CN105349749A CN201410416840.6A CN201410416840A CN105349749A CN 105349749 A CN105349749 A CN 105349749A CN 201410416840 A CN201410416840 A CN 201410416840A CN 105349749 A CN105349749 A CN 105349749A
Authority
CN
China
Prior art keywords
bolt
temperature
heat treatment
quenching
furnace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410416840.6A
Other languages
Chinese (zh)
Inventor
金国洪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUXI SECOND COMPONENT Co Ltd
Original Assignee
WUXI SECOND COMPONENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUXI SECOND COMPONENT Co Ltd filed Critical WUXI SECOND COMPONENT Co Ltd
Priority to CN201410416840.6A priority Critical patent/CN105349749A/en
Publication of CN105349749A publication Critical patent/CN105349749A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a bolt heat treatment technology which comprises the following steps: 1) ultrasonic cleaning is carried out by ultrasonic equipment; a bolt is taken out of the ultrasonic equipment and then put into a water tank to undergo high-pressure washing by the use of a high-pressure water pistol; and then the bolt is naturally aired for 20-30 min; 2) the bolt is preheated for 2-3 h while the preheating furnace temperature is 440-460 DEG C; (3) the bolt undergoes thermal insulation in a salt-bath furnace of 600-620 DEG C for 2-3 h and then undergoes quenching; 4) after quenching, the bolt undergoes tempering at the temperature of 180-200 DEG C, and thermal insulation is then carried out for 20-30 min to stabilize the structure; and after thermal insulation is then carried out in a tempering furnace of 300-305 DEG C for 8-10 h, the bolt is air-cooled to normal temperature; 5) the bolt is successively immersed into a phosphorization tank and a saponification tank; and 6) the bolt is finally washed and aired to obtain a finished product. Through the above mode, the prepared bolt has low shrinkage on cross section, match rate is raised, rejection rate is reduced, and use of cyanide permeating agents which are harmful to human body and the environment is avoided.

Description

Bolt heat treatment process
Technical field
The present invention relates to standardized component field, particularly relate to a kind of bolt heat treatment process.
Background technology
The treatment process of the bolt that intensity is high adopts carburizing or cyaniding to add the techniques such as Q-tempering to process, and adopt the 850-900 DEG C of Full Annealing technique being incubated 10 hours, but utilize the bolt of this explained hereafter relative reduction in area when quenching larger, deformation rate is large, low with the fit rate of nut, scrap rate is too high.
Summary of the invention
The technical problem that the present invention mainly solves is to provide a kind of bolt heat treatment process, can solve the problem.
For solving the problems of the technologies described above, the technical scheme that the present invention adopts is: provide a kind of bolt heat treatment process, comprise the steps:
1) ultrasonic equipment is adopted to carry out ultrasonic cleaning; Carry out after taking-up putting into pond, carry out high pressure washing with high pressure water spray gun; Then naturally 20-30 minute is dried;
2) by bolt preheating 2-3 hour, preheating oven furnace temperature 440-460 DEG C;
3) in the salt bath furnace of 600-620 DEG C, be incubated 2-3 hour again to quench; Described quenching adopts nitrate quenching agent to be at the uniform velocity quenched to 550-600 DEG C with 50-55 DEG C/min;
4), after bolt quenching, be tempering under the condition of 180-200 DEG C in temperature, be then incubated 20-30 minute, with stabilizing tissue; Again the tempering stove inside holding of 300-305 DEG C after 8-10 hour air cooling to normal temperature;
5) bolt is immersed successively in phosphating pond and saponification pond; For volumetric concentration is the zinc calcium phosphorization liquid of 10-11% in described phosphating pond, the temperature of Phosphating Solution is 65-75 DEG C, and steel pipe dipping time is 25-30 minute.
6) finally clean for bolt drying is obtained finished product.
In a preferred embodiment of the present invention, step 2) best furnace temperature be 450 degrees Celsius, preheating Best Times is 2 hours.
In a preferred embodiment of the present invention, the best soaking time of the salt bath furnace of step 4) is 2 hours.
The invention has the beneficial effects as follows: the bolt relative reduction in area that the present invention obtains is little, fit rate improves, and scrap rate reduces, and avoids using the Cyanides penetration enhancer to human body and bad environmental.
Embodiment
A kind of bolt heat treatment process, comprises the steps:
1) ultrasonic equipment is adopted to carry out ultrasonic cleaning; Carry out after taking-up putting into pond, carry out high pressure washing with high pressure water spray gun; Then naturally 20-30 minute is dried;
2) by bolt preheating 2-3 hour, preheating oven furnace temperature 440-460 DEG C;
3) in the salt bath furnace of 600-620 DEG C, be incubated 2-3 hour again to quench; Described quenching adopts nitrate quenching agent to be at the uniform velocity quenched to 550-600 DEG C with 50-55 DEG C/min;
4), after bolt quenching, be tempering under the condition of 180-200 DEG C in temperature, be then incubated 20-30 minute, with stabilizing tissue; Again the tempering stove inside holding of 300-305 DEG C after 8-10 hour air cooling to normal temperature;
5) bolt is immersed successively in phosphating pond and saponification pond; For volumetric concentration is the zinc calcium phosphorization liquid of 10-11% in described phosphating pond, the temperature of Phosphating Solution is 65-75 DEG C, and steel pipe dipping time is 25-30 minute;
6) finally clean for bolt drying is obtained finished product.
Described step 2) best furnace temperature be 450 degrees Celsius, preheating Best Times is 2 hours.
The best soaking time of the salt bath furnace of described step 4) is 2 hours.
The foregoing is only embodiments of the invention; not thereby the scope of the claims of the present invention is limited; every utilize description of the present invention to do equivalent structure or equivalent flow process conversion; or be directly or indirectly used in other relevant technical fields, be all in like manner included in scope of patent protection of the present invention.

Claims (3)

1. bolt heat treatment process, is characterized in that, comprises the steps:
1) ultrasonic equipment is adopted to carry out ultrasonic cleaning; Carry out after taking-up putting into pond, carry out high pressure washing with high pressure water spray gun; Then naturally 20-30 minute is dried;
2) by bolt preheating 2-3 hour, preheating oven furnace temperature 440-460 DEG C;
3) in the salt bath furnace of 600-620 DEG C, be incubated 2-3 hour again to quench; Described quenching adopts nitrate quenching agent to be at the uniform velocity quenched to 550-600 DEG C with 50-55 DEG C/min;
4), after bolt quenching, be tempering under the condition of 180-200 DEG C in temperature, be then incubated 20-30 minute, with stabilizing tissue; Again the tempering stove inside holding of 300-305 DEG C after 8-10 hour air cooling to normal temperature;
5) bolt is immersed successively in phosphating pond and saponification pond; For volumetric concentration is the zinc calcium phosphorization liquid of 10-11% in described phosphating pond, the temperature of Phosphating Solution is 65-75 DEG C, and steel pipe dipping time is 25-30 minute;
6) finally clean for bolt drying is obtained finished product.
2. bolt heat treatment process according to claim 1, is characterized in that, described step 2) best furnace temperature be 450 degrees Celsius, preheating Best Times is 2 hours.
3. bolt heat treatment process according to claim 1, is characterized in that, the best soaking time of the salt bath furnace of described step 4) is 2 hours.
CN201410416840.6A 2014-08-22 2014-08-22 Bolt heat treatment technology Pending CN105349749A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410416840.6A CN105349749A (en) 2014-08-22 2014-08-22 Bolt heat treatment technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410416840.6A CN105349749A (en) 2014-08-22 2014-08-22 Bolt heat treatment technology

Publications (1)

Publication Number Publication Date
CN105349749A true CN105349749A (en) 2016-02-24

Family

ID=55325808

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410416840.6A Pending CN105349749A (en) 2014-08-22 2014-08-22 Bolt heat treatment technology

Country Status (1)

Country Link
CN (1) CN105349749A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105908087A (en) * 2016-07-05 2016-08-31 安庆市灵宝机械有限责任公司 High-temperature-resistant and abrasion-resistant alloy steel for bucket teeth of coal cutter and preparation method of high-temperature-resistant and abrasion-resistant alloy steel for bucket teeth of coal cutter
CN107435088A (en) * 2017-07-06 2017-12-05 江苏永昊高强度螺栓有限公司 The Technology for Heating Processing of bolt
CN108570545A (en) * 2018-04-04 2018-09-25 海宁市丁桥镇永畅知识产权服务部 The heat treatment process of automobile bolt
CN109097538A (en) * 2018-09-27 2018-12-28 深圳市和胜金属技术有限公司 A kind of metal surface treating device
CN109628718A (en) * 2017-10-09 2019-04-16 徐州东鹏工具制造有限公司 A kind of heat treatment process of bolt
CN113088642A (en) * 2021-03-31 2021-07-09 南京鼎胜冶金机械有限公司 Salt bath quenching heat treatment equipment for high-wear-resistance shear blades

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105908087A (en) * 2016-07-05 2016-08-31 安庆市灵宝机械有限责任公司 High-temperature-resistant and abrasion-resistant alloy steel for bucket teeth of coal cutter and preparation method of high-temperature-resistant and abrasion-resistant alloy steel for bucket teeth of coal cutter
CN107435088A (en) * 2017-07-06 2017-12-05 江苏永昊高强度螺栓有限公司 The Technology for Heating Processing of bolt
CN109628718A (en) * 2017-10-09 2019-04-16 徐州东鹏工具制造有限公司 A kind of heat treatment process of bolt
CN108570545A (en) * 2018-04-04 2018-09-25 海宁市丁桥镇永畅知识产权服务部 The heat treatment process of automobile bolt
CN109097538A (en) * 2018-09-27 2018-12-28 深圳市和胜金属技术有限公司 A kind of metal surface treating device
CN109097538B (en) * 2018-09-27 2023-05-09 深圳市和胜金属技术有限公司 Metal surface treatment equipment
CN113088642A (en) * 2021-03-31 2021-07-09 南京鼎胜冶金机械有限公司 Salt bath quenching heat treatment equipment for high-wear-resistance shear blades

Similar Documents

Publication Publication Date Title
CN105349749A (en) Bolt heat treatment technology
CN106544494B (en) A kind of online soft annealing method suitable for 1Cr17Ni2 stainless steel cold pull wires
CN102995029A (en) Heat treatment process of bolt processing
CN103643018A (en) Thermal processing technology for bolts
RU2015141563A (en) HIGH-STRENGTH STEEL WITH GOOD PLASTICITY AND METHOD FOR PRODUCING BY TREATMENT BY HARDENING WITH DISTRIBUTION WITH THE BATH FOR ZINC PLATING
RU2015146678A (en) STEEL WITH ZINC COATING FOR HARDENING UNDER PRESS, APPLICATION AND METHOD OF MANUFACTURE
CN102994707A (en) Heat treatment process in high-strength nut processing
CN103757181A (en) High-strength nut heat treatment technology
CN104451713A (en) Novel rust remover
CN109082627B (en) Method for improving surface hardness of Cr-Mn-N austenitic stainless steel
CN106811745A (en) A kind of steel tube surface handling process
CN104264199A (en) A nut thermal treatment process
CN102080204A (en) Heating processing technology of metal steel tube
CN108203802A (en) A kind of metal heating processing technology
CN105714067A (en) Heat treatment process for bolt
CN102041512A (en) Process method for austenitic nitridation
CN103725831A (en) Hardening and tempering process of alloy-steel pipe
CN105695701A (en) 40Cr quenching and tempering technology
CN107747097A (en) A kind of heat processing technique of steel pipe
CN103305677A (en) Thermal treatment technology of 45 steel thin-wall sleeve
CN105779738A (en) Heat treatment technology of bolt
CN105714239A (en) Nitriding process for pin
CN109628718A (en) A kind of heat treatment process of bolt
CN104451097A (en) Carburizing and quenching process for springs
CN106755779A (en) The Technology for Heating Processing of bolt

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160224