CN105304275B - A kind of substation equipment misoperation method for early warning and its device - Google Patents
A kind of substation equipment misoperation method for early warning and its device Download PDFInfo
- Publication number
- CN105304275B CN105304275B CN201510821299.1A CN201510821299A CN105304275B CN 105304275 B CN105304275 B CN 105304275B CN 201510821299 A CN201510821299 A CN 201510821299A CN 105304275 B CN105304275 B CN 105304275B
- Authority
- CN
- China
- Prior art keywords
- deflector
- transformer
- backboard
- substation equipment
- warning device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/16—Electric power substations
Landscapes
- Housings And Mounting Of Transformers (AREA)
- Transformer Cooling (AREA)
Abstract
The invention discloses a kind of substation equipment misoperation prior-warning device, the transformer leg being connected including a back side by some connectors with backboard, connector is connected by the upper deflector set before the back side of transformer leg and/or backboard with backboard and/or transformer leg, cooling agent gap is formed by connector between backboard and transformer leg, if setting dry temperature sensor and flow sensor in back plate surface in cooling agent gap;For existing transformer device structure form, cooling body is set directly at transformer leg, directly it cooled down, ensures the effect of cooling, the form of deflector is being set thereon, and connecting hole is set thereon, it is ensured that whole cooling procedure adds the service life of transformer without dead angle, it ensure that the operating efficiency of transformer, some sensors are only set on backboard with regard to that can play the monitoring and warning to transformer simultaneously, and it is reliable and stable, it is worthy to be popularized and is applied.
Description
Technical field
The present invention relates to substation equipment safe operation technical field, particularly a kind of substation equipment misoperation early warning
Method and its device.
Background technology
With the continuous development of society, people are also increasing to the demand of electric power, especially in annual peak of power consumption
In winter summer phase, often transformer works overloadingly, and most transformers are substantial amounts of warm because overwork produces, it is impossible to dissipates in time
Go out to cause transformer to be stopped or occur transformer damage, or even cause the phenomenon of Explosion of Transformer, not only have a strong impact on
The production and living of the people, and the damage of power equipment is also result in, caused damage to country, analyze its reason:
During transformer station high-voltage side bus, heat caused by the loss in winding and iron core must dissipate away in time, in order to avoid overheat
And cause insulation damages;For small capacity transformer, external surface area and the ratio between transformer volume are relatively large, can use self cooling
Mode, heat can be dispersed by radiation and free convection;Also oil immersed type can be used;Self cooling mode becomes suitable for indoor small
Depressor, for fire preventing, typically using dry type, without oil immersion;But because subregion power supply pressure is big, it can also use oil immersion
Formula transformer is powered, but heat radiation cooling device is conventional oil, but the cooling of air is often due to gas
Specific heat capacity is smaller, the thermal Finite for taking away it;Because the loss of transformer is proportional to its volume, so as transformer holds
The increase of amount, its volume and loss will be increased with core dimensions cube, and the quadratic power increase that external surface area is only sized.Cause
This, high-power transformer is unshakable in one's determination and winding should be immersed in oil, it is necessary to be cooled down using other cooling provisions, and need by setting
Put monitoring device and the generation for avoiding danger is monitored to it.
A kind of oil-water cooler is disclosed in the A of CN 102403090, and in particular to a kind of transformer is cooled down with profit
Device, belong to technical field of heat dissipation.Oil-water cooler, including oil cooler and water cooler and deputy tank, oil cooler and water cooler are arranged side by side
Placement, deputy tank are arranged above water cooler;Oil cooler and water cooler one side installation fan guard, the fan guard are square, covered
Lid oil cooler and water cooler, fan guard center is manhole;The another side of oil cooler installs oily side Air Filter, oily side Air Filter
Size and oil cooler section are similar, the another side installation water side Air Filter of water cooler, size and the water cooler phase of water side Air Filter
If.But it does not solve the problems, such as that radiating is uneven still.
