CN105317180A - Semi-assembly stair with prefabricated steps - Google Patents

Semi-assembly stair with prefabricated steps Download PDF

Info

Publication number
CN105317180A
CN105317180A CN201510870289.7A CN201510870289A CN105317180A CN 105317180 A CN105317180 A CN 105317180A CN 201510870289 A CN201510870289 A CN 201510870289A CN 105317180 A CN105317180 A CN 105317180A
Authority
CN
China
Prior art keywords
prefabricated
cast
embedded
ladder step
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510870289.7A
Other languages
Chinese (zh)
Inventor
黄章建
周建元
于海祥
周雪梅
孟露
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING CONSTRUCTION NINTH ENGINEERING Co Ltd
Chongqing Construction Engineering Group Co Ltd
Original Assignee
CHONGQING CONSTRUCTION NINTH ENGINEERING Co Ltd
Chongqing Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING CONSTRUCTION NINTH ENGINEERING Co Ltd, Chongqing Construction Engineering Group Co Ltd filed Critical CHONGQING CONSTRUCTION NINTH ENGINEERING Co Ltd
Priority to CN201510870289.7A priority Critical patent/CN105317180A/en
Publication of CN105317180A publication Critical patent/CN105317180A/en
Pending legal-status Critical Current

Links

Landscapes

  • Ladders (AREA)

Abstract

The invention relates to a stair, and particularly discloses a semi-assembly stair with prefabricated steps. The semi-assembly stair comprises a cast-in-situ cantboard and the prefabricated steps, the cast-in-situ cantboard is provided with first embedded bars and first embedded holes, second embedded holes matched with the first embedded bars are formed in the prefabricated steps, the prefabricated steps are provided with second embedded bars matched with the first embedded holes, and a cement mortar layer is formed between the cast-in-situ cantboard and the prefabricated steps in a cast-in-situ mode. The semi-assembly stair with the prefabricated steps is convenient to transport and convenient to install stably, and therefore the problems that an existing prefabricated assembly stair is heavy, difficult to transport, inconvenient to install and instable in installation are solved.

Description

Prefabricated ladder step half assembling stair
Technical field
The present invention relates to stair field, be specifically related to a kind of prefabricated ladder step half assembling stair.
Background technology
Stair are the components as floor gap vertical transportation in building, for the traffic connection between floor and when the discrepancy in elevation is larger.Although highrise building adopts elevator as main vertical transportation instrument, but still stair to be retained for escaping during fire; Stair are made up of the bench (running also known as ladder) of continuous step, platform (half space) and fender member etc.Minimum and the highest level of stair mark time between horizontal projection distance for ladder long, the height overall of step be terraced high.
Now current, generally use cast-in-situ steel reinforced concrete stair to be that staristep, platform and landing beam cast in situs are become an entirety in building engineering, its good integrity, rigidity are larger.Shock resistance is strong.But in work progress, experience installation half space, some arrange loaded down with trivial details operation to install ladder step, welding and the cementation of fissures etc., in the process that stair make, be subject to extraneous factor impact larger, as: workman's level is uneven, template splicing mode is improper, concrete blinding piece is not tight, very easily cause stair construction joint process not in place, surface of marking time is not upright, unfilled corner of marking time falls rib, mark time the quality problems such as size exceeds standard, stair trueness error brings a series of trouble to follow-up decoration construction and examination.
Along with development, in order to solve the problem, people have createed prefabricated assembled stair, and prefabricated assembled stair refer in pre-fabricated factory or the good staristep of site prefabrication, turn the parts such as Liang Tai, then lift staircase at the scene.Prefabricated assembled stair are better than cast-in-situ stair in environmental protection, low-carbon (LC) and end product quality, but present stage housing industrialization be just in starting the exploratory stage, prefabricated assembled stair cost is a little more than cast-in-place structural, and indoor staircase hoisting difficulty is larger, the node required precision of installing is high, and meanwhile, staircase is the easiest damaged location of entire building structure, precast stair is used in cast-in-place framework, and its globality and anti-seismic performance are also controversial.
In the building engineering of cast-in-place framework, for solving the common quality problems of concrete staircase, meanwhile, iterative method process of industrialization, is necessary to study ladder step prefabricated assembled (half assembling stair) technology.
And existing prefabricated assembled stair great majority are by prefabricated while of swash plate and ladder step, and one-body molded, swash plate and ladder step gross weight comparatively greatly, directly have influence on the transport of prefabricated assembled stair, and simultaneously when installing prefabricated assembled stair, too increase lifting difficulty; After rigging out, because without any mutual restriction on the steel mesh reinforcement between swash plate and two rest ledges, easily there is inconsistent phenomenon in prefabricated assembled stair, causes workmanship to reduce.Can the advantage of comprehensive full prefabricated stair of cast-in-situ stair and factory, carry out site prefabrication installation to swash plate cast-in-place (not affecting globality and the shock resistance of structure), ladder step piecemeal, ensure the Forming Quality of stair, construction is simple, economic and practical.
Summary of the invention
The object of the invention is to provide convenient transportation, installation firmly and prefabricated ladder walks half assembling stair easily.
Prefabricated ladder step half assembling stair in this programme, comprise cast-in-place swash plate and prefabricated ladder step, cast-in-place swash plate is provided with the first embedded bar and the first embedded hole, prefabricated ladder step is provided with the second embedded hole coordinated with the first embedded bar, prefabricated ladder step is also provided with the second embedded bar coordinated with the first embedded hole, between cast-in-place swash plate and prefabricated ladder step, is cast with cement sand bed.
The know-why of this programme and beneficial effect are: in staircase, first build out cast-in-place swash plate, when building cast-in-place swash plate, first on the reinforcing bar of cast-in-place swash plate inside, evenly connect several first embedded bars, and uniform several first embedded holes reserved.
In factory, use mould to build out prefabricated ladder and walk, when not building, first uniform several second embedded bars of connection on the reinforcing bar of prefabricated ladder step, and reserve several the second embedded holes uniformly.
Cast-in-place swash plate and prefabricated ladder walk piecemeal and make, and alleviate the weight of prefabricated ladder step on the whole, and make prefabricated ladder step be more convenient for transporting; Use the hoisting prefabricated ladder step of hanging apparatus, due to alleviating of weight, decrease the operation burden of hanging apparatus, thus facilitate the installation of prefabricated ladder step.
During installation, after prefabricated ladder step is sling, prefabricated ladder step is adjusted orientation, put on cast-in-place swash plate, first embedded bar will be inserted in the second embedded hole, and the second embedded bar will be inserted in the first embedded hole, and cast-in-place swash plate is fixing, prefabricated ladder step will be subject to the restriction point restriction of several first embedded bars and the second embedded bar, thus prefabricated ladder step stably can be fixed on cast-in-place swash plate.
Finally, joints cement mortar between the prefabricated ladder step installed and cast-in-place swash plate, forms cement sand bed, and prefabricated ladder step is fixed on cast-in-place swash plate, and makes prefabricated ladder step stable further.
Further: also comprise the first rest ledge and be positioned at the second rest ledge below the first rest ledge, cast-in-place swash plate is fixedly connected between the first rest ledge and the second rest ledge.First rest ledge and the second rest ledge will be fixed in staircase, form two fixing tie points, are then fixedly attached between the first rest ledge and the second rest ledge by cast-in-place swash plate, can make the gripper shoe on the cast-in-place straight inclined-plane of swash plate shape.
Further: prefabricated ladder walks the end be connected with the first rest ledge and the second rest ledge and is provided with card article, and the first rest ledge and the second rest ledge are provided with the draw-in groove coordinating card article.When making prefabricated ladder step, the reinforcing bar that prefabricated ladder step is inner is first permanently connected several card articles, when making first rest ledge and the second rest ledge, first reserves the position that size is a bit larger tham the draw-in groove of card article, then builds; Then when installing prefabricated ladder step, card article will easily enter in draw-in groove, is then welded on by card article on draw-in groove wall, uses cement mortar to be filled and led up by draw-in groove afterwards.
Further: prefabricated ladder step is inner is hollow setting.The weight of prefabricated ladder step can be alleviated further, thus convenient transport and installation.
Further: cast-in-place swash plate to be embedded with the first built-in pipe, first embedded bar is inserted in the first built-in pipe, is provided with the second built-in pipe in the first embedded hole, and prefabricated ladder step is embedded with the 3rd built-in pipe, second embedded bar is inserted in the 3rd built-in pipe, is provided with the 4th built-in pipe in the second embedded hole.When making cast-in-place swash plate and prefabricated ladder step, directly several first built-in pipes pre-buried and the second built-in pipe on the relevant position of cast-in-place swash plate, several the 3rd built-in pipes pre-buried and the 4th built-in pipe on the relevant position of prefabricated ladder step, the first embedded bar of interference fit is inserted in the first built-in pipe, the second embedded bar of interference fit is inserted in the 3rd built-in pipe, facilitate the installation of the first embedded bar and the second embedded bar, also facilitate the making of the first embedded hole and the second embedded hole simultaneously.
Further: the first built-in pipe, the second built-in pipe, the 3rd built-in pipe and the 4th built-in pipe are pre-buried PCV and manage.Pvc pipe resistance to corrosion is strong, be easy to bonding, price is low, quality is hard, is convenient to fix, not yielding, is also convenient to the insertion of the first embedded bar and the second embedded bar.
Accompanying drawing explanation
Fig. 1 is the partial schematic diagram of the prefabricated ladder step of the embodiment of the present invention one half assembling stair;
Fig. 2 is the partial schematic diagram of Fig. 1;
Fig. 3 is the sectional drawing of the prefabricated ladder step of the embodiment of the present invention one half assembling stair.
Detailed description of the invention
Below by detailed description of the invention, the present invention is further detailed explanation:
Reference numeral in Figure of description comprises: the second rest ledge 1, cast-in-place swash plate 2, prefabricated ladder step 3, loss of weight through hole 4, first rest ledge 5, second embedded hole 6, first embedded bar 7, second embedded bar 8, first embedded hole 9, card article 10, draw-in groove wall 11, cement sand bed 12.
The basic reference diagram 1 of embodiment one, shown in Fig. 2 and Fig. 3: prefabricated ladder step half assembling stair, comprise cast-in-place swash plate 2, prefabricated ladder step 3, first rest ledge 5 and the second rest ledge 1 be positioned at below the first rest ledge 5, first rest ledge 5 and the second rest ledge 1 are cast in staircase, the inner reinforcing bar of cast-in-place swash plate 2 loses no time to weld with the first rest ledge 5 and the second rest ledge 1 inside, the welding edges that prefabricated ladder step 3 is connected with the first rest ledge 5 and the second rest ledge 1 has card article 10, first rest ledge 5 and the second rest ledge 1 are welded with the draw-in groove coordinating card article 10, cast-in-place swash plate 2 is embedded with two rows laterally equally distributed pre-buried PCV pipe, cement is used to build cast-in-place swash plate 2, some first embedded bar 7 compartment of terrains are inserted in the pre-buried PCV pipe of two rows, first embedded bar 7 and pre-buried PCV pipe interference fit, the pre-buried PCV pipe not inserting the first embedded bar 7 is the first embedded hole 9, prefabricated ladder step 3 is also embedded with two rows laterally equally distributed pre-buried PCV pipe, the prefabricated ladder using mould and cement to build out with loss of weight through hole 4 walks 3, some second embedded bar 8 compartment of terrains are inserted in the pre-buried PCV pipe of two rows, second embedded bar 8 and pre-buried PCV pipe interference fit, the pre-buried PCV pipe not inserting the second embedded bar 8 is the second embedded hole 6, first embedded bar 7 coordinates with the second embedded hole 6, second embedded bar 8 coordinates with the first embedded hole 9.
Conveying arrangement is used to be transported to erecting bed prefabricated ladder step 3, hanging apparatus is used prefabricated ladder step 3 to be sling, and prefabricated ladder step 3 is arranged on cast-in-place swash plate 2, first embedded bar 7 is inserted in the second embedded hole 6, second embedded bar 8 is inserted in the first embedded hole 9, is inserted in draw-in groove by card article 10, and uses electric welding to be welded on draw-in groove wall 11 by card article 10, then use cement mortar to be filled and led up by draw-in groove, thus prefabricated ladder step 3 can be made to be fixed on cast-in-place swash plate 2 by stable further; Finally, joints cement mortar between cast-in-place swash plate 2 and prefabricated ladder step 3, forms cement sand bed 12.
Above-described is only embodiments of the invention, and in scheme, the general knowledge such as known concrete structure and characteristic does not do too much description at this.Should be understood that; for a person skilled in the art, under the prerequisite not departing from structure of the present invention, some distortion and improvement can also be made; these also should be considered as protection scope of the present invention, and these all can not affect effect of the invention process and practical applicability.The protection domain that this application claims should be as the criterion with the content of its claim, and the detailed description of the invention in manual etc. record the content that may be used for explaining claim.

Claims (6)

1. prefabricated ladder step half assembling stair, comprise cast-in-place swash plate and prefabricated ladder step, it is characterized in that: cast-in-place swash plate is provided with the first embedded bar and the first embedded hole, prefabricated ladder step is provided with the second embedded hole coordinated with the first embedded bar, prefabricated ladder step is also provided with the second embedded bar coordinated with the first embedded hole, between cast-in-place swash plate and prefabricated ladder step, is cast with cement sand bed.
2. prefabricated ladder step according to claim 1 half assembling stair, is characterized in that: also comprise the first rest ledge and be positioned at the second rest ledge below the first rest ledge, cast-in-place swash plate is fixedly connected between the first rest ledge and the second rest ledge.
3. prefabricated ladder step according to claim 1 half assembling stair, is characterized in that: described prefabricated ladder walks the end be connected with the first rest ledge and the second rest ledge and is provided with card article, and the first rest ledge and the second rest ledge are provided with the draw-in groove coordinating card article.
4. prefabricated terraced step according to claim 1 half assembling stair, is characterized in that: described prefabricated ladder step is inner is hollow setting.
5. prefabricated ladder step according to claim 4 half assembling stair, it is characterized in that: described cast-in-place swash plate is embedded with the first built-in pipe, first embedded bar is inserted in the first built-in pipe, the second built-in pipe is provided with in first embedded hole, prefabricated ladder step is embedded with the 3rd built-in pipe, second embedded bar is inserted in the 3rd built-in pipe, is provided with the 4th built-in pipe in the second embedded hole.
6. prefabricated ladder step according to claim 5 half assembling stair, is characterized in that: described first built-in pipe, the second built-in pipe, the 3rd built-in pipe and the 4th built-in pipe are pre-buried PCV and manage.
CN201510870289.7A 2015-12-02 2015-12-02 Semi-assembly stair with prefabricated steps Pending CN105317180A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510870289.7A CN105317180A (en) 2015-12-02 2015-12-02 Semi-assembly stair with prefabricated steps

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510870289.7A CN105317180A (en) 2015-12-02 2015-12-02 Semi-assembly stair with prefabricated steps

Publications (1)

Publication Number Publication Date
CN105317180A true CN105317180A (en) 2016-02-10

Family

ID=55245415

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510870289.7A Pending CN105317180A (en) 2015-12-02 2015-12-02 Semi-assembly stair with prefabricated steps

Country Status (1)

Country Link
CN (1) CN105317180A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110485661A (en) * 2018-07-23 2019-11-22 李藏柱 A kind of precast stair and its connection structure
CN112482676A (en) * 2020-11-20 2021-03-12 广州金辉建设集团有限公司 Prefabricated staircase and installation process thereof
CN112854634A (en) * 2021-03-26 2021-05-28 淮阴工学院 Assembling method of assembled prefabricated staircase

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2540164B1 (en) * 1983-01-27 1990-08-31 Briquet Claude PREFABRICATED STAIRCASE WITH ADJUSTABLE MOUNTING MEANS
JP2001227126A (en) * 2000-02-16 2001-08-24 Kurosawa Kensetsu Kk Prefabricated frame structure of stair
CN102767288A (en) * 2012-01-17 2012-11-07 中国建筑第四工程局有限公司 Method and structure for mounting precast reinforced concrete stairs
CN104499663A (en) * 2014-12-11 2015-04-08 济南轨道交通集团有限公司 Concrete stair and assembling method of concrete stair
CN204370727U (en) * 2014-12-01 2015-06-03 河南亚鹰钢结构幕墙工程有限公司 Precast stair unit and use the staristep of this stairway unit
CN204609154U (en) * 2015-03-30 2015-09-02 王新强 The hollow stair system of a kind of prefabricated assembling type reinforced concrete
CN205369755U (en) * 2015-12-02 2016-07-06 重庆建工第九建设有限公司 Prefabricated half assembled stair of ladder step

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2540164B1 (en) * 1983-01-27 1990-08-31 Briquet Claude PREFABRICATED STAIRCASE WITH ADJUSTABLE MOUNTING MEANS
JP2001227126A (en) * 2000-02-16 2001-08-24 Kurosawa Kensetsu Kk Prefabricated frame structure of stair
CN102767288A (en) * 2012-01-17 2012-11-07 中国建筑第四工程局有限公司 Method and structure for mounting precast reinforced concrete stairs
CN204370727U (en) * 2014-12-01 2015-06-03 河南亚鹰钢结构幕墙工程有限公司 Precast stair unit and use the staristep of this stairway unit
CN104499663A (en) * 2014-12-11 2015-04-08 济南轨道交通集团有限公司 Concrete stair and assembling method of concrete stair
CN204609154U (en) * 2015-03-30 2015-09-02 王新强 The hollow stair system of a kind of prefabricated assembling type reinforced concrete
CN205369755U (en) * 2015-12-02 2016-07-06 重庆建工第九建设有限公司 Prefabricated half assembled stair of ladder step

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
潘睿等: "《房屋建筑学(第三版)》", 30 September 2014, 华中科技大学出版社 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110485661A (en) * 2018-07-23 2019-11-22 李藏柱 A kind of precast stair and its connection structure
CN112482676A (en) * 2020-11-20 2021-03-12 广州金辉建设集团有限公司 Prefabricated staircase and installation process thereof
CN112854634A (en) * 2021-03-26 2021-05-28 淮阴工学院 Assembling method of assembled prefabricated staircase
CN112854634B (en) * 2021-03-26 2022-02-18 淮阴工学院 Assembling method of assembled prefabricated staircase

Similar Documents

Publication Publication Date Title
CN205777185U (en) A kind of full assembling concrete beam-type stair
CN103850363B (en) Prefabricated through hole assembly type reinforced concrete shear wall and construction method of prefabricated through hole assembly type reinforced concrete shear wall
CN108561156B (en) Separated tunnel arch-changing supporting structure and construction method thereof
CN206888385U (en) Prefabricated ladder step
CN105317180A (en) Semi-assembly stair with prefabricated steps
CN106760196B (en) The construction method of cross box-type section steel column structure
CN111926910A (en) Installation method of fabricated building
CN104264920A (en) Construction method of ultrahigh large-curvature circular spiral as-cast-finish stair
CN103806448B (en) Foundation pit reinforced concrete horizontal struts system column replacing structure and construction method thereof
CN106346596A (en) Precast stair template matching system
CN103572964B (en) Building engineering structure construction stage prefabricated air channel mounting method
CN103526859B (en) Method for constructing combined shock-resistant system of section steel columns, steel beams and buckling restraining support
CN210685444U (en) Quick leveling, mounting and supporting device for prefabricated external wall panel
CN107355008B (en) Prefabricated connection structure and method for newly added concrete filled steel tubular column and existing structure
CN104878867A (en) Integrated structure of ceiling keel and double-layer construction platform and manufacturing method thereof
CN205369755U (en) Prefabricated half assembled stair of ladder step
CN113738121A (en) Optimization method of high-rise building glass curtain wall structure
CN106948267B (en) A kind of memorial archway bar formula bridge cable tower king-post method for synchronously constructing
CN205894273U (en) Concrete module pin -connected panel frame building structure
CN110552519A (en) Deep foundation pit assembled type safe passage construction method
CN114016518A (en) Underground foundation pit V-shaped column and construction method thereof
JP2017057568A (en) External reinforcing frame for existing building, unit body structure thereof, and construction method
CN204282788U (en) Assembled fixed scaffold
CN203007954U (en) Stand pillar replacing structure in foundation ditch reinforced concrete horizontal support system
CN113550453A (en) Green construction process for external wall heat insulation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160210