CN105301635B - A kind of construction method and device of marine streamer time-lapse seismic data - Google Patents

A kind of construction method and device of marine streamer time-lapse seismic data Download PDF

Info

Publication number
CN105301635B
CN105301635B CN201510649649.0A CN201510649649A CN105301635B CN 105301635 B CN105301635 B CN 105301635B CN 201510649649 A CN201510649649 A CN 201510649649A CN 105301635 B CN105301635 B CN 105301635B
Authority
CN
China
Prior art keywords
seismic data
lapse seismic
shot point
time
big gun
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510649649.0A
Other languages
Chinese (zh)
Other versions
CN105301635A (en
Inventor
张立彬
凌云
邹振
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
BGP Inc
Original Assignee
China National Petroleum Corp
BGP Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Petroleum Corp, BGP Inc filed Critical China National Petroleum Corp
Priority to CN201510649649.0A priority Critical patent/CN105301635B/en
Publication of CN105301635A publication Critical patent/CN105301635A/en
Application granted granted Critical
Publication of CN105301635B publication Critical patent/CN105301635B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The embodiment of the present application provides a kind of construction method and device of marine streamer time-lapse seismic data.This method includes:First phase time-lapse seismic data and second phase time-lapse seismic data are obtained in advance;Travel through each big gun inspection pair in each shot point in the first phase time-lapse seismic data, and the time-lapse seismic data of traversal first shot point.The time-lapse seismic data of the first shot point are obtained from first phase time-lapse seismic data;It is determined that the second phase time-lapse seismic data in default circle scope;Obtain in the time-lapse seismic data of the first shot point the first bombard inspection to information;Judge big gun inspection in the second phase time-lapse seismic data in default circle scope to information whether with the first bombard examine to information match;When mismatch when, from the second phase time-lapse seismic data in default round scope choose meet preparatory condition big gun inspection to information as the time-lapse seismic data after structure.The technical scheme provided beneficial to the embodiment of the present application can effectively improve the repeatability of two phase time-lapse seismic data.