A kind of water-cooled transformer iron core cooling means is disclosed in the A of CN 103714948, it is characterised in that:Described
Core interior uses recirculated water cooling method.Heretofore described core interior uses recirculated water cooling method, efficiently avoid
Because transformer fe core diameter is big, unit area thermic load is big, and heat conduction path is very long, and caused damage is transferred out inside iron core
Consumption is greatly so as to cause the overheat of iron core to cause scaling loss, and because iron core is effectively cooled down, temperature is effectively obtained control will not
Producing overheat causes scaling loss, so the diameter of iron core can be reduced, so as to reduce the loss of core material, and its water cooling transformation therewith
The material of device main body also can obtain corresponding reduction, while also ensure that comprehensive radiating effect of water-cooled transformer, improves and uses
Life-span.But the present apparatus is because the water used is medium, and the specific heat capacity of water is smaller, it is easy to due to boiling water build-up of pressure mistake
Greatly, so as to producing the phenomenon of leak or gas leakage, potential safety hazard is increased, and because it does not design the method for reply safety monitoring,
Not only bad for the stabilization of transformer in transformer station, and increase the input and the input of equipment of staff.
To sum up:Need one kind can either uniform decrease in temperature ensure transformer steady operation, and a kind of transformer station can be provided and set
Standby abnormity early warning scheme protects liquid cooling apparatus even running.
The content of the invention
It is an object of the invention to overcome above-mentioned deficiency, a kind of substation equipment misoperation method for early warning and its dress are disclosed
Put.
Used technical scheme to achieve these goals:
A kind of substation equipment misoperation prior-warning device, including a back side are connected by some connectors with backboard
Transformer leg, the connector by before the back side of the transformer leg and/or the backboard it is upper set leads
Flowing plate is connected with the backboard and/or the transformer leg, by described between the backboard and the transformer leg
Connector forms cooling agent gap, if setting dry temperature sensor and flow sensing in back plate surface in the cooling agent gap
Device.
Cooling agent gap surrounding sets sealing plate, and water inlet and water outlet are set respectively at two parallel sealing plates
Mouthful.
The deflector is arranged on the water inlet, and the water (flow) direction of the top surface of the deflector and the water inlet is non-
It is parallel.
The deflector overlooks face in circular arc type, reverse V-shaped or linear pattern, the interlaced setting of deflector.
Projection is set on the deflector, connecting hole is set in the projection.
The reverse V-shaped deflector angle is 120~150 °, and the height of the deflector is the 1/2~4/ of gap width
5。
The connector is bolt.
The quantity of the water inlet and delivery port is three.
The height of the deflector is consistent with the width in gap, sets connecting hole on the deflector, the connecting hole it
Between deflector on water hole is set.
The temperature sensor interconnects with the microcontroller signal respectively with the flow sensor, the miniature control
Device processed is connected by signal transceiver with the control platform of Substation control room.
A kind of substation equipment misoperation method for early warning, comprises the following steps:
1)By the feedback of the information of temperature sensor and flow sensor to microcontroller, and adjusted by microcontroller
Section;
2)The information of acquisition is fed back to control platform by microcontroller by signal transceiver;
3)Control platform is analyzed the information of acquisition, and early warning alarm can be sent if being sent after alarm numerical value,
Staff is reminded to take the necessary measures.
The present invention is using carrier of the transformer leg as radiating so that faster, heat conduction amount is bigger for heat conductivility;In transformation
The form of deflector is set behind device leg and/or before backboard, and connecting hole is set thereon so that bolt will by it
Transformer leg closely connects with backboard;It can not only play a part of supporting cooling agent gap, and if set
The intensity of transformer leg can then be increased on transformer leg, so as to add the service life of transformer leg, using more
The mode of individual water inlet and delivery port is disperseed current, so as to avoid part corner current caused by being concentrated due to current
Cross slowly, cause temperature too high, so that hot-spot causes the impaired phenomenon of transformer;Temperature is set to pass on backboard simultaneously
The temperature and changes in flow rate of cooling agent, pass through the change of temperature and flow, energy when sensor can obtain cooling with flow sensor
Whether the operation for enough analyzing transformer in transformer station overloads, and can send highest warning if temperature rise and flow velocity are accelerated, carry
Awake staff pays attention to inspection;If temperature rise and flow velocity inconvenience, give a warning and improve the flow velocity of cooling agent;If temperature drops
Low and flow velocity increases, then will not give a warning, and display is normally shown with low temperature underflow speed identical;And the microcontroller set
For common PLC, it, which possesses display function, can not only realize that part automatically controls, and signal can also be passed to control
Platform, moreover it is possible to which realizing can directly observe during inspection so that operation is very easy.
