CN105328430A - Workpiece centralizing device - Google Patents
Workpiece centralizing device Download PDFInfo
- Publication number
- CN105328430A CN105328430A CN201510827254.5A CN201510827254A CN105328430A CN 105328430 A CN105328430 A CN 105328430A CN 201510827254 A CN201510827254 A CN 201510827254A CN 105328430 A CN105328430 A CN 105328430A
- Authority
- CN
- China
- Prior art keywords
- workpiece
- flap
- plate
- centralizing
- righting board
- Prior art date
Links
- 210000001503 Joints Anatomy 0.000 claims description 3
- 230000002787 reinforcement Effects 0.000 claims description 3
- 238000010586 diagrams Methods 0.000 description 2
- 239000007799 cork Substances 0.000 description 1
- 238000005516 engineering processes Methods 0.000 description 1
- 239000000686 essences Substances 0.000 description 1
- 238000000034 methods Methods 0.000 description 1
- 239000002699 waste materials Substances 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23P—OTHER WORKING OF METAL; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
- B23P19/00—Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes
Abstract
Description
Technical field
The present invention relates to a kind of workpiece erection device.
Background technology
Many large-scale workpieces between cars on hand need the hand assembled of carrying out multiaspect, but due to large-scale workpiece weight comparatively large, carry out artificial upset very inconvenient, and waste time and energy.
Summary of the invention
For the technical problem of above-mentioned existence, the object of the invention is: propose a kind of workpiece erection device.
Technical solution of the present invention is achieved in that a kind of workpiece erection device, comprises righting board and flap, and righting board is vertically connected on the rear end of flap, and righting board is provided with supporting plate, and flap is provided with base plate; The bottom of described flap is the narrow arc-shaped in wide rear end, front end, the circular arc at flap rear portion and the bottom smooth connection of righting board.
Preferably, the vertical joints of described righting board and flap is provided with reinforcement.
Preferably, described supporting plate has multiple, and multiple supporting plate is evenly distributed on righting board.
Preferably, the other end of described righting board is provided with handrail.
Due to the utilization of technique scheme, the present invention compared with prior art has following advantages:
Workpiece erection device of the present invention, utilizes the arc sections bottom flap, can, like a cork by the workpiece turning on supporting plate 90 degree, make workpiece be pressed on base plate after upset, achieves the quick upset assembling of the different surfaces of workpiece.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, technical solution of the present invention is described further:
Accompanying drawing 1 is the schematic diagram of a kind of workpiece erection device of the present invention.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention is described.
As shown in Figure 1, a kind of workpiece erection device of the present invention, comprise righting board 1 and flap 2, righting board 1 is vertically connected on the rear end of flap 2, righting board 1 is provided with supporting plate 3, flap 2 is provided with base plate 4; The bottom of described flap 2 is the narrow arc-shaped in wide rear end, front end, the circular arc at flap 2 rear portion and the bottom smooth connection of righting board 1; The vertical joints of described righting board 1 and flap 2 is provided with reinforcement; Described supporting plate 3 has multiple, and multiple supporting plate 3 is evenly distributed on righting board 1; The other end of described righting board 1 is provided with handrail 6.
During use, first erection device is placed by diagram, workpiece is placed on supporting plate 3, and makes the sidepiece of workpiece lean against on base plate 4, then by handrail 6 by entirety along the bottom circular arc of flap 2 by integrated overturn 90 degree, the upset of workpiece can be realized.
Above-described embodiment is only for illustrating technical conceive of the present invention and feature; its object is to person skilled in the art can be understood content of the present invention and be implemented; can not limit the scope of the invention with this; all equivalences done according to Spirit Essence of the present invention change or modify, and all should be encompassed in protection scope of the present invention.
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510827254.5A CN105328430A (en) | 2015-11-24 | 2015-11-24 | Workpiece centralizing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510827254.5A CN105328430A (en) | 2015-11-24 | 2015-11-24 | Workpiece centralizing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105328430A true CN105328430A (en) | 2016-02-17 |
Family
ID=55279301
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510827254.5A CN105328430A (en) | 2015-11-24 | 2015-11-24 | Workpiece centralizing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105328430A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106862986A (en) * | 2017-03-31 | 2017-06-20 | 苏州市淞舜五金有限公司 | A kind of scalable righting work piece apparatus |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0664269A1 (en) * | 1993-12-03 | 1995-07-26 | Gérard Cecchi | Reel for storing and transporting cables |
CN101428417A (en) * | 2008-12-10 | 2009-05-13 | 河南恒星科技股份有限公司 | Spool turning device |
KR101110837B1 (en) * | 2009-11-23 | 2012-02-24 | 삼성중공업 주식회사 | Turnover method of use turn over jig |
CN102452014A (en) * | 2010-10-20 | 2012-05-16 | 徐工集团工程机械股份有限公司建设机械分公司 | Turning mechanism |
CN103386656A (en) * | 2012-05-09 | 2013-11-13 | 珠海格力电器股份有限公司 | Operating device for sheet metal part assembly and sheet metal part assembly method |
CN203312676U (en) * | 2013-07-08 | 2013-11-27 | 吉林省金冠电气股份有限公司 | Tipping device for assembling 12kV high-voltage SF6 switch cabinet |
CN203918616U (en) * | 2014-06-26 | 2014-11-05 | 合肥永升机械有限公司 | A kind of front frame upset positioner |
CN205147727U (en) * | 2015-11-24 | 2016-04-13 | 苏州市顺仪五金有限公司 | Work piece righting device |
-
2015
- 2015-11-24 CN CN201510827254.5A patent/CN105328430A/en not_active Application Discontinuation
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0664269A1 (en) * | 1993-12-03 | 1995-07-26 | Gérard Cecchi | Reel for storing and transporting cables |
CN101428417A (en) * | 2008-12-10 | 2009-05-13 | 河南恒星科技股份有限公司 | Spool turning device |
KR101110837B1 (en) * | 2009-11-23 | 2012-02-24 | 삼성중공업 주식회사 | Turnover method of use turn over jig |
CN102452014A (en) * | 2010-10-20 | 2012-05-16 | 徐工集团工程机械股份有限公司建设机械分公司 | Turning mechanism |
CN103386656A (en) * | 2012-05-09 | 2013-11-13 | 珠海格力电器股份有限公司 | Operating device for sheet metal part assembly and sheet metal part assembly method |
CN203312676U (en) * | 2013-07-08 | 2013-11-27 | 吉林省金冠电气股份有限公司 | Tipping device for assembling 12kV high-voltage SF6 switch cabinet |
CN203918616U (en) * | 2014-06-26 | 2014-11-05 | 合肥永升机械有限公司 | A kind of front frame upset positioner |
CN205147727U (en) * | 2015-11-24 | 2016-04-13 | 苏州市顺仪五金有限公司 | Work piece righting device |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106862986A (en) * | 2017-03-31 | 2017-06-20 | 苏州市淞舜五金有限公司 | A kind of scalable righting work piece apparatus |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
USD722952S1 (en) | Detachable smartphone protective device with backup power unit | |
USD688190S1 (en) | Wheel center | |
USD675482S1 (en) | Foldable shot glass | |
USD736703S1 (en) | Charging station with tablets | |
USD668981S1 (en) | Solar energy navigation light | |
USD734291S1 (en) | Clock radio with docking station | |
USD653999S1 (en) | Truck bumper component | |
USD828878S1 (en) | Wheel for a model vehicle | |
USD769498S1 (en) | Portable solar power lamp | |
USD647053S1 (en) | Battery charger for automobile | |
USD781727S1 (en) | Vehicle aligner | |
CN104108559B (en) | A kind of portable glass placing rack | |
USD804850S1 (en) | Inclined pillow with a depression feature | |
USD718051S1 (en) | Tool case trolley | |
USD680068S1 (en) | Mobile stand with power bank | |
USD712823S1 (en) | Solar power station | |
USD828462S1 (en) | Wheel for a model vehicle | |
CN105312874B (en) | A kind of buffering erection device of stabilization | |
WO2012154804A3 (en) | Wheeled cart slidable onto horizontal surface | |
USD802852S1 (en) | Bottle | |
USD786082S1 (en) | Bottle | |
CN105328449B (en) | A kind of slip erection device of stabilization | |
CN204595725U (en) | One exempts from screw hard disk support bracket | |
CN204896627U (en) | Rail mounted ramp | |
USD868171S1 (en) | Portable axle for a model vehicle |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160217 |