Description

A kind of construction method and device of marine streamer time-lapse seismic data
Technical field
The present invention relates to time-lapse seismic technical field, more particularly to a kind of construction method of marine streamer time-lapse seismic data And device.
Background technology
Time-lapse seismic technology is the different information progress Reservoir behavior spy for many phase seismic responses of same survey area Levy the technology of research.When the seismic response features of non-reservoir rock are not changed over time, it can be divided by time-lapse seismic technology The oil reservoirs such as reservoir inner pore pressure, porosity, fluid composition, fluid saturation and temperature of the precipitation caused by mining factor are special Property situation of change, so as to understand the situation of change of fluid flow and fluid composition in reservoir, to formulate or more fresh oil Gas development plan provides effective foundation.
In the prior art, typically subtracting each other two reproducible phase time-lapse seismic data can eliminate by non-reservoir rock The seismic response of the formation such as construction, lithology, obtains difference seismic response.Can be with Study In Reservoir using the difference seismic response The situation of change of fluid flow and fluid composition.But in time-lapse seismic exploration implementation process, particularly marine streamer When gathering time-lapse seismic data, due to being limited by the specific construction environment such as tide, stormy waves, ocean current and acquisition condition, hull The receiving position of each wave detector is all difficult to accurate control on the shot position excited during traveling and towing cable.This results in two The repeatability of the marine time-lapse seismic data of phase is difficult to be protected so that two phase geological datas subtract each other differently ringing of obtaining Both reservoir fluid has been included in answering and has changed the expectation difference produced, the unexpected difference of non-changes in reservoir generation is included again.Therefore, nothing Method accurately obtains the situation of change of fluid flow and fluid composition in reservoir according to difference geological data, it is impossible to formulate Or the effective foundation of oil and gas development scheme offer is provided.
The content of the invention
The purpose of the application is to provide a kind of construction method and device of marine streamer time-lapse seismic data, to improve for two phases The repeatability of time-lapse seismic data, it is hereby achieved that accurately reflecting the change of fluid flow and fluid composition in reservoir The difference geological data of situation, effective foundation is provided to formulate or updating oil and gas development scheme.
To achieve these goals, it is described this application provides a kind of construction method of marine streamer time-lapse seismic data Method includes:First phase time-lapse seismic data and second phase time-lapse seismic data are obtained in advance;With traveling through the first phase time shift Each shot point in data is shaken, operations described below is performed to each shot point in the first phase time-lapse seismic data:
The time-lapse seismic data of the first shot point are obtained from the first phase time-lapse seismic data;
It is determined that the second phase time-lapse seismic data in default circle scope, the default circle is included with the position of first shot point It is set to the center of circle, and using the shot point error threshold that pre-sets as the circle of radius;
Each big gun inspection pair in the time-lapse seismic data of first shot point is traveled through, to each big gun in first shot point Inspection is to performing operations described below:
Obtain in the time-lapse seismic data of first shot point the first bombard inspection to information;
Judge big gun inspection in the second phase time-lapse seismic data in the default round scope to information whether with described the One big gun inspection to information match;
When judged result is mismatches, choose and meet from the second phase time-lapse seismic data in the default round scope Preparatory condition big gun inspection to information be used as the time-lapse seismic data after structure.
In a preferred embodiment, methods described also includes:
When judged result is matching, by the second phase time-lapse seismic data in the default round scope with described first Big gun inspection to information match big gun inspection to information be used as the time-lapse seismic data after structure.
In a preferred embodiment, chosen in the second phase time-lapse seismic data out of described default round scope Meet preparatory condition big gun inspection to information include as the time-lapse seismic data after structure:
Calculate first bombard inspection to shot point and the in the second phase time-lapse seismic data in the default round scope Second Artillery Force's inspection shot point shot point distance, calculate first bombard inspection to geophone station and second big gun examine to geophone station Between geophone interval from calculating the shot point distance with the geophone interval from sum;
The shot point error threshold pre-set described in being less than when shot point distance, and the geophone interval is from less than advance During the geophone station error threshold of setting, and the shot point distance and the geophone interval from sum be less than the big gun that pre-sets and examine During to error threshold, by the minimum shot point distance of numerical value and the geophone interval from sum corresponding to big gun inspection to letter Cease as the time-lapse seismic data after building.
In a preferred embodiment, methods described also includes:
In a preferred embodiment, the shot point error threshold is set to 70m.
In a preferred embodiment, the geophone station error threshold is set to 50m.
In a preferred embodiment, the big gun inspection is set to 100m to error threshold.
A kind of construction device of marine streamer time-lapse seismic data, described device includes:
Presetting module, for obtaining first phase time-lapse seismic data and second phase time-lapse seismic data in advance;Traversal is described Each big gun inspection in each shot point in first phase time-lapse seismic data, and the time-lapse seismic data of traversal first shot point It is right;
First data acquisition module, the time-lapse seismic for obtaining the first shot point from the first phase time-lapse seismic data Data;
First determining module, for determining the second phase time-lapse seismic data in default circle scope, the default circle includes The center of circle is in position using first shot point, and using the shot point error threshold that pre-sets as the circle of radius;
In second data acquisition module, the time-lapse seismic data for obtaining first shot point the first bombard inspection to letter Breath;
Judge module, for judge the big gun in the second phase time-lapse seismic data in the default round scope inspection to information Whether with the first bombard examine to information match;
First data processing module, for when the judged result of the judge module is mismatches, from the default circle In the range of second phase time-lapse seismic data in choose meet the big gun inspection of preparatory condition to information as the time shift after structure Shake data.
In a preferred embodiment, described device also includes:
Second data processing module, for when the judged result of the judge module is matching, by the default round model Enclose in interior second phase time-lapse seismic data examined with the first bombard to information match big gun inspection to information as structure Time-lapse seismic data afterwards.
In a preferred embodiment, the first data processing module includes:
Computing unit, for calculate first bombard inspection to shot point and the second phase time shift in the default round scope Shake the second big gun inspection in data shot point shot point distance, calculate first bombard inspection to geophone station and second big gun Examine geophone station geophone interval from calculating the shot point distance with the geophone interval from sum;
Data processing unit, for being less than the shot point error threshold pre-set when shot point distance, and it is described When geophone interval is from less than the geophone station error threshold pre-set, and the shot point distance and the geophone interval from sum When examining less than the big gun pre-set to error threshold, by the minimum shot point distance of numerical value with the geophone interval from sum institute The inspection of corresponding big gun to information be used as the time-lapse seismic data after structure.
In a preferred embodiment, described device also includes:
In a preferred embodiment, the shot point error threshold is set to 70m.
In a preferred embodiment, the geophone station error threshold is set to 50m.
In a preferred embodiment, the big gun inspection is set to 100m to error threshold.
The technical scheme provided from above the embodiment of the present application, the embodiment of the present application passes through to by first phase time shift Each geophone station in each shot point in shake data is matched with the geophone station in second phase time-lapse seismic data successively, and From the second phase time-lapse seismic data in the default round scope choose meet preparatory condition big gun inspection to information as structure Time-lapse seismic data after building.Time-lapse seismic data after the structure of acquisition have good collection uniformity, with described first Phase time-lapse seismic data have good repeatability.This feature is beneficial to subsequently obtain determining flow of fluid and stream in reservoir Difference seismic response caused by body composition transfer.Compared with prior art, the technical scheme provided using the embodiment of the present application can To improve the repeatability of two phase time-lapse seismic data, so as to accurately reflect flow of fluid and fluid composition in reservoir beneficial to acquisition Difference geological data, effective foundation is provided to formulate or updating oil and gas development scheme caused by change.
Brief description of the drawings
, below will be to embodiment or existing in order to illustrate more clearly of the embodiment of the present application or technical scheme of the prior art There is the accompanying drawing used required in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments described in application, for those of ordinary skill in the art, are not paying the premise of creative labor Under, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is a kind of flow chart of the first embodiment of the construction method of marine streamer time-lapse seismic data of the application;
Fig. 2 is a kind of flow chart of the second embodiment of the construction method of marine streamer time-lapse seismic data of the application;
Fig. 3 is a kind of schematic diagram of the construction device for marine streamer time-lapse seismic data that the embodiment of the present application is provided;
Fig. 4 is a kind of another signal of the construction device for marine streamer time-lapse seismic data that the embodiment of the present application is provided Figure.
Embodiment
In order that those skilled in the art more fully understand the technical scheme in the application, it is real below in conjunction with the application The accompanying drawing in example is applied, the technical scheme in the embodiment of the present application is clearly and completely described, it is clear that described implementation Example only some embodiments of the present application, rather than whole embodiments.Based on the embodiment in the application, this area is common The every other embodiment that technical staff is obtained under the premise of creative work is not made, should all belong to the application protection Scope.
Below implementing for the embodiment of the present application is described in detail with several specific examples.
Introduce a kind of first embodiment of the construction method of marine streamer time-lapse seismic data of the application first below.Fig. 1 It is a kind of flow chart of the first embodiment of the construction method of marine streamer time-lapse seismic data of the application, although stream is described below Journey includes multiple operations for occurring with particular order, but it should be clearly understood that these processes can include it is more or less Operation, these operations can sequentially be performed or performed parallel.With reference to accompanying drawing 1, the embodiment includes:
First phase time-lapse seismic data and second phase time-lapse seismic data are obtained in advance;Travel through the first phase time-lapse seismic Each shot point in data, operations described below is performed to each shot point in the first phase time-lapse seismic data:
S110:The time-lapse seismic data of the first shot point are obtained from the first phase time-lapse seismic data.
In actual applications, acquisition time-lapse seismic data can be gathered by way of marine streamer.Specifically, described One shot point can include any shot point in the first phase time-lapse seismic data.The time-lapse seismic data of first shot point can With including corresponding to first shot point big gun inspection to information.In certain embodiments, each shot point correspondence is one or more Geophone station, accordingly, the one or more pairs of big gun inspections pair of the first shot point correspondence.
In certain embodiments, the time-lapse seismic number of the first shot point can be obtained from the first phase time-lapse seismic data According to.Specifically, the first phase time-lapse seismic data can include can as later stage time-lapse seismic data to be matched reference number According to.In a specific embodiment, the first phase time-lapse seismic data can include 4 towing cable collections of 100 meters of spacing Time-lapse seismic data, and every towing cable has 368, the wave detector of 12.5 meters of spacing.
S120:It is determined that the second phase time-lapse seismic data in default circle scope, the default circle is included with the first bombard The position of point is the center of circle, and is used as using the shot point error threshold that pre-sets the circle of radius.
In certain embodiments, it may be determined that the second phase time-lapse seismic data in default circle scope, the default circle bag The position using first shot point is included as the center of circle, and is used as using the shot point error threshold that pre-sets the circle of radius.Specifically, institute Later stage time-lapse seismic data to be matched can be included by stating second phase time-lapse seismic data.It is described in a specific embodiment Second phase time-lapse seismic data can include the time-lapse seismic data of 10 towing cable collections of 100 meters of spacing, and every towing cable has 372, the wave detector that 12.5 meters of spacing.
Further, the shot point error threshold pre-set can be including shot point in two phase time-lapse seismic data most Big position interval error value, and when the distance between two shot points is less than the shot point error threshold, it can be determined that two shot points Position for overlap.Specifically, the shot point error threshold can be preset according to application scenarios.It is specific at one In embodiment, the shot point error threshold could be arranged to 70m, but the embodiment of the present application is not limited thereto.
Further, each big gun inspection pair in the time-lapse seismic data of first shot point is traveled through, to first shot point In each big gun inspection to perform operations described below:
S130:Obtain in the time-lapse seismic data of first shot point the first bombard inspection to information.
In certain embodiments, can obtain in the time-lapse seismic data of first shot point the first bombard inspection to letter Breath.First bombard inspection to information can include any big gun inspection in first shot point to shot point positional information and institute State big gun inspection to geophone station positional information.
S140:Judge in the second phase time-lapse seismic data in the default round scope big gun inspection to information whether with institute State the first bombard inspection to information match.
In certain embodiments, step S130 obtain first bombard inspection to information after, it can be determined that it is described default Circle scope in second phase time-lapse seismic data in big gun inspection to information whether with the first bombard examine to information match.
Further, when judge the big gun in the second phase time-lapse seismic data in the default round scope inspection to information With the first bombard examine to information mismatch when, step S150 can be performed.
S150:When judged result is mismatches, selected from the second phase time-lapse seismic data in the default round scope Take meet preparatory condition big gun inspection to information as the time-lapse seismic data after structure.
In certain embodiments, can be out of described default round scope when step S140 judged result is mismatches Second phase time-lapse seismic data in choose meet preparatory condition big gun inspection to information as the time-lapse seismic data after structure. Specifically, can include:Calculate first bombard inspection to shot point and the second phase time-lapse seismic number in the default round scope The second big gun inspection in shot point shot point distance, calculate first bombard inspection to geophone station and second big gun inspection pair Geophone station between geophone interval from calculating the shot point distance with the geophone interval from sum;When the shot point is apart from small In the shot point error threshold pre-set, and the geophone interval from less than the geophone station error threshold pre-set when, And the shot point distance and the geophone interval are when being less than the big gun pre-set from sum and examining to error threshold, numerical value is minimum The shot point distance and the geophone interval from the big gun inspection corresponding to sum to information be used as the time-lapse seismic data after structure. Specifically, the second big gun inspection is examined to that can include any big gun in the second phase time-lapse seismic data in the default round scope It is right.
Further, the shot point error threshold pre-set can be including shot point in two phase time-lapse seismic data most Big position interval error value, and when the distance between two shot points is less than the shot point error threshold, it can be determined that two shot points Position for overlap.Specifically, the shot point error threshold can be preset according to application scenarios.It is specific at one In embodiment, the shot point error threshold could be arranged to 70m, but the embodiment of the present application is not limited thereto.
Further, the geophone station error threshold pre-set can include examining in the two phases time-lapse seismic data The maximum position interval error value of wave point, and when the distance between two geophone stations is less than the shot point error threshold, can sentence The position of disconnected two geophone stations is coincidence.Specifically, the geophone station error threshold can in advance be set according to application scenarios It is fixed.In a specific embodiment, the geophone station error threshold could be arranged to 50m, but the embodiment of the present application not with This is limited.
Further, the big gun inspection pre-set can include big gun inspection pair in two phase time-lapse seismic data to error threshold Maximum position interval error threshold value, the maximum position interval error threshold value include two phase big guns examine to shot position spacing miss Difference and the two phases big gun examine to geophone station position interval error value sum.When the two phases big gun examine to shot position spacing Error amount and the two phases big gun examine to geophone station position interval error value sum be less than the shot point error threshold when, can sentence Disconnected two big guns inspection to position to overlap.Specifically, the big gun inspection can in advance be set to error threshold according to application scenarios It is fixed.In a specific embodiment, big gun inspection could be arranged to 100m to error threshold, but the embodiment of the present application not with This is limited.
As can be seen here, the technical side that a kind of embodiment of construction method of marine streamer time-lapse seismic data of the application is provided Case by by each geophone station in each shot point in first phase time-lapse seismic data successively with second phase time-lapse seismic number Geophone station in is matched, and selection meets default bar from the second phase time-lapse seismic data in the default round scope Part big gun inspection to information be used as the time-lapse seismic data after structure.Time-lapse seismic data after the structure of acquisition have good Uniformity is gathered, there is good repeatability with the first phase time-lapse seismic data.This feature is beneficial to that follow-up obtain can be with Determine flow of fluid and the caused difference seismic response of fluid composition change in reservoir.Compared with prior art, this Shen is utilized Please embodiment provide technical scheme can improve the repeatability of two phase time-lapse seismic data, so as to accurately reflect storage beneficial to acquisition Flow of fluid and the caused difference geological data of fluid composition change, are provided with to formulate or updating oil and gas development scheme in layer The foundation of effect.
The application second embodiment also add extra step on the basis of first embodiment.Introduced below Apply for a kind of construction method for marine streamer time-lapse seismic data that second embodiment is provided.Fig. 2 is that a kind of sea of the application is dragged The flow chart of the second embodiment of the construction method of cable time-lapse seismic data, although flow, which is described below, to be included going out with particular order Existing multiple operations, but it should be clearly understood that these processes can include more or less operations, these operations can be suitable Sequence is performed or parallel execution.As shown in Fig. 2 the embodiment includes:
First phase time-lapse seismic data and second phase time-lapse seismic data are obtained in advance;Travel through the first phase time-lapse seismic Each shot point in data, operations described below is performed to each shot point in the first phase time-lapse seismic data:
S210:The time-lapse seismic data of the first shot point are obtained from the first phase time-lapse seismic data.
S220:It is determined that the second phase time-lapse seismic data in default circle scope, the default circle is included with the first bombard The position of point is the center of circle, and using the shot point error threshold that pre-sets as the circle of radius;
Each big gun inspection pair in the time-lapse seismic data of first shot point is traveled through, to each big gun in first shot point Inspection is to performing operations described below to acquisition third phase time-lapse seismic data:
S230:Obtain in the time-lapse seismic data of first shot point the first bombard inspection to information.
S240:Judge in the second phase time-lapse seismic data in the default round scope big gun inspection to information whether with institute State the first bombard inspection to information phase.
In certain embodiments, when judge the big gun in the second phase time-lapse seismic data in the default round scope inspection pair Information and the first bombard examine to information match when, step S250 can be performed;When judging the default round scope Big gun inspection in interior second phase time-lapse seismic data to information and the first bombard examine to information matches when, step can be performed Rapid S260.
S250:When judged result for matching when, by the second phase time-lapse seismic data in the default round scope with institute State the first bombard inspection to information match big gun inspection to information as the time-lapse seismic data after structure.
In certain embodiments, when judge the big gun in the second phase time-lapse seismic data in the default round scope inspection pair Information and the first bombard examine to information match when, can be by the second phase time-lapse seismic number in the default round scope In with the first bombard examine to information match big gun inspection to information be used as the time-lapse seismic data after structure.
S260:When judged result is mismatches, selected from the second phase time-lapse seismic data in the default round scope Take meet preparatory condition big gun inspection to information as the time-lapse seismic data after structure.
As can be seen here, the technical side that a kind of embodiment of construction method of marine streamer time-lapse seismic data of the application is provided Case by by each geophone station in each shot point in first phase time-lapse seismic data successively with second phase time-lapse seismic number Geophone station in is matched, and selection meets default bar from the second phase time-lapse seismic data in the default round scope Part big gun inspection to information be used as the time-lapse seismic data after structure.Time-lapse seismic data after the structure of acquisition have good Uniformity is gathered, there is good repeatability with the first phase time-lapse seismic data.This feature is beneficial to that follow-up obtain can be with Determine flow of fluid and the caused difference seismic response of fluid composition change in reservoir.Compared with prior art, this Shen is utilized Please embodiment provide technical scheme can improve the repeatability of two phase time-lapse seismic data, so as to accurately reflect storage beneficial to acquisition Flow of fluid and the caused difference geological data of fluid composition change, are provided with to formulate or updating oil and gas development scheme in layer The foundation of effect.
On the other hand the application also provides a kind of embodiment of the construction device of marine streamer time-lapse seismic data, and Fig. 3 is A kind of schematic diagram of the construction device for marine streamer time-lapse seismic data that the embodiment of the present application is provided, with reference to accompanying drawing 3, the dress Putting 300 can include:
Presetting module 310, can be used for obtaining first phase time-lapse seismic data and second phase time-lapse seismic data in advance;Time It is every in each shot point gone through in the first phase time-lapse seismic data, and the time-lapse seismic data of traversal first shot point The inspection pair of one big gun.
First data acquisition module 320, can be used for obtaining the first shot point from the first phase time-lapse seismic data Time-lapse seismic data.
First determining module 330, is determined for the second phase time-lapse seismic data in default circle scope, described default Circle is included using the position of first shot point as the center of circle, and using the shot point error threshold that pre-sets as the circle of radius.
Second data acquisition module 340, can be used for obtaining the first bombard in the time-lapse seismic data of first shot point Examine to information.
Judge module 350, the big gun inspection that can be used for judging in the second phase time-lapse seismic data in the default round scope To information whether with the first bombard examine to information match.
First data processing module 360, when can be used for the judged result when the judge module for matching, from described pre- If circle scope in second phase time-lapse seismic data in choose meet preparatory condition big gun inspection to information as after structure when Move geological data.
Fig. 4 is a kind of another signal of the construction device for marine streamer time-lapse seismic data that the embodiment of the present application is provided Figure.In a preferred embodiment, with reference to accompanying drawing 4, described device 300 can also include:
Second data processing module 370, can be used for when the judged result of the judge module is matching, will be described pre- If circle scope in second phase time-lapse seismic data in the first bombard examine to information match big gun inspection to information make For the time-lapse seismic data after structure.
In a preferred embodiment, the first data processing module 360 can include:
Computing unit, can be used for calculating the first bombard inspection to shot point with second phase in the default round scope when The the second big gun inspection moved in geological data shot point shot point distance, calculate first bombard inspection to geophone station and described the Second Artillery Force's inspection geophone station geophone interval from calculating the shot point distance with the geophone interval from sum;
Data processing unit, can be used for the shot point error threshold pre-set described in being less than when shot point distance, and When the geophone interval is from less than the geophone station error threshold pre-set, and the shot point distance with the geophone interval from it During with examining less than the big gun pre-set to error threshold, by the minimum shot point distance of numerical value with the geophone interval from sum Corresponding big gun inspection to information be used as the time-lapse seismic data after structure.
In a preferred embodiment, the shot point error threshold is set to 70m.
In a preferred embodiment, the geophone station error threshold is set to 50m.
In a preferred embodiment, the big gun inspection is set to 100m to error threshold.
As can be seen here, the embodiment of a kind of construction method of marine streamer time-lapse seismic data of the application and device is provided Technical scheme by by each geophone station in each shot point in first phase time-lapse seismic data successively with second phase time shift Geophone station in geological data is matched, and is chosen and met from the second phase time-lapse seismic data in the default round scope Preparatory condition big gun inspection to information be used as the time-lapse seismic data after structure.Time-lapse seismic data after the structure of acquisition have Good collection uniformity, has good repeatability with the first phase time-lapse seismic data.This feature is beneficial to follow-up obtain To difference seismic response caused by flow of fluid and fluid composition change can be determined in reservoir.Compared with prior art, it is sharp The technical scheme provided with the embodiment of the present application can improve the repeatability of two phase time-lapse seismic data, so that accurate beneficial to obtaining Reflect flow of fluid and the caused difference geological data of fluid composition change in reservoir, to formulate or updating oil and gas development scheme Effective foundation is provided.
Each embodiment in this specification is described by the way of progressive, what each embodiment was stressed be with Between the difference of other embodiment, each embodiment identical similar part mutually referring to.It is real especially for system Apply for example, because it is substantially similar to embodiment of the method, so description is fairly simple, related part is referring to embodiment of the method Part explanation.
Although depicting the application by embodiment, it will be appreciated by the skilled addressee that the application have it is many deformation and Change is without departing from spirit herein, it is desirable to which appended claim includes these deformations and changed without departing from the application's Spirit.

Claims (8)

1. a kind of construction method of marine streamer time-lapse seismic data, it is characterised in that methods described includes:First is obtained in advance Phase time-lapse seismic data and second phase time-lapse seismic data;Each shot point in the first phase time-lapse seismic data is traveled through, it is right Each shot point in the first phase time-lapse seismic data performs operations described below:
The time-lapse seismic data of the first shot point are obtained from the first phase time-lapse seismic data;
It is determined that the second phase time-lapse seismic data in default circle scope, the default circle include using the position of first shot point as The center of circle, and using the shot point error threshold that pre-sets as the circle of radius;
Each big gun inspection pair in the time-lapse seismic data of first shot point is traveled through, to each big gun inspection pair in first shot point Perform operations described below:
Obtain in the time-lapse seismic data of first shot point the first bombard inspection to information;
Judge in the second phase time-lapse seismic data in the default round scope big gun inspection to information whether with the first bombard Examine to information match;
When judged result is mismatches, chosen from the second phase time-lapse seismic data in the default round scope and meet default Condition big gun inspection to information be used as the time-lapse seismic data after structure;
When judged result is matching, it will be examined in the second phase time-lapse seismic data in the default round scope with the first bombard To information match big gun inspection to information be used as the time-lapse seismic data after structure;
Wherein, the big gun inspection pair for meeting preparatory condition is chosen in the second phase time-lapse seismic data out of described default round scope Information include as the time-lapse seismic data after structure:
Calculate first bombard inspection to shot point and the second big gun in the second phase time-lapse seismic data in the default round scope Examine shot point shot point distance, calculate first bombard inspection to geophone station and second big gun inspection to geophone station between Geophone interval is from the calculating shot point distance is with the geophone interval from sum;
When shot point distance is less than the shot point error threshold pre-set, and the geophone interval is from less than pre-setting Geophone station error threshold, and the shot point distance and the geophone interval be less than the big gun pre-set from sum and examine to error threshold During value, using the minimum shot point distance of numerical value and the geophone interval from the big gun inspection corresponding to sum to information be used as structure Time-lapse seismic data afterwards.
2. according to the method described in claim 1, it is characterised in that the shot point error threshold is set to 70m.
3. according to the method described in claim 1, it is characterised in that the geophone station error threshold is set to 50m.
4. according to the method described in claim 1, it is characterised in that the big gun inspection is set to 100m to error threshold.
5. a kind of construction device of marine streamer time-lapse seismic data, it is characterised in that described device includes:
Presetting module, for obtaining first phase time-lapse seismic data and second phase time-lapse seismic data in advance;Travel through described first Each big gun inspection pair in each shot point in phase time-lapse seismic data, and the time-lapse seismic data of the first shot point of traversal;
First data acquisition module, the time-lapse seismic number for obtaining the first shot point from the first phase time-lapse seismic data According to;
First determining module, for determining the second phase time-lapse seismic data in default circle scope, the default circle is included with institute The position for stating the first shot point is the center of circle, and using the shot point error threshold that pre-sets as the circle of radius;
In second data acquisition module, the time-lapse seismic data for obtaining first shot point the first bombard inspection to information;
Judge module, for judge the big gun in the second phase time-lapse seismic data in the default round scope inspection to information whether With the first bombard examine to information match;
First data processing module, for when the judged result of the judge module is mismatches, from the default round scope In interior second phase time-lapse seismic data choose meet preparatory condition big gun inspection to information as the time-lapse seismic number after structure According to;
Second data processing module, for when the judged result of the judge module is matching, by the default round scope Second phase time-lapse seismic data in the first bombard examine to information match big gun inspection to information as structure after Time-lapse seismic data;
Wherein, the first data processing module includes:
Computing unit, for calculate first bombard inspection to shot point and the second phase time-lapse seismic number in the default round scope The second big gun inspection in shot point shot point distance, calculate first bombard inspection to geophone station and second big gun inspection pair Geophone station between geophone interval from calculating the shot point distance with the geophone interval from sum;
Data processing unit, for being less than the shot point error threshold pre-set, and the detection when shot point distance When point distance is less than the geophone station error threshold pre-set, and the shot point distance and the geophone interval from sum be less than When the big gun pre-set is examined to error threshold, by the minimum shot point distance of numerical value with the geophone interval from corresponding to sum Big gun inspection to information be used as the time-lapse seismic data after structure.
6. device according to claim 5, it is characterised in that the shot point error threshold is set to 70m.
7. device according to claim 5, it is characterised in that the geophone station error threshold is set to 50m.
8. device according to claim 5, it is characterised in that the big gun inspection is set to 100m to error threshold.
CN201510649649.0A 2015-10-09 2015-10-09 A kind of construction method and device of marine streamer time-lapse seismic data Active CN105301635B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510649649.0A CN105301635B (en) 2015-10-09 2015-10-09 A kind of construction method and device of marine streamer time-lapse seismic data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510649649.0A CN105301635B (en) 2015-10-09 2015-10-09 A kind of construction method and device of marine streamer time-lapse seismic data

Publications (2)

Publication Number Publication Date
CN105301635A CN105301635A (en) 2016-02-03
CN105301635B true CN105301635B (en) 2017-10-17

Family

ID=55199111

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510649649.0A Active CN105301635B (en) 2015-10-09 2015-10-09 A kind of construction method and device of marine streamer time-lapse seismic data

Country Status (1)

Country Link
CN (1) CN105301635B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112198550B (en) * 2019-07-08 2023-09-26 中国石油天然气集团有限公司 Time-lapse seismic data repeatability measurement method and device

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6208587B1 (en) * 1997-07-10 2001-03-27 Pgs Tensor, Inc. Method of detecting seismic events and for detecting and correcting geometry and statics error in seismic data
WO2009123471A1 (en) * 2008-03-31 2009-10-08 Statoilhydro Asa Method for reflection time shift matching a first and a second set of seismic reflection data
CN104570076A (en) * 2013-10-17 2015-04-29 中国石油化工股份有限公司 Automatic seismic wave first-arrival picking method based on dichotomy

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9772415B2 (en) * 2011-08-05 2017-09-26 Saudi Arabian Oil Company Correcting time lapse seismic data for overburden and recording effects

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6208587B1 (en) * 1997-07-10 2001-03-27 Pgs Tensor, Inc. Method of detecting seismic events and for detecting and correcting geometry and statics error in seismic data
WO2009123471A1 (en) * 2008-03-31 2009-10-08 Statoilhydro Asa Method for reflection time shift matching a first and a second set of seismic reflection data
CN104570076A (en) * 2013-10-17 2015-04-29 中国石油化工股份有限公司 Automatic seismic wave first-arrival picking method based on dichotomy

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
非重复性采集随时间推移地震勘探实例研究;凌云 等;《石油物探》;20070531;第46卷(第3期);第231-248页 *

Also Published As

Publication number Publication date
CN105301635A (en) 2016-02-03

Similar Documents

Publication Publication Date Title
CN112013286B (en) Method and device for positioning pipeline leakage point, storage medium and terminal
CN107918156B (en) Detect the method and device of subsea node acquisition earthquake data polarity
CN106405651B (en) Full waveform inversion initial velocity model construction method based on logging matching
NO342539B1 (en) Consistent fall angle estimation for seismic imaging
CN105301650A (en) Quality monitoring method and quality monitoring device for time-lapse seismic data acquired by marine towline
CN105259570B (en) A kind of marine time-lapse seismic receiving point displacement correction method
CN110954950B (en) Underground transverse wave velocity inversion method, device, computing equipment and storage medium
CN105158795A (en) Seam hole detection method by means of stratum pre-stack texture attribute value
US9482774B2 (en) Variable turn radius for marine vessels
CN104297790B (en) Quantitative evaluation method for offset distribution in fluctuating submarine earthquake observation system
CN108845355A (en) Seismic migration imaging method and device
CN112013285A (en) Method and device for detecting pipeline leakage point, storage medium and terminal
CN113901927B (en) Underwater object shape recognition method based on flow field pressure time course
CN105301635B (en) A kind of construction method and device of marine streamer time-lapse seismic data
CN107076865B (en) Offset footprint analysis for selecting candidate lines for seismic surveying
CN109298450A (en) Earthquake-capturing observation system property analysis method and device
CN205374761U (en) Detection apparatus for urban road and underground piping hidden danger
CN109581484B (en) Method and device for analyzing total illumination index of seismic longitudinal wave component multiples
CN112684498A (en) Reservoir fracture prediction method and system based on wide-azimuth seismic data
US11454734B2 (en) Automated extraction of horizon patches from seismic data
CN113568041A (en) Repeatability analysis method and system for time-lapse seismic three-dimensional streamer acquisition data
CN105259568B (en) A kind of method and apparatus of determination exploratory area shot point maximum offset
CN113740906A (en) Underwater vertical cable seismic wave interference imaging method and device
CN105204070B (en) A kind of inclined detection method and device of big gun
CN112179566A (en) Gun array seismic source air leakage early warning method and system for marine streamer acquisition

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant