CN105321320B - A kind of 4G LTE network on-line early warning system and method based on VPN framework - Google Patents

A kind of 4G LTE network on-line early warning system and method based on VPN framework Download PDF

Info

Publication number
CN105321320B
CN105321320B CN201510713867.6A CN201510713867A CN105321320B CN 105321320 B CN105321320 B CN 105321320B CN 201510713867 A CN201510713867 A CN 201510713867A CN 105321320 B CN105321320 B CN 105321320B
Authority
CN
China
Prior art keywords
vpn
server
electric power
data packet
control center
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510713867.6A
Other languages
Chinese (zh)
Other versions
CN105321320A (en
Inventor
王杰
谢峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yan'an Power Supply Co Of State Grid Shaanxi Electric Power Co
State Grid Corp of China SGCC
Original Assignee
Yan'an Power Supply Co Of State Grid Shaanxi Electric Power Co
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yan'an Power Supply Co Of State Grid Shaanxi Electric Power Co, State Grid Corp of China SGCC filed Critical Yan'an Power Supply Co Of State Grid Shaanxi Electric Power Co
Priority to CN201510713867.6A priority Critical patent/CN105321320B/en
Publication of CN105321320A publication Critical patent/CN105321320A/en
Application granted granted Critical
Publication of CN105321320B publication Critical patent/CN105321320B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G08SIGNALLING
    • G08CTRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
    • G08C17/00Arrangements for transmitting signals characterised by the use of a wireless electrical link
    • G08C17/02Arrangements for transmitting signals characterised by the use of a wireless electrical link using a radio link
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N7/00Television systems
    • H04N7/18Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Multimedia (AREA)
  • Signal Processing (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The present invention provides a kind of 4G LTE network on-line early warning system and method based on VPN framework, which includes sensor module, video image module, centralized control center's server, 4G wireless transport module, front end vpn server and electric power Intranet vpn server;For electric power transmission line monitoring requirements, safe front end processor in existing power transmission state monitoring device is replaced using the VPN framework with encryption function, the associated traffic data that preposition terminal camera and sensor acquire safely is transmitted to background management platform and carries out data displaying, the use of the system will increase the bandwidth demand of data traffic transmission, reduce data terminal and carryover effects, height line upkeep safety is provided significantly, reduces line fault incidence.

Description

A kind of 4G LTE network on-line early warning system and method based on VPN framework
[technical field]
The invention belongs to electric power transmission lines to monitor field, and it is pre- online to be related to a kind of 4G LTE network based on VPN framework Alert system and method.
[background technique]
Existing power transmission state monitoring system mostly uses 3G personal mobile communications mode greatly to realize that monitoring data are collecting The transmission between central server and electric power Intranet is controlled, and guarantees the safety of communication process using safe front end processor.But the shape State monitoring is mostly single module function, and intercommunity is bad, it is contemplated that geographical environment locating for transmission line of electricity, 3G coverage rate are unable to satisfy Line status monitoring requirements, while remote mountain areas 3G wireless bandwidth is limited by geographical environment, to realize each data interchange and number Existing status monitoring communication pattern and hardware systems must be changed according to the safety of transmission, stability, reliability and real-time Framework, to realize demand of the special geological surrounding in terms of equipment performance and function.
[summary of the invention]
The purpose of the present invention is to provide a kind of 4G LTE network on-line early warning system and method based on VPN framework is protected The reliability and stability of data transmission are demonstrate,proved.
The technical solution adopted by the present invention is that:
A kind of 4G LTE network on-line early warning system based on VPN framework, including sensor module, video image module, Centralized control center's server, 4G wireless transport module, front end vpn server and electric power Intranet vpn server;
The sensor module is mounted on the front end monitoring host computer of power transmission state monitoring, including multiple sensors It is monitored to acquire the environment parament of transmission line of electricity, and to shaft tower, insulator and Lead status;
The video image module is mounted on the front end monitoring host computer of power transmission state monitoring, to power transmission line Road and surrounding various situations are taken pictures, are recorded a video, and send centralized control center's service for acquired image video information Device;
Centralized control center's server carries out intelligence to receive the various monitoring data in transmission line of electricity, to data Statistical analysis, and provide corresponding judging result and treatment advice feeds back to the monitoring terminal of electric power Intranet;
The 4G wireless transport module is the communication module between centralized control center's server and electric power Intranet, which adopts The communication between server and Intranet is realized with the 4G LTE network of VPN framework;
Front end vpn server and electric power Intranet vpn server constitute double gateways of VPN framework.
Further, the sensor forms sensor network, by sensor network to disassembly, cutting, steal tower material Destruction carries out intellectual monitoring.
A kind of 4G LTE network on-line early warning method based on VPN framework, comprising the following steps:
Step 1: sensor module and video image module acquire surrounding transmission line of electricity operation data, and control according to collection The request of central server will individually, partly or completely acquire data and pass through 4G LTE wireless network transmissions to centralized control center Server;
Step 2: centralized control center's server is concentrated in a manner of video, chart, curve after receiving various monitoring data It has been shown that, and Intelligent statistical analysis is carried out, corresponding judging result is provided according to previous data record;
Step 3: the treatment advice that analysis obtains is fed back to the monitoring terminal of electric power Intranet by centralized control center's server, this is anti- Feedback process is communicated by the 4G LTE network of VPN framework.
Further, the vpn gateway of VPN framework uses double netcard structure, and outer network interface card accesses 4G LTE network using public network IP, Intranet is clamped into electric power Intranet.
Further, sensor module and video image module acquire the environmental parameter of surrounding transmission line of electricity, icing feelings Condition is monitored shaft tower, insulator, conducting wire, while to disassembly, cutting, the destruction progress intellectual monitoring for stealing tower material.
Further, centralized control center's server in 4G LTE network feeds back to the monitoring terminal A of electric power Intranet and suggests, the end The specific communication process at end is as follows:
(1) centralized control center's server issues access data packet, and destination address is the implicit IP address for monitoring terminal A;
(2) vpn gateway is when receiving the access data packet of centralized control center's server sending in the local area network of front end, to its mesh Mark address is checked, if destination address belongs to the address of electric power Intranet, which is sealed using VPN technologies Dress, while vpn gateway can construct a new VPN data packet, and using the former data packet after encapsulation as the load of VPN data packet, The destination address of VPN data packet is the external address of the vpn gateway of electric power Intranet;
(3) vpn gateway of front end local area network sends VPN data packet in 4G LTE net, which will be by 4G LTE network is correctly transmitted to the vpn gateway of electric power Intranet;
(4) vpn gateway of electric power Intranet checks the data packet received, if it find that the data packet is from front end What the vpn gateway of local area network issued, that is, it can determine that the data packet is VPN data packet, and unpacking processing is carried out to the data packet, solve Packet is first to remove the packet header of VPN data packet, then data packet reverse process is reduced into original data packet;
(5) raw data packets after reduction are sent to target terminal A by the vpn gateway of electric power Intranet.
The present invention is based on the 4G LTE network on-line early warning systems of VPN framework, monitor and lead in the same status monitoring front end On machine, by the different sensor module of the installation of selectivity, video image module individually, can be adopted partly or completely Collection transmits common transmission line of electricity operation data, such as the monitoring of environment parament, icing, shaft tower, insulator, conducting wire, is being During system operates normally, accessory can also be replaced arbitrarily at any time, be increased and decreased.Communication network uses VPN framework, realizes in 4G By the reliable transmission of monitoring data of two-way encryption safe on LTE public network, the use of the system will increase data traffic transmission Bandwidth demand reduces data terminal and carryover effects, provides height line upkeep safety significantly, reduces line fault Rate.
Meanwhile centralized control center's server software is after receiving various monitoring data, in a manner of video, chart, curve Centralized displaying, and Intelligent statistical analysis is carried out, corresponding judging result is provided according to previous data record and treatment advice is anti- It feeds and monitors terminal, carry out early warning if any warning information, that is, included warning device of starting state monitoring terminal device.
Further, the sensor forms sensor network, can be to disassembly, cutting, pilferage tower material by sensor network Etc. external force destruction carry out intellectual monitoring.
[Detailed description of the invention]
Fig. 1 is system architecture of the invention
Fig. 2 is packet transmission flow journey figure in the 4G LTE network based on VPN framework
[specific embodiment]
Present invention will now be described in detail with reference to the accompanying drawings.:
Fig. 1 is the 4G LTE network on-line early warning system construction drawing based on VPN framework, to transmission line of electricity operation data Quickly, reliably transmit.Including sensor module, video image module, centralized control center's server, 4G wireless transmission mould Block, front end vpn server and electric power Intranet vpn server.
The sensor module is the corresponding sensor installed on the monitoring host computer of power transmission state monitoring front end, To environment parament, icing, shaft tower, insulator, the conducting wire monitoring etc. for acquiring transmission line of electricity, while passing through sensor network To disassembly, cutting, steal the external force destructions such as tower material progress intellectual monitoring.Wherein, it is needed on different front end monitoring host computers The sensor function and type of installation can be selected according to factors such as the location of monitoring host computer, environment, normal in system During operation, accessory can be replaced arbitrarily at any time, be increased and decreased.
The video image module is that the video camera etc. installed on the monitoring host computer of power transmission state monitoring front end is set Standby, to be taken pictures, be recorded a video to transmission line of electricity and surrounding various situations, acquired image video information can be sent out It is sent to centralized control center's server, so that transmission line of electricity operation conditions is analyzed and handled.Wherein, different front ends monitors master Needed on machine the performances such as memory, the function of video camera to be mounted can according to the factors such as the location of monitoring host computer, environment into Row selection, during system operates normally, accessory can also be replaced arbitrarily at any time, be increased and decreased.
Centralized control center's server is to receive the various monitoring data in transmission line of electricity, with video, chart, song The mode centralized displaying of line, and Intelligent statistical analysis is carried out, corresponding judging result and place are provided according to previous data record Reason suggests feeding back to monitoring terminal, if any the included warning device progress early warning of warning information, that is, starting state monitoring terminal device Prompt.
The 4G wireless transport module is the communication module between centralized control center's server and electric power Intranet, which adopts The communication between server and Intranet is realized with the 4G LTE network of VPN framework.It is realized on public network using VPN technologies The dedicated communications network between server and Intranet is set up, coded communication is carried out, guarantees the safety of data transmission;
Front end vpn server and electric power Intranet vpn server constitute double gateways of VPN framework.
On-line early warning system is implemented as follows:
Firstly the need of setting up a vpn server, centralized control center's server respectively in front end local area network and electric power Intranet After locality connects 4G LTE network, the vpn server in electric power Intranet is connected by 4G LTE network, is then taken by VPN Business device enters electric power enterprise Intranet.Communication data in order to guarantee data security, between vpn server sum aggregate control central server Encryption is all carried out, it is believed that data are to carry out safe transmission in a dedicated data link, just as special It is the same a dedicated network is set up, but actually the communication process uses the common link on internet.Utilize encryption Technology encapsulates out a data Communication tunnel on public network, and the safety realized between centralized control center's server and electric power Intranet can The remote access and communication leaned on.
Then the present invention carries out two-way encryption to data transmission using VPN framework, has fully ensured that the safety of data transmission Property.But since the two-way encryption in VPN framework transmission process needs bigger bandwidth, 3G communication network is no longer satisfied The demand of VPN framework.
The specific implementation steps are as follows for on-line early warning method of the invention:
Step 1: sensor module and video image module acquire surrounding common transmission line of electricity operation data, such as meteorological Environmental parameter, icing, shaft tower, insulator, conducting wire monitoring etc., at the same to disassembly, cutting, steal the external force destruction such as tower material into Row intellectual monitoring, and will individually, partly or completely acquire data according to the request of centralized control center's server and pass through 4G LTE Wireless network transmissions are to centralized control center's server.
Step 2: centralized control center's server software is after receiving various monitoring data, in a manner of video, chart, curve Centralized displaying, and Intelligent statistical analysis is carried out, corresponding judging result is provided according to previous data record.
Step 3: the treatment advice that analysis obtains is fed back to monitoring terminal by centralized control center's server, which passes through The 4G LTE network of VPN framework is communicated.Wherein, vpn gateway takes double netcard structure, and outer network interface card accesses 4G using public network IP LTE network, Intranet are clamped into electric power Intranet.
As shown in Figure 2, wherein some terminal A in centralized control center's server access electric power Intranet in 4G LTE network Specific communication process is as follows:
(1) centralized control center's server issues access data packet, and destination address is the implicit IP address of terminal A.
(2) vpn gateway is when receiving the access data packet of centralized control center's server sending in the local area network of front end, to its mesh Mark address is checked, if destination address belongs to the address of electric power Intranet, which is packaged, the mode of encapsulation It is determined according to used VPN technologies, while vpn gateway can construct a new VPN data packet, and by the former data packet after encapsulation As the load of VPN data packet, the destination address of VPN data packet is the external address of the vpn gateway of electric power Intranet.
(3) the vpn gateway of front end local area network sends VPN data packet in 4G LTE net, due to the target of VPN data packet Address is the external address of the vpn gateway of electric power Intranet, so the data packet will be correctly transmitted to electric power by 4G LTE network The vpn gateway of Intranet.
(4) the vpn gateway of electric power Intranet checks the data packet received, if it find that the data packet is from front end What the vpn gateway of local area network issued, that is, it can determine that the data packet is VPN data packet, and unpacking processing is carried out to the data packet.Solution The process of packet is mainly first to remove the packet header of VPN data packet, then data packet reverse process is reduced into original data packet.
(5) the raw data packets after reduction are sent to target terminal A by the vpn gateway of electric power Intranet, due to raw data packets Destination address be terminal A IP, so the data packet can be sent correctly to terminal A.In terminal A, it is received Data packet just as directly sent from centralized control center's server.
From terminal A in electric power Intranet back to the treatment process of the data packet of centralized control center's server in the local area network of front end and The above process is the same, and a data Communication tunnel has thus been encapsulated out in public network 4G LTE network using encryption technology, real The safe and reliable communication of terminal in the centralized control center Xian Liao server and electric power Intranet.

Claims (3)

1. a kind of 4G LTE network on-line early warning system based on VPN framework, it is characterised in that: including sensor module, video Image module, centralized control center's server, 4G wireless transport module, front end vpn server and electric power Intranet vpn server;
The sensor module is mounted on the front end monitoring host computer of power transmission state monitoring, including multiple sensors to The environment parament of transmission line of electricity is acquired, and shaft tower, insulator and Lead status are monitored;
The video image module is mounted on the front end monitoring host computer of power transmission state monitoring, to transmission line of electricity and Surrounding various situations are taken pictures, are recorded a video, and send centralized control center's server for acquired image video information;
Centralized control center's server carries out Intelligent statistical to receive the various monitoring data in transmission line of electricity, to data Analysis, and provide corresponding judging result and treatment advice feeds back to the monitoring terminal of electric power Intranet;
The 4G wireless transport module is the communication module between centralized control center's server and electric power Intranet, which uses The 4G LTE network of VPN framework realizes the communication between server and Intranet;
Front end vpn server and electric power Intranet vpn server constitute double gateways of VPN framework;The sensor forms sensor Network, by sensor network to disassembly, cutting, the destruction progress intellectual monitoring for stealing tower material.
2. a kind of 4G LTE network on-line early warning method based on VPN framework, it is characterised in that the following steps are included:
Step 1: sensor module and video image module acquire surrounding transmission line of electricity operation data, and according to centralized control center The request of server will individually, partly or completely acquire data and be serviced by 4G LTE wireless network transmissions to centralized control center Device;
Step 2: centralized control center's server is concentrated aobvious after receiving various monitoring data in a manner of video, chart, curve Show, and carry out Intelligent statistical analysis, corresponding judging result is provided according to previous data record;
Step 3: the obtained treatment advice of analysis is fed back to the monitoring terminal of electric power Intranet by centralized control center's server, the feedback Journey is communicated by the 4G LTE network of VPN framework;The vpn gateway of VPN framework uses double netcard structure, and outer network interface card uses public It nets IP and accesses 4G LTE network, Intranet is clamped into electric power Intranet;
Centralized control center's server in 4G LTE network is fed back to the monitoring terminal A of electric power Intranet suggests, the specific of the terminal is led to Letter process is as follows:
(1) centralized control center's server issues access data packet, and destination address is the implicit IP address for monitoring terminal A;
(2) vpn gateway is when receiving the access data packet of centralized control center's server sending in the local area network of front end, to its target Location is checked, if destination address belongs to the address of electric power Intranet, which is packaged using VPN technologies, together When vpn gateway can construct a new VPN data packet, and using the former data packet after encapsulation as the load of VPN data packet, VPN number Destination address according to packet is the external address of the vpn gateway of electric power Intranet;
(3) vpn gateway of front end local area network sends VPN data packet in 4G LTE net, which will be by 4G LTE net Network is correctly transmitted to the vpn gateway of electric power Intranet;
(4) vpn gateway of electric power Intranet checks the data packet received, if it find that the data packet is from preceding end office (EO) domain What the vpn gateway of net issued, that is, it can determine that the data packet is VPN data packet, and unpacking processing is carried out to the data packet, unpacking is First the packet header of VPN data packet is removed, then data packet reverse process is reduced into original data packet;
(5) raw data packets after reduction are sent to target terminal A by the vpn gateway of electric power Intranet.
3. the 4G LTE network on-line early warning method according to claim 2 based on VPN framework, it is characterised in that: sensing Device module and video image module acquire the environmental parameter of surrounding transmission line of electricity, icing situation, to shaft tower, insulator, lead Line is monitored, while to disassembly, cutting, the destruction progress intellectual monitoring for stealing tower material.
CN201510713867.6A 2015-10-28 2015-10-28 A kind of 4G LTE network on-line early warning system and method based on VPN framework Active CN105321320B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510713867.6A CN105321320B (en) 2015-10-28 2015-10-28 A kind of 4G LTE network on-line early warning system and method based on VPN framework

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510713867.6A CN105321320B (en) 2015-10-28 2015-10-28 A kind of 4G LTE network on-line early warning system and method based on VPN framework

Publications (2)

Publication Number Publication Date
CN105321320A CN105321320A (en) 2016-02-10
CN105321320B true CN105321320B (en) 2019-01-04

Family

ID=55248620

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510713867.6A Active CN105321320B (en) 2015-10-28 2015-10-28 A kind of 4G LTE network on-line early warning system and method based on VPN framework

Country Status (1)

Country Link
CN (1) CN105321320B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108022422A (en) * 2017-12-29 2018-05-11 国网浙江建德市供电有限公司 A kind of safe power station information acquisition system
CN109459972A (en) * 2018-11-15 2019-03-12 北方重工装备(沈阳)有限公司 The belt conveyor programmable logic controller (PLC) tele-diagnostic device of Virtual Private Network
CN109803019A (en) * 2019-01-24 2019-05-24 广州中国科学院沈阳自动化研究所分所 A kind of forming machine exhaust-gas treatment equipment cluster remotely monitors and operational system
CN111049720A (en) * 2019-12-06 2020-04-21 合肥阳光新能源科技有限公司 Virtual power plant energy management platform
CN111313545A (en) * 2020-01-08 2020-06-19 国网内蒙古东部电力有限公司检修分公司 Extra-high voltage transmission line on-line monitoring platform based on big data
CN111510335A (en) * 2020-04-21 2020-08-07 天津远明电气科技有限公司 Real-time monitoring system of power transmission distribution network based on 4G network and encryption mode
CN114374709B (en) * 2021-12-08 2024-05-28 国网河北省电力有限公司信息通信分公司 5G video and Internet of things distribution network monitoring system and method based on edge cloud cooperation

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101262409A (en) * 2008-04-23 2008-09-10 华为技术有限公司 Virtual private network VPN access method and device
CN102055243A (en) * 2010-12-15 2011-05-11 北京交通大学 High-voltage transmission line/ tower long-distance video on-line monitoring system
CN102832705A (en) * 2012-05-28 2012-12-19 深圳市科陆电子科技股份有限公司 Method and system for remote monitoring of power quality
US20140010084A1 (en) * 2012-07-09 2014-01-09 Arun Kavunder System and method associated with a service flow router
CN103853143A (en) * 2014-03-26 2014-06-11 南京航赛智能科技有限公司 Long-distance wireless monitoring network system applied in power transmission line of power supply system
CN104319893A (en) * 2014-11-12 2015-01-28 国家电网公司 Electric transmission line GIS based on AGPS and 4G and implementation method
CN104320634A (en) * 2014-11-21 2015-01-28 国网河南省电力公司三门峡供电公司 Method for rapidly transmitting electric transmission line remote intelligent line patrolling data

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101262409A (en) * 2008-04-23 2008-09-10 华为技术有限公司 Virtual private network VPN access method and device
CN102055243A (en) * 2010-12-15 2011-05-11 北京交通大学 High-voltage transmission line/ tower long-distance video on-line monitoring system
CN102832705A (en) * 2012-05-28 2012-12-19 深圳市科陆电子科技股份有限公司 Method and system for remote monitoring of power quality
US20140010084A1 (en) * 2012-07-09 2014-01-09 Arun Kavunder System and method associated with a service flow router
CN103853143A (en) * 2014-03-26 2014-06-11 南京航赛智能科技有限公司 Long-distance wireless monitoring network system applied in power transmission line of power supply system
CN104319893A (en) * 2014-11-12 2015-01-28 国家电网公司 Electric transmission line GIS based on AGPS and 4G and implementation method
CN104320634A (en) * 2014-11-21 2015-01-28 国网河南省电力公司三门峡供电公司 Method for rapidly transmitting electric transmission line remote intelligent line patrolling data

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
VoLTE核心网组网及其VPN互通研究;钟玮等;《移动通信》;20141030(第20期);第42-47页

Also Published As

Publication number Publication date
CN105321320A (en) 2016-02-10

Similar Documents

Publication Publication Date Title
CN105321320B (en) A kind of 4G LTE network on-line early warning system and method based on VPN framework
US11974201B2 (en) Vehicle-road collaboration apparatus and method, electronic device, and storage medium
US20240146881A1 (en) Mobile surveillance unit
CN106251578B (en) Stream of people's early warning analysis method and system based on probe
KR101348617B1 (en) Surveillance systemme using wireless network, master sensor node and server apparatus
JP2013502865A (en) Monitoring system
CN104365029A (en) Dual communication-interface facility monitoring and management system and method
CN113566883A (en) Power cable monitoring method and system based on Internet of things and storage medium
CN104993979A (en) Network connection monitoring method, terminal equipment and communication system
CN202077136U (en) Superposing device for elevator
CN202535476U (en) Video monitoring system for electric power device
CN106707101A (en) Distribution network operating state monitoring device with four-remote function
CN103634576B (en) A kind of highway mobile terminal monitoring system and method
CN108600372A (en) A kind of information interaction system based on more transmission facility inspection devices and control terminal
CN206162859U (en) Automatic measurement data acquisition system based on Beidou satellite
CN102630042A (en) Delivery and monitoring system for outdoor electronic information broadcast network
CN106254227A (en) Image acquisition transmission system based on 4G car-mounted terminal
CN111988397B (en) Earthquake-proof disaster-reduction disaster-relief method and system based on edge calculation
CN202035000U (en) Control host for internet of things and internet of things provided with same
CN205151415U (en) Intelligence elevator system
CN106542388A (en) Intelligent lift system
CN202998178U (en) Elevator remote monitoring system
CN115801487A (en) Video AI box, video data processing method and device and electronic equipment
EP3026978A1 (en) M2m oriented service platform interface apparatus and method
CN108152660A (en) The distant combination system of one Remote Sensing 2 of power matching network fault location

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant