CN105313908B - Facility scanning means by a kind of rail - Google Patents

Facility scanning means by a kind of rail Download PDF

Info

Publication number
CN105313908B
CN105313908B CN201510853390.1A CN201510853390A CN105313908B CN 105313908 B CN105313908 B CN 105313908B CN 201510853390 A CN201510853390 A CN 201510853390A CN 105313908 B CN105313908 B CN 105313908B
Authority
CN
China
Prior art keywords
data
rail
crossbeam
industrial computer
laser radar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510853390.1A
Other languages
Chinese (zh)
Other versions
CN105313908A (en
Inventor
苏光辉
杨建兴
王胜
赵兴华
张云太
李熙光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Electrification Survey Design and Research Institute Co Ltd
Original Assignee
Tianjin Railway Electrification Design And Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Railway Electrification Design And Research Institute Co Ltd filed Critical Tianjin Railway Electrification Design And Research Institute Co Ltd
Priority to CN201510853390.1A priority Critical patent/CN105313908B/en
Publication of CN105313908A publication Critical patent/CN105313908A/en
Application granted granted Critical
Publication of CN105313908B publication Critical patent/CN105313908B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Length Measuring Devices By Optical Means (AREA)

Abstract

The invention discloses facility scanning means by a kind of rail, including Laser Radar Scanning device (1), camera of finding a view (2), mast (3), battery power supply system (4), crossbeam (5), rail wheel (6), detachable lateral support (7), run-length encoding device (8), gigabit networking system controller (9), embedded controller (10), industrial computer (11), obliquity sensor (12), equipment is assembled, the switch that switches on power starts industrial computer (11), operating measurement program;Synchronous acquisition to data such as radar data, view data, inclination datas and storage again, using lead high stagger, three-dimensional image segmentation scheduling algorithm extracts final data, generation chart be shown.The functions such as the present invention has to trackside facility 3D modeling, scene is toured around, the export of equipment geometric data.

Description

Facility scanning means by a kind of rail
Technical field
The present invention relates to facility scanning means by track detecting field, more particularly to a kind of rail.
Background technology
Track is made up of multiple materials such as soil, rock, steel, timber, concrete, and it is different from house, bridge It is a kind of more loose architecture structure form Deng building.Under train and the effect of various external force, allow certain bullet be present Property and plastic deformation.The state of track structure constantly changes in use, produces various track irregularities.With train Run without interruption, track irregularity is inevitable.The effect that train wheel goes round and begins again in orbit, its wheel-rail force make rail Road irregularity constantly occurs, develops deterioration.Various track irregularities are to train operation stationarity, riding comfort, safe for operation Property, wheel-rail force, vehicle and the service life of track component, the speed of worsening of track condition have considerable influence.Track is not The change of smooth-going will also result in the hurt aggravation and the reduction of service life of rail vehicle operation part, serious track irregularity Train overturning or derailing can be caused.Track condition and the interaction relationship of train operation, direct relation safety of railway traffic effect Benefit, so must pay much attention to.
With the speed-raising year after year of railway, railway track inspection work can effectively work shorter and shorter without the car time, original people Work bracing wire detection method does not adapt to public affair testing requirements, and portable railway detection car can increase substantially railway track inspection The detection efficiency of work, mitigate the labor intensity of trackwalker, it is that work is engaged in enter row line routine testing using portable railway detection car The inexorable trend of detection.
Orbit parameter detection is divided into dynamic detection and Static Detection, and dynamic detection is that detection circuit is being transported in rolling stock The elastic deformation and permanent deformation occurred under dynamic action in row is detected, and it is high speed track checking car that it, which predominantly detects equipment, But high-speed rail inspection car is expensive, it is difficult to extends to track division use;Static Detection is examined with rail checking instrument or manual method The rail of survey line road rail is to, the geometric parameter such as height, gauge.Artificial detection means are to use artificial string pulling by experienced worker Method carries out rail to measurement, using track gauge detect rail to and gauge.Because of hand inspection, speed to be present slow, unreliable etc. many to ask Topic, have started to study fast, the easy to use track detector of detection speed in this year with instead of hand inspection.
The content of the invention
The present invention overcomes the shortcomings of the prior art, and technical problem to be solved is a kind of simple in construction to provide, behaviour Make simplicity, efficiency high, data type is enriched, facility scanning means by the rail shortened working hours.
In order to solve the above-mentioned technical problem, the technical solution adopted by the present invention is:
Facility scanning means by a kind of rail, including Laser Radar Scanning device 1, camera 2 of finding a view, mast 3, electricity Pond electric power system 4, crossbeam 5, rail wheel 6, detachable lateral support 7, run-length encoding device 8, gigabit networking system controller 9, insertion Formula controller 10, industrial computer 11, obliquity sensor 12, the rail wheel 6 have two groups, and the detachable lateral support 7 has two, often The group rail wheel 6 is arranged in a detachable lateral support 7, and the detachable lateral support 7 is arranged on the two of crossbeam 5 Side, the middle of the crossbeam 5 install the mast 3, the Laser Radar Scanning device are installed on the mast 3 1, three mutually perpendicular cameras 2 of finding a view, the obliquity sensor are installed in the side of the Laser Radar Scanning device 1 12 are arranged on the underface of the mast 3, and the industrial computer 11 and the battery are installed respectively in the both sides of the crossbeam 5 Electric power system 4, the embedded controller 10 and the gigabit networking system controller are installed in the side of the industrial computer 11 9, the run-length encoding device 8 is arranged in detachable lateral support 7.
Further, the Laser Radar Scanning device 1 scans section information of the rail side facility in current mileage.
Further, what the Laser Radar Scanning device 1 measured is the profile data in whole space.
Further, the camera 2 of finding a view is taken pictures to the top of current mileage and the left and right sides, is found a view described in three Camera 2 is mutually perpendicular to so that three photos can splice, the central region and the laser radar of the covering of camera 2 of finding a view The scan line center superposition of scanning means 1.
Further, the mast 3 causes the space of the Laser Radar Scanning device 1 and the camera 2 of finding a view Image and section information are mutually corresponding.
Further, the battery power supply system 4 is the power suppling part point of complete machine.
Further, the crossbeam 5 is the supporting construction across track both ends, and complete machine and other equipment can be arranged on Above the crossbeam 5.
Further, there is a projection 14 side of the rail wheel 6.
Further, the run-length encoding device 8 is the device for recording mileage, and measurement signal is provided to device.
Further, for the embedded controller 10 using arm-m3 controller, it is device to external equipment With the middle controller of power-supply system, the inclination data of the industrial computer 11 and the processing task of encoded signal are shared.
Further, the gigabit networking controller 9 is the controller of instrument data transmission, data is quickly and accurately passed It is defeated by industrial computer 11.
Further, for the industrial computer 11 using intel corei7 controller, it is the data record of device And processing core.
Further, the obliquity sensor 12 with crossbeam 5 is horizontal and vertical aligns installation, accurate measurement pitch angles Spend and the angle that tilts, the obliquity sensor 12 is the sensor of tape deck athletic posture in orbit, to rear issue According to the compensation for carrying out processing and locus.
Further, the run-length encoding device 8 is arranged on a detachable lateral and supported on 7 movable axis, run-length encoding device Wheel 13 abuts the rail wheel 6, makes direct abrasion of run-length encoding device wheel 13 not by track, and distance measurement result is more accurate.
The operating method of facility scanning means, comprises the following steps by a kind of rail:
(1) equipment is transported to and assembled crossbeam 5, detachable lateral support 7 after measure field, ensure both sides rail wheel 6 Projection 14 it is accurate be stuck on the inside of track, ensure that equipment can stabilized walking in orbit;
(2) remainder is installed, and is sequentially connected the communication line and power circuit of equipment;
(3) switch that switches on power starts industrial computer 11, operating measurement program;
(4) for process of measurement under the instruction of operating personnel, the pulse sent using run-length encoding device 8 obtains current device Displacement, the synchronous acquisitions of data such as radar data, view data, inclination data are carried out on the position of pre-determined distance and are deposited Storage.
(5) record data and after importing data, in processing routine, is calculated using high stagger, three-dimensional image segmentation etc. is led Method extracts final data, and generation chart is shown.Three-dimensional data can also be included generating outside chart three Dimension demonstration is toured around in interface, and operating personnel can browse in this interface to the scene at scene.
Beneficial effects of the present invention:
(1) present invention has the functions such as tour around, equipment geometric data exports to facility 3D modeling, scene by rail.Allow Technical staff can not have to go to scene again behind scanning scene, and the scene that later-stage utilization scan data reproduces is carried out to trackside facility Browse and make the decision-making of correlation.
(2) present invention is realized to the measurement of the physical dimension of trackside building structure facility, including pillar, davit, hard crossbeam, The trackside facility such as tunnel, sound barrier.By data analysis, the letters such as the slope of pillar and davit, side gauge, tunnel cross-section are obtained Breath, and provide the risk judgment for whether having intrusion track clearance.
(3) present invention is simple in construction, and easy to operate, the hardware platform and software processing platform of system are set using modularization Meter, realizes the measurement to span and rail superelevation inclination angle.
(4) present invention is adopted using computer vision and the technological means of image co-registration to facilities information by rail Collection and analysis, shorten the working time, improve operating efficiency.
Brief description of the drawings
Fig. 1 is the schematic diagram of the present invention.
Fig. 2 is the front view of the present invention.
Fig. 3 is the side view of the present invention.
Fig. 4 is the top view of the present invention.
Fig. 5 is the principle schematic of the present invention.
In figure:1- Laser Radar Scanning devices, 2- find a view camera, 3- masts, 4- batteries and electric power system, and 5- is horizontal Beam, 6- rail wheels, the support of 7- detachable laterals, 8- run-length encoding devices, 9- gigabit networking system controllers, 10- embedded controllers, 11- industrial computers, 12- obliquity sensors, 13- run-length encodings device wheel, 14- are raised.
Embodiment
With reference to specific embodiment, the present invention is further detailed explanation.
With reference to embodiment, the present invention is described in further detail, but the invention is not restricted to given implementation Example:
Facility scanning means by a kind of rail, including Laser Radar Scanning device 1, camera 2 of finding a view, mast 3, electricity Pond electric power system 4, crossbeam 5, rail wheel 6, detachable lateral support 7, run-length encoding device 8, gigabit networking system controller 9, insertion Formula controller 10, industrial computer 11, obliquity sensor 12, rail wheel 6 have two groups, and detachable lateral support 7 has two, every group of rail wheel 6, which are arranged on a detachable lateral, supports on 7, and detachable lateral support 7 is arranged on the both sides of crossbeam 5, the middle installation mast of crossbeam 5 Support 3, Laser Radar Scanning device 1 is installed on mast 3, three are installed in the side of Laser Radar Scanning device 1 mutually Perpendicular camera 2 of finding a view, obliquity sensor 12 are arranged on the underface of mast 3, distinguish erector in the both sides of crossbeam 5 Control machine 11 and battery power supply system 4, embedded controller 10 and gigabit networking system controller are installed in the side of industrial computer 11 9, run-length encoding device 8 is arranged in detachable lateral support 7.
Laser Radar Scanning device 1 scans by rail that facility is in the section information of current mileage, and camera 2 of finding a view is to current The top and the left and right sides of mileage are taken pictures, and three cameras 2 of finding a view are mutually perpendicular to, and are ensured that three photos can splice, are found a view The scan line center superposition of the central region that camera 2 covers and Laser Radar Scanning device 1;Laser Radar Scanning device 1 measures Be whole space profile data.Mast 3 cause Laser Radar Scanning device 1 and find a view camera 2 spatial image and Section information is mutually corresponding.
Crossbeam 5 is the supporting construction across track both ends, and complete machine and other equipment can be arranged on above crossbeam 5, There is a projection 14 side of rail wheel 6, and anti-locking apparatus drops from track.
Run-length encoding device 8 is arranged on a detachable lateral and supported on 7 movable axis, and run-length encoding device wheel 13 abuts track Wheel 6, makes direct abrasion of run-length encoding device wheel 13 not by track, makes distance measurement result more accurate, and it is the dress for recording mileage Put, to provide measurement signal to device, embedded controller 10 is that device is controlled external equipment and the middle of power-supply system Device, share the inclination data of industrial computer 11 and the processing task of encoded signal.
Gigabit networking controller 9 is the controller of instrument data transmission, data is quickly and accurately transferred to industry control Machine 11, industrial computer 11 are the data record and processing core of device.
Obliquity sensor 12 and crossbeam 5 are horizontal and vertical to align installation, ensures pitch measurement angle and tilts The accuracy of measurement angle, obliquity sensor 12 are the sensors of tape deck athletic posture in orbit, for carrying out the later stage The processing of data and the compensation of locus.
The operating method of facility scanning means, comprises the following steps by a kind of rail:
(1) equipment is transported to and assembled crossbeam 5, detachable lateral support 7 after measure field, ensure both sides rail wheel 6 Projection 14 it is accurate be stuck on the inside of track, ensure that equipment can stabilized walking in orbit;
(2) remainder is installed, and is sequentially connected the communication line and power circuit of equipment;
(3) switch that switches on power starts industrial computer 11, operating measurement program;
(4) for process of measurement under the instruction of operating personnel, the pulse sent using run-length encoding device 8 obtains current device Displacement, the synchronous acquisitions of data such as radar data, view data, inclination data are carried out on the position of pre-determined distance and are deposited Storage.
(5) record data and after importing data, in processing routine, is calculated using high stagger, three-dimensional image segmentation etc. is led Method extracts final data, and generation chart is shown.Three-dimensional data can also be included generating outside chart three Dimension demonstration is toured around in interface, and operating personnel can browse in this interface to the scene at scene.
The principle of the present invention is as follows:
Field scan:The tape deck of obliquity sensor 12 athletic posture in orbit, run-length encoding device 8 record mileage, Thermometer measure prevailing circumstances temperature, by the data transfer of three's record into embedded controller 10, embedded controller 10 It is device to external equipment and the middle controller of power-supply system, shares the processing of the inclination data and encoded signal of industrial computer 11 Task, industrial computer 11 are the data record and processing core of device, and camera 2 of finding a view is carried out above current mileage with the left and right sides Take pictures, Laser Radar Scanning device 1 scans the section information of facility by rail in current mileage, by the spatial image of gained and Section information is transferred in industrial computer 11, then is transferred data to by radio node in operation terminal.
Later data processing:Operation terminal carries out data transmission with later data processing platform, finally by data processing Platform is analyzed data, and technical staff can not have to go to scene again behind scanning scene, and later-stage utilization scan data reproduces Scene facility by rail is browsed.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention God any modification, equivalent substitution and improvements made etc., should be included in the scope of the protection with principle.

Claims (1)

1. facility scanning means by a kind of rail, it is characterised in that including Laser Radar Scanning device (1), camera of finding a view (2), mast (3), battery power supply system (4), crossbeam (5), rail wheel (6), detachable lateral support (7), run-length encoding device (8), gigabit networking system controller (9), embedded controller (10), industrial computer (11), obliquity sensor (12), the track Wheel (6) has two groups, and the detachable lateral support (7) has two, and rail wheel (6) described in every group is arranged on a detachable lateral Support on (7), the detachable lateral support (7) is arranged on the both sides of the crossbeam (5), and institute is installed among the crossbeam (5) Mast (3) is stated, the Laser Radar Scanning device (1) is installed on the mast (3), swept in the laser radar Three mutually perpendicular cameras (2) of finding a view are installed in the side of imaging apparatus (1), and the obliquity sensor (12) is arranged on described The underface of mast (3), the industrial computer (11) and the battery powered system are installed respectively in the both sides of the crossbeam (5) Unite (4), the embedded controller (10) and the gigabit networking system controller are installed in the side of the industrial computer (11) (9), the run-length encoding device (8) be arranged on the detachable lateral support (7) on, the embedded controller (10) using Arm-m3 controller, the industrial computer (11) is using intel corei7 controller, camera of finding a view (2) covering Central region and the Laser Radar Scanning device (1) scan line center superposition, the Laser Radar Scanning device (1) surveys Amount be whole space profile data, the obliquity sensor (12) with crossbeam (5) is horizontal and vertical aligns installation, accurate survey Amount pitch angle and the angle that tilts, the run-length encoding device (8) are arranged on the activity that a detachable lateral supports (7) On axle, run-length encoding device wheel (13) abuts the rail wheel (6), and there are one raised (14) side of the rail wheel (6).
CN201510853390.1A 2015-11-30 2015-11-30 Facility scanning means by a kind of rail Active CN105313908B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510853390.1A CN105313908B (en) 2015-11-30 2015-11-30 Facility scanning means by a kind of rail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510853390.1A CN105313908B (en) 2015-11-30 2015-11-30 Facility scanning means by a kind of rail

Publications (2)

Publication Number Publication Date
CN105313908A CN105313908A (en) 2016-02-10
CN105313908B true CN105313908B (en) 2018-02-27

Family

ID=55242473

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510853390.1A Active CN105313908B (en) 2015-11-30 2015-11-30 Facility scanning means by a kind of rail

Country Status (1)

Country Link
CN (1) CN105313908B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2691145B2 (en) * 2017-05-23 2020-04-08 Univ Madrid Carlos Iii Unmanned railway vehicle, system and procedure for the inspection of railway infrastructure and superstructure.
CN108860214A (en) * 2018-07-12 2018-11-23 肖力 A kind of medium-and low-speed maglev F type track detector with positioning function
CN108860213A (en) * 2018-07-12 2018-11-23 肖力 A kind of band remotely monitors and the rail of wireless data transmission function examines instrument
CN109443197A (en) * 2018-10-15 2019-03-08 北京航天控制仪器研究所 A kind of online cruising inspection system of contact net geometric parameter
CN110001710B (en) * 2019-04-04 2021-06-04 同济大学 Magnetic suspension track three-dimensional scene rapid reconstruction system, method and application
CN112394357A (en) * 2019-08-12 2021-02-23 天津泰恒电气科技有限公司 Railway track scanning detection device
CN112389497A (en) * 2019-08-12 2021-02-23 天津泰恒电气科技有限公司 Device for continuously scanning and detecting railway
CN111079627A (en) * 2019-12-12 2020-04-28 哈尔滨市科佳通用机电股份有限公司 Railway wagon brake beam body breaking fault image identification method
CN113223168B (en) * 2021-03-29 2023-06-30 浙江大学台州研究院 Method for rapidly modeling three-dimensional shape of tunnel
CN114485751B (en) * 2022-01-21 2023-09-12 中国铁道科学研究院集团有限公司 System and method for spatially synchronizing detection data of rail flaw detection vehicle
CN114802342A (en) * 2022-04-24 2022-07-29 西南交通大学 Visual self-walking inspection equipment for railway track machine

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101913368A (en) * 2010-08-11 2010-12-15 唐粮 System and method for fast precise measurement and total factor data acquisition of high speed railway
CN202038324U (en) * 2010-11-03 2011-11-16 唐粮 Track battery truck for high speed railway movement measurement
CN203228781U (en) * 2013-04-23 2013-10-09 四川澄观电子技术有限公司 Track detection trolley not affecting train passing
CN103754231A (en) * 2014-01-22 2014-04-30 成都唐源电气有限责任公司 Contact network step touring working equipment
CN203704866U (en) * 2014-02-17 2014-07-09 武汉迅能光电科技有限公司 3D laser scanner

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8958079B2 (en) * 2004-06-30 2015-02-17 Georgetown Rail Equipment Company System and method for inspecting railroad ties

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101913368A (en) * 2010-08-11 2010-12-15 唐粮 System and method for fast precise measurement and total factor data acquisition of high speed railway
CN202038324U (en) * 2010-11-03 2011-11-16 唐粮 Track battery truck for high speed railway movement measurement
CN203228781U (en) * 2013-04-23 2013-10-09 四川澄观电子技术有限公司 Track detection trolley not affecting train passing
CN103754231A (en) * 2014-01-22 2014-04-30 成都唐源电气有限责任公司 Contact network step touring working equipment
CN203704866U (en) * 2014-02-17 2014-07-09 武汉迅能光电科技有限公司 3D laser scanner

Also Published As

Publication number Publication date
CN105313908A (en) 2016-02-10

Similar Documents

Publication Publication Date Title
CN105313908B (en) Facility scanning means by a kind of rail
CN106192634B (en) A kind of railroad track elastic bar fastener condition automatic detection device and method
CN205327082U (en) Urban railway detection device based on integrated synchro control of multisensor
CN102507601B (en) Online abrasion detection method and system for pantograph of electric locomotive
CN103207403B (en) Satellite navigation and inertial measurement combined orbit measuring system and method
CN204007533U (en) The comprehensive checkout equipment of tunnel defect
CN113320447A (en) Track-contact net equipment health state integration comprehensive detection robot
CN104890699B (en) A kind of track detector
CN104477211B (en) Flaw detection system for wheel sets on same bogie
CN204674616U (en) A kind of dynamic detector for train wheel pair size
CN102607439A (en) System and method for carrying out on-line monitoring on railway wheel-rail contact relationship on basis of structured light
CN207268608U (en) Detector for train wheel pair size dynamic detection system
CN203020332U (en) Satellite navigation and inertia measurement combined track measurement system
CN106400628B (en) Models computed method, control unit, control system and railway switch detection method
CN108755306A (en) A kind of track geometry status high precision measuring device
CN114312877B (en) Railway comprehensive inspection system
CN107097807A (en) A kind of measurement system of high-speed railway wheel track dynamic Contact state
Geng et al. UAV-LiDAR-based measuring framework for height and stagger of high-speed railway contact wire
CN205320146U (en) 3D scanner of other facility of railway rail
CN107356671A (en) Full-automatic unmannedization subway or subway track detection method
CN110926417B (en) Vehicle-mounted railway tunnel detection system based on machine vision
CN202368605U (en) Device for detecting rail directions of left and right rails of railway track dynamically
CN114379607B (en) Comprehensive railway inspection method
CN102721547A (en) Wheel-type stair climbing wheelchair fatigue testing machine
CN114379598B (en) Railway comprehensive inspection system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20170616

Address after: 300250 Tianjin Fuyuan Wuqing Development Zone Wuqing Road No. 18 531-83 (central office)

Applicant after: Tianjin railway electrification design and Research Institute Co Ltd

Address before: 300000 Tianjin Binhai New Area Airport Economic Zone West Road No. 166 A2-372

Applicant before: China Railway Electrification Survey Design & Research Institute Co., Ltd.

GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: Room 125, 36 Central West Road, pilot free trade zone (Airport Economic Zone), Binhai New Area, Tianjin

Patentee after: CHINA RAILWAY ELECTRIFICATION SURVEY DESIGN & RESEARCH INSTITUTE Co.,Ltd.

Address before: 531-83, No. 18, Fuyuan Road, Wuqing Development Zone (centralized office area)

Patentee before: TIANJIN ZHONGTIE ELECTRIFICATION DESIGN RESEARCH INSTITUTE Co.,Ltd.