CN105332521A - Seismic hardening additional damping and reinforcing frame connected with joint region - Google Patents

Seismic hardening additional damping and reinforcing frame connected with joint region Download PDF

Info

Publication number
CN105332521A
CN105332521A CN201510781876.9A CN201510781876A CN105332521A CN 105332521 A CN105332521 A CN 105332521A CN 201510781876 A CN201510781876 A CN 201510781876A CN 105332521 A CN105332521 A CN 105332521A
Authority
CN
China
Prior art keywords
framework
existing
damping reinforcement
shear connector
additional
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510781876.9A
Other languages
Chinese (zh)
Inventor
高向宇
徐帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing University of Technology
Original Assignee
Beijing University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing University of Technology filed Critical Beijing University of Technology
Priority to CN201510781876.9A priority Critical patent/CN105332521A/en
Publication of CN105332521A publication Critical patent/CN105332521A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/04Propping of endangered or damaged buildings or building parts, e.g. with respect to air-raid action
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/92Protection against other undesired influences or dangers
    • E04B1/98Protection against other undesired influences or dangers against vibrations or shocks; against mechanical destruction, e.g. by air-raids
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Mechanical Engineering (AREA)
  • Electrochemistry (AREA)
  • Chemical & Material Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Working Measures On Existing Buildindgs (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The invention relates to a seismic hardening additional damping and reinforcing frame connected with a joint region. The frame is arranged on an existing frame structure, when the top of the existing frame structure is provided with cantilever slabs and is reinforced by an external additional concrete damping and reinforcing frame, the cantilever slabs are connected with an existing frame upper beam of the existing frame structure and a left column of the additional damping and reinforcing frame in an opposite penetrating mode; and space is reserved between the external additional concrete damping and reinforcing frame and the cantilever slabs, so that concrete pouring is facilitated. When the bearing capacity of components of the existing frame structure cannot meet normal operation of a shear connector, the components of the existing frame are reinforced locally. The joint region is connected with the additional damping and reinforcing frame, stress interference and load on the existing frame structure due to arrangement of the additional damping and reinforcing frame are reduced, stress interference on the existing frame structure is small, design analysis and a construction process are relatively simple, and antiseismic performance and seismic rehabilitation of the existing frame structure are facilitated.

Description

Seismic hardening nodes domains connects additional damping reinforcement framework
Technical field
The present invention relates to and a kind ofly connect additional damping reinforcement framework that sinker is set by adding shear connector in existing frame construction nodes domains and realize the technology of damping reinforcement, belong to concrete frame structure antidetonation and energy-dissipating and shock-absorbing field of reinforcement.
Background technology
The application of energy-dissipating and shock-absorbing reinforcing technique in concrete structure reinforcement transformation is more and more wider, wherein, adopt buckling restrained brace, metal yield type damper equipotential to move relationship type sinker when carrying out damping reinforcement, determining face multiple design alternative in sinker rigidity and surrender bearing capacity, connected mode, existing frame structure component disposal etc.The additional damping reinforcement frame strengthening existing concrete structure adopting nodes domains to connect can reduce, to the stressed interference of existing frame construction and the damage to existing frame structure component, can select multiple types, many specifications sinker, and facilitate user, short construction period.At present, relevant supporting technology obtained experimental verification already.
Summary of the invention
The present invention is directed to traditional Quan Liang is connected existing frame construction and additional damping reinforcement framework method with full post implantation shear connector, propose a kind of method that nodes domains connects additional damping reinforcement framework and existing frame construction.This additional damping reinforcement framework is connected by means of only the shear connector of nodes domains (beam-ends and styletable) with between existing frame construction, and in girder span and in the middle part of post, shear connector is not set, thus ensure additional damping reinforcement framework and existing frame construction under geological process during collaborative work, displacement field constraint is few, existing structure burden is little, at utmost can play the energy-dissipating and shock-absorbing effect of existing structure antidetonation, additional damping reinforcement framework antidetonation and sinker.Compared with seismic strengthening technology, the present invention can shorten construction period, significantly improve structural seismic performance etc.; Compared with the additional damping reinforcement framework technology of the company's of setting shear connector within the scope of Quan Liang, column length, the present invention is few to existing frame construction disturbance, and reasonable stress can save material, shortens construction period etc.The present invention shock test authenticating security is reliable, and can reduce the stressed interference to existing frame construction, the damage of work progress to existing frame structure component is little, and energy-dissipating and shock-absorbing consolidation effect is obvious.
For reaching above-mentioned effect, the present invention adopts following technical scheme.The internal force shared under the cross section composite interior force of additional damping reinforcement framework comprises the deadweight of additional damping reinforcement framework and geological process.The shearing resistance checking computations of rear anchoring (or to wearing anchoring) connector, additional damping reinforcement framework and the existing frame construction that should consider to arrange sinker are issued to the shearing corresponding to displacement coordination at frequently occurred earthquake.Design with this shearing force design value and determine section area and the quantity of shear connector, and the beam-ends be evenly arranged near all nodes domains and styletable.Shear connector possesses certain structure resistance to tension at existing structure and newly-built additional frame planted agent, expanding die bed mechanical anchor or special back taper chemical anchor bolts, in newly-built additional frame, arranging crotch etc. as adopted during anchoring in existing structure.
Existing framework upper beam (1), existing framework underbeam (2) are parallel to each other, and the left post of existing framework (3), the right post of existing framework (4) are arranged in parallel and be separately fixed at the two ends up and down of existing framework upper beam (1), existing framework underbeam (2); Existing framework upper beam (1), existing framework underbeam (2), the left post of existing framework (3), the right post of existing framework (4) connect to form existing frame construction.
Seismic hardening connects additional damping reinforcement framework by nodes domains and is arranged in existing frame construction, seismic hardening connects additional damping reinforcement framework by nodes domains and is divided into additional concrete damping reinforcement framework and additional steel damping reinforcement framework according to material difference, is divided into outside additional damping reinforcement framework and inside to add damping reinforcement framework according to installation position difference.
Additional damping reinforcement frame joint is formed by adding damping reinforcement framework upper beam (6), additional damping reinforcement framework underbeam (7), the additional left post of damping reinforcement framework (8), the additional right post of damping reinforcement framework (9), sinker (10) and being connected sinker parts (11).Wherein, additional damping reinforcement framework upper beam (6) is connected respectively by upper beam right-hand member node shear connector (12) and upper beam left end node shear connector (13) with existing framework upper beam (1); Additional damping reinforcement framework underbeam (7) is connected with underbeam left end node shear connector (15) respectively by underbeam right-hand member node shear connector (14) with existing framework underbeam (2); The additional left post of damping reinforcement framework (8) is connected with end node shear connector (17) under left post respectively by end node shear connector (16) on left post with the left post of existing framework (3); The additional right post of damping reinforcement framework (9) is connected with right post lower end shear connector (19) respectively by end node shear connector (18) on right post with the right post of existing framework (4); Sinker (10) is arranged in outside additional damping reinforcement framework, sinker (10) is first connected by the beam of sinker link (11) and additional damping reinforcement framework or post component, then is connected with existing frame construction by the shear connector of the additional each Nodes of damping reinforcement framework.
When the top of existing frame construction is provided with floor of encorbelmenting (5) and adopts outside additional concrete damping reinforcement frame strengthening, floor (5) of encorbelmenting is by being connected with the existing framework upper beam (1) of existing frame construction, the additional left post of damping reinforcement framework (8) wearing, space is reserved with between outside additional concrete damping reinforcement framework and floor of encorbelmenting (5), so that concreting, mortar material dense packing effect use in reserved space after concreting completes, and guarantee floor (5) of encorbelmenting is connected reliably with outside additional concrete shock frame.When the element bearing capacity of existing frame construction can not meet shear connector normally work time, carry out local stiffening to existing framing component, described local stiffening is local encased steel plate (26).
Existing framework underbeam (2) is connected by underbeam left end node shear connector (15) with additional damping reinforcement framework underbeam (7), and the left post of existing framework (3) is connected by end node shear connector (17) under left post with the left post of additional damping reinforcement framework (8).
Additional damping reinforcement frame joint is made up of additional damping reinforcement framework upper beam (6) and the right post of additional damping reinforcement framework (9).First local encased steel plate (26) consolidation process is carried out to existing framework upper beam (1) node linkage section, and additional damping reinforcement framework upper beam (6) is installed using local encased steel plate (26) as backing plate.Local encased steel plate (26) adopts and is fixed on existing frame structure component to ensure local encased steel plate (26) stability pull-type structure crab-bolt (27).Additional damping reinforcement framework upper beam (6) is connected by upper beam right-hand member node shear connector (12) with existing framework upper beam (1), and the additional right post of damping reinforcement framework (9) is connected by end node shear connector (18) on right post with the right post of existing framework (4).
Shear connector to comprise on upper beam right-hand member node shear connector (12), upper beam left end node shear connector (13), left post under end node shear connector (16), left post on end node shear connector (17), right post end node shear connector (19) under end node shear connector (18), right post.Shear connector adopts mechanical anchor, chemical anchor bolts; Method of attachment adopts wearing formula connection or having the rear anchoring shear connector constructing tension function; In existing structure, anchoring adopts and expands die bed mechanical anchor or special back taper chemical anchor bolts, at external anchor in newly-built additional frame, or arranges crotch in inside and carries out interior anchor.Beyond nodes domains linkage section, do not arrange that additional frame and existing framework separate by the new and old component junction plastic film material of shear connector.
The parameter such as surrender bearing capacity, original yield displacement of the cross section of additional damping reinforcement Vierendeel girder, post and arrangement of reinforcement parameter, displacement relationship type sinker is determined according to energy-dissipating and shock-absorbing reinforcing design.The existing frame construction compatibility of deformation relation be connected with it according to the additional damping reinforcement framework under geological process obtains the quantity of certain one deck shear connector, the shear connector of floor totally two ten, comprise upper beam right-hand member node shear connector (12), upper beam left end node shear connector (13), end node shear connector (16) on left post, end node shear connector (17) under left post, end node shear connector (19) under end node shear connector (18) and right post on right post, be evenly distributed to two ends, upper beam left and right, the upper and lower two ends of left post, the node linkage section at the upper and lower two ends of right post, anchorage style adopts drawing anchoring or rear anchoring.Again because adopt chevron shaped support, in girder span, connect the position mounting rail of buckling restrained brace across interior structure crab-bolt (20).
Existing framework upper beam (1) is connected by upper beam shear connector (22) with additional damping reinforcement framework upper beam (6), existing framework underbeam (2) is connected by underbeam shear connector (23) with additional damping reinforcement framework underbeam (7), the left post of existing framework (3) is connected by left post shear connector (24) with the left post of additional damping reinforcement framework (8), and the right post of existing framework (4) is connected by right post shear connector (25) with the right post of additional damping reinforcement framework (9).Under geological process, additional damping reinforcement framework is consistent with the deformation of member of the existing frame construction of connection, the existing frame structure component formation compound section that additional damping reinforcement frame structure component is coupled, significantly increase the rigidity of the existing frame structure component connecting additional damping reinforcement framework, the stressed rule of existing frame construction is changed comparatively large, higher to the shock resistance demand of existing frame construction.And nodes domains connection side rule is only connected at the Nodes of existing frame construction with additional damping reinforcement framework, effective connection is not all formed in girder span He in the middle part of post, reduce the stressed interference and burden that the existing frame structure component connecting additional damping reinforcement framework are brought because arranging additional damping reinforcement framework, simultaneously less to the stressed interference of existing frame construction.
Traditional additional damping reinforcement framework passes through along the connection of arranging shear connector and existing frame construction within the scope of whole girder span and post height.By the ruggedized construction of the method design, under geological process, the existing frame structure component formation compound section that additional damping reinforcement frame structure component is coupled, significantly increase the rigidity of structural element, change larger to the stressed rule of existing frame construction, improve the shock resistance demand of existing frame construction, when causing geological process, existing framework breakoff phenomenon occurs early, damage is large.By contrast, nodes domains is adopted to connect additional damping reinforcement framework, only need additional damping reinforcement framework consistent near nodal distortion with the existing frame construction of connection, the distortion of other parts is not constrained each other, reduce the stressed interference and burden that existing frame construction are brought because arranging additional damping reinforcement framework, less to the stressed interference of existing frame construction, design analysis and work progress are comparatively simple, are conducive to performance and the rear reparation of shake of existing Seismic Performance of Concrete Frame.
Accompanying drawing explanation
Fig. 1 is outside additional concrete damping reinforcement frame joint territory connection diagram of installing buckling restrained brace.
Fig. 2 is C-C sectional view.
Fig. 3 is D-D sectional view.
Fig. 4 is C-C sectional view.
Fig. 5 is D-D sectional view.
Fig. 6 is the full girder span of concrete damping reinforcement framework of outside additional installation buckling restrained brace and full post high connection diagram.
Fig. 7 is E-E sectional view.
Fig. 8 is F-F sectional view.
Fig. 9 is outside additional steel damping reinforcement framework local nodes territory connection diagram of installing buckling restrained brace.
Figure 10 is inner additional steel damping reinforcement framework local nodes territory connection diagram of installing buckling restrained brace.
Figure 11 is G-G sectional view.
In figure: the existing framework upper beam of 1-, the existing framework underbeam of 2-, the left post of the existing framework of 3-, the right post of the existing framework of 4-, 5-encorbelments floor, 6-adds damping reinforcement framework upper beam, 7-adds damping reinforcement framework underbeam, 8-adds the left post of damping reinforcement framework, 9-adds the right post of damping reinforcement framework, 10-sinker, 11-connects sinker parts, 12-upper beam right-hand member node shear connector, 13-upper beam left end node shear connector, 14-underbeam right-hand member node shear connector, 15-underbeam left end node shear connector, end node shear connector on the left post of 16-, end node shear connector under the left post of 17-, end node shear connector on the right post of 18-, end node shear connector under the right post of 19-, 20-constructs crab-bolt, 21-packed layer, 22-upper beam shear connector, 23-underbeam shear connector, the left post shear connector of 24-, the right post shear connector of 25-, 26-local encased steel plate, the structure crab-bolt of 27-local encased steel plate.
Detailed description of the invention
Implementation principle
1. shear connector should be evenly arranged beam-ends near all nodes domains and styletable, its section area and quantity by existing frame construction and additional damping reinforcement framework the distortion conspiracy relation under geological process determine.Shear connector should not be arranged in joint cores.
2. beam-ends and styletable arrange that the linkage section total length of shear connector should be no more than its hoop reinforcement length, wherein, the linkage section length limit value of one-level Vierendeel girder should get the smaller value in 1.5h (h is beam section height) and 500mm, the linkage section length limit value at the upper and lower two ends of post should get the smaller value in 1/6 and 500mm of post clear height, for the post root of bottom column, the smaller value in 1/4 and 500m of desirable post clear height; The linkage section length limit value of secondary Vierendeel girder should get the smaller value in 1.2h (h is beam section height) and 400mm, the linkage section length limit value at the upper and lower two ends of post should get the smaller value in 1/8 and 400mm of post clear height, for the post root of bottom column, the smaller value in 1/4 and 400m of desirable post clear height.
3. when additional damping reinforcement framework adopts herringbone or " X " shape supports, structure crab-bolt or reinforcing bar should be arranged within the scope of the anchoring supported, the grade of crab-bolt or reinforcing bar should be identical with shear connector, its quantity can be determined by the difference of the maximum axial pulling force supported and maximum axial pressure, but its cross section gross area, I and II should not be less than three, level Four framework should not be less than
4. shear connector should select high-strength bolt or Ribbed Bar, should adopt drawing anchorage style; When adopting when drawing anchorage style, can adopt the rear anchoring crab-bolt with structure tension function and in newly-built additional frame, arrange the mode of 90 degree of crotches, crotch tip lengths is greater than 5d.The cross section of rear anchoring shear amchor bolt, anchorage length, structure way and requirement should meet the related request of existing industry standard " concrete post anchoring tecnical regulations " JGJ297.
5. the relevant parameter of additional damping reinforcement framework, sinker and connection sinker parts, shear connector is determined by seismic Calculation.
Implementation method
Existing framework upper beam (1), existing framework underbeam (2) are parallel to each other, and the left post of existing framework (3), the right post of existing framework (4) are arranged in parallel and be separately fixed at the two ends up and down of existing framework upper beam (1), existing framework underbeam (2); Existing framework upper beam (1), existing framework underbeam (2), the left post of existing framework (3), the right post of existing framework (4) connect to form existing frame construction.
Additional damping reinforcement framework is arranged in existing frame construction.Different according to material, additional damping reinforcement framework is divided into additional concrete damping reinforcement framework (as Fig. 1 and Fig. 2) and additional steel damping reinforcement framework (as Fig. 9 and Figure 10) etc.; Different according to installation position, additional damping reinforcement framework can be divided into outside additional damping reinforcement framework (as shown in Figure 1, Figure 2 and Fig. 9) and inside to add damping reinforcement framework (as Figure 10) etc.
Seismic hardening connects additional damping reinforcement framework by nodes domains and forms by adding damping reinforcement framework upper beam (6), additional damping reinforcement framework underbeam (7), the additional left post of damping reinforcement framework (8), the additional right post of damping reinforcement framework (9), sinker (10) and being connected sinker parts (11).Wherein, additional damping reinforcement framework upper beam (6) is connected respectively by upper beam right-hand member node shear connector (12) and upper beam left end node shear connector (13) with existing framework upper beam (1); Additional damping reinforcement framework underbeam (7) is connected (as shown in Figure 2) with underbeam left end node shear connector (15) respectively by underbeam right-hand member node shear connector (14) with existing framework underbeam (2); The additional left post of damping reinforcement framework (8) is connected (as shown in Figure 3) with end node shear connector (17) under left post respectively by end node shear connector (16) on left post with the left post of existing framework (3); The additional right post of damping reinforcement framework (9) is connected with right post lower end shear connector (19) respectively by end node shear connector (18) on right post with the right post of existing framework (4).
When the top of existing frame construction is provided with floor of encorbelmenting (5) and adopts outside additional concrete damping reinforcement frame strengthening, floor (5) of encorbelmenting passes through wearing the existing framework upper beam (1) with existing frame construction, the additional left post of damping reinforcement framework (8) connects, space is reserved with between outside additional concrete damping reinforcement framework and floor of encorbelmenting (5), so that concreting, (as Fig. 1) is filled with densify such as mortars in reserved space after concreting completes, guarantee floor (5) of encorbelmenting is connected reliably with outside additional concrete shock frame.When the element bearing capacity of existing frame construction can not meet shear connector normally work time, local stiffening is carried out to existing framing component, as local encased steel plate (26).
Fig. 9 is outside additional steel damping reinforcement frame joint schematic diagram.In figure, existing frame construction node is existing framework underbeam (2) and the left post of existing framework (3) joint; Outside additional steel damping reinforcement frame joint is by additional damping reinforcement framework underbeam (7), the additional left post of damping reinforcement framework (8), sinker (10) and be connected sinker parts (11) and form.Existing framework underbeam (2) is connected by underbeam left end node shear connector (15) with additional damping reinforcement framework underbeam (7), and the left post of existing framework (3) is connected by end node shear connector (17) under left post with the left post of additional damping reinforcement framework (8).
Figure 10 is inner additional steel damping reinforcement frame joint schematic diagram.In figure, existing frame construction node is existing framework upper beam (1) and the right post of existing framework (3) joint; Additional damping reinforcement frame joint is made up of additional damping reinforcement framework upper beam (6) and the right post of additional damping reinforcement framework (9).First local encased steel plate (26) consolidation process is carried out to existing framework upper beam (1) node linkage section, and additional damping reinforcement framework upper beam (6) (as Figure 11, G-G cross section) is installed using local encased steel plate (26) as backing plate.Local encased steel plate (26) adopts and is fixed on existing frame structure component to ensure local encased steel plate (26) stability pull-type structure crab-bolt (27).Additional damping reinforcement framework upper beam (6) is connected by upper beam right-hand member node shear connector (12) with existing framework upper beam (1), and the additional right post of damping reinforcement framework (9) is connected by end node shear connector (18) on right post with the right post of existing framework (4).
Sinker (10) is arranged in outside additional damping reinforcement framework, sinker (10) is first connected by the beam of sinker link (11) and additional damping reinforcement framework or post component, then is connected with existing frame construction by the shear connector of the additional each Nodes of damping reinforcement framework.
Shear connector to comprise on upper beam right-hand member node shear connector (12), upper beam left end node shear connector (13), left post under end node shear connector (16), left post on end node shear connector (17), right post end node shear connector (19) under end node shear connector (18), right post.Shear connector adopts mechanical anchor, chemical anchor bolts; Method of attachment adopts and connects (as Fig. 2 wearing formula, Fig. 7, Figure 10 and Figure 11) or there is the rear anchoring shear connector constructing tension function, such as, in existing structure, anchoring adopts and expands die bed mechanical anchor or special back taper chemical anchor bolts, can at external anchor (as Fig. 3) in newly-built additional frame, or crotch is set in inside carries out interior anchor (as Fig. 8).Beyond nodes domains linkage section, do not arrange that additional frame and existing framework can separate in (as Fig. 5, D-D cross section) by plastic film and other material by the new and old component junction of shear connector.
The parameter such as surrender bearing capacity, original yield displacement of the parameters such as the cross section of additional damping reinforcement Vierendeel girder, post and arrangement of reinforcement, displacement relationship type sinker should be determined according to energy-dissipating and shock-absorbing reinforcing design.The existing frame construction compatibility of deformation relation be connected with it according to the additional damping reinforcement framework under geological process can obtain the quantity of certain one deck shear connector, the shear connector (diameter is drawn by designing and calculating) of floor shown in Fig. 1 totally two ten, comprise upper beam right-hand member node shear connector (12), upper beam left end node shear connector (13), end node shear connector (16) on left post, end node shear connector (17) under left post, end node shear connector (19) under end node shear connector (18) and right post on right post, be evenly distributed to two ends, upper beam left and right, the upper and lower two ends of left post, the node linkage section at the upper and lower two ends of right post, anchorage style adopts drawing anchoring or rear anchoring.Again because adopt chevron shaped support, in girder span, connect the position mounting rail of buckling restrained brace across interior structure crab-bolt (20) (as Fig. 4, C-C cross section).The length of Fig. 1 interior joint linkage section all meets implementation principle 2.The detailing requiments of shear connector all meets the requirement of " concrete post anchoring tecnical regulations ".
Fig. 6 is the outside additional concrete damping reinforcement block schematic illustration arranging shear connector along full girder span and Quan Zhugao.Existing frame construction is made up of existing framework upper beam (1), existing framework underbeam (2), the left post of existing framework (3) and the right post of existing framework (4); Additional damping reinforcement framework forms by adding damping reinforcement framework upper beam (6), additional damping reinforcement framework underbeam (7), the additional left post of damping reinforcement framework (8), the additional right post of damping reinforcement framework (9), sinker (10) and being connected sinker parts (11).Existing framework upper beam (1) is connected (as Fig. 7 with additional damping reinforcement framework upper beam (6) by upper beam shear connector (22), E-E cross section), existing framework underbeam (2) is connected by underbeam shear connector (23) with additional damping reinforcement framework underbeam (7), the left post of existing framework (3) is connected by left post shear connector (24) with the left post of additional damping reinforcement framework (8), the right post of existing framework (4) is connected (as Fig. 8 with the right post of additional damping reinforcement framework (9) by right post shear connector (25), F-F cross section).Under geological process, additional damping reinforcement framework is consistent with the deformation of member of the existing frame construction of connection, existing frame structure component formation compound section (as Fig. 7 and Fig. 8) that additional damping reinforcement frame structure component is coupled, significantly increase the rigidity of the existing frame structure component connecting additional damping reinforcement framework, the stressed rule of existing frame construction is changed comparatively large, higher to the shock resistance demand of existing frame construction.And nodes domains connection side rule only carries out being connected (as Fig. 3) in existing frame construction with the Nodes of additional damping reinforcement framework, effective connection (as Fig. 5) is not all formed in girder span He in the middle part of post, reduce the stressed interference and burden that the existing frame structure component connecting additional damping reinforcement framework are brought because arranging additional damping reinforcement framework, simultaneously less to the stressed interference of existing frame construction.

Claims (7)

1. seismic hardening nodes domains connects additional damping reinforcement framework, existing framework upper beam (1), existing framework underbeam (2) are parallel to each other, and the left post of existing framework (3), the right post of existing framework (4) are arranged in parallel and be separately fixed at the two ends up and down of existing framework upper beam (1), existing framework underbeam (2); Existing framework upper beam (1), existing framework underbeam (2), the left post of existing framework (3), the right post of existing framework (4) connect to form existing frame construction;
Seismic hardening connects additional damping reinforcement framework by nodes domains and is arranged in existing frame construction, it is characterized in that: seismic hardening connects additional damping reinforcement framework by nodes domains and is divided into additional concrete damping reinforcement framework and additional steel damping reinforcement framework according to material difference, be divided into outside additional damping reinforcement framework and inside to add damping reinforcement framework according to installation position difference;
Additional damping reinforcement frame joint is formed by adding damping reinforcement framework upper beam (6), additional damping reinforcement framework underbeam (7), the additional left post of damping reinforcement framework (8), the additional right post of damping reinforcement framework (9), sinker (10) and being connected sinker parts (11); Wherein, additional damping reinforcement framework upper beam (6) is connected respectively by upper beam right-hand member node shear connector (12) and upper beam left end node shear connector (13) with existing framework upper beam (1); Additional damping reinforcement framework underbeam (7) is connected with underbeam left end node shear connector (15) respectively by underbeam right-hand member node shear connector (14) with existing framework underbeam (2); The additional left post of damping reinforcement framework (8) is connected with end node shear connector (17) under left post respectively by end node shear connector (16) on left post with the left post of existing framework (3); The additional right post of damping reinforcement framework (9) is connected with right post lower end shear connector (19) respectively by end node shear connector (18) on right post with the right post of existing framework (4); Sinker (10) is arranged in outside additional damping reinforcement framework, sinker (10) is first connected by the beam of sinker link (11) and additional damping reinforcement framework or post component, then is connected with existing frame construction by the shear connector of the additional each Nodes of damping reinforcement framework.
2. seismic hardening according to claim 1 nodes domains connects additional damping reinforcement framework, it is characterized in that: when the top of existing frame construction is provided with floor of encorbelmenting (5) and adopts outside additional concrete damping reinforcement frame strengthening, floor (5) of encorbelmenting passes through wearing the existing framework upper beam (1) with existing frame construction, the additional left post of damping reinforcement framework (8) connects, space is reserved with between outside additional concrete damping reinforcement framework and floor of encorbelmenting (5), so that concreting, mortar material dense packing effect is used in reserved space after concreting completes, guarantee floor (5) of encorbelmenting is connected reliably with outside additional concrete shock frame, when the element bearing capacity of existing frame construction can not meet shear connector normally work time, carry out local stiffening to existing framing component, described local stiffening is local encased steel plate (26).
3. seismic hardening according to claim 1 nodes domains connects additional damping reinforcement framework, it is characterized in that: existing framework underbeam (2) is connected by underbeam left end node shear connector (15) with additional damping reinforcement framework underbeam (7), the left post of existing framework (3) is connected by end node shear connector (17) under left post with the left post of additional damping reinforcement framework (8).
4. seismic hardening according to claim 1 nodes domains connects additional damping reinforcement framework, it is characterized in that: additional damping reinforcement frame joint is made up of additional damping reinforcement framework upper beam (6) and the right post of additional damping reinforcement framework (9); First local encased steel plate (26) consolidation process is carried out to existing framework upper beam (1) node linkage section, and additional damping reinforcement framework upper beam (6) is installed using local encased steel plate (26) as backing plate; Local encased steel plate (26) adopts and is fixed on existing frame structure component to ensure local encased steel plate (26) stability pull-type structure crab-bolt (27); Additional damping reinforcement framework upper beam (6) is connected by upper beam right-hand member node shear connector (12) with existing framework upper beam (1), and the additional right post of damping reinforcement framework (9) is connected by end node shear connector (18) on right post with the right post of existing framework (4).
5. seismic hardening according to claim 1 nodes domains connects additional damping reinforcement framework, it is characterized in that: shear connector to comprise on upper beam right-hand member node shear connector (12), upper beam left end node shear connector (13), left post under end node shear connector (16), left post on end node shear connector (17), right post end node shear connector (19) under end node shear connector (18), right post; Shear connector adopts mechanical anchor, chemical anchor bolts; Method of attachment adopts wearing formula connection or having the rear anchoring shear connector constructing tension function; In existing structure, anchoring adopts and expands die bed mechanical anchor or special back taper chemical anchor bolts, at external anchor in newly-built additional frame, or arranges crotch in inside and carries out interior anchor; Beyond nodes domains linkage section, do not arrange that additional frame and existing framework separate by the new and old component junction plastic film material of shear connector.
6. seismic hardening according to claim 1 nodes domains connects additional damping reinforcement framework, it is characterized in that: cross section and arrangement of reinforcement parameter, the surrender bearing capacity of displacement relationship type sinker, the original yield displacement parameter of additional damping reinforcement Vierendeel girder, post are determined according to energy-dissipating and shock-absorbing reinforcing design, the existing frame construction compatibility of deformation relation be connected with it according to the additional damping reinforcement framework under geological process obtains the quantity of certain one deck shear connector, the shear connector of floor totally two ten, comprise upper beam right-hand member node shear connector (12), upper beam left end node shear connector (13), end node shear connector (16) on left post, end node shear connector (17) under left post, end node shear connector (19) under end node shear connector (18) and right post on right post, be evenly distributed to two ends, upper beam left and right, the upper and lower two ends of left post, the node linkage section at the upper and lower two ends of right post, anchorage style adopts drawing anchoring or rear anchoring, again because adopt chevron shaped support, in girder span, connect the position mounting rail of buckling restrained brace across interior structure crab-bolt (20).
7. seismic hardening according to claim 1 nodes domains connects additional damping reinforcement framework, it is characterized in that: existing framework upper beam (1) is connected by upper beam shear connector (22) with additional damping reinforcement framework upper beam (6), existing framework underbeam (2) is connected by underbeam shear connector (23) with additional damping reinforcement framework underbeam (7), the left post of existing framework (3) is connected by left post shear connector (24) with the left post of additional damping reinforcement framework (8), the right post of existing framework (4) is connected by right post shear connector (25) with the right post of additional damping reinforcement framework (9), under geological process, additional damping reinforcement framework is consistent with the deformation of member of the existing frame construction of connection, the existing frame structure component formation compound section that additional damping reinforcement frame structure component is coupled, significantly increase the rigidity of the existing frame structure component connecting additional damping reinforcement framework, change large to the stressed rule of existing frame construction, high to the shock resistance demand of existing frame construction, and nodes domains connection side rule is only connected at the Nodes of existing frame construction with additional damping reinforcement framework, effective connection is not all formed in girder span He in the middle part of post, reduce the stressed interference and burden that the existing frame structure component connecting additional damping reinforcement framework are brought because arranging additional damping reinforcement framework, simultaneously little to the stressed interference of existing frame construction.
CN201510781876.9A 2015-11-15 2015-11-15 Seismic hardening additional damping and reinforcing frame connected with joint region Pending CN105332521A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510781876.9A CN105332521A (en) 2015-11-15 2015-11-15 Seismic hardening additional damping and reinforcing frame connected with joint region

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510781876.9A CN105332521A (en) 2015-11-15 2015-11-15 Seismic hardening additional damping and reinforcing frame connected with joint region

Publications (1)

Publication Number Publication Date
CN105332521A true CN105332521A (en) 2016-02-17

Family

ID=55283263

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510781876.9A Pending CN105332521A (en) 2015-11-15 2015-11-15 Seismic hardening additional damping and reinforcing frame connected with joint region

Country Status (1)

Country Link
CN (1) CN105332521A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105804262A (en) * 2016-03-25 2016-07-27 合肥工业大学 Energy consumption support and assembly type concrete framework dual energy consumption node and assembly method
CN106013837A (en) * 2016-07-19 2016-10-12 关喜才 Method for increasing bearing capacity by compounding existing floor with steel support and structure system
CN106088379A (en) * 2016-06-13 2016-11-09 北京工业大学 A kind of BRB locking detrusion nodal point connecting and installation method thereof
CN106499211A (en) * 2016-11-29 2017-03-15 中国电建集团成都勘测设计研究院有限公司 Newly-increased outrigger framework Baogang anchor traction therapy structure and technique
CN106894648A (en) * 2017-03-14 2017-06-27 哈尔滨工业大学 A kind of prefabricated assembling type reinforced concrete frame structure bracing reinforcement node component
CN106988552A (en) * 2017-05-19 2017-07-28 福州大学 Existing reinforced concrete structure reinforcing construction and its reinforcement means based on BRB
CN107815977A (en) * 2017-10-13 2018-03-20 中建三局第三建设工程有限责任公司 Pre-stressed steel plate and presstressed reinforcing steel composite reinforcement large-span concrete beam construction method
CN108894321A (en) * 2018-07-24 2018-11-27 沈阳建筑大学 Quadrate steel pipe column-K shape bracing members the connecting node and construction method of T-steel connection
CN109184310A (en) * 2018-09-04 2019-01-11 国核电力规划设计研究院有限公司 Weak combined support construction and support system are suppressed in a kind of drawing
CN110644806A (en) * 2019-10-22 2020-01-03 东南大学 External prestress assembly type concrete frame-energy dissipation support reinforcing structure of existing structure
CN110863669A (en) * 2019-11-30 2020-03-06 南宁学院 Concrete beam reinforced structure
CN111197413A (en) * 2020-01-08 2020-05-26 青海民族大学 Reinforcing apparatus of ancient building

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007198071A (en) * 2006-01-30 2007-08-09 Toray Ind Inc Reinforcement structure of opening part of concrete slab and its reinforcing method
CN101864846A (en) * 2010-06-18 2010-10-20 北京工业大学 Embedded shock-absorption steel frame for seismic hardening
CN201991099U (en) * 2010-07-02 2011-09-28 北京工业大学 Externally applied shock-absorbing steel frame for shock resistance and reinforcement
CN204385908U (en) * 2014-10-27 2015-06-10 江南大学 A kind of band angle steel assembly concrete framework composition node with Self-resetting function
CN204385907U (en) * 2014-10-27 2015-06-10 江南大学 A kind of assembly concrete framework composition node with the band steel pipe of Self-resetting function

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007198071A (en) * 2006-01-30 2007-08-09 Toray Ind Inc Reinforcement structure of opening part of concrete slab and its reinforcing method
CN101864846A (en) * 2010-06-18 2010-10-20 北京工业大学 Embedded shock-absorption steel frame for seismic hardening
CN201991099U (en) * 2010-07-02 2011-09-28 北京工业大学 Externally applied shock-absorbing steel frame for shock resistance and reinforcement
CN204385908U (en) * 2014-10-27 2015-06-10 江南大学 A kind of band angle steel assembly concrete framework composition node with Self-resetting function
CN204385907U (en) * 2014-10-27 2015-06-10 江南大学 A kind of assembly concrete framework composition node with the band steel pipe of Self-resetting function

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105804262A (en) * 2016-03-25 2016-07-27 合肥工业大学 Energy consumption support and assembly type concrete framework dual energy consumption node and assembly method
CN106088379A (en) * 2016-06-13 2016-11-09 北京工业大学 A kind of BRB locking detrusion nodal point connecting and installation method thereof
CN106088379B (en) * 2016-06-13 2018-07-17 北京工业大学 A kind of shear-deformable nodal point connecting of BRB lockings and its installation method
CN106013837B (en) * 2016-07-19 2019-12-17 关喜才 Method and structure system for increasing bearing capacity by combining existing floor and steel structure support
CN106013837A (en) * 2016-07-19 2016-10-12 关喜才 Method for increasing bearing capacity by compounding existing floor with steel support and structure system
CN106499211A (en) * 2016-11-29 2017-03-15 中国电建集团成都勘测设计研究院有限公司 Newly-increased outrigger framework Baogang anchor traction therapy structure and technique
CN106894648A (en) * 2017-03-14 2017-06-27 哈尔滨工业大学 A kind of prefabricated assembling type reinforced concrete frame structure bracing reinforcement node component
CN106988552A (en) * 2017-05-19 2017-07-28 福州大学 Existing reinforced concrete structure reinforcing construction and its reinforcement means based on BRB
CN107815977A (en) * 2017-10-13 2018-03-20 中建三局第三建设工程有限责任公司 Pre-stressed steel plate and presstressed reinforcing steel composite reinforcement large-span concrete beam construction method
CN108894321A (en) * 2018-07-24 2018-11-27 沈阳建筑大学 Quadrate steel pipe column-K shape bracing members the connecting node and construction method of T-steel connection
CN109184310A (en) * 2018-09-04 2019-01-11 国核电力规划设计研究院有限公司 Weak combined support construction and support system are suppressed in a kind of drawing
CN109184310B (en) * 2018-09-04 2020-11-10 国核电力规划设计研究院有限公司 Supporting structure and supporting system of tensile and compressive weak combination type
CN110644806A (en) * 2019-10-22 2020-01-03 东南大学 External prestress assembly type concrete frame-energy dissipation support reinforcing structure of existing structure
CN110863669A (en) * 2019-11-30 2020-03-06 南宁学院 Concrete beam reinforced structure
CN110863669B (en) * 2019-11-30 2021-09-21 南宁学院 Concrete beam reinforced structure
CN111197413A (en) * 2020-01-08 2020-05-26 青海民族大学 Reinforcing apparatus of ancient building
CN111197413B (en) * 2020-01-08 2021-10-26 青海民族大学 Reinforcing apparatus of ancient building

Similar Documents

Publication Publication Date Title
CN105332521A (en) Seismic hardening additional damping and reinforcing frame connected with joint region
CN101046109B (en) New type of frame supported shear wall structure and its making process
CN104831818B (en) The connecting node of precast reinforced concrete beam and superposed column
CN102900169A (en) Concrete-filled steel tube combined shear wall and construction process thereof
CN105133793A (en) Space constraint multi-cavity pipe-in-pipe steel bar concrete huge column and construction method
CN104389419A (en) Cantilevered formwork platform installation structure and construction method
CN104963415A (en) Circular steel tube constraint type steel concrete column and steel beam node structure
CN103726586A (en) H-shaped steel and steel plate framework assembly shear wall with interfaces with grooves and manufacturing method
CN105649217A (en) Profiled steel structure beam column joint for reverse construction of stiffened structure and construction method
CN105239726A (en) Prefabricated steel-reinforced concrete combined special-shaped energy-dissipating column
ITRM20130600A1 (en) METHOD TO IMPROVE THE STRUCTURAL STABILITY OF A BUILDING CONSTRUCTION
Wang et al. Seismic performance of a novel partly precast RC shear wall with double precast edge members and a central T-shape CIP member
CN202850266U (en) Steel pipe concrete combination shear wall
CN204715539U (en) A kind of round steel pipe binding type steel concrete column and reinforced concrete beam node structure
CN204715540U (en) A kind of round steel pipe binding type steel concrete column and steel beam joint structure
CN204780635U (en) Super wide nonprismatic continuous beam 0# piece concreties and relieves construction structures
CN103821161B (en) Prestressed concrete pipe pile stiffness fills out cored structure
CN101413294A (en) Construction method of damage-reduction shear-slip basic damping structure
CN203905036U (en) Stiff filling core structure of pre-stressed concrete pipe pile
Guo et al. Horizontal translocation of a high-rise building: Case study
CN205000555U (en) Huge post of multicavity guan zhongguan reinforced concrete of space restraint
KR101109244B1 (en) Structural Wall having Fiber Concrete Reinforcing Part for Plastic Hinge
CN204715537U (en) A kind of round steel pipe binding type steel concrete column and reinforced concrete beam node structure
JP5676800B1 (en) Method of introducing PS into constructed building later and its building
CN105040828B (en) A kind of round steel pipe binding type steel concrete column and steel beam joint structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160217