The deflector that the present invention uses can be arc-shaped, the shape of falling V or linear pattern in water inlet, its shape, mainly be
The current of water inlet are disperseed so that it is scattered more uniformly, avoid cooling agent directly from water inlet enter and from water outlet
Mouth outflow, causes corner heat to take away in time, causes the phenomenon of hot-spot;Led using its two halves during the shape of falling V deflector
Angle between flowing plate is 120~150 °, and current can not only be carried out scattered and can reduced as far as possible by this angle
Influence to streaming potential so that water-flow equation is more uniform, and the height set causes gap location for the 1/2~4/5 of gap
The gap of a very little is provided with, current can be made to pass therethrough the dorsal part for avoiding deflector in face of current due to the original of turbulent flow
Flow velocity causes the phenomenon of hot-spot slowly excessively caused by, in order to ensure the cooling quality of corner two water inlets close to corner with
Delivery port nearby pipe is set so that its can by the current at high pressure not by other current interfere in the case of be drained to it is low
Press at water, it is further to improve corner sluggish flow phenomenon.
The structure type of the present invention, for existing transformer device structure form, is set directly at transformer by cooling body
At leg, directly it is cooled down, ensures the effect of cooling, the form of deflector is being set thereon, and is set thereon
Connecting hole is put, fixed supported effect can not only be realized, and can be by the more uniform of water-flow equation, it is ensured that whole cooling
Process adds the service life of transformer, ensure that the operating efficiency of transformer, while only set on backboard without dead angle
Some sensors are and reliable and stable with regard to that can play the monitoring and warning to transformer, it is worthy to be popularized and is applied.
Brief description of the drawings
Fig. 1 is the side structure schematic diagram of the present invention;
Fig. 2 is the structural representation of top view cross section of the present invention;
Fig. 3 is the partial structurtes enlarged diagram of the air deflector of embodiments of the invention one;
Fig. 4 is the partial structurtes enlarged diagram of the air deflector of embodiments of the invention two;
Fig. 5 is the structural representation of deflector of the present invention;
Fig. 6 is the structure diagram of warning system of the present invention.
Embodiment
For the superiority of the further instruction present invention, the test of different pieces of information is carried out to the performance of the present invention:
First group:Using identical transformer, the structure type of the present invention, traditional forced oil-circulation cooler is respectively adopted
The structure type of structure and natural heat dissipation, difference test transformer leg bulk temperature difference, first maintenance time and maintenance period,
The experimental data of acquisition is as shown in the table:
Title | Temperature difference | Maintenance time first | Maintenance period |
The present invention | 3~6 DEG C | 8.7-9.5 year | 2 years |
Forced oil-circulation cools down | 15~20 DEG C | 6-6.5 year | 0.6 year |
Natural heat dissipation | 20~25 DEG C | 4-5.5 year | 0.3 year |
Note:This group of experiment test object is 100KV oil-filled transformers, and working environment is normal temperate continental climate;Together
When 200 sets average values for being tested respectively of equipments of continuous use, the temperature difference used is the corner on leg same temperature band
Region and the temperature difference of central area.
Although the present invention can be seen that very from continuous use situation using identical transformer as can be seen from the above table
It is good to overcome that temperature deviation is larger, and the time safeguarded first has reached 9.5 years, exceeds well over the time of conventional transformer,
Its single maintenance period is 2 years simultaneously, it is seen that its easy maintenance, is easy to manage, fault rate is low.
Second group:Using the structure type that deflector is set at the transformer leg back side, then test setting pipe respectively
Temperature difference and service life with being not provided with pipe, the data of acquisition are as follows:
Title | Temperature difference | Maintenance time first |
Pipe is set | 3~6 DEG C | 8.7-9.5 year |
It is not provided with pipe | 10~17 DEG C | 7.3-7.9 year |
Note:This group of experiment test object is 100KV oil-filled transformers, and working environment is normal temperate continental climate;Together
When 200 sets average values for being tested respectively of equipments of continuous use, the temperature difference used is the corner on leg same temperature band
Region and the temperature difference of central area.
As can be seen from the above table even with identical deflector structure, if the pipe not set using the present invention, obtain
Effect also below the present invention, it is seen that only just generated in the presence of each component of the present apparatus mutually cooperates with the present invention it is excellent
Practical function.
3rd group:Use deflector form set respectively 120 °, 135 °, 150 ° of angles and height for gap width 1/2,
2/3rd, at 4/5, its temperature difference, service life and structure bending strength are tested respectively, and the experimental data of acquisition is as follows:
Title | Temperature difference DEG C | Maintenance time first |
120°1/2 | 3.8 | 8.9 year |
120°2/3 | 3.6 | 9.1 year |
120°4/5 | 4.9 | 9.2 year |
135°1/2 | 4.3 | 8.95 year |
135°2/3 | 3.0 | 9.5 year |
135°4/5 | 3.9 | 9.35 year |
150°1/2 | 4.1 | 8.8 year |
150°2/3 | 5.99 | 8.7 year |
150°4/5 | 3.3 | 9.3 year |
As can be seen from the above table when deflector is in 135 ° and height is gap 2/3, the effect that it is obtained is best, not only first
Secondary maintenance time length, and the temperature of corner and the difference in central high temperature region are minimum on its same temperature band, it is seen that not appoint
Meaning combination can be achieved with the optimum efficiency of the present invention;It is under the synergy of deflector and deflector height, obtains this hair
Bright optimum efficiency.
4th group:Using identical device for transformer, test setting prior-warning device is with being not provided with prior-warning device respectively, test
The probability that transformer goes wrong, the data of acquisition are as follows:
Title | Probability | Maintenance time first |
Prior-warning device is set | 0.01% | 8.8-9.9 year |
It is not provided with prior-warning device | 2-3% | 7.1-7.5 year |
Note:This group of experiment test object is 100KV oil-filled transformers, and working environment is normal temperate continental climate;Together
When 200 sets average values for being tested respectively of equipments of continuous use, the probability to be gone wrong by statistical calculations.
As can be seen from the above table even with identical deflector structure, if the prior-warning device not set using the present invention,
The effect of acquisition is also below the present invention, it is seen that only just generates the present invention in the presence of each component of the present apparatus mutually cooperates with
Excellent practical function.
The superiority of the present invention is further illustrated below in conjunction with the specific embodiment of accompanying drawing 1~6:
Embodiment one:A kind of substation equipment misoperation prior-warning device, including a back side by some connectors with
The transformer leg 1 that backboard 2 is connected, the deflector 3 and institute that the connector is set by the back side of the transformer leg 1
State transformer leg 1 to be connected, by between connector composition cooling agent between the backboard 2 and the transformer leg 1
Gap, if setting dry temperature sensor 13 and flow sensor 14 in back plate surface in the cooling agent gap.
Cooling agent gap surrounding sets sealing plate 9, set respectively at two parallel sealing plates 9 water inlet 6 with
Delivery port 8.
The deflector 3 is arranged at the water inlet 6, the current side of the top surface of the deflector 3 and the water inlet 6
To non-parallel.
It is in reverse V-shaped, the interlaced setting of deflector that the deflector 3, which overlooks face,.
Set on the deflector 3 in projection 4, described raised 4 and connecting hole is set.
The reverse V-shaped angle 10 of deflector 3 is 120 °, and the height of the deflector is the 1/2 of gap width.
The quantity of the water inlet 6 and delivery port 8 is three.
The height of the deflector 3 is consistent with the width in gap, sets connecting hole on the deflector, the connecting hole it
Between deflector 3 on set water hole 7.
The water inlet 6 and the delivery port 8 are setting pipe 5 at the panel of both sides, and described one end of pipe 5 is close to entering
The mouth of a river 6 or delivery port 8, edge of the other end close to the transformer leg.
The cylinder 5 is more than the horn-like cylinder of apopore in inlet opening.
The temperature sensor 13 interconnects with the signal of microcontroller 15 respectively with the flow sensor 14, described
Microcontroller 15 is connected by signal transceiver 16 with the control platform 17 of Substation control room.
A kind of substation equipment misoperation method for early warning, comprises the following steps:
1)By the feedback of the information of temperature sensor and flow sensor to microcontroller, and adjusted by microcontroller
Section;
2)The information of acquisition is fed back to control platform by microcontroller by signal transceiver;
3)Control platform is analyzed the information of acquisition, and early warning alarm can be sent if being sent after alarm numerical value,
Staff is reminded to take the necessary measures.
Embodiment two:A kind of substation equipment misoperation prior-warning device, including a back side by some connectors with
The transformer leg 1 that backboard 2 is connected, deflector 3 that the connector is set on the back side by the transformer leg 1 with
The transformer leg 1 is connected, and cooling agent is formed by the connector between the backboard 2 and the transformer leg 1
Gap, if setting dry temperature sensor 13 and flow sensor 14 in back plate surface in the cooling agent gap.
Cooling agent gap surrounding sets sealing plate 9, set respectively at two parallel sealing plates 9 water inlet 6 with
Delivery port 8.
The deflector 3 is arranged at the water inlet 6, the current side of the top surface of the deflector 3 and the water inlet 6
To non-parallel.
It is in reverse V-shaped, the interlaced setting of deflector that the deflector 3, which overlooks face,.
Set on the deflector 3 in projection 4, described raised 4 and connecting hole is set.
The reverse V-shaped angle 10 of deflector 3 is 135 °, and the height of the deflector is the 2/3 of gap width.
The quantity of the water inlet 6 and delivery port 8 is three.
The height of the deflector 3 is consistent with the width in gap, sets connecting hole on the deflector, the connecting hole it
Between deflector 3 on set water hole 7.
The water inlet 6 and the delivery port 8 are setting pipe 5 at the panel of both sides, and described one end of pipe 5 is close to entering
The mouth of a river 6 or delivery port 8, edge of the other end close to the transformer leg.
The cylinder 5 is more than the horn-like cylinder of apopore in inlet opening.
The temperature sensor 13 interconnects with the signal of microcontroller 15 respectively with the flow sensor 14, described
Microcontroller 15 is connected by signal transceiver 16 with the control platform 17 of Substation control room.
Embodiment three, a kind of substation equipment misoperation prior-warning device, including a back side by some connectors with
The transformer leg 1 that backboard 2 is connected, the connector pass through the upper deflector 3 set before the backboard 2 and the back of the body
Plate 2 is connected, and cooling agent gap, the cooling are formed by the connector between the backboard 2 and the transformer leg 1
If dry temperature sensor 13 and flow sensor 14 are set in back plate surface in agent gap.
Cooling agent gap surrounding sets sealing plate 9, set respectively at two parallel sealing plates 9 water inlet 6 with
Delivery port 8.
The deflector 3 is arranged at the water inlet 6, the current side of the top surface of the deflector 3 and the water inlet 6
To non-parallel.
It is in circular arc type that the deflector 3, which overlooks face, the interlaced setting of deflector.
Set on the deflector 3 in projection 4, described raised 4 and connecting hole is set.
The reverse V-shaped angle 10 of deflector 3 is 150 °, and the height of the deflector is the 4/5 of gap width.
The quantity of the water inlet 6 and delivery port 8 is three.
The height of the deflector 3 is consistent with the width in gap, sets connecting hole on the deflector, the connecting hole it
Between deflector 3 on set water hole 7.
The water inlet 6 and the delivery port 8 are setting pipe 5 at the panel of both sides, and described one end of pipe 5 is close to entering
The mouth of a river 6 or delivery port 8, edge of the other end close to the transformer leg.
Its inlet opening is towards water inlet when close to water inlet for the cylinder 5, and it enters when the cylinder 5a is close to delivery port
Water hole is then towards the edge of transformer leg.
The temperature sensor 13 interconnects with the signal of microcontroller 15 respectively with the flow sensor 14, described
Microcontroller 15 is connected by signal transceiver 16 with the control platform 17 of Substation control room.
The present embodiment using circular arc type deflector cause current it is scattered with more potential energy that is streamlined, and then causing current
What is reduced is less, and resistance is smaller, can quickly take away corner and overall heat, avoiding leg from occurring, uneven heating is even to be showed
As substantially prolongs the service life of transformer leg.
Example IV:A kind of substation equipment misoperation prior-warning device, including a back side by some connectors with
The transformer leg 1 that backboard 2 is connected, deflector 3 that the connector is set on the back side by the transformer leg 1 with
The backboard 2 is connected, and cooling agent gap, institute are formed by the connector between the backboard 2 and the transformer leg 1
State in cooling agent gap and if dry temperature sensor 13 and flow sensor 14 are set in back plate surface.
Cooling agent gap surrounding sets sealing plate 9, set respectively at two parallel sealing plates 9 water inlet 6 with
Delivery port 8.
The deflector 3 is arranged at the water inlet 6, the current side of the top surface of the deflector 3 and the water inlet 6
To non-parallel.
It is in reverse V-shaped, the interlaced setting of deflector that the deflector 3, which overlooks face,.
Set on the deflector 3 in projection 4, described raised 4 and connecting hole is set.
The reverse V-shaped angle 10 of deflector 3 is 150 °, and the height of the deflector is the 1/2 of gap width.
The quantity of the water inlet 6 and delivery port 8 is three.
The height of the deflector 3 is consistent with the width in gap, sets connecting hole on the deflector, the connecting hole it
Between deflector 3 on set water hole 7.
The water inlet 6 and the delivery port 8 are setting pipe 5 at the panel of both sides, and described one end of pipe 5 is close to entering
The mouth of a river 6 or delivery port 8, edge of the other end close to the transformer leg.
The temperature sensor 13 interconnects with the signal of microcontroller 15 respectively with the flow sensor 14, described
Microcontroller 15 is connected by signal transceiver 16 with the control platform 17 of Substation control room.
Although the present invention is disclosed as above with preferred embodiment, so it is not intended to limiting the invention, any to be familiar with this
Those skilled in the art, make an amendment, change and retouching, the change that can readily occur in or replace without departing from the spirit and scope of the present invention
Change, should all be included within the scope of the present invention.
Claims (8)
1. a kind of substation equipment misoperation prior-warning device, including a back side is connected by some connectors with backboard
Transformer leg, the connector pass through the upper water conservancy diversion set before the back side of the transformer leg and/or the backboard
Plate is connected with the backboard and/or the transformer leg, it is characterised in that:Between the backboard and the transformer leg
Cooling agent gap is formed by the connector, if setting dry temperature sensor and stream in back plate surface in the cooling agent gap
Quantity sensor;Cooling agent gap surrounding sets sealing plate, and water inlet is set respectively with going out on two parallel sealing plates
The mouth of a river, the water inlet and the delivery port are setting pipe at the panel of both sides, described pipe one end close to water inlet or
Delivery port, edge of the other end close to the transformer leg.
2. substation equipment misoperation prior-warning device as claimed in claim 1, it is characterised in that:The deflector is arranged on
The water inlet, the water (flow) direction of the top surface of the deflector and the water inlet are non-parallel.
3. substation equipment misoperation prior-warning device as claimed in claim 1, it is characterised in that:The deflector overlooks face
In circular arc type, reverse V-shaped or linear pattern, the interlaced setting of deflector.
4. substation equipment misoperation prior-warning device as claimed in claim 1, it is characterised in that:Set on the deflector
Projection, it is described projection on connecting hole is set.
5. substation equipment misoperation prior-warning device as claimed in claim 3, it is characterised in that:The reverse V-shaped water conservancy diversion
Plate angle is 120 °~150 °, and the height of the deflector is the 1/2~4/5 of the width in cooling agent gap.
6. substation equipment misoperation prior-warning device as claimed in claim 1, it is characterised in that:The height of the deflector
It is consistent with the width in cooling agent gap, connecting hole is set on the deflector, water is set on the deflector between the connecting hole
Hole.
7. substation equipment misoperation prior-warning device as claimed in claim 1, it is characterised in that:The temperature sensor with
The flow sensor is interconnected with microcontroller signal respectively, and the microcontroller is controlled by signal transceiver and transformer station
The control platform of room processed is connected.
8. the application method of substation equipment misoperation prior-warning device as claimed in claim 1, it is characterised in that:Including with
Lower step:
1)By the feedback of the information of temperature sensor and flow sensor to microcontroller, and it is adjusted by microcontroller;
2)The information of acquisition is fed back to control platform by microcontroller by signal transceiver;
3)Control platform is analyzed the information of acquisition, after the alarm numerical value beyond temperature and flow if can send early warning police
Report, staff is reminded to take the necessary measures.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510821299.1A CN105304275B (en) | 2015-11-24 | 2015-11-24 | A kind of substation equipment misoperation method for early warning and its device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510821299.1A CN105304275B (en) | 2015-11-24 | 2015-11-24 | A kind of substation equipment misoperation method for early warning and its device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105304275A CN105304275A (en) | 2016-02-03 |
CN105304275B true CN105304275B (en) | 2017-12-08 |
Family
ID=55201408
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510821299.1A Active CN105304275B (en) | 2015-11-24 | 2015-11-24 | A kind of substation equipment misoperation method for early warning and its device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105304275B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107025981B (en) * | 2017-06-15 | 2018-10-16 | 国网山东省电力公司龙口市供电公司 | A kind of power transformer automatic spray heat sink and spraying cooling method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202084384U (en) * | 2011-04-14 | 2011-12-21 | 河南勃达微波设备有限责任公司 | Novel hybrid cooling device for water jacket oil immersed transformer |
CN203351342U (en) * | 2013-06-22 | 2013-12-18 | 浙江申工变压器制造有限公司 | Oil-immersed transformer with water circulation cooling device |
CN103779046A (en) * | 2013-12-17 | 2014-05-07 | 浙江金冠特种变压器有限公司 | Transformer cooling device |
CN204286154U (en) * | 2014-12-03 | 2015-04-22 | 中国西电电气股份有限公司 | A kind of oil-filled transformer cooling gilled radiator |
CN104766702A (en) * | 2015-04-18 | 2015-07-08 | 陈剑浩 | Intelligent water cooling type transformer |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001135527A (en) * | 1999-11-10 | 2001-05-18 | Toshiba Corp | Stationary induction equipment |
JP2006295021A (en) * | 2005-04-14 | 2006-10-26 | Nissin Electric Co Ltd | Power apparatus |
-
2015
- 2015-11-24 CN CN201510821299.1A patent/CN105304275B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202084384U (en) * | 2011-04-14 | 2011-12-21 | 河南勃达微波设备有限责任公司 | Novel hybrid cooling device for water jacket oil immersed transformer |
CN203351342U (en) * | 2013-06-22 | 2013-12-18 | 浙江申工变压器制造有限公司 | Oil-immersed transformer with water circulation cooling device |
CN103779046A (en) * | 2013-12-17 | 2014-05-07 | 浙江金冠特种变压器有限公司 | Transformer cooling device |
CN204286154U (en) * | 2014-12-03 | 2015-04-22 | 中国西电电气股份有限公司 | A kind of oil-filled transformer cooling gilled radiator |
CN104766702A (en) * | 2015-04-18 | 2015-07-08 | 陈剑浩 | Intelligent water cooling type transformer |
Also Published As
Publication number | Publication date |
---|---|
CN105304275A (en) | 2016-02-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107658101A (en) | A kind of height warm area differentiation power transformer cooling device | |
CN103474202B (en) | A kind of transformer burn-out-proof protective device and using method | |
CN105304275B (en) | A kind of substation equipment misoperation method for early warning and its device | |
CN108364754A (en) | A kind of transformer radiating shell and its application method | |
CN104252945B (en) | A kind of offshore wind farm tower dry-type transformer | |
CN207558545U (en) | A kind of transformer cooling device | |
CN204102666U (en) | A kind of transformer case with water cooling function | |
CN204596575U (en) | A kind ofly be convenient to the dry-type transformer changing cooling blower online | |
CN104393739A (en) | Power cabinet heat dissipation system | |
CN202307436U (en) | Water-cooling reactor | |
CN107403682A (en) | A kind of transformer cooling device | |
CN205229361U (en) | Air -cooled transformer experiment device of strong oil direction | |
CN203799788U (en) | Dry-type transformer | |
CN204117767U (en) | A kind of Oversea wind power generation dry-type transformer | |
CN207135419U (en) | A kind of Electric Appliance Cabinet of perfect heat-dissipating | |
CN105244145B (en) | A kind of liquid cooling apparatus based on oil-immersed type transformer radiator | |
CN204010821U (en) | A kind of hyperconductive cable circulating cooling system | |
CN207993624U (en) | A kind of almag cooler | |
CN207503772U (en) | A kind of high-power transformer cooling mechanism | |
CN105469942A (en) | Marine transformer cabinet | |
CN210984466U (en) | Cooling structure of non-encapsulated dry-type transformer | |
CN204045340U (en) | A kind of cooling device of main transformer radiator | |
CN209371839U (en) | A kind of radiator with leak alarm function | |
CN209297884U (en) | A kind of self-circulating wind cold type oil-immersed type transformer | |
CN108074717A (en) | A kind of current transformer for cooling of alarming |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |