深基坑地下水控制技术研究", 《地下水》 * |
刘俊岩: "《高层建筑施工》", 31 January 2014 * |
边文超: "谈地铁基坑坑内管井降水施工", 《山西建筑》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109025912A (zh) * | 2018-09-13 | 2018-12-18 | 河南工程学院 | 煤层气排水采气装置 |
CN109025912B (zh) * | 2018-09-13 | 2020-10-09 | 河南工程学院 | 煤层气排水采气装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102535488B (zh) | 一种高水位地下室底板防水施工方法 | |
CN104196034A (zh) | 一种利用钢板桩作为支护围堰的基坑施工方法 | |
CN109056761A (zh) | 河道清淤方法 | |
CN109371918B (zh) | 具有永临结合多功能排水箱涵的大坝结构及其施工方法 | |
CN203429597U (zh) | 水电站下游河道防淘刷的护坡结构 | |
CN104110038A (zh) | 深厚淤泥质软土地区大面积基坑围护结构的施工方法 | |
CN107587516A (zh) | 一种跟进式高效止水阻砂降水复合系统及其施工方法 | |
CN110847199A (zh) | 深基坑地下水暗埋引流施工方法 | |
CN104074166B (zh) | 一种恢复干枯河流的方法 | |
CN104912097A (zh) | 一种新型的挡墙反滤排水系统及施工方法 | |
CN104947680A (zh) | 一种流砂地层水上承台基坑开挖施工方法 | |
CN113931209A (zh) | 一种大面积深基坑弱透水层地下水位控制方法 | |
CN103898915B (zh) | 建筑物小面积深基坑抗浮止水施工方法 | |
CN105350552A (zh) | 回填夹渣土层的地下水控制方法 | |
CN106545070B (zh) | 既有检查井中采用顶管增设管道时的导流方法 | |
CN211172034U (zh) | 一种富水基底降排水结构 | |
CN104846837B (zh) | 一种明排水基坑中超深井坑的施工方法 | |
CN104652357A (zh) | 筒桩加插板护岸结构 | |
CN110777829A (zh) | 一种基底定点涌水处理方法 | |
CN214363565U (zh) | 用于悬挂式帷幕的基坑底部快速降排水结构及管道网络 | |
CN206829167U (zh) | 一种带泄流孔的现浇箱梁支架筏板基础 | |
CN108755724A (zh) | 综合管廊体外疏排水防水方法 | |
CN204435321U (zh) | 一种火力发电厂取水明渠 | |
CN210621746U (zh) | 一种用于高压天然气管道敷设的淤泥管沟管基设施 | |
CN210341959U (zh) | 一种基坑排水系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160224 |