CN105303020A - AHP-based method for natural disaster risk assessment of power grid - Google Patents

AHP-based method for natural disaster risk assessment of power grid Download PDF

Info

Publication number
CN105303020A
CN105303020A CN201410334145.5A CN201410334145A CN105303020A CN 105303020 A CN105303020 A CN 105303020A CN 201410334145 A CN201410334145 A CN 201410334145A CN 105303020 A CN105303020 A CN 105303020A
Authority
CN
China
Prior art keywords
index
risk
evaluation index
assessment
electrical network
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410334145.5A
Other languages
Chinese (zh)
Inventor
马维青
唐保国
杨军
宋述停
穆昭玺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Yangquan Power Supply Co of State Grid Shanxi Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Yangquan Power Supply Co of State Grid Shanxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Yangquan Power Supply Co of State Grid Shanxi Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410334145.5A priority Critical patent/CN105303020A/en
Publication of CN105303020A publication Critical patent/CN105303020A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provides an AHP-based method for natural disaster risk assessment of a power grid. The method comprises: performing statistical analysis on historical disasters and historical weather forecast information in a region in which an assessed power grid is located, and constructing a risk assessment indicator system through harm identification and vulnerability analysis; constructing a natural disaster risk estimation model of the assessed power grid by using an improved analytic hierarchy process; determining a relative weight of each assessment indicator by using the analytic hierarchy process; determining a risk value the of each assessment indicator based on a preset risk assessment standard; calculating a comprehensive risk value by using the risk value of each assessment indicator and the relative weight of each assessment indicator as an input value of the natural disaster risk assessment model; and establishing a risk level standard so as to obtain a final risk level of the assessed power grid. Impacts from the natural environment and the social environment are comprehensively considered, and comprehensive assessment that combines qualitative and quantitative assessment is performed on the natural disasters of a power grid, thereby providing a theoretical basis for ensuring safe and stable operation of the power grid and for reducing economic loss.

Description

A kind of electrical network natural hybridized orbit appraisal procedure based on AHP
Technical field
The invention belongs to power system security and risk assessment technology field, be specifically related to a kind of electrical network natural hybridized orbit appraisal procedure based on AHP.
Background technology
In recent years, along with the development of China's electric system, network system is also developed rapidly, network system working voltage grade improves constantly, network size also constantly expands, at present, China has defined Northeast China Power Grid, North China Power Telecommunication Network, Central China Power Grid, East China Power Grid, Northwest Grid and south electric network 6 large area electrical network transprovincially, and has basically formed complete long distance powedr transmission Net Frame of Electric Network.Power grid construction has become the Main way of China's power construction, and electric power netting safe running is the key ensureing whole Operation of Electric Systems safety.Once network system meets with accidental pollution event, be not only the loss of electrical network itself, bring the loss of great material, spirit, property aspect also to country and society simultaneously.Therefore, electrical network natural hybridized orbit is assessed, to adopt an effective measure, loss is reduced to minimum, have important practical significance.
In prior art, when assessing power grid risk, usually only considering the electrical specification of electric system, there is the problem that assessment result accuracy is limited.
Summary of the invention
For the defect that prior art exists, the invention provides a kind of electrical network natural hybridized orbit appraisal procedure based on AHP, in order to solve the problem.
The technical solution used in the present invention is as follows:
The invention provides a kind of electrical network natural hybridized orbit appraisal procedure based on AHP, comprise the following steps:
S1, carries out statistical study to the history the condition of a disaster of evaluated electrical network location and history Weather Forecast Information, is built the Risk Assessment Index System of described evaluated electrical network by Danger recognition, vulnerability analysis; Wherein, described Risk Assessment Index System is made up of several evaluation indexes; The one-level evaluation index that described evaluation index comprises is: natural cause influence index, electrical network characteristic index, combat a natural disaster restoring force index and social influence index; Each one-level evaluation index comprises several secondary evaluation indexs; Each secondary evaluation index also comprises several three-tiered evaluation indexs; By that analogy, multistage evaluation index system is formed;
S2, according to the membership between evaluation index at different levels in described Risk Assessment Index System, utilizes improved H to build the natural hybridized orbit assessment models of evaluated electrical network; Wherein, described natural hybridized orbit assessment models is by being from bottom to top sequentially made up of multiple layer; The evaluation index of every one deck is the evaluation index with one-level in assessment indicator system; Further, lower floor's evaluation index is the sub-index of corresponding evaluation index in upper strata;
S3, adopts analytical hierarchy process to determine the relative weighting of each evaluation index in described natural hybridized orbit assessment models;
S4, based on the risk assessment standard preset, determines the value-at-risk of each evaluation index;
S5, using the relative weighting of the value-at-risk of each evaluation index and each evaluation index as the input value of described natural hybridized orbit assessment models, calculates the integrated risk value of described evaluated electrical network;
S6, build risk level standard, described risk level standard is made up of w risk class; The corresponding value-at-risk interval of each risk class, is respectively: (x on i, x under i), i=1,2,3,4 ... w; Wherein, x on i, x under ifor the boundary value in each interval;
S7, what judge each risk class in the integrated risk value that S5 calculates and described risk level standard is subordinate to situation, obtains the ultimate risk grade of described evaluated electrical network.
Preferably, in S1, described secondary evaluation index comprises:
Rainfall amount, icing situation and high wind conditions are as the secondary evaluation index of natural cause influence index;
Electrical network subtracts for load condition, power network line situation, Network Voltage Deviation and the mains frequency deviation secondary evaluation index as electrical network characteristic index;
Early warning processing power, material stock ability and repairing recovery capability are as combating a natural disaster the secondary evaluation index of restoring force index;
Area death toll, regional severely injured number, Area Inhabitants customer interrupted ratio and regional direct economic loss are as the secondary evaluation index of social influence index.
Preferably, S3 is specially:
S31, determines the relative importance of each evaluation index in described Risk Assessment Index System;
S32, is configured to consistent judgment matrix by described relative importance;
S33, calculates the eigenvalue of maximum corresponding to constructed consistent judgment matrix and corresponding proper vector, and after normalized, the proper vector obtained is the weight of corresponding evaluation index;
S34, advances layer by layer by the hierarchical relationship between index, obtains the weight of each index successively, finally obtains the weight that first class index is corresponding.
Preferably, S4 is specially:
Described evaluation index divides into qualitative assessment index and qualitative evaluation index;
For qualitative evaluation index, expertise scoring is adopted to determine the value-at-risk of described qualitative evaluation index;
For qualitative assessment index, fuzzy membership function is adopted to calculate the value-at-risk of described qualitative assessment index.
Beneficial effect of the present invention is as follows:
Electrical network natural hybridized orbit appraisal procedure based on AHP provided by the invention, breach the limitation of traditional appraisal procedure centered by power equipment physical characteristics, consider physical environment and all many-sided impacts of social environment, electrical network natural hybridized orbit is carried out to the comprehensive assessment of combination of qualitative and quantitative analysis, for guarantee power network safety operation, reduce economic loss provide theoretical foundation.
Accompanying drawing explanation
Fig. 1 is the schematic flow sheet of the electrical network natural hybridized orbit appraisal procedure based on AHP provided by the invention.
Embodiment
Below in conjunction with accompanying drawing, the present invention is described in detail:
As shown in Figure 1, the invention provides a kind of electrical network natural hybridized orbit appraisal procedure based on AHP, comprise the following steps:
S1, statistical study is carried out to the history the condition of a disaster of evaluated electrical network location and history Weather Forecast Information, by Danger recognition, vulnerability analysis, determine several evaluation indexes larger to electric power netting safe running influence degree, thus build the Risk Assessment Index System of described evaluated electrical network; Wherein, described Risk Assessment Index System is made up of several evaluation indexes; The one-level evaluation index that described evaluation index comprises is: natural cause influence index, electrical network characteristic index, combat a natural disaster restoring force index and social influence index; Each one-level evaluation index comprises several secondary evaluation indexs; Each secondary evaluation index also comprises several three-tiered evaluation indexs; By that analogy, multistage evaluation index system is formed;
By the impact investigated different regions disaster with suiting measures to local conditions a situation arises and cause electrical network, namely carry out Danger recognition and vulnerability analysis, the accuracy of power grid risk assessment can be improved further.
In practical application, rainfall amount, icing situation and high wind conditions can be used as the secondary evaluation index of natural cause influence index; Electrical network subtracts the secondary evaluation index that can be used as electrical network characteristic index for load condition, power network line situation, Network Voltage Deviation and mains frequency deviation; Early warning processing power, material stock ability and repairing recovery capability can be used as combats a natural disaster the secondary evaluation index of restoring force index; Area death toll, regional severely injured number, Area Inhabitants customer interrupted ratio and regional direct economic loss can be used as the secondary evaluation index of social influence index.
S2, according to the membership between evaluation index at different levels in described Risk Assessment Index System, utilizes improved H to build the natural hybridized orbit assessment models of evaluated electrical network; Wherein, described natural hybridized orbit assessment models adopts hierarchical structure, by being from bottom to top sequentially made up of multiple layer; The evaluation index of every one deck is the evaluation index of same one-level; Further, lower floor's evaluation index is the sub-index of corresponding evaluation index in upper strata;
S3, adopts analytical hierarchy process to determine the relative weighting of each evaluation index in described natural hybridized orbit assessment models;
This step is specially:
S31, determines the relative importance of each evaluation index in described Risk Assessment Index System;
Such as, compare the relative importance of two evaluation indexes, if evaluation index i and evaluation index j is of equal importance, then make C ij=1; If evaluation index i is more important than evaluation index j, then make C ij=2; If evaluation index i is important not as evaluation index j, then make C ij=3.
S32, is configured to consistent judgment matrix by described relative importance;
S33, calculates the eigenvalue of maximum corresponding to constructed consistent judgment matrix and corresponding proper vector, and after normalized, the proper vector obtained is the weight of corresponding evaluation index;
S34, advances layer by layer by the hierarchical relationship between index, obtains the weight of each index successively, finally obtains the weight that first class index is corresponding.
Compared with traditional AHP method, the present invention, under guarantee result accurately prerequisite, had both been convenient to expert and had been made accurate judgment, additionally reduced the calculated amount brought because of the inconsistency of judgment matrix, thus made fast convergence rate, iterations few.
S4, based on the risk assessment standard preset, determines the value-at-risk of each evaluation index;
When determining the value-at-risk of evaluation index, can for operation of power networks situation, according to the expertise knowledge of the relevant criterion each place such as " rescue of electric power safety accident emergency and regulations of investigating " and " China Nanfang Grid Co., Ltd's electrical production accident investigation code ", agriculture products value-at-risk.
Based on mentioned above principle, evaluation index can divide into qualitative assessment index and qualitative evaluation index;
For qualitative evaluation index, expertise scoring is adopted to determine the value-at-risk of described qualitative evaluation index;
For qualitative assessment index, fuzzy membership function is adopted to calculate the wind value of described qualitative assessment index.
S5, using the relative weighting of the value-at-risk of each evaluation index and each evaluation index as the input value of described natural hybridized orbit assessment models, calculates the integrated risk value of described evaluated electrical network;
S6, build risk level standard, described risk level standard is made up of w risk class; The corresponding value-at-risk interval of each risk class, is respectively: (x on i, x under i), i=1,2,3,4 ... w; Wherein, x on i, x under ifor the boundary value in each interval;
Such as, 5 risk class can be built, be respectively: be outstanding, good, general, to worsen and serious.
S7, what judge each risk class in the integrated risk value that S5 calculates and described risk level standard is subordinate to situation, obtains the ultimate risk grade of described evaluated electrical network.
For certain province key city electrical network, the history the statistics of geological disaster situation according to this area is analyzed, and by Danger recognition, vulnerability analysis, sets up the Risk Assessment Index System of this area.Choosing affects more natural cause index to this city and has: rainfall, icing, strong wind; Electrical network characteristic index has: subtract for load, line conditions, voltage deviation, frequency departure; Combating a natural disaster restoring force index has: early warning processing power, material stock ability, repairing recovery capability; Social influence index has: death toll, severely injured number, resident's customer interrupted ratio, direct economic loss.
AHP (analytical hierarchy process, AnalyticHierarchyProcess) method is utilized to build this urban distribution network natural hybridized orbit assessment models; Be specially: the contrast matrix T=(t constructing each level ij) n × n, utilize range method be translated into corresponding judgment matrix T'=(t ' ij) n × n.Utilize Matlab to calculate eigenvalue of maximum and the characteristic of correspondence vector thereof of each judgment matrix, and carry out consistency check.Utilize defined method to calculate the value-at-risk of each evaluation index, after each value-at-risk is quantized according to the regulation in " rescue of electric power safety accident emergency and regulations of investigating ", be worth scale by strong breeze danger, calculate the integrated risk value of electrical network.
In sum, the electrical network natural hybridized orbit appraisal procedure based on AHP provided by the invention, has the following advantages:
(1) limitation of traditional appraisal procedure centered by power equipment physical characteristics is breached, consider physical environment and all many-sided impacts of social environment, electrical network natural hybridized orbit is carried out to the comprehensive assessment of combination of qualitative and quantitative analysis, for guarantee power network safety operation, reduce economic loss provide theoretical foundation;
(2) apply the determination that revised simplex algorithm carries out index weights, not only can obtain assessment result accurately, and simplify calculating process, fast convergence rate, iterations are few;
(3) organically combine qualitative analysis and quantitative test, make that evaluation process is simple and easy to do, assessment result is with a high credibility, thus provide comparatively practical theoretical foundation for defence disaster, urgent danger prevention; By the realization of the method, actively set up electrical network natural hybridized orbit evaluating system, to tackle precipitate disaster, rationally take to dodge the precautionary measures, improve electrical network withstand natural calamities ability, reduce every loss;
(4) the present invention can prevent and reduce the harm of various disaster to power equipment effectively, reduce electric network fault and power outage, to the robustness strengthening electrical network, ensure power grid security economical operation, thus effectively for national economy service has great importance.
The above is only the preferred embodiment of the present invention; it should be pointed out that for those skilled in the art, under the premise without departing from the principles of the invention; can also make some improvements and modifications, these improvements and modifications also should look protection scope of the present invention.

Claims (4)

1., based on an electrical network natural hybridized orbit appraisal procedure of AHP, it is characterized in that, comprise the following steps:
S1, carries out statistical study to the history the condition of a disaster of evaluated electrical network location and history Weather Forecast Information, is built the Risk Assessment Index System of described evaluated electrical network by Danger recognition, vulnerability analysis; Wherein, described Risk Assessment Index System is made up of several evaluation indexes; The one-level evaluation index that described evaluation index comprises is: natural cause influence index, electrical network characteristic index, combat a natural disaster restoring force index and social influence index; Each one-level evaluation index comprises several secondary evaluation indexs; Each secondary evaluation index also comprises several three-tiered evaluation indexs; By that analogy, multistage evaluation index system is formed;
S2, according to the membership between evaluation index at different levels in described Risk Assessment Index System, utilizes improved H to build the natural hybridized orbit assessment models of evaluated electrical network; Wherein, described natural hybridized orbit assessment models is by being from bottom to top sequentially made up of multiple layer; The evaluation index of every one deck is the evaluation index with one-level in assessment indicator system; Further, lower floor's evaluation index is the sub-index of corresponding evaluation index in upper strata;
S3, adopts analytical hierarchy process to determine the relative weighting of each evaluation index in described natural hybridized orbit assessment models;
S4, based on the risk assessment standard preset, determines the value-at-risk of each evaluation index;
S5, using the relative weighting of the value-at-risk of each evaluation index and each evaluation index as the input value of described natural hybridized orbit assessment models, calculates the integrated risk value of described evaluated electrical network;
S6, build risk level standard, described risk level standard is made up of w risk class; The corresponding value-at-risk interval of each risk class, is respectively: (x on i, x under i), i=1,2,3,4 ... w; Wherein, x on i, x under ifor the boundary value in each interval;
S7, what judge each risk class in the integrated risk value that S5 calculates and described risk level standard is subordinate to situation, obtains the ultimate risk grade of described evaluated electrical network.
2. the electrical network natural hybridized orbit appraisal procedure based on AHP according to claim 1, is characterized in that, in S1, described secondary evaluation index comprises:
Rainfall amount, icing situation and high wind conditions are as the secondary evaluation index of natural cause influence index;
Electrical network subtracts for load condition, power network line situation, Network Voltage Deviation and the mains frequency deviation secondary evaluation index as electrical network characteristic index;
Early warning processing power, material stock ability and repairing recovery capability are as combating a natural disaster the secondary evaluation index of restoring force index;
Area death toll, regional severely injured number, Area Inhabitants customer interrupted ratio and regional direct economic loss are as the secondary evaluation index of social influence index.
3. the electrical network natural hybridized orbit appraisal procedure based on AHP according to claim 1, it is characterized in that, S3 is specially:
S31, determines the relative importance of each evaluation index in described Risk Assessment Index System;
S32, is configured to consistent judgment matrix by described relative importance;
S33, calculates the eigenvalue of maximum corresponding to constructed consistent judgment matrix and corresponding proper vector, and after normalized, the proper vector obtained is the weight of corresponding evaluation index;
S34, advances layer by layer by the hierarchical relationship between index, obtains the weight of each index successively, finally obtains the weight that first class index is corresponding.
4. the electrical network natural hybridized orbit appraisal procedure based on AHP according to claim 1, it is characterized in that, S4 is specially:
Described evaluation index divides into qualitative assessment index and qualitative evaluation index;
For qualitative evaluation index, expertise scoring is adopted to determine the value-at-risk of described qualitative evaluation index;
For qualitative assessment index, fuzzy membership function is adopted to calculate the value-at-risk of described qualitative assessment index.
CN201410334145.5A 2014-07-14 2014-07-14 AHP-based method for natural disaster risk assessment of power grid Pending CN105303020A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410334145.5A CN105303020A (en) 2014-07-14 2014-07-14 AHP-based method for natural disaster risk assessment of power grid

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410334145.5A CN105303020A (en) 2014-07-14 2014-07-14 AHP-based method for natural disaster risk assessment of power grid

Publications (1)

Publication Number Publication Date
CN105303020A true CN105303020A (en) 2016-02-03

Family

ID=55200287

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410334145.5A Pending CN105303020A (en) 2014-07-14 2014-07-14 AHP-based method for natural disaster risk assessment of power grid

Country Status (1)

Country Link
CN (1) CN105303020A (en)

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105763562A (en) * 2016-04-15 2016-07-13 全球能源互联网研究院 Electric power information network vulnerability threat evaluation model establishment method faced to electric power CPS risk evaluation and evaluation system based on the model
CN105893758A (en) * 2016-04-01 2016-08-24 河北工程大学 WMNT gas explosion disaster risk evaluation method
CN106021946A (en) * 2016-05-30 2016-10-12 北京师范大学 Risk fuzzy synthetic evaluation method for regional water environment
CN106156797A (en) * 2016-07-08 2016-11-23 常熟理工学院 A kind of evaluation methodology of diesel particulate emission hazard
CN106447044A (en) * 2016-10-27 2017-02-22 四川大学 Risk assessment method based on Shapley value and interaction index
CN106447088A (en) * 2016-09-08 2017-02-22 成都希盟泰克科技发展有限公司 Construction site disaster prediction method based on genetic algorithm
CN107292478A (en) * 2016-04-13 2017-10-24 中国电力科学研究院 A kind of disaster influences the acquisition methods of situation on power distribution network
CN107943880A (en) * 2017-11-15 2018-04-20 国网四川省电力公司经济技术研究院 A kind of susceptibility of geological hazards based on analytic hierarchy process (AHP) improves appraisal procedure
CN108804381A (en) * 2018-04-13 2018-11-13 江苏省气象科学研究所 City flash flood calamity degree computation model
CN109472428A (en) * 2018-01-24 2019-03-15 国网浙江省电力公司湖州供电公司 A kind of power distribution network operation risk assessment method based on loss expectation method
CN109858729A (en) * 2018-12-05 2019-06-07 广东电网有限责任公司 A kind of power distribution network methods of risk assessment and device
CN110459329A (en) * 2019-07-11 2019-11-15 广东省公共卫生研究院 A kind of dengue fever risk integrative assessment method
CN111062588A (en) * 2019-11-30 2020-04-24 贵州电网有限责任公司 Regional power grid equipment heavy rainfall disaster influence assessment method based on hierarchical analysis
CN111489091A (en) * 2020-04-14 2020-08-04 广东电网有限责任公司广州供电局 Comprehensive evaluation method for restoring force of power system
CN111738546A (en) * 2020-05-19 2020-10-02 无锡融合大数据创新中心有限公司 Power equipment state evaluation system
CN111882244A (en) * 2020-08-07 2020-11-03 中国地质科学院水文地质环境地质研究所 Construction method of multi-source homeland development risk assessment system based on hierarchical framework
CN112365100A (en) * 2020-12-08 2021-02-12 国网四川省电力公司内江供电公司 Power grid disaster early warning and coping method based on disaster risk comprehensive assessment
CN114065127A (en) * 2021-11-04 2022-02-18 国网辽宁省电力有限公司电力科学研究院 Regional power grid environment risk assessment method
CN114254963A (en) * 2022-03-01 2022-03-29 航天宏图信息技术股份有限公司 Natural disaster comprehensive risk assessment method and device, electronic equipment and storage medium
CN114819259A (en) * 2022-03-11 2022-07-29 国网浙江省电力有限公司绍兴供电公司 Method for evaluating regional disasters based on disaster power indexes
CN115510669A (en) * 2022-10-11 2022-12-23 昆明理工大学 Power transmission line seismic loss assessment method based on GIS fuzzy analysis
CN115713239A (en) * 2022-12-07 2023-02-24 中国南方电网有限责任公司超高压输电公司广州局 Operation and maintenance risk prediction method and device, computer equipment and storage medium
US11693763B2 (en) 2019-07-30 2023-07-04 General Electric Company Resilient estimation for grid situational awareness
CN116562681A (en) * 2023-03-30 2023-08-08 深圳市城市公共安全技术研究院有限公司 Forest recovery evaluation method and device after disaster, storage medium and electronic equipment

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103439593A (en) * 2013-07-31 2013-12-11 国家电网公司 Distributed power grid risk assessment system and distributed power grid risk assessment method based on fault feature of electric circuit

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103439593A (en) * 2013-07-31 2013-12-11 国家电网公司 Distributed power grid risk assessment system and distributed power grid risk assessment method based on fault feature of electric circuit

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
何永秀等: "城市电网规划自然灾害风险评价研究", 《电工技术学报》 *
周景等: "基于AHP的电网自然灾害风险评估方法", 《电力建设》 *
赵云飞等: "层次分析法及其在电力系统中的应用", 《电力自动化设备》 *
金菊良等: "改进的层次分析法及其在自然灾害风险识别中的应用", 《自然灾害学报》 *

Cited By (33)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105893758A (en) * 2016-04-01 2016-08-24 河北工程大学 WMNT gas explosion disaster risk evaluation method
CN107292478B (en) * 2016-04-13 2022-08-09 中国电力科学研究院 Method for acquiring influence situation of disaster on power distribution network
CN107292478A (en) * 2016-04-13 2017-10-24 中国电力科学研究院 A kind of disaster influences the acquisition methods of situation on power distribution network
CN105763562B (en) * 2016-04-15 2019-04-09 全球能源互联网研究院 Power Information Network method for establishing model and system towards electric power CPS risk assessment
CN105763562A (en) * 2016-04-15 2016-07-13 全球能源互联网研究院 Electric power information network vulnerability threat evaluation model establishment method faced to electric power CPS risk evaluation and evaluation system based on the model
CN106021946A (en) * 2016-05-30 2016-10-12 北京师范大学 Risk fuzzy synthetic evaluation method for regional water environment
CN106156797A (en) * 2016-07-08 2016-11-23 常熟理工学院 A kind of evaluation methodology of diesel particulate emission hazard
CN106156797B (en) * 2016-07-08 2019-10-11 常熟理工学院 A kind of evaluation method of diesel particulate emission hazard
CN106447088A (en) * 2016-09-08 2017-02-22 成都希盟泰克科技发展有限公司 Construction site disaster prediction method based on genetic algorithm
CN106447088B (en) * 2016-09-08 2021-03-26 成都希盟泰克科技发展有限公司 Construction site disaster prediction method based on genetic algorithm
CN106447044A (en) * 2016-10-27 2017-02-22 四川大学 Risk assessment method based on Shapley value and interaction index
CN107943880A (en) * 2017-11-15 2018-04-20 国网四川省电力公司经济技术研究院 A kind of susceptibility of geological hazards based on analytic hierarchy process (AHP) improves appraisal procedure
CN107943880B (en) * 2017-11-15 2022-04-01 国网四川省电力公司经济技术研究院 Geological disaster susceptibility improvement and evaluation method based on analytic hierarchy process
CN109472428A (en) * 2018-01-24 2019-03-15 国网浙江省电力公司湖州供电公司 A kind of power distribution network operation risk assessment method based on loss expectation method
CN108804381A (en) * 2018-04-13 2018-11-13 江苏省气象科学研究所 City flash flood calamity degree computation model
CN109858729A (en) * 2018-12-05 2019-06-07 广东电网有限责任公司 A kind of power distribution network methods of risk assessment and device
CN110459329A (en) * 2019-07-11 2019-11-15 广东省公共卫生研究院 A kind of dengue fever risk integrative assessment method
CN110459329B (en) * 2019-07-11 2022-11-18 广东省公共卫生研究院 Dengue fever risk comprehensive assessment method
US11693763B2 (en) 2019-07-30 2023-07-04 General Electric Company Resilient estimation for grid situational awareness
CN111062588A (en) * 2019-11-30 2020-04-24 贵州电网有限责任公司 Regional power grid equipment heavy rainfall disaster influence assessment method based on hierarchical analysis
CN111489091A (en) * 2020-04-14 2020-08-04 广东电网有限责任公司广州供电局 Comprehensive evaluation method for restoring force of power system
CN111738546A (en) * 2020-05-19 2020-10-02 无锡融合大数据创新中心有限公司 Power equipment state evaluation system
CN111882244A (en) * 2020-08-07 2020-11-03 中国地质科学院水文地质环境地质研究所 Construction method of multi-source homeland development risk assessment system based on hierarchical framework
CN112365100A (en) * 2020-12-08 2021-02-12 国网四川省电力公司内江供电公司 Power grid disaster early warning and coping method based on disaster risk comprehensive assessment
CN112365100B (en) * 2020-12-08 2024-05-10 国网四川省电力公司内江供电公司 Disaster risk comprehensive assessment-based power grid disaster early warning and response method
CN114065127A (en) * 2021-11-04 2022-02-18 国网辽宁省电力有限公司电力科学研究院 Regional power grid environment risk assessment method
CN114254963A (en) * 2022-03-01 2022-03-29 航天宏图信息技术股份有限公司 Natural disaster comprehensive risk assessment method and device, electronic equipment and storage medium
CN114254963B (en) * 2022-03-01 2022-05-20 航天宏图信息技术股份有限公司 Natural disaster comprehensive risk assessment method and device, electronic equipment and storage medium
CN114819259A (en) * 2022-03-11 2022-07-29 国网浙江省电力有限公司绍兴供电公司 Method for evaluating regional disasters based on disaster power indexes
CN115510669A (en) * 2022-10-11 2022-12-23 昆明理工大学 Power transmission line seismic loss assessment method based on GIS fuzzy analysis
CN115713239A (en) * 2022-12-07 2023-02-24 中国南方电网有限责任公司超高压输电公司广州局 Operation and maintenance risk prediction method and device, computer equipment and storage medium
CN115713239B (en) * 2022-12-07 2024-04-02 中国南方电网有限责任公司超高压输电公司广州局 Operation and maintenance risk prediction method, device, computer equipment and storage medium
CN116562681A (en) * 2023-03-30 2023-08-08 深圳市城市公共安全技术研究院有限公司 Forest recovery evaluation method and device after disaster, storage medium and electronic equipment

Similar Documents

Publication Publication Date Title
CN105303020A (en) AHP-based method for natural disaster risk assessment of power grid
Peng et al. Urban flooding risk assessment based on GIS-game theory combination weight: A case study of Zhengzhou City
Mili et al. Developing a holistic model for earthquake risk assessment and disaster management interventions in urban fabrics
Liang et al. Risk assessment for long-distance gas pipelines in coal mine gobs based on structure entropy weight method and multi-step backward cloud transformation algorithm based on sampling with replacement
CN105894096B (en) A kind of grounding net of transformer substation state evaluating method based on cloud model
CN105035902B (en) A kind of elevator safety condition evaluation method
CN103093400A (en) Adjacent building safety quantitative evaluation method in tunnel construction
CN107742040A (en) A kind of power transmission line comprehensive methods of risk assessment based on TOPSIS and optimum combination weight
Zhang Analysis on comprehensive risk assessment for urban fire: The case of Haikou City
CN107491694B (en) Method for quantitative evaluation SCADA system information security fragility
CN104281920A (en) Tailing pond layered index safety assessment and early-warning method and system
CN110135093A (en) City road traffic system toughness appraisal procedure towards waterlogging
Liu et al. Study of a comprehensive assessment method for coal mine safety based on a hierarchical grey analysis
CN109685339A (en) Static-dynamic risk assessment method and system for traffic infrastructure construction engineering
CN106209829A (en) A kind of network security management system based on warning strategies
CN104732448A (en) Power grid infrastructure vulnerability evaluation method
CN105809572A (en) Evaluation method for long distance water transporting system's safety based on the multiple factors at play of procedure objectives
CN113837549A (en) Natech risk calculation method and system based on coupling probability model and information diffusion method
CN105046421A (en) Comprehensive safety evaluation method for electric vehicle charging facility
Hu et al. Early warning method for overseas natural gas pipeline accidents based on FDOOBN under severe environmental conditions
CN114881511A (en) Flood disaster-oriented community disaster-prevention toughness evaluation method
CN109615237A (en) A kind of Safety of Gas Station appraisal procedure based on three-dimensional risk analysis
CN108615098A (en) Water supply network pipeline burst Risk Forecast Method based on Bayesian survival analysis
Ching et al. Predicting rainfall-induced landslide potential along a mountain road in Taiwan
Alrehaili A systematic review of the emergency planning for flash floods response in the kingdom of Saudi Arabia

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160203