CN105301635A CN201510649649.0A CN201510649649A CN105301635A CN 105301635 A CN105301635 A CN 105301635A CN 201510649649 A CN201510649649 A CN 201510649649A CN 105301635 A CN105301635 A CN 105301635A
Authority
CN
China
Prior art keywords
seismic data
lapse seismic
time
shot point
big gun
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510649649.0A
Other languages
Chinese (zh)
Other versions
CN105301635B (en
Inventor
张立彬
凌云
邹振
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
BGP Inc
Original Assignee
China National Petroleum Corp
BGP Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Petroleum Corp, BGP Inc filed Critical China National Petroleum Corp
Priority to CN201510649649.0A priority Critical patent/CN105301635B/en
Publication of CN105301635A publication Critical patent/CN105301635A/en
Application granted granted Critical
Publication of CN105301635B publication Critical patent/CN105301635B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Geophysics And Detection Of Objects (AREA)

Abstract

An embodiment of the invention provides a constructing method and a constructing device for time-lapse seismic data acquired by marine towline. The method comprises the steps of acquiring first-period time-lapse seismic data and second-period time-lapse seismic data beforehand; traversing each source point in the first-period time-lapse seismic data, and traversing each source receiver pair in the time-lapse seismic data of the first source point; acquiring the time-lapse seismic data of the first source point from the first-period time-lapse seismic data; defining the second-period time-lapse seismic data in a preset circular range; acquiring information of a first source receiver pair in the time-lapse seismic data of the first source point; determining whether the information of the source receiver pair in the second-period time-lapse seismic data in the preset circular range matches the information of the first source receiver pair; and when the information of the source receiver pair in the second-period time-lapse seismic data in the preset circular range does not match the information of the first source receiver pair, selecting information of the source receiver pair which satisfies the preset condition from the second-period time-lapse seismic data in the preset circular range as the time-lapse seismic data after construction. The constructing method and the constructing device provided by the technical solution according to the embodiment of the invention can effectively improve repeatability of the first-period time-lapse seismic data and the second-period time-lapse seismic data.

Description

A kind of construction method of marine streamer time-lapse seismic data and device
Technical field
The present invention relates to time-lapse seismic technical field, particularly relate to a kind of construction method and device of marine streamer time-lapse seismic data.
Background technology
Time-lapse seismic technology is the technology of carrying out Reservoir behavior properties study for the different information of the seismic response of many phases of same survey area.When the seismic response features of non-reservoir rock does not change in time, the situation of change of the reservoir characteristics such as reservoir inner pore pressure, factor of porosity, fluid composition, fluid saturation and the temperature caused because of mining factor can be analyzed by time-lapse seismic technology, thus the situation of change of fluid flow and fluid composition in understanding reservoir, provide effective foundation for formulating or upgrading oil and gas development scheme.
In prior art, generally two reproducible phase time-lapse seismic data are subtracted each other the seismic response can eliminated and be formed by the structure of non-reservoir rock, lithology etc., obtain difference seismic response.Utilize described difference seismic response can the situation of change of fluid flow and fluid composition in Study In Reservoir.But in time-lapse seismic exploration implementation process, when particularly marine streamer gathers time-lapse seismic data, owing to being subject to the restriction of the specific construction environments such as tide, stormy waves, ocean current and acquisition condition, on the sp location that hull excites in traveling process and towing cable, the receiving position of each wave detector is all difficult to accurate control.This just causes the repeatability of the marine time-lapse seismic data of two phases to be difficult to be protected, and two phase geological datas is subtracted each other in the difference seismic response obtained and had both comprised the expectation difference that reservoir fluid changes generation, comprise again the unexpected difference that non-changes in reservoir produces.Therefore, according to the situation of change of fluid flow and fluid composition in difference geological data Obtaining Accurate reservoir, effective foundation can not cannot be provided for formulating or upgrading oil and gas development scheme.
Summary of the invention
The object of the application is to provide a kind of construction method and device of marine streamer time-lapse seismic data, to improve the repeatability of two phase time-lapse seismic data, thus the difference geological data of the situation of change accurately reflecting fluid flow and fluid composition in reservoir can be obtained, provide effective foundation for formulating or upgrading oil and gas development scheme.
To achieve these goals, this application provides a kind of construction method of marine streamer time-lapse seismic data, described method comprises: obtain first phase time-lapse seismic data and second phase time-lapse seismic data in advance; Travel through each shot point in described first phase time-lapse seismic data, following operation performed to each shot point in described first phase time-lapse seismic data:
The time-lapse seismic data of the first shot point are obtained from described first phase time-lapse seismic data;
Determine to preset the second phase time-lapse seismic data in circle scope, described default circle comprises with the position of described first shot point for the center of circle, and with the circle that the shot point error threshold pre-set is radius;
Each big gun inspection traveled through in the time-lapse seismic data of described first shot point is right, to each big gun inspection in described first shot point to the following operation of execution:
Right information is examined in the first bombard obtained in the time-lapse seismic data of described first shot point;
The big gun judging in the second phase time-lapse seismic data in described default round scope is examined right information and whether is examined right information match with the described first bombard;
When judged result for do not mate time, choose from the second phase time-lapse seismic data in described default round scope meet pre-conditioned big gun examine right information as build after time-lapse seismic data.
In a preferred embodiment, described method also comprises:
When judged result is for coupling, the big gun examining right information match is examined right information as the time-lapse seismic data after building in the second phase time-lapse seismic data in described default round scope with the described first bombard.
In a preferred embodiment, described choose from the second phase time-lapse seismic data in described default round scope meet pre-conditioned big gun examine right information as build after time-lapse seismic data comprise:
The second big gun calculated in the second phase time-lapse seismic data that the described first bombard examines in right shot point and described default round scope examine shotpoint spacing between right shot point from, calculate the described first bombard examine right geophone station and described second big gun examine geophone interval between right geophone station from, calculate described shotpoint spacing from described geophone interval from sum;
When described shotpoint spacing is from the shot point error threshold pre-set described in being less than, and described geophone interval is from when being less than the geophone station error threshold pre-set, and described shotpoint spacing from described geophone interval from sum be less than the big gun pre-set examine error threshold time, using described shotpoint spacing minimum for numerical value from described geophone interval from sum corresponding to big gun examine right information as the time-lapse seismic data after building.
In a preferred embodiment, described method also comprises:
In a preferred embodiment, described shot point error threshold is set to 70m.
In a preferred embodiment, described geophone station error threshold is set to 50m.
In a preferred embodiment, described big gun inspection is set to 100m to error threshold.
A construction device for marine streamer time-lapse seismic data, described device comprises:
Presetting module, for obtaining first phase time-lapse seismic data and second phase time-lapse seismic data in advance; Travel through each shot point in described first phase time-lapse seismic data, and each big gun inspection traveled through in the time-lapse seismic data of described first shot point is right;
First data acquisition module, for obtaining the time-lapse seismic data of the first shot point from described first phase time-lapse seismic data;
First determination module, preset the second phase time-lapse seismic data in circle scope for determining, described default circle comprises with the position of described first shot point for the center of circle, and with the circle that the shot point error threshold pre-set is radius;
Second data acquisition module, examines right information for the first bombard obtained in the time-lapse seismic data of described first shot point;
Judge module, the big gun for judging in the second phase time-lapse seismic data in described default round scope is examined right information and whether is examined right information match with the described first bombard;
First data processing module, for when described judge module judged result for do not mate time, choose from the second phase time-lapse seismic data in described default round scope meet pre-conditioned big gun examine right information as build after time-lapse seismic data.
In a preferred embodiment, described device also comprises:
Second data processing module, for when the judged result of described judge module is for coupling, the big gun examining right information match is examined right information as the time-lapse seismic data after building in the second phase time-lapse seismic data in described default round scope with the described first bombard.
In a preferred embodiment, the first data processing module comprises:
Computing unit, for the second big gun calculated in second phase time-lapse seismic data that the described first bombard examines in right shot point and described default round scope examine shotpoint spacing between right shot point from, calculate the described first bombard examine right geophone station and described second big gun examine geophone interval between right geophone station from, calculate described shotpoint spacing from described geophone interval from sum;
Data processing unit, for when described shotpoint spacing is from the shot point error threshold pre-set described in being less than, and described geophone interval is from when being less than the geophone station error threshold pre-set, and described shotpoint spacing from described geophone interval from sum be less than the big gun pre-set examine error threshold time, described shotpoint spacing minimum for numerical value is examined right information as the time-lapse seismic data after building from described geophone interval from the big gun corresponding to sum.
In a preferred embodiment, described device also comprises:
In a preferred embodiment, described shot point error threshold is set to 70m.
In a preferred embodiment, described geophone station error threshold is set to 50m.
In a preferred embodiment, described big gun inspection is set to 100m to error threshold.
The technical scheme provided from above the embodiment of the present application, the embodiment of the present application by mating with the geophone station in second phase time-lapse seismic data successively by each geophone station in each shot point in first phase time-lapse seismic data, and choose from the second phase time-lapse seismic data in described default round scope meet pre-conditioned big gun examine right information as build after time-lapse seismic data.Time-lapse seismic data after the structure obtained have good collection consistance, have good repeatability with described first phase time-lapse seismic data.This feature is beneficial to follow-up obtaining can determine that in reservoir, fluid flowing and fluid composition change the difference seismic response caused.Compared with prior art, the technical scheme utilizing the embodiment of the present application to provide can improve the repeatability of two phase time-lapse seismic data, thus be beneficial to obtain accurately in reflection reservoir fluid flowing and fluid composition change the difference geological data caused, for formulate or renewal oil and gas development scheme provides effective foundation.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present application or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, the accompanying drawing that the following describes is only some embodiments recorded in the application, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the process flow diagram of the first embodiment of the construction method of a kind of marine streamer time-lapse seismic of the application data;
Fig. 2 is the process flow diagram of the second embodiment of the construction method of a kind of marine streamer time-lapse seismic of the application data;
Fig. 3 is the schematic diagram of the construction device of a kind of marine streamer time-lapse seismic data that the embodiment of the present application provides;
Fig. 4 is another schematic diagram of the construction device of a kind of marine streamer time-lapse seismic data that the embodiment of the present application provides.
Embodiment
Technical scheme in the application is understood better in order to make those skilled in the art person, below in conjunction with the accompanying drawing in the embodiment of the present application, technical scheme in the embodiment of the present application is clearly and completely described, obviously, described embodiment is only some embodiments of the present application, instead of whole embodiments.Based on the embodiment in the application, those of ordinary skill in the art are not making the every other embodiment obtained under creative work prerequisite, all should belong to the scope of the application's protection.
The specific implementation of the embodiment of the present application is described below in detail with several concrete example.
Below the first embodiment of the construction method of a kind of marine streamer time-lapse seismic of the application data is first introduced.Fig. 1 is the process flow diagram of the first embodiment of the construction method of a kind of marine streamer time-lapse seismic of the application data, although hereafter describe flow process to comprise the multiple operations occurred with particular order, but should have a clear understanding of, these processes can comprise more or less operation, and these operations can sequentially perform or executed in parallel.By reference to the accompanying drawings 1, this embodiment comprises:
Obtain first phase time-lapse seismic data and second phase time-lapse seismic data in advance; Travel through each shot point in described first phase time-lapse seismic data, following operation performed to each shot point in described first phase time-lapse seismic data:
S110: the time-lapse seismic data obtaining the first shot point from described first phase time-lapse seismic data.
In actual applications, acquisition time-lapse seismic data can be gathered by the mode of marine streamer.Concrete, described first shot point can comprise the arbitrary shot point in described first phase time-lapse seismic data.Right information examined by the big gun that the time-lapse seismic data of described first shot point can comprise corresponding to described first shot point.In certain embodiments, the corresponding one or more geophone station of each shot point, accordingly, the inspection of described first shot point corresponding one or more pairs of big gun is right.
In certain embodiments, the time-lapse seismic data of the first shot point can be obtained from described first phase time-lapse seismic data.Concrete, described first phase time-lapse seismic data can comprise the reference data that can be used as later stage time-lapse seismic data to be matched.In a specific embodiment, described first phase time-lapse seismic data can comprise the time-lapse seismic data of 4 towing cable collections of spacing 100 meters, and every bar towing cable has 368, the wave detector of spacing 12.5 meters.
S120: determine to preset the second phase time-lapse seismic data in circle scope, described default circle comprises with the position of described first shot point for the center of circle, and using the shot point error threshold pre-set as the circle of radius.
In certain embodiments, can determine to preset the second phase time-lapse seismic data in circle scope, described default circle comprises with the position of described first shot point for the center of circle, and using the shot point error threshold pre-set as the circle of radius.Concrete, described second phase time-lapse seismic data can comprise later stage time-lapse seismic data to be matched.In a specific embodiment, described second phase time-lapse seismic data can comprise the time-lapse seismic data of 10 towing cable collections of spacing 100 meters, and every bar towing cable has 372, the wave detector of spacing 12.5 meters.
Further, described in the shot point error threshold that pre-sets can comprise the maximum position interval error value of shot point in two phase time-lapse seismic data, and when the distance when between two shot points is less than described shot point error threshold, can judge that the position of two shot points is as overlapping.Concrete, described shot point error threshold can preset according to application scenarios.In a specific embodiment, described shot point error threshold can be set to 70m, but the embodiment of the present application is not as limit.
Further, each big gun inspection traveled through in the time-lapse seismic data of described first shot point is right, to each big gun inspection in described first shot point to the following operation of execution:
S130: right information is examined in the first bombard obtained in the time-lapse seismic data of described first shot point.
In certain embodiments, right information is examined in the first bombard that can obtain in the time-lapse seismic data of described first shot point.The described first bombard is examined right information and can be comprised arbitrary big gun in described first shot point and examine the positional information that right geophone station examined by the positional information of right shot point and described big gun.
S140: the big gun judging in the second phase time-lapse seismic data in described default round scope is examined right information and whether examined right information match with the described first bombard.
In certain embodiments, obtain after the first bombard examines right information in step S130, the big gun that can judge in the second phase time-lapse seismic data in described default round scope is examined right information and whether is examined right information match with the described first bombard.
Further, when judge the big gun in the second phase time-lapse seismic data in described default round scope examine right information and the described first bombard examine right information do not mate time, can step S150 be performed.
S150: when judged result for do not mate time, choose from the second phase time-lapse seismic data in described default round scope meet pre-conditioned big gun examine right information as build after time-lapse seismic data.
In certain embodiments, when step S140 judged result for do not mate time, can choose from the second phase time-lapse seismic data in described default round scope meet pre-conditioned big gun examine right information as build after time-lapse seismic data.Concrete, can comprise: the second big gun calculated in the second phase time-lapse seismic data that the described first bombard examines in right shot point and described default round scope examine shotpoint spacing between right shot point from, calculate the described first bombard examine right geophone station and described second big gun examine geophone interval between right geophone station from, calculate described shotpoint spacing from described geophone interval from sum; When described shotpoint spacing is from the shot point error threshold pre-set described in being less than, and described geophone interval is from when being less than the geophone station error threshold pre-set, and described shotpoint spacing from described geophone interval from sum be less than the big gun pre-set examine error threshold time, described shotpoint spacing minimum for numerical value is examined right information as the time-lapse seismic data after building from described geophone interval from the big gun corresponding to sum.Concrete, described second big gun inspection is right to big gun inspection arbitrary in the second phase time-lapse seismic data that can comprise in described default round scope.
Further, described in the shot point error threshold that pre-sets can comprise the maximum position interval error value of shot point in two phase time-lapse seismic data, and when the distance when between two shot points is less than described shot point error threshold, can judge that the position of two shot points is as overlapping.Concrete, described shot point error threshold can preset according to application scenarios.In a specific embodiment, described shot point error threshold can be set to 70m, but the embodiment of the present application is not as limit.
Further, the described geophone station error threshold pre-set can comprise the maximum position interval error value of geophone station in described two phase time-lapse seismic data, and the distance when between two geophone stations is when being less than described shot point error threshold, can judge that the position of two geophone stations is as overlapping.Concrete, described geophone station error threshold can preset according to application scenarios.In a specific embodiment, described geophone station error threshold can be set to 50m, but the embodiment of the present application is not as limit.
Further, the described big gun inspection pre-set can comprise big gun in two phase time-lapse seismic data to error threshold and examines right maximum position interval error threshold value, and described maximum position interval error threshold value comprises two phase big guns and examines right sp location interval error value and right geophone station location gap error amount sum examined by described two phase big guns.When described two phase big guns examine right sp location interval error value and described two phase big guns examine right geophone station location gap error amount sum be less than described shot point error threshold time, can judge that two big guns examine right position as overlapping.Concrete, described big gun inspection can preset according to application scenarios error threshold.In a specific embodiment, described big gun inspection can be set to 100m to error threshold, but the embodiment of the present application is not as limit.
As can be seen here, the technical scheme that the embodiment of the construction method of a kind of marine streamer time-lapse seismic of the application data provides by mating with the geophone station in second phase time-lapse seismic data successively by each geophone station in each shot point in first phase time-lapse seismic data, and is chosen and is met pre-conditioned big gun and examine right information as the time-lapse seismic data after building from the second phase time-lapse seismic data in described default round scope.Time-lapse seismic data after the structure obtained have good collection consistance, have good repeatability with described first phase time-lapse seismic data.This feature is beneficial to follow-up obtaining can determine that in reservoir, fluid flowing and fluid composition change the difference seismic response caused.Compared with prior art, the technical scheme utilizing the embodiment of the present application to provide can improve the repeatability of two phase time-lapse seismic data, thus be beneficial to obtain accurately in reflection reservoir fluid flowing and fluid composition change the difference geological data caused, for formulate or renewal oil and gas development scheme provides effective foundation.
The application second embodiment, on the basis of the first embodiment, also add extra step.Below introduce the construction method of a kind of marine streamer time-lapse seismic data that the application second embodiment provides.Fig. 2 is the process flow diagram of the second embodiment of the construction method of a kind of marine streamer time-lapse seismic of the application data, although hereafter describe flow process to comprise the multiple operations occurred with particular order, but should have a clear understanding of, these processes can comprise more or less operation, and these operations can sequentially perform or executed in parallel.As shown in Figure 2, this embodiment comprises:
Obtain first phase time-lapse seismic data and second phase time-lapse seismic data in advance; Travel through each shot point in described first phase time-lapse seismic data, following operation performed to each shot point in described first phase time-lapse seismic data:
S210: the time-lapse seismic data obtaining the first shot point from described first phase time-lapse seismic data.
S220: determine to preset the second phase time-lapse seismic data in circle scope, described default circle comprises with the position of described first shot point for the center of circle, and with the circle that the shot point error threshold pre-set is radius;
Each big gun inspection traveled through in the time-lapse seismic data of described first shot point is right, obtains third phase time-lapse seismic data to each big gun inspection in described first shot point to following being operated to of execution:
S230: right information is examined in the first bombard obtained in the time-lapse seismic data of described first shot point.
S240: the big gun judging in the second phase time-lapse seismic data in described default round scope is examined right information and whether examined right information with the described first bombard mutually.
In certain embodiments, when judge the big gun in the second phase time-lapse seismic data in described default round scope examine right information and the described first bombard examine right information match time, can step S250 be performed; When judge the big gun in the second phase time-lapse seismic data in described default round scope examine right information and the described first bombard examine right information matches time, can step S260 be performed.
S250: when judged result is for coupling, the big gun examining right information match is examined right information as the time-lapse seismic data after building in the second phase time-lapse seismic data in described default round scope with the described first bombard.
In certain embodiments, when judge the big gun in the second phase time-lapse seismic data in described default round scope examine right information and the described first bombard examine right information match time, the big gun examining right information match in the second phase time-lapse seismic data in described default round scope with the described first bombard can be examined right information as the time-lapse seismic data after building.
S260: when judged result for do not mate time, choose from the second phase time-lapse seismic data in described default round scope meet pre-conditioned big gun examine right information as build after time-lapse seismic data.
As can be seen here, the technical scheme that the embodiment of the construction method of a kind of marine streamer time-lapse seismic of the application data provides by mating with the geophone station in second phase time-lapse seismic data successively by each geophone station in each shot point in first phase time-lapse seismic data, and is chosen and is met pre-conditioned big gun and examine right information as the time-lapse seismic data after building from the second phase time-lapse seismic data in described default round scope.Time-lapse seismic data after the structure obtained have good collection consistance, have good repeatability with described first phase time-lapse seismic data.This feature is beneficial to follow-up obtaining can determine that in reservoir, fluid flowing and fluid composition change the difference seismic response caused.Compared with prior art, the technical scheme utilizing the embodiment of the present application to provide can improve the repeatability of two phase time-lapse seismic data, thus be beneficial to obtain accurately in reflection reservoir fluid flowing and fluid composition change the difference geological data caused, for formulate or renewal oil and gas development scheme provides effective foundation.
The application also provides a kind of embodiment of construction device of marine streamer time-lapse seismic data on the other hand, Fig. 3 is the schematic diagram of the construction device of a kind of marine streamer time-lapse seismic data that the embodiment of the present application provides, by reference to the accompanying drawings 3, described device 300 can comprise:
Presetting module 310, may be used for obtaining first phase time-lapse seismic data and second phase time-lapse seismic data in advance; Travel through each shot point in described first phase time-lapse seismic data, and each big gun inspection traveled through in the time-lapse seismic data of described first shot point is right.
First data acquisition module 320, may be used for the time-lapse seismic data obtaining the first shot point from described first phase time-lapse seismic data.
First determination module 330, may be used for determining to preset the second phase time-lapse seismic data in circle scope, described default circle comprises with the position of described first shot point for the center of circle, and with the circle that the shot point error threshold pre-set is radius.
Second data acquisition module 340, may be used for the first bombard obtained in the time-lapse seismic data of described first shot point and examines right information.
Judge module 350, the big gun that may be used for judging in the second phase time-lapse seismic data in described default round scope is examined right information and whether is examined right information match with the described first bombard.
First data processing module 360, may be used for when described judge module judged result for coupling time, choose from the second phase time-lapse seismic data in described default round scope meet pre-conditioned big gun examine right information as build after time-lapse seismic data.
Fig. 4 is another schematic diagram of the construction device of a kind of marine streamer time-lapse seismic data that the embodiment of the present application provides.In a preferred embodiment, by reference to the accompanying drawings 4, described device 300 can also comprise:
Second data processing module 370, may be used for, when the judged result of described judge module is for coupling, the big gun examining right information match being examined right information as the time-lapse seismic data after building in the second phase time-lapse seismic data in described default round scope with the described first bombard.
In a preferred embodiment, the first data processing module 360 can comprise:
Computing unit, the second big gun that may be used for calculating in the second phase time-lapse seismic data that the described first bombard examines in right shot point and described default round scope examine shotpoint spacing between right shot point from, calculate the described first bombard examine right geophone station and described second big gun examine geophone interval between right geophone station from, calculate described shotpoint spacing from described geophone interval from sum;
Data processing unit, may be used for when described shotpoint spacing is from the shot point error threshold pre-set described in being less than, and described geophone interval is from when being less than the geophone station error threshold pre-set, and described shotpoint spacing from described geophone interval from sum be less than the big gun pre-set examine error threshold time, described shotpoint spacing minimum for numerical value is examined right information as the time-lapse seismic data after building from described geophone interval from the big gun corresponding to sum.
In a preferred embodiment, described shot point error threshold is set to 70m.
In a preferred embodiment, described geophone station error threshold is set to 50m.
In a preferred embodiment, described big gun inspection is set to 100m to error threshold.
As can be seen here, the technical scheme that the construction method of a kind of marine streamer time-lapse seismic of the application data and the embodiment of device provide by mating with the geophone station in second phase time-lapse seismic data successively by each geophone station in each shot point in first phase time-lapse seismic data, and choose from the second phase time-lapse seismic data in described default round scope meet pre-conditioned big gun examine right information as build after time-lapse seismic data.Time-lapse seismic data after the structure obtained have good collection consistance, have good repeatability with described first phase time-lapse seismic data.This feature is beneficial to follow-up obtaining can determine that in reservoir, fluid flowing and fluid composition change the difference seismic response caused.Compared with prior art, the technical scheme utilizing the embodiment of the present application to provide can improve the repeatability of two phase time-lapse seismic data, thus be beneficial to obtain accurately in reflection reservoir fluid flowing and fluid composition change the difference geological data caused, for formulate or renewal oil and gas development scheme provides effective foundation.
Each embodiment in this instructions all adopts the mode of going forward one by one to describe, and what each embodiment stressed is the difference with other embodiments, between each embodiment identical similar part mutually see.Especially, for system embodiment, because it is substantially similar to embodiment of the method, so description is fairly simple, relevant part illustrates see the part of embodiment of the method.
Although depict the application by embodiment, those of ordinary skill in the art know, the application has many distortion and change and do not depart from the spirit of the application, and the claim appended by wishing comprises these distortion and change and do not depart from the spirit of the application.

Claims (12)

1. a construction method for marine streamer time-lapse seismic data, is characterized in that, described method comprises: obtain first phase time-lapse seismic data and second phase time-lapse seismic data in advance; Travel through each shot point in described first phase time-lapse seismic data, following operation performed to each shot point in described first phase time-lapse seismic data:
The time-lapse seismic data of the first shot point are obtained from described first phase time-lapse seismic data;
Determine to preset the second phase time-lapse seismic data in circle scope, described default circle comprises with the position of described first shot point for the center of circle, and with the circle that the shot point error threshold pre-set is radius;
Each big gun inspection traveled through in the time-lapse seismic data of described first shot point is right, to each big gun inspection in described first shot point to the following operation of execution:
Right information is examined in the first bombard obtained in the time-lapse seismic data of described first shot point;
The big gun judging in the second phase time-lapse seismic data in described default round scope is examined right information and whether is examined right information match with the described first bombard;
When judged result for do not mate time, choose from the second phase time-lapse seismic data in described default round scope meet pre-conditioned big gun examine right information as build after time-lapse seismic data.
2. method according to claim 1, is characterized in that, described method also comprises:
When judged result is for coupling, the big gun examining right information match is examined right information as the time-lapse seismic data after building in the second phase time-lapse seismic data in described default round scope with the described first bombard.
3. method according to claim 1, is characterized in that, described choose from the second phase time-lapse seismic data in described default round scope meet pre-conditioned big gun examine right information as build after time-lapse seismic data comprise:
The second big gun calculated in the second phase time-lapse seismic data that the described first bombard examines in right shot point and described default round scope examine shotpoint spacing between right shot point from, calculate the described first bombard examine right geophone station and described second big gun examine geophone interval between right geophone station from, calculate described shotpoint spacing from described geophone interval from sum;
When described shotpoint spacing is from the shot point error threshold pre-set described in being less than, and described geophone interval is from being less than the geophone station error threshold pre-set, and described shotpoint spacing from described geophone interval from sum be less than the big gun pre-set examine error threshold time, described shotpoint spacing minimum for numerical value is examined right information as the time-lapse seismic data after building from described geophone interval from the big gun corresponding to sum.
4. the method according to claim 1 or 3, is characterized in that, described shot point error threshold is set to 70m.
5. method according to claim 3, is characterized in that, described geophone station error threshold is set to 50m.
6. method according to claim 3, is characterized in that, described big gun inspection is set to 100m to error threshold.
7. a construction device for marine streamer time-lapse seismic data, is characterized in that, described device comprises:
Presetting module, for obtaining first phase time-lapse seismic data and second phase time-lapse seismic data in advance; Travel through each shot point in described first phase time-lapse seismic data, and each big gun inspection traveled through in the time-lapse seismic data of described first shot point is right;
First data acquisition module, for obtaining the time-lapse seismic data of the first shot point from described first phase time-lapse seismic data;
First determination module, preset the second phase time-lapse seismic data in circle scope for determining, described default circle comprises with the position of described first shot point for the center of circle, and with the circle that the shot point error threshold pre-set is radius;
Second data acquisition module, examines right information for the first bombard obtained in the time-lapse seismic data of described first shot point;
Judge module, the big gun for judging in the second phase time-lapse seismic data in described default round scope is examined right information and whether is examined right information match with the described first bombard;
First data processing module, for when described judge module judged result for coupling time, choose from the second phase time-lapse seismic data in described default round scope meet pre-conditioned big gun examine right information as build after time-lapse seismic data.
8. device according to claim 7, is characterized in that, described device also comprises:
Second data processing module, for when the judged result of described judge module is for coupling, the big gun examining right information match is examined right information as the time-lapse seismic data after building in the second phase time-lapse seismic data in described default round scope with the described first bombard.
9. device according to claim 7, is characterized in that, the first data processing module comprises:
Computing unit, for the second big gun calculated in second phase time-lapse seismic data that the described first bombard examines in right shot point and described default round scope examine shotpoint spacing between right shot point from, calculate the described first bombard examine right geophone station and described second big gun examine geophone interval between right geophone station from, calculate described shotpoint spacing from described geophone interval from sum;
Data processing unit, for when described shotpoint spacing is from the shot point error threshold pre-set described in being less than, and described geophone interval is from when being less than the geophone station error threshold pre-set, and described shotpoint spacing from described geophone interval from sum be less than the big gun pre-set examine error threshold time, described shotpoint spacing minimum for numerical value is examined right information as the time-lapse seismic data after building from described geophone interval from the big gun corresponding to sum.
10. the device according to claim 7 or 9, is characterized in that, described shot point error threshold is set to 70m.
11. devices according to claim 9, is characterized in that, described geophone station error threshold is set to 50m.
12. devices according to claim 9, is characterized in that, described big gun inspection is set to 100m to error threshold.
CN201510649649.0A 2015-10-09 2015-10-09 A kind of construction method and device of marine streamer time-lapse seismic data Active CN105301635B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510649649.0A CN105301635B (en) 2015-10-09 2015-10-09 A kind of construction method and device of marine streamer time-lapse seismic data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510649649.0A CN105301635B (en) 2015-10-09 2015-10-09 A kind of construction method and device of marine streamer time-lapse seismic data

Publications (2)

Publication Number Publication Date
CN105301635A true CN105301635A (en) 2016-02-03
CN105301635B CN105301635B (en) 2017-10-17

Family

ID=55199111

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510649649.0A Active CN105301635B (en) 2015-10-09 2015-10-09 A kind of construction method and device of marine streamer time-lapse seismic data

Country Status (1)

Country Link
CN (1) CN105301635B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112198550A (en) * 2019-07-08 2021-01-08 中国石油天然气集团有限公司 Repeatability measurement method and device for time-lapse seismic data

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6208587B1 (en) * 1997-07-10 2001-03-27 Pgs Tensor, Inc. Method of detecting seismic events and for detecting and correcting geometry and statics error in seismic data
WO2009123471A1 (en) * 2008-03-31 2009-10-08 Statoilhydro Asa Method for reflection time shift matching a first and a second set of seismic reflection data
US20130033961A1 (en) * 2011-08-05 2013-02-07 Saudi Aramco Correcting Time Lapse Seismic Data for Overburden and Recording Effects
CN104570076A (en) * 2013-10-17 2015-04-29 中国石油化工股份有限公司 Automatic seismic wave first-arrival picking method based on dichotomy

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6208587B1 (en) * 1997-07-10 2001-03-27 Pgs Tensor, Inc. Method of detecting seismic events and for detecting and correcting geometry and statics error in seismic data
WO2009123471A1 (en) * 2008-03-31 2009-10-08 Statoilhydro Asa Method for reflection time shift matching a first and a second set of seismic reflection data
US20130033961A1 (en) * 2011-08-05 2013-02-07 Saudi Aramco Correcting Time Lapse Seismic Data for Overburden and Recording Effects
CN104570076A (en) * 2013-10-17 2015-04-29 中国石油化工股份有限公司 Automatic seismic wave first-arrival picking method based on dichotomy

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
凌云 等: "非重复性采集随时间推移地震勘探实例研究", 《石油物探》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112198550A (en) * 2019-07-08 2021-01-08 中国石油天然气集团有限公司 Repeatability measurement method and device for time-lapse seismic data
CN112198550B (en) * 2019-07-08 2023-09-26 中国石油天然气集团有限公司 Time-lapse seismic data repeatability measurement method and device

Also Published As

Publication number Publication date
CN105301635B (en) 2017-10-17

Similar Documents

Publication Publication Date Title
CN105301650A (en) Quality monitoring method and quality monitoring device for time-lapse seismic data acquired by marine towline
CN104656141B (en) Attitude road collection earth surface consistency vibration amplitude compensation method and device altogether
CN107918156B (en) Detect the method and device of subsea node acquisition earthquake data polarity
CN112013286B (en) Method and device for positioning pipeline leakage point, storage medium and terminal
NO342539B1 (en) Consistent fall angle estimation for seismic imaging
CN104297790B (en) Quantitative evaluation method for offset distribution in fluctuating submarine earthquake observation system
CN103454681A (en) Method and equipment for evaluating imaging effect of three-dimensional earthquake observing system
CN105116419A (en) GNSS receiver double channel carrier wave phase pseudorange smoothing method
EP3164737B1 (en) Offset footprint analysis for selecting candidate lines for seismic survey
CN105301635A (en) Constructing method and constructing device for time-lapse seismic data acquired by marine towline
WO2021127382A1 (en) Full waveform inversion in the midpoint-offset domain
CN109581484B (en) Method and device for analyzing total illumination index of seismic longitudinal wave component multiples
CN110132509A (en) A kind of buried pipeline breakage point positioning system and method
CN113568041B (en) Repeatability analysis method and system for time-lapse seismic three-dimensional towing cable acquired data
CN112684498A (en) Reservoir fracture prediction method and system based on wide-azimuth seismic data
CN103777244A (en) Method for quantitatively analyzing earthquake crack attribute volume
CN104266646A (en) Method and device for determining movement direction of terminal
Li et al. Multiple Kalman filters model with shaping filter GPS real-time deformation analysis
CN104570091B (en) A kind of method and apparatus for obtaining first arrival wave ray
CN105204070B (en) A kind of inclined detection method and device of big gun
CN112241020A (en) Method and apparatus for determining undersampling rate in sparse seismic data acquisition
CN112649875A (en) Method and device for positioning submarine node geophone
Yang et al. Robust sequential adaptive Kalman filter algorithm for ultrashort baseline underwater acoustic positioning
CN111177886B (en) Marine ranging planning and soil thickness prediction method based on geophysical prospecting data analysis
CN113568040B (en) Repeatability analysis method and system for time-lapse seismic acquisition data

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant