CN105347268B - Orthogonal horizontal adjusting means - Google Patents

Orthogonal horizontal adjusting means Download PDF

Info

Publication number
CN105347268B
CN105347268B CN201510719171.4A CN201510719171A CN105347268B CN 105347268 B CN105347268 B CN 105347268B CN 201510719171 A CN201510719171 A CN 201510719171A CN 105347268 B CN105347268 B CN 105347268B
Authority
CN
China
Prior art keywords
points
bubble
substrate
regulation
adjusting means
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510719171.4A
Other languages
Chinese (zh)
Other versions
CN105347268A (en
Inventor
刘永言
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Hope Hydropower Development Co ltd
Original Assignee
CHENGDU SHENLAN HIGH TECHNOLOGY DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHENGDU SHENLAN HIGH TECHNOLOGY DEVELOPMENT Co Ltd filed Critical CHENGDU SHENLAN HIGH TECHNOLOGY DEVELOPMENT Co Ltd
Priority to CN201510719171.4A priority Critical patent/CN105347268B/en
Publication of CN105347268A publication Critical patent/CN105347268A/en
Application granted granted Critical
Publication of CN105347268B publication Critical patent/CN105347268B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F11/00Lifting devices specially adapted for particular uses not otherwise provided for
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C9/00Measuring inclination, e.g. by clinometers, by levels
    • G01C9/18Measuring inclination, e.g. by clinometers, by levels by using liquids
    • G01C9/24Measuring inclination, e.g. by clinometers, by levels by using liquids in closed containers partially filled with liquid so as to leave a gas bubble
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F2700/00Lifting apparatus

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Foundations (AREA)

Abstract

The present invention relates to a kind of orthogonal horizontal adjusting means.For the leveling of platform and equipment, the method for its diagonal detection orthogonal horizontal regulation comprises the following steps:Make the rectangular Triangle-Profile of three fulcrums, using right-angled apices C as fixed pivot, A points and B points are adjusted respectively, because AC is mutually perpendicular to BC, when adjusting A points, the height change of A points does not have component in BC directions;Similarly, B points are adjusted, the height change of B points, also without component, is so achieved that the separately adjustable of both direction on AC directions, and practical adjustments amount is consistent with design regulated quantity.Using this method, two tube bubbles are placed along AC and BC directions respectively, substrate is adjusted to level by metal building pile foundation level positioner by absolute altitude regulation and Level tune, location-plate is by magnet adsorption in substrate corner, whole horizontal adjustment is completed, it is simple efficient that regulation process is distributed the regulation of three fulcrums than the equilateral triangle of prior art.

Description

Orthogonal horizontal adjusting means
Technical field
The present invention relates to a kind of orthogonal horizontal adjusting means, and in particular to a kind of metal building pile foundation location adjusting device, Including absolute altitude regulation and Level tune.
Background technology
Platform and equipment leveling, due to the result that diagonal is detected, data are uniquely accurately conventional detection method, platform Supporting-point is generally three, even if multiple supporting-points, is also that leveling is carried out based on three supporting-points, each adjustable fulcrum adjustment When in measurement plane adjustment increment caused by the same area or same point be different, be phase in the same area adjustment result Anti-.The adjustable fulcrum of usual diagonal mensuration is distributed in equilateral triangle, and when adjusting each supporting-point, working face is respectively with each Supporting-point diagonal rotates for axle, its diagonal etc. is higher than datum plane.The advantage of this method is that measurement result is unique, is lacked Point is that horizontal adjustment occurs repeatedly, and adjustment trouble is time-consuming.Its reason is to work as to adjust a diagonal parallel to datum plane, When adjusting another diagonal again, because each adjustable fulcrum adjustment result is interfered and is influenceed, so that adjusted is right The height of linea angulata changes again.Solving this problem should just start with from the mechanism of analysis leveling, find the side of fast leveling Method.
Level tune and measurement are widely used in building field, including constitute stake by the pile framing of many piles and connection stake top Basis a, root post is connected to form single pile isolated footing, referred to as foundation pile with pile foundation, and pile framing is divided into metal cabinet and cast-in-place steel Reinforced concrete.So, the horizontal accuracy of pile framing directly affects the construction quality of pile foundation.
The content of the invention
To overcome the defect present in the method and apparatus of above-mentioned orthogonal horizontal regulation, technology to be solved by this invention is asked Topic is to provide a kind of adjustable fulcrum adjustment and not interfered, the practical adjustments amount method consistent with design regulated quantity.
Corresponding to this, it is mutually not dry that another technical problem to be solved of the invention is to provide a kind of adjustable fulcrum adjustment Relate to, the practical adjustments amount device consistent with design regulated quantity.
For orthogonal horizontal adjusting method, present invention solves the technical problem that method comprise the following steps:By three The rectangular Triangle-Profile of point, using right-angled apices C as fixed pivot, adjusts A points and B points respectively;Because AC is mutually perpendicular to BC, When adjusting A points, the height change of A points do not have component in BC directions, is substantially that A points are raised and lowered in working platform plane Upper each point is highly changed, and its working platform plane is rotated along other two strong points BC lines for axle.Similarly, B points, B are adjusted The height change of point, also without component, is so achieved that the separately adjustable of both direction on AC directions, practical adjustments amount with Design regulated quantity consistent.
As a kind of preferred scheme of the above method, for tube bubble is placed respectively along right-angle side AC and BC, with C Point is fulcrum, adjusts A points, makes the bubble of tube bubble placed in the middle, in horizontality;B points are adjusted again, make the gas of tube bubble Bubble is placed in the middle, is rapidly completed horizontal adjustment.Another preferred scheme corresponding with this, if optional position is put inside and outside right angled triangle A circle bubble is put, using C points as fulcrum, A points are adjusted, the bubble in circle bubble is moved from o points along perpendicular to BC directions To a points, then B points are adjusted, bubble in circle bubble is directly reached home b along AC vertical direction, be equally rapidly completed water Heibei provincial opera is whole.
For pile framing orthogonal horizontal adjusting means, above-mentioned technical problem is so solved:Adjustable column is in straight Angle Triangle-Profile, C is right-angled apices, and right-angle side AC places tube bubble, and right-angle side BC places tube bubble, including adjusts The substrate of whole building pile foundation corner location-plate benchmark, hit disk connection hits post through substrate, hits disc compacting layer of ground soil and enters Row positioning, flywheel linkage adjustable column can realize upper and lower regulation, and the scale strip that the concrete numerical value of regulation can be by flywheel is read. There is external screw thread on adjustable column, itself and the nut being fixed on substrate form screw thread pair.The aluminium material substrate two ends are provided with fixation Location-plate is adsorbed on substrate by the carbon steel suction disc of magnet, magnet, and handle is used for carrying substrate, and hitting for being connected as a single entity and hits post at disk It is extensible to be placed on other adjustable column operating positions.
Using the device of said structure, the vertical graduated scale of 0 and positive and negative numerical value is carved with because C points are set, using disc as Benchmark, adjusts vertical absolute altitude.Used in sunshade board above vertical graduated scale is in blocking sunshine, shadow shield, graduated scale and substrate Surface painted black, reduces interference of the ambient light to naked eyes reading.
If pile framing is a rectangle or square platform, it is constituted on the basis of four pieces of location-plates, the substrate that 3 points of A, B, C Measurement plane is parallel with the location-plate for determining cushion cap plane, and this fast leveling method is applied to plurality of devices and platform.
Brief description of the drawings
The embodiment to the present invention elaborates below in conjunction with the accompanying drawings:
Fig. 1 is the schematic diagram that the present invention places the regulation of tube bubble orthogonal horizontal.
Fig. 2 is the schematic diagram that the present invention places the regulation of circle bubble orthogonal horizontal.
Fig. 3 is the schematic diagram that prior art places circle bubble regulation.
Fig. 4 is the stereogram that metal building pile foundation of the present invention positions water transfer leveling device.
Fig. 5 is the front view of Fig. 4 shown devices.
Fig. 6 is the stereogram for the post shore connection pile foundation that Fig. 4, Fig. 5 device position leveling.
Embodiment
The method of orthogonal horizontal regulation of the present invention is applied to the fast levelings such as equipment, equipment and building pile framing, by Tube bubble and circle bubble, its principle is as shown in Figure 1 and Figure 2.3 points determine a plane, and Fig. 3 shows prior art pair Methods generally are adjusted using 3 points in the Level tune of a plane, that is, the height for adjusting at 3 points reaches horizontal purpose.Common three Fulcrum is distributed in equilateral triangle, when adjusting one of fulcrum, and the high variable quantity on this direction is in other two and its It is important on into 120 ° of directions, the deviation of practical adjustments amount and expected regulated quantity is formed, causes regulation process repeatedly to repair It is positive and negative multiple tediously long.
Fig. 4 and Fig. 5 using metal building pile foundation level, vertically oriented device as embodiment, the device it is main by substrate 9, Location-plate 12, adjustable column 7, the first tube bubble 10, the second tube bubble 4, hit disk 3, disc 14 etc. composition.Three regulations The rectangular Triangle-Profile of post 7, adjustable column C is right-angled apices, and adjustable column A, B are that hypotenuse end points, i.e. AC are vertical with BC, the first pipe The tube bubble 4 of shape air level 10 and second is placed along AC and BC directions respectively, and regulation is divided into absolute altitude regulation and Level tune.Base The two ends of plate 9 are provided with carbon steel suction disc 16, are mainly used in fixed magnet 1, and handle 2 is used for carrying substrate 9, and substrate 9 is with lightweight, rigidly Good superduralumin is made.
Specific regulation process to the present invention is described below:
1st, three pieces of discs 14 are padded under three ends of adjustable column 7 respectively, hits post 15 with three that hit the riveting of disk 3 and hit respectively Three discs 14 are made a call to, disc 14 is moved down, 14 times soil layers of disc are tamped, it is along outer three pilot holes of adjustable column 7 to hit post 15 Through substrate 9.Certainly, if original soil layer is smooth and hard, this step can be saved.
2nd, on the basis of disc 14, vertical absolute altitude is adjusted.Laser elevation line is got with laser leveler and is shown in vertical quarter Spend on chi 6.Vertical graduated scale 6 is carved with 0 and positive and negative numerical value, and scale where control elevation line, regulation C points adjustable column 7 makes mark High Line beam aligns 0, if absolute altitude Line beam is on the occasion of the past up-regulation of adjustable column 7;If otherwise positioned at negative value, adjustable column 7 is down Adjust.Flywheel 8 is used to fine-tune, and the tapered end of adjustable column 7 is used for having external screw thread on quick regulation, adjustable column 7, and it is with being fixed on substrate The formation screw thread pair of nut 13 on 9, rotates adjustable column 7 and upper and lower regulation can be achieved.The concrete numerical value of regulation can be according to flywheel by Scale strip 11 read.
3rd, regulation A points adjustable column 7, makes the first tube bubble(10)Bubble be in middle position.
4th, regulation B points adjustable column 7, makes the second tube bubble(4)Bubble be in middle position.
5th, now substrate 9 has been adjusted to level, now, and location-plate 12 is adsorbed on substrate 9 with magnet 1, four pieces of location-plates 12 are in horizontality.
Fig. 6 is the stereogram for the post shore connection pile foundation that said apparatus positions leveling.Location-plate 12 opens profiled holes The top of spiral ground pile 17 being driven underground is enclosed on, four pieces of movements of location-plate 12 are fitted with the substrate 9 of leveling, on this position The gap of sealing weld profiled holes and spiral ground pile 17, can also first spot welding live to remove location adjusting device sealing weld again, determining after welding Position plate 12 is gone to the bottom as benchmark laminating cushion cap casing 18, and spiral ground pile 17 passes through cushion cap casing 18 with another its head of location-plate soldering and sealing Portion, because plane is parallel with location-plate 12 on cushion cap casing 18, hanging down for the upper pillar stand 19 of cushion cap casing 18 is welded on so as to ensure that Straight degree.
Certainly, above-mentioned pile foundation structure is because engine request is from metal and using welding, if held from armored concrete Platform is equally applicable, in the knowledge that those skilled in the art possess, can be on the premise of present inventive concept is not departed from Various changes can be made.

Claims (5)

1. a kind of orthogonal horizontal adjusting means, the device is main by substrate(9), location-plate(12), adjustable column(7), the first tubulose Air level(10), the second tube bubble(4), hit disk(3), flywheel(8)Constitute, it is characterised in that:The adjustable column(7)In straight Angle Triangle-Profile, right-angled apices C is fixed pivot, and right-angle side AC places the first tube bubble(10), right-angle side BC placements Second tube bubble(4), including adjustment building pile foundation corner location-plate(12)The substrate of benchmark(9), connect and hit disk(3)Hit Post(15)Through substrate(9), and hit disc(14)Compacting layer of ground soil is positioned, flywheel(8)Link adjustable column(7)Can be real Existing upper and lower regulation, the concrete numerical value of regulation can be according to flywheel(8)Other scale strip(11)Read, the adjustable column(7)On have outer Screw thread, it is with being fixed on substrate(9)On nut(13)Form screw thread pair;The substrate(9)Two ends are provided with fixed magnet(1)'s Carbon steel suction disc(16), magnet(1)By location-plate(12)It is adsorbed in substrate(9)On;It is described to hit disk(3)With hitting post(15)Connection one Body, entirety is extensible and is placed on each adjustable column(7)Operating position.
2. according to the orthogonal horizontal adjusting means described in claim 1, it is characterised in that:The C points are fulcrum, adjust A points, make First tube bubble(10)Bubble is in horizontality between two parties, then adjusts B points, makes the second tube bubble(4)Bubble is located between two parties In horizontality, horizontal adjustment is completed.
3. according to the orthogonal horizontal adjusting means described in claim 1, it is characterised in that:Any position inside and outside the right angled triangle The circle bubble of placement location one, using C points as fulcrum, adjusts A points, makes in circle bubble bubble from o points along perpendicular to BC directions A points are moved to, then adjust B points, circle bubble is directly reached home b along AC vertical direction in horizontality bubble, completion Horizontal adjustment.
4. according to the orthogonal horizontal adjusting means described in claim 1, it is characterised in that:The C points set be carved with 0 and just, The vertical graduated scale of negative value(6)And shadow shield(5).
5. according to the orthogonal horizontal adjusting means described in claim 1, it is characterised in that:The substrate(9), scale strip(11)、 Shadow shield(5)And vertical graduated scale(6)Surface painted black.
CN201510719171.4A 2015-10-30 2015-10-30 Orthogonal horizontal adjusting means Active CN105347268B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510719171.4A CN105347268B (en) 2015-10-30 2015-10-30 Orthogonal horizontal adjusting means

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510719171.4A CN105347268B (en) 2015-10-30 2015-10-30 Orthogonal horizontal adjusting means

Publications (2)

Publication Number Publication Date
CN105347268A CN105347268A (en) 2016-02-24
CN105347268B true CN105347268B (en) 2017-09-26

Family

ID=55323370

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510719171.4A Active CN105347268B (en) 2015-10-30 2015-10-30 Orthogonal horizontal adjusting means

Country Status (1)

Country Link
CN (1) CN105347268B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115290122A (en) * 2022-08-02 2022-11-04 重庆巨能建设集团路桥工程有限公司 Simple calibration method for prism centering rod
CN116592846A (en) * 2023-06-02 2023-08-15 昆山开发区建设工程检测有限公司 Perpendicularity detection device for engineering quality detection

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2296899Y (en) * 1997-05-28 1998-11-11 周本祥 Gantry cylinder top pressure type hydraulic static pile press
US6062517A (en) * 1998-05-05 2000-05-16 Torres; Joseph A. Carpet shim
CN201247048Y (en) * 2008-07-24 2009-05-27 天津港东科技发展股份有限公司 Thickness meter for optical film
CN101810402B (en) * 2010-04-15 2011-05-18 中国石油大学(华东) Real-time automatically leveled table and chair
CN103206603B (en) * 2012-01-11 2016-12-14 昆山允升吉光电科技有限公司 Support the leveling method of platform

Also Published As

Publication number Publication date
CN105347268A (en) 2016-02-24

Similar Documents

Publication Publication Date Title
CN109489618B (en) Engineering construction supervision quality acceptance actual measurement device and method
CN111679060B (en) Angle-variable side slope model test device and method under coupling effect of earthquake and rainfall
CN104328799A (en) Accurate positioning method for steel pipe column in cover and cut top-down subway station
CN107449397A (en) A kind of novel building engineering surveying instrument
CN104110140A (en) Net rack node location adjusting device and location adjusting method
CN105347268B (en) Orthogonal horizontal adjusting means
CN110424479A (en) A kind of rectifying of leaned building system and method based on 3 D laser scanning
CN103195011B (en) Method for adjusting flatness of U-steel columns of transparent water tank
CN207017267U (en) Engineering pile guider in piling construction
CN106871882B (en) Hole digging pile verticality and flatness laser guiding device and construction method thereof
CN107144261A (en) A kind of pile tube perpendicularity deviation rapid measurement device and detection method
CN109457806B (en) Adjustable assembling structure and method for welding ball net rack
CN109179222B (en) Construction method for controlling inclination and levelness of embedded joint of tower crane
CN208721078U (en) A kind of fixed holder of hand-held construction account equipment
DE102013205512B3 (en) Sensor arrangement for determining the orientation of a pile
CN110344454B (en) Checking method of pile position checking device for impact drilling construction pile foundation
CN203783615U (en) Quick and precise positioning device for anchor rod drilling
CN212179756U (en) Quick positioner of inclined plane height measurement of making level
JPH07229300A (en) Base surface leveller and method of construction levelling base surface
CN210242751U (en) Area measuring instrument for engineering survey
CN204831200U (en) Pavement width automatic measuring device
CN102995899A (en) Measurement control method for size of vertical member for building construction
CN209958389U (en) Foundation bolt positioning device convenient to adjust
CN206311097U (en) A kind of earth excavation control device
CN207892537U (en) A kind of positioning drilling platform for urban track traffic

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Liu Yongyan

Inventor before: Liu Yongyan

Inventor before: Wang Lianhua

Inventor before: Liang Dong

Inventor before: Zhang Qian

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20231121

Address after: Yadu Village, Chibusu Town, Mao County, Aba Tibetan and Qiang Autonomous Prefecture, Sichuan 623200

Patentee after: Sichuan Hope Hydropower Development Co.,Ltd.

Address before: No. 168 Xihanggang Hope Road, Shuangliu County, Chengdu City, Sichuan Province, 610225

Patentee before: CHENGDU SHENLAN HIGH TECHNOLOGY DEVELOPMENT Co.,Ltd.