CN105301325B - With hall sensing theory to the method for UHVDC Arrester leakage current collection - Google Patents

With hall sensing theory to the method for UHVDC Arrester leakage current collection Download PDF

Info

Publication number
CN105301325B
CN105301325B CN201510610686.0A CN201510610686A CN105301325B CN 105301325 B CN105301325 B CN 105301325B CN 201510610686 A CN201510610686 A CN 201510610686A CN 105301325 B CN105301325 B CN 105301325B
Authority
CN
China
Prior art keywords
hall
electric current
current
arrester
circuit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510610686.0A
Other languages
Chinese (zh)
Other versions
CN105301325A (en
Inventor
邓敏
袁愿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Red Phase Ltd By Share Ltd
Original Assignee
Red Phase Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Red Phase Ltd By Share Ltd filed Critical Red Phase Ltd By Share Ltd
Priority to CN201510610686.0A priority Critical patent/CN105301325B/en
Publication of CN105301325A publication Critical patent/CN105301325A/en
Application granted granted Critical
Publication of CN105301325B publication Critical patent/CN105301325B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)
  • Measuring Instrument Details And Bridges, And Automatic Balancing Devices (AREA)

Abstract

With hall sensing theory to the method for UHVDC Arrester leakage current collection, following steps are respectively completed using a detection device:A, judge whether to carry out signal acquisition to electric current;B, signal acquisition is carried out to electric current;C, the output of electric current Value Data is formed after being handled the signal of acquisition.The voltage signal that the present invention is generated by double Hall circuit elements is acted on through power amplifier conducting so that generating Contrary compensation electric current in second coil winding, it is opposite with flow direction caused by arrester leakage current to compensate the magnetic flux that electric current generates, after the two realizes magnetic balance, after compensating test of the electric current using circuit acquisition module in second coil winding, obtain the direct current signal value of leakage current of an arrester, it thereby may be ensured that collecting unit can effectively and stably be run in complex electromagnetic fields, not only voltage endurance capability is greatly promoted, and can have stronger self- recoverage and adaptive ability under overvoltage.

Description

With hall sensing theory to the method for UHVDC Arrester leakage current collection
Technical field
The present invention relates to UHVDC Transmission Lines arrester state inspection, refer in particular to be related to hall sensing theory To the method for UHVDC Arrester leakage current collection.
Background technology
With China's rapid economic development, electricity needs increases rapidly, and there are in electric power resource distribution and load in China The unmatched natural characteristic in heart district domain needs to improve imbalance between power supply and demand problem by remote, large capacity transmission circuit, " west Send in electric east ", the engineerings such as " north and south supply mutually " be major deployments scheme at this stage, extra-high voltage direct-current transmission technology is specific to implement skill Art means.
Alternating current is transformed into direct current by direct current transportation by transverter, is then sent to by electricity by DC power transmission line It holds and alternating current is become by transverter, finally inject AC network.The voltage class concept of extra-high voltage direct-current transmission with exchange It transmits electricity different.For ac transmission, 220kV and voltage class below are generally known as high pressure, 330~750kV's Referred to as super-pressure, 1000kV's or more is known as extra-high voltage.Direct current transportation is then slightly different, and ± 100kV's or more is referred to as height Pressure;± 500kV and ± 600kV are still referred to as high pressure, are not known as super-pressure generally;And be more than ± 600kV then be known as extra-high voltage.
± 800kV extra-high voltage direct-current transmissions can have a large amount of big load centers of electric power direct sending since centre is without drop point Transmission capacity is big, power transmission distance is remote, saves the advantages that transmission of electricity stringing corridor, the technologies such as relevant device research and development, control and operation and Demonstration project is rapidly developed and extensive use in recent years, and China has been made to be in the world in UHV transmission technical field Leading position leads technological development direction and key equipment Development Trend.
The construction of extra-high voltage DC transmission system be unable to do without overvoltage protection, and direct current arrester is extra-high voltage direct-current The key equipment of transmission system overvoltage protection determines the dielectric level of whole system, influences equipment volume, project occupation of land Area and cost.It is most important for the Insulation Coordination of optimization system and reduction project cost to improve protection of arrester level.The palm Direct current arrester real-time running state and protection feature are held to reinforcing the operational management, perfect of direct-current ultra high voltage transmission system equipment Its live detection technology and repair based on condition of component level have a very important significance.
For now, the service condition of direct current arrester is much harsher than alternating-current lightning arrestor, to direct current arrester The technology that runnability proposes requires very high.Direct current arrester structure, operating condition, action principle, protection feature etc. with friendship It is different to flow arrester.In order to find the making moist of direct current arrester, aging and other hidden danger in time, avoid huge caused by accident Economic loss carries out ultra-high voltage lightning arrester while improving ultra-high voltage lightning arrester product reliability, strengthening quality control It monitors on-line significant and is in urgent need.A kind of UHVDC Arrester leakage current that is directed to especially is needed in a hurry Detection device and detection method.
Chinese utility model patent(CN202693723U)A kind of leakage current of an arrester alarm system is disclosed, including is kept away Thunder device and counter, arrester are connected with the first current transformer and the second current transformer for switching current, the first electricity Current transformer is connected with reference voltage circuit, and reference voltage is added on first voltage conversion circuit, the second electricity by reference voltage circuit Current transformer is connected with first voltage conversion circuit, and first voltage conversion circuit is powered for the first warning device, and first voltage turns It changes circuit and is connected with the progress secondary voltage conversion of second voltage conversion circuit, second voltage conversion circuit is that the second warning device supplies Electricity.Although the above leakage current alarm system principle is simple, alarm effect is apparent, however in the actual use process also It has the following disadvantages:1, the above leakage current alarm system is mainly in transmission line of alternation current, since arrester exists Service condition in extra high voltage direct current transmission line is much harsher than alternating-current lightning arrestor, especially in the self-insurance of Lightning Over-voltage Shield requirement may also be difficult to reach, thus the technology of leakage current alarm system requires to cannot be satisfied in extra-high voltage direct-current transmission line It is effectively and stably run in road;2, the above leakage current alarm system major function is to carry out qualitative operation, can not be right All the time the big decimal fractions of middle leakage current are detected.
Invention content
The present invention is provided with hall sensing theory to the method for UHVDC Arrester leakage current collection, main mesh Be overcome existing leakage current alarm system that can not carry out stablizing to UHVDC Arrester leakage current and accurate inspection The defect of survey.
In order to solve the above technical problems, the present invention adopts the following technical scheme that:
With hall sensing theory to the method for UHVDC Arrester leakage current collection, distinguished using a detection device Complete following steps:A, judge whether to carry out signal acquisition to electric current;B, signal acquisition is carried out to electric current;C, by the signal of acquisition The output of electric current Value Data is formed after being handled, the detection device includes data acquisition unit, data processing unit, protection electricity Road unit and power supply unit, the data acquisition unit include current sensor, power amplifier and circuit acquisition module, The current sensor includes a toroidal shell, the magnetic core of a C-shaped arrangement and two Hall circuit modules, the toroidal shell Inside it is provided with an accommodating space, rotating around equipped with a first coil winding and a second coil winding on the magnetic core, and The magnetic core is installed in the accommodating space, the two Hall circuit modules be installed in the accommodating space and its both ends with The both ends of the magnetic core abut, and an electric bridge, the input of the first coil winding are connected between the two Hall circuit modules End is electrically connected with lightning arrester leakance, and the input terminal of the second coil winding and an output end of the power amplifier are electrically connected It connects, another output end of the power amplifier is electrically connected with the circuit acquisition module, and the detection device further includes adopting Collect protection module, the electric energy output end of the power supply unit is divided into four tunnels, and the electric energy being electrically connected in protection circuit unit is defeated Electrical energy inputs, the electrical energy inputs of data acquisition unit and the electric energy of data processing unit for entering end, acquiring protection module The output end of input terminal, arrester electric current is divided into two-way, is connected to the Enable Pin of the data acquisition unit all the way, and another way connects It is connected to the Enable Pin of the acquisition protection module, the output end of the acquisition protection module is connected to the protection circuit unit The Enable Pin of Enable Pin, the data processing unit is equipped with two-way, connects the output end of the data acquisition unit all the way, another Road connects the output end of the protection circuit unit;After the step a is included in the extraction wire for connecting arrester electric current, pass through It acquires protection module and data acquisition unit and Preliminary detection is carried out to the electric current on lead, when arrester electric current is less than or equal to 1 Milliampere hour, acquisition protection module are failure to actuate, and data acquisition unit starts and after carrying out signal acquisition and data processing to electric current It is exported via data processing unit;When arrester electric current is more than 1 milliampere hour, data acquisition unit is motionless, and acquires protection module Start, high-impedance state is presented to input in the detection device, at this time without signal acquisition and data processing, and via data processing Unit exports.
Further, the step b include when arrester leakage current direct current signal after first coil winding The magnetic field generated in magnetic core is focused into the two Hall circuit modules, due to the two Hall circuit module position not Together, thus unequal Hall voltage is generated, the two Hall circuit modules are connected via circuit in parallel according to shunt capacitance After equivalent circuit synthesis, the output valve for the voltage signal that the two Hall circuit modules generate is two Hall circuit module output valves Arithmetic mean of instantaneous value, the output valve of the voltage signal acts on through power amplifier conducting so that being generated in second coil winding reversed Compensation electric current, the magnetic flux that compensation electric current generates is with flow direction caused by arrester leakage current on the contrary, when the two realizes magnetic After balance, core flux zero, in second coil winding compensation electric current using after the test of circuit acquisition module to get going out to keep away The direct current signal value of thunder device leakage current is hence into step c.
Further, each Hall circuit module include a Hall element and be in series with the Hall element one Resistance is adjusted, the control current terminal parallel connection of the Hall circuit module is accessed in DC constant flowing power an I+ and I-, and two institutes The output end data contacts that also parallel connection is VH+ and VH- of Hall circuit module are stated, the power amplifier includes one and the number According to operational amplifier, one first triode, one second triode and an input power that contact output end is electrically connected, described the The collector of one triode is electrically connected to the positive interface of the input power, and the collector of second triode is connected to described The output end of the negative interface of input power, the power amplifier is divided into two-way, is connected to the base of first triode all the way Pole, another way are connected to the base stage of second triode, and the amplifying stage of first triode is divided into two-way, is connected to all the way The input terminal of the second coil winding, another way are connected to the amplifying stage of second triode, the circuit acquisition module It is connected to the measurement resistance R1 of the second coil winding output end including one end and for measuring electric current in the measurement resistance The ammeter of numerical value, the other end ground connection for measuring resistance R1;The step b includes, when the direct current of arrester leakage current The magnetic field that signal generates after first coil winding in magnetic core is focused on two Hall elements, due to two Hall The position of circuit module is different, thus generates unequal Hall voltage, and the two Hall circuit modules connect via circuit in parallel After connecing the equivalent circuit synthesis according to shunt capacitance, the output valve of the voltage signal that the two Hall circuit modules generate is two suddenly The arithmetic mean of instantaneous value of your circuit module output valve, amplification of the output valve through operational amplifier of the voltage signal are completed pair The control of discharge of input power so that the positive interface of input power exports Contrary compensation electric current in second coil winding, compensation The magnetic flux that electric current generates is with flow direction caused by arrester leakage current on the contrary, by operational amplifier to Contrary compensation electricity The control of stream, it is always definite value to make the magnetic flux density in magnetic core, and it is electric using measuring to compensate electric current in second coil winding at this time Be input to ground after resistance R1, by ammeter to measuring the current values that circulate in resistance R1, and according to the current values into Row scale operation is the direct current signal value for obtaining leakage current of an arrester, hence into step c.
Further, inert-gas diode and TVS diode are added in the extraction wire of arrester electric current, it should TVS diode differential concatenation is grounded, and in step a, when arrester electric current is higher than preset threshold value, TVS diode can To be actuated for release current rapidly, inert-gas diode is started later, sustained release electric current.
Further, further include step f, step f is through entire on-line checking process comprising to adding on the magnetic core It is loaded with AC signal, after upper AC signal is loaded on magnetic core, the magnetic flux density of magnetic core will back and forth magnetize in forward and reverse And demagnetization, it can interrupt magnetic polarization process of the external electromagnetic field to magnetic material in this process.
Further, the toroidal shell includes a shield shell and the insulation shell that is set on the outside of the shield shell Body, the magnetic core include two symmetrically arranged arc pellets and a fixing pipe, and two arc pellets are respectively mutually abutted with one end, And in the both sides of the abutted position by the way that on fixing pipe set, the arc pellet is arc made of nano amorphous material Pellet, the fixing pipe are nano amorphous material fixing pipe.
Further, the opening of the magnetic core is formed with an air gap, the two Hall circuit module parallel arranged for interval In in the air gap, the volume occupied by the fixing pipe is a quarter of the accommodating space volume, is located at the fixing pipe The one third that the volume occupied by the part of fixing pipe is the accommodating space volume, position are not put in the arc pellet of side It is the accommodating space body not put on the volume occupied by the part of fixing pipe in the arc pellet of the fixing pipe other side Long-pending one third, the second coil winding include upper second coil around portion and lower second coil around portion, and described upper second Coil is set around the part for not putting on fixing pipe in the arc pellet of the fixing pipe side, lower second coil around portion Be set around the part for not putting on fixing pipe in the arc pellet of the fixing pipe other side around portion, upper second coil around Portion and lower second coil are electrically connected to each other around portion, and the first coil winding is set around the outside of the fixing pipe.
Compared to the prior art, the advantageous effect that the present invention generates is:
1, the configuration of the present invention is simple, highly practical, when the direct current signal of arrester leakage current passes through first coil winding The magnetic field generated in magnetic core afterwards is focused into the two Hall circuit modules, due to the position of the two Hall circuit module Difference is set, thus generates unequal Hall voltage, the two Hall circuit modules are connected via circuit in parallel according to electricity in parallel After the equivalent circuit synthesis of appearance, the output valve for the voltage signal that the two Hall circuit modules generate is that two Hall circuit modules are defeated Go out the arithmetic mean of instantaneous value of value, the output valve of the voltage signal is acted on through power amplifier conducting so that being generated in second coil winding Contrary compensation electric current, the magnetic flux that compensation electric current generates is with flow direction caused by arrester leakage current on the contrary, when the two is real After existing magnetic balance, core flux zero, in second coil winding compensation electric current using after the test of circuit acquisition module to get Go out the direct current signal value of leakage current of an arrester, thus one aspect of the present invention is carried out to lightning arrester leakance using contactless Acquisition, thereby may be ensured that collecting unit can effectively and stably be run in complex electromagnetic fields, not only voltage endurance capability It is greatly promoted, and can have stronger self- recoverage and adaptive ability under overvoltage.Another aspect of the present invention is Have two Hall circuit modules of setting, in this case the Hall element in this two Hall circuit module can be connected into two kinds it is defeated Go out form, the output one is sensor is the arithmetic mean of instantaneous value form of two single Hall output, this kind of method is suitable for closed loop Hall current sensor pattern can considerably reduce the nonlinearity and site error of sensor, improve sensor Anti-interference ability and range ability.Another kind is the sensor that two Halls coordinate certain component to form, and output is poor Form-separating.This kind of double Hall current sensor schemes can inhibit temperature drift and common mode interference from signal source, improve The stability and the linearity of current sensor, and the feature with self compensation and linearity correction, can be to the micro- of the microampere order of magnitude Weak circuit signal carries out online acquisition.
2, in the present invention, it is modularization of the core sensing element for isolation detection electric current by using double Hall elements Product, since Hall element itself can generate Hall effect, thus its operation principle is to use magnetic balance type principle, that is, is worked as When electric current flows through the straight wire of a root long, generate magnetic field around conducting wire, the size in magnetic field and flow through the size of current of conducting wire at Direct ratio, this magnetic field can be assembled by Hall element, be then detected with double Hall elements, due to magnetic field variation with The output voltage signal of double Hall elements has good linear dependence, therefore the output signal measured using double Hall elements, The size of current in conducting wire is directly reflected, and the advantage of double Hall elements is that its accuracy higher, response are faster, warm Float small, especially under complicated electric field environment, double Hall elements have stronger diamagneticization and anti-polarized characteristic, thus can be with Realize the accurate and stably measured of alternating current and direct current, pulse signal etc..
3, in the present invention, after by loading upper AC signal on magnetic core, the magnetic flux density of magnetic core will positive and It reversely magnetizes and demagnetizes back and forth, magnetic polarization process of the external electromagnetic field to magnetic core can be interrupted in this process.So can be fine The magnetic polarization for avoiding magnetic core, be conducive to improve the present invention accuracy of detection and service life.
4, in the present invention, all lead-in conductors, extraction wire and other it is necessary to part may be selected install additional it is lazy Property gas diode and TVS diodes prevent high current destroy circuit system.Since the TVS diodes startup time is fast, but It is that electric discharge continuous capability is poor;And the startup time of inert-gas diode is slow, electric discharge continuous capability is strong.So the two makes simultaneously With can be good at solving the problems, such as circuit protection.
5, in the present invention, complicated electromagnetic field is other than it can cause magnetic core the influence of magnetic polarization, it is also possible to influence electricity The steady operation of sub-circuit.So the present invention realizes electromagnetic isolation, decoupling filtering by the way that shield shell and insulation shell is arranged Etc. functions, to enable a system to long-time steady operation.And by the way that above-mentioned shield shell and insulation shell is arranged, be conducive to The magnetic flux leakage for reducing magnetic core, accordingly improves measurement accuracy, at the same also can effective shield perimeter electromagnetic field interference, reduce and measure Error.
6, in the present invention, current sensor by nano amorphous material, double Hall elements, nano amorphous material fixing pipe and Shell is shielded to constitute.In order to facilitate the installation of, nano amorphous material is made HALF structures by us.It is installed in nano amorphous material It is fixed using fixing pipe after finishing, to ensure that the material can be docked preferably sensor at work.The present invention is in selection magnetic When property material, the problem of having fully taken into account heavy current impact.So we select nano amorphous and amorphous soft magnet as electric current The core material of sensor.Amorphous soft magnet and nano amorphous material have good recovery capability, in the high current for bearing moment After impact, it can be very good to restore.
7, in the present invention, it is generated in magnetic core after first coil winding when the direct current signal of arrester leakage current Magnetic field be focused on double Hall elements, voltage will be generated after double hall sensings to this part magnetic flux density, double Halls are first Amplification of the voltage signal through operational amplifier that part generates completes the control of discharge to input power so that input power Positive interface export Contrary compensation electric current in second coil winding, the magnetic flux and arrester leakage current institute that compensation electric current generates The flow direction of generation makes magnetic flux density in magnetic core always on the contrary, control by operational amplifier to Contrary compensation electric current For definite value, electric current is compensated in second coil winding at this time using ground is input to after measuring resistance R1, passes through ammeter pair The current values to circulate in resistance R1 are measured, and carries out scale operation according to the current values and obtains leakage current of an arrester Direct current signal value, not only circuit structure is simple for the above detection process, manufacturing cost is low, but also detection accuracy is high, can ensure Signal detection precision.
Description of the drawings
Fig. 1 is the schematic block circuit diagram of embodiment one in the present invention.
Fig. 2 is the structural schematic diagram of heretofore described data acquisition unit.
Fig. 3 is the schematic block circuit diagram of each component in Fig. 2.
Fig. 4 is the scheme of installation of heretofore described toroidal shell.
Fig. 5 is the schematic block circuit diagram of two Hall circuit modules in the present invention.
Fig. 6 is the schematic block circuit diagram of embodiment two in the present invention.
Specific implementation mode
Illustrate the specific implementation mode of the present invention with reference to the accompanying drawings.
Embodiment one
Referring to Fig.1.A kind of online detecting system of UHVDC Arrester leakage current, including one be set to direct current and keep away The data that detection device 1 near thunder device, the leakage current testing result for obtaining the detection device 1 are transmitted are sent Device, data sink, central monitoring device and mobile terminal 3.The data sending device is that public network signal transmitting is single Member 5, data sink are public network signal receiving unit 6.Public network signal transmitter unit 5 and public network signal receiving unit 6 can be with Pass through mobile public network(GSM network or GPRS network)Realize data transmission, public network signal receiving unit 6 is preferred in the present embodiment The communication mould of the modem of GSM network or GPRS network, 5 preferred GSM network of public network signal transmitter unit or GPRS network Block.The central monitoring device includes background processor 40 and reservoir 41, the input terminal connection of the background processor 40 It is connected to the mobile terminal 3 and above-mentioned storage in the output end of the data sink, the background processor 40 The input terminal of storage 41, the background processor 40 is also associated with an encryption unit 42, the output end connection of the reservoir 41 There is a terminal display 43.The Enable Pin of the data sink is connected to the output end of the data sending device, described The Enable Pin of central monitoring device is connected to the output end of the data sink, and the output end of the central monitoring device connects Connect the Enable Pin with the mobile terminal 3.By above-mentioned setting, maintenance personal can in time by the central monitoring device with Short message or other forms know the relevant information of direct current arrester leakage current, to both avoid maintenance personnel severe Weather is frequently patrolled surge arrester failure point, and the risk that maintenance personal gets an electric shock is reduced, and reduces the time restored needed for line powering.
In the present embodiment, one can be built into and collect the various monitoring data of various regions UHVDC Arrester state Cloud platform generallys include the Cloud Server by net connection(The as described central monitoring device), cloud client(As institute State mobile terminal 3)With at least one measuring terminals(As it is set to the detection dress in each power grid on each UHVDC Arrester Set 1 or the detecting instrument and equipment of other direct current arrester status informations, the function of these detecting instruments and equipment includes Grounding resistance, leakage current and harmonic wave, the electrostatic of the equipment such as measurement lightning protection or telecommunications, electrical and electronics board may be implemented Deng variation).In the system normal operation, measuring terminals are by net connection by data transfer to Cloud Server, cloud Client obtains required measurement data from Cloud Server, and user inquires measurement data by cloud client, shows, is defeated Go out, utilization, the operations such as assessment, realize the impossible association to the associated objects positioned at Different field of conventional measurement techniques It adjusts or correlation measurement is realized so as to shorten time of measuring and is carried out at the same time real time monitoring to multiple measuring terminals and to tested pair The long-range measurement of elephant, while being conducive to analyse and study thunder-strike phenomenon scientifically.
Referring to Fig.1.The detection device 1 includes data acquisition unit 10, data processing unit 11, protection circuit unit 12, power supply unit 13 and one acquires protection module 14.
The electric energy output end of the power supply unit 13 is divided into four tunnels, be electrically connected in protection circuit unit 12 electric energy it is defeated The electrical energy inputs and data processing unit 11 for entering end, acquiring the electrical energy inputs of protection module 14, data acquisition unit 10 Electrical energy inputs.At work, the output end of arrester electric current is divided into two-way, is connected to the data acquisition unit 10 all the way Enable Pin, another way be connected to it is described acquisition protection module 14 Enable Pin, it is described acquisition protection module 14 output end connect It is connected to the Enable Pin of the protection circuit unit 12, the Enable Pin of the data processing unit 11 is equipped with two-way, connects institute all the way The output end of data acquisition unit 10 is stated, another way connects the output end of the protection circuit unit 12, when arrester electric current is small In or equal to 1 milliampere hour, acquisition protection module 14 is failure to actuate, and data acquisition unit 10 starts and carries out signal acquisition to electric current It is exported by data processing unit 11 with being passed through after data processing;When arrester electric current is more than 1 milliampere hour, data acquisition unit 10 is not It is dynamic, and the startup of protection module 14 is acquired, high-impedance state is presented to input in the detection device 1, at this time without signal acquisition sum number It is exported according to processing, and via data processing unit 11.
Referring to Fig.1, Fig. 2, Fig. 3, Fig. 4 and Fig. 5.The data acquisition unit 10 includes current sensor 7, power amplifier 8, circuit acquisition module 9.
Referring to Fig.1, Fig. 2, Fig. 3, Fig. 4 and Fig. 5.The current sensor 7 includes a toroidal shell 70, a C-shaped arrangement Magnetic core 71 and two Hall circuit modules 72, an accommodating space 700 is provided in the toroidal shell 70, on the magnetic core 71 Rotating around equipped with a first coil winding 710 and a second coil winding 711, and the magnetic core 71 is installed on the accommodating sky Between in 700, the two Hall circuit modules 72 are installed in the accommodating space 700 and its both ends and the two of the magnetic core 71 End adjoining, is connected with an electric bridge 73 between two Hall circuits, 72 module, the input terminal of the first coil winding 710 with keep away Thunder device leakage current is electrically connected, and the input terminal of the second coil winding 711 and an output end of the power amplifier 8 are electrically connected It connects, another output end of the power amplifier 8 is electrically connected with the circuit acquisition module 9,711 institute of the second coil winding The magnetic flux density direction of generation is opposite with the magnetic flux density direction of the first coil winding 710.
Referring to Fig.1, Fig. 2, Fig. 3, Fig. 4 and Fig. 5.Each Hall circuit module 72 include a Hall element 720 and With the Hall element 720 be in series one adjustment resistance 722, the Hall circuit module 72 control current terminal parallel connection access in The I+ and I- of one DC constant flowing power 723, and it is VH+'s and VH- that the output end of the two Hall circuit modules 72 is also in parallel Data contacts 721, the power amplifier 8 include one be electrically connected with 721 output end of the data contacts operational amplifier 80, One first triode 81, one second triode 82 and an input power 83, the collector electrical connection of first triode 81 It is connected to the negative of the input power 83 in the collector of the positive interface 830 of the input power 83, second triode 82 The output end of interface 831, the power amplifier 8 is divided into two-way, is connected to the base stage of first triode 81 all the way, another Road is connected to the base stage of second triode, and the amplifying stage of first triode 81 is divided into two-way, is connected to all the way described The input terminal of second coil winding 711, another way are connected to the amplifying stage of second triode 82, the circuit acquisition module 9 including one end are connected to the measurement resistance R1 of 711 output end of the second coil winding and for measuring in the measurement resistance The ammeter A of current values, the other end ground connection for measuring resistance R1.When the direct current signal of arrester leakage current is by the The magnetic field generated in magnetic core after one coil windings is focused into the two Hall circuit modules, due to the two Hall electricity The position of road module is different, thus generates unequal Hall voltage, and the two Hall circuit modules are connected via circuit in parallel After the equivalent circuit synthesis of shunt capacitance, the output valve for the voltage signal that the two Hall circuit modules generate is two Halls The output valve of the arithmetic mean of instantaneous value of circuit module output valve, the voltage signal is acted on through power amplifier conducting so that the second coil Contrary compensation electric current is generated on winding, the magnetic flux and flow direction phase caused by arrester leakage current that compensation electric current generates Instead, after the two realizes magnetic balance, core flux zero, compensation electric current is using circuit acquisition module in second coil winding To get going out the direct current signal value of leakage current of an arrester after test, thus one aspect of the present invention is using contactless to lightning-arrest Device leakage current is acquired, and thereby may be ensured that collecting unit can effectively and stably be run in complex electromagnetic fields, Not only voltage endurance capability is greatly promoted, but also can have stronger self- recoverage and adaptive ability under overvoltage.This hair Bright another aspect is that have two Hall circuit modules of setting, and in this case the Hall element in this two Hall circuit module is equal Two kinds of output forms can be connected into, the output one is sensor is the arithmetic mean of instantaneous value form of two single Hall output, this kind of side Method is suitable for closed-loop Hall current sensor pattern, can considerably reduce the nonlinearity and site error of sensor, carry The high anti-interference ability and range ability of sensor.Another kind is the sensing that two Halls coordinate certain component to form Device, output is difference form.This kind of double Hall current sensor schemes can inhibit temperature drift and are total to from signal source Mould interferes, and improves the stability and the linearity of current sensor, and the feature with self compensation and linearity correction, can be to micro- The faint circuit signal of amperage magnitude carries out online acquisition, and can be monitored in direct current arrester at any time by central monitoring device The variation of leakage current, harmonic wave and electrostatic etc., can effectively prevent the equipment such as lightning protection telecommunications or electrical and electronics board because Grounding resistance is excessively high, influences the earthing effect of lightning stroke, effectively prevents the damage and the injures and deaths that cause building and people and animals, and It is conducive to extend the service life of arrester.It is that core sensing element is used for isolation detection that the present embodiment, which also utilizes double Hall elements, The modular product of electric current, since Hall element itself can generate Hall effect, thus its operation principle is to use magnetic recording level Weighing apparatus formula principle generates magnetic field that is, when electric current flows through the straight wire of a root long around conducting wire, the size in magnetic field and flows through conducting wire Size of current it is directly proportional, this magnetic field can be assembled by Hall element, be then detected with double Hall elements, due to The variation in magnetic field and the output voltage signal of double Hall elements have good linear dependence, therefore are measured using double Hall elements Output signal, directly reflect the size of current in conducting wire, and the advantage of double Hall elements is its accuracy higher, Faster, temperature drift is small for response, and especially under complicated electric field environment, double Hall elements have stronger diamagneticization and resist polarized spy Property, thus the accurate and stably measured that alternating current and direct current, pulse signal may be implemented etc..
Referring to Fig.1, Fig. 2, Fig. 3, Fig. 4 and Fig. 5.The electric bridge 73 includes two resistance pair 730 being arranged in parallel and resistance pair 731, the contact of the side of the resistance pair 730 and resistance pair 731 is connected in a Hall circuit module 72 Hall element 720 and adjusts The contact of the other side of connecting part among whole resistance 722, the resistance pair 730 and resistance pair 731 is connected to another Hall circuit Hall element 720 and the connecting part among adjustment resistance 722 in module 72, resistance pair 730 and resistance pair 731 include respectively two strings Join the resistance 733 of setting, and in resistance pair 730 in the centre of two 733 wiring of resistance being arranged in series and another resistance pair 731 The intermediate electrical of two 733 wiring of resistance being arranged in series connects.
Referring to Fig.1, Fig. 2, Fig. 3, Fig. 4 and Fig. 6.The toroidal shell 70 includes a shield shell 701 and is set to this The insulation shell 702 in 701 outside of shield shell, the magnetic core 71 include that two symmetrically arranged arc pellets 714 and one are solid Fixed tube 715, two arc pellets 714 are respectively mutually abutted with one end, and pass through the fixing pipe 715 in the both sides of the abutted position It puts on, the arc pellet 714 is arc pellet 714 made of nano amorphous material, and the fixing pipe 715 is nano amorphous material Expect fixing pipe 715.Current sensor is by nano amorphous material, double Hall elements, nano amorphous material fixing pipe and shielding shell It constitutes.In order to facilitate the installation of, nano amorphous material is made HALF structures by us.Make after nano amorphous material installs It is fixed with fixing pipe, to ensure that the material can be docked preferably sensor at work.The present invention when selecting magnetic material, The problem of having fully taken into account heavy current impact.So we select nano amorphous and amorphous soft magnet as current sensor Core material.Amorphous soft magnet and nano amorphous material have good recovery capability, after bearing the heavy current impact of moment, It can be very good to restore.
Referring to Fig.1, Fig. 2, Fig. 3, Fig. 4 and Fig. 5.The opening of the magnetic core 71 is formed with an air gap 718, two Halls 72 parallel interval of circuit module is arranged in the air gap, and the volume occupied by the fixing pipe 715 is 700 body of the accommodating space Long-pending a quarter is not put in the arc pellet 714 of 715 side of the fixing pipe occupied by the part of fixing pipe 715 Volume be 700 volume of the accommodating space one third, be located at 715 other side of the fixing pipe arc pellet 714 in The one third that the volume occupied by the part of fixing pipe 715 is 700 volume of the accommodating space, second coil are not put on Winding 711 includes upper second coil around portion and descends the second coil around portion, and upper second coil is set around around portion positioned at described The part of fixing pipe 715 is not put in the arc pellet 714 of 715 side of fixing pipe, lower second coil is set around position around portion The part of fixing pipe 715 is not put in the arc pellet 714 of 715 other side of the fixing pipe, upper second coil is around portion It is electrically connected to each other around portion with lower second coil, the first coil winding 710 is set around the outside of the fixing pipe 715.
Referring to Fig.1, Fig. 2, Fig. 3, Fig. 4 and Fig. 6.Two pole of inert gas is added in the extraction wire of the arrester electric current Pipe and TVS diode, TVS diode differential concatenation ground connection.The present embodiment all lead-in conductors, extraction wire and other It is necessary to part may be selected to install inert-gas diode and TVS diodes additional and prevent high current from destroying circuit system.By It is fast in the TVS diodes startup time, but the continuous capability that discharges is poor;And the startup time of inert-gas diode is slow, puts Electric continuous capability is strong.So the two use simultaneously can be good at solving the problems, such as circuit protection.
Referring to Fig.1, Fig. 2, Fig. 3, Fig. 4 and Fig. 5.It is loaded with AC signal on the magnetic core 71.By adding on magnetic core 71 In load after AC signal, the magnetic flux density of magnetic core 71 will magnetize and demagnetize back and forth in forward and reverse, can be beaten in this process Magnetic polarization process of the disconnected external electromagnetic field to magnetic material.So can be very good to avoid the magnetic polarization of magnetic material.Be conducive to Improve the accuracy of detection and service life of the present invention.
Referring to Fig.1, Fig. 2, Fig. 3, Fig. 4 and Fig. 5.The toroidal shell 70 is set on the ground wire 16 of arrester and it is wrapped Include the left shell half body 705 that can mutually dismantle and right half-shell body 706.
Referring to Fig.1, Fig. 2, Fig. 3, Fig. 4 and Fig. 6.When the direct current signal of arrester leakage current is after first coil winding The magnetic field generated in magnetic core is focused on double Hall elements, and electricity will be generated after double hall sensings to this part magnetic flux density Pressure, amplification of the voltage signal through operational amplifier that double Hall elements generate complete the control of discharge to input power, So that the positive interface of input power exports Contrary compensation electric current in second coil winding, the magnetic flux and take shelter from the thunder that compensation electric current generates Flow direction caused by device leakage current makes on the contrary, control by operational amplifier to Contrary compensation electric current in magnetic core Magnetic flux density is always definite value, at this time in second coil winding compensate electric current using measure resistance R1 after be input to ground, By ammeter to measuring the current values that circulate in resistance R1, and according to the current values carry out scale operation obtain it is lightning-arrest The direct current signal value of device leakage current, not only circuit structure is simple for the above detection process, manufacturing cost is low, but also detection accuracy Height can ensure signal detection precision.
In addition, since complicated electromagnetic field is other than it can cause magnetic core the influence of magnetic polarization, it is also possible to influence electronics electricity The steady operation on road.So the present invention can also realize electromagnetic isolation, decoupling in terms of wire laying mode, structure design and shell processing The functions such as filtering, to enable a system to long-time steady operation.By the way that shield shell and insulation shell is arranged, advantageously reduce The magnetic flux leakage of magnetic core, accordingly improves measurement accuracy, at the same also can effective shield perimeter electromagnetic field interference, reduce to measure and miss Difference.
Referring to Fig.1, Fig. 2, Fig. 3, Fig. 4 and Fig. 5.The corresponding UHVDC Arrester leakage current of the present embodiment it is online Method for detecting includes the following steps:
A, judge whether to carry out signal acquisition to electric current, when arrester electric current is higher than preset threshold value, bis- poles TVS Pipe can be actuated for rapidly release current, and inert-gas diode is started later, sustained release electric current.
B, signal acquisition is carried out to electric current, when the direct current signal of arrester leakage current is after first coil winding 710 The magnetic field generated in magnetic core 71 is focused on double Hall elements 720, due to two Hall element 720 position not Together, thus unequal Hall voltage is generated, the two Hall circuit modules 72 are connected via circuit in parallel according to shunt capacitance Equivalent circuit synthesis after, the output valve for the voltage signal that the two Hall circuit modules 72 generate is two Hall circuit modules 72 The arithmetic mean of instantaneous value of output valve, amplification of the voltage signal through operational amplifier 80 that double Hall elements 720 generate are completed To the control of discharge of input power 83 so that the positive interface 830 of input power 83 exports reversed benefit in second coil winding 711 Electric current is repaid, the magnetic flux that compensation electric current generates is with flow direction caused by arrester leakage current on the contrary, passing through operational amplifier The control of 80 pairs of Contrary compensation electric currents, it is always definite value to make the magnetic flux density in magnetic core 71, is mended in second coil winding 711 at this time Electric current is repaid using ground is input to after measuring resistance R1, by ammeter A to measuring the current values that circulate in resistance R1, And it is the direct current signal value for obtaining leakage current of an arrester to carry out scale operation according to the current values, hence into next step Suddenly.
C, the output of electric current Value Data is formed after being handled the signal of acquisition.
D, the current data of acquisition is summarized by being wirelessly transmitted in central monitoring device, data processing unit 11 After being handled by data operation, by public network signal transmitter unit 5 by the direct current signal value containing leakage current of an arrester, survey The coding of amount time or arrester installation site information is sent to public network signal receiving unit 6 in the form of short message.
E, central monitoring device shows that current data distribution is sent to corresponding arrester management by the current data simultaneously After the mobile terminal 3 of person, specially background processor 40 receive the short message of coding form, converts, will encode into row information Information is converted into Chinese information and is sent on the mobile terminal 3 of related management personnel or maintenance personal, and in reservoir 41 forever Kubo deposits above- mentioned information.
In addition, running through entire on-line checking process, have to being loaded with AC signal on the magnetic core 71, on magnetic core 71 In load after AC signal, the magnetic flux density of magnetic core 71 will magnetize and demagnetize back and forth in forward and reverse, in this process meeting Interrupt magnetic polarization process of the external electromagnetic field to magnetic material.
In addition, being tested by Chinese Academy of Sciences's magnetisable material and device emphasis using nano amorphous material in the present embodiment experiment Room provides.It also passes through the applicant repeatedly to test, magnetic core made from other kinds of nano amorphous material can also complete this The purpose of item application.
Embodiment two
With reference to Fig. 6.The present embodiment and the embodiment of embodiment one are substantially the same, the difference is that:The data Sending device include be in sequentially connected emission of radio frequency signals unit 50, frequency modulation retransmission unit 51 and dual mode communication unit 52, The data sink is the public network signal receiving unit 6 being connect with the output end of the dual mode communication unit 52.
The present embodiment can be made both circuit can to have been detected numerical value in the range of having public network covering using above-mentioned setting It is transferred to central monitoring device, the emission of radio frequency signals unit and frequency modulation can also be passed through in the region of not public network signal Lightning strike information is first dealt into the dual mode communication unit being arranged in public network coverage area, passed again later by the cooperation of retransmission unit It is defeated to arrive central monitoring device, the applicable situation of the present invention can be widened significantly in this way so that be located in some remote mountains or thick forest Direct current arrester can also real-time online detect the information of its leakage current.
The present embodiment can be automatically selected in frequency range by the cooperation of emission of radio frequency signals unit and frequency modulation retransmission unit The farthest frequency point of propagation distance emits collected current data, can overcome the single frequency point propagation distance too short Defect so that applicable situation of the invention is broader.
In addition, since the present embodiment is for data sending device and one different from of embodiment, thus the present embodiment is to spy The online method for detecting of high voltage direct current arrester leakage circuit is also different, the difference is that:
On the one hand, step d includes that after data processing unit is handled by data operation, will contain leakage current of an arrester Direct current signal value, time of measuring or arrester installation site information coding pass through emission of radio frequency signals unit and frequency modulation turns The cooperation of bill member, ensure communication channel it is unimpeded in the case of, coding information is passed through in a manner of private network automatic frequency-hopping Level-one is forwarded on the bimodulus communication unit of mobile public network signal coverage areas, then again by bimodulus communication unit with short message Form is sent to public network signal receiving unit.
On the other hand, it after step e includes the short message that background processor receives coding form, is converted into row information, it will Coding information is converted into Chinese information and is sent on the mobile terminal of related management personnel or maintenance personal, and in reservoir forever Kubo deposits above- mentioned information.
The specific implementation mode of the present invention is above are only, but the design concept of the present invention is not limited thereto, it is all to utilize this Conceive the change for carrying out unsubstantiality to the present invention, the behavior for invading the scope of the present invention should all be belonged to.

Claims (6)

1. with hall sensing theory to the method for UHVDC Arrester leakage current collection, which is characterized in that utilize an inspection It surveys device and is respectively completed following steps:A, judge whether to carry out signal acquisition to electric current;B, signal acquisition is carried out to electric current;C, will The signal of acquisition forms current data output after being handled, the detection device includes data acquisition unit, data processing list Member, protection circuit unit and power supply unit, the data acquisition unit include current sensor, power amplifier and circuit Acquisition module, the current sensor include a toroidal shell, the magnetic core of a C-shaped arrangement and two Hall circuit modules, institute It states and is provided with an accommodating space in toroidal shell, rotating around equipped with a first coil winding and one second coil on the magnetic core Winding, and the magnetic core is installed in the accommodating space, and the two Hall circuit modules are installed in the accommodating space simultaneously And its both ends and the both ends of the magnetic core abut, and an electric bridge is connected between the two Hall circuit modules;Each Hall electricity Road module includes a Hall element and the adjustment resistance being in series with the Hall element, the control of the Hall circuit module Current terminal parallel connection access processed is in DC constant flowing power an I+ and I-, and also parallel connection is the output end of the two Hall circuit modules The data contacts of VH+ and VH-, the power amplifier include an operation amplifier being electrically connected with the data contacts output end Device, one first triode, one second triode and an input power, the collector of first triode are electrically connected to described The collector of the positive interface of input power, second triode is connected to the negative interface of the input power, and the operation is put The output end of big device is divided into two-way, is connected to the base stage of first triode all the way, another way is connected to the two or three pole The amplifying stage of the base stage of pipe, first triode is divided into two-way, is connected to the input terminal of the second coil winding all the way, separately Be connected to the amplifying stage of second triode all the way, the circuit acquisition module include one end be connected to second coil around The measurement resistance R1 of group output end and the ammeter for measuring current values in the measurement resistance, it is described to measure resistance R1's The other end is grounded;The electric bridge includes two resistance pair being arranged in parallel, and the contact of the side of two resistance pair is connected to a Hall Hall element and the connecting part among adjustment resistance in circuit module, the contact of the other side of two resistance pair be connected to it is another suddenly Hall element and the connecting part among adjustment resistance in your circuit module, the two each resistance of resistance centering being arranged in parallel are to each packet Include two resistance being arranged in series, and the centre for the resistor wiring that wherein a resistance centering two is arranged in series and another resistance pair In the intermediate electricals of two resistor wirings being arranged in series connect;The input terminal of the first coil winding is electrically connected with lightning arrester leakance It connects, the input terminal of the second coil winding is electrically connected with an output end of the power amplifier, the power amplifier Another output end is electrically connected with the circuit acquisition module, and the detection device further includes an acquisition protection module, the power supply The electric energy output end of unit is divided into four tunnels, is electrically connected the electrical energy inputs in protection circuit unit, acquires protection module The electrical energy inputs of electrical energy inputs, the electrical energy inputs of data acquisition unit and data processing unit, arrester electric current Output end is divided into two-way, is connected to the Enable Pin of the data acquisition unit all the way, and another way is connected to the acquisition protection mould The Enable Pin of block, the output end of the acquisition protection module is connected to the Enable Pin of the protection circuit unit, at the data The Enable Pin for managing unit is equipped with two-way, connects the output end of the data acquisition unit all the way, and another way connects the protection electricity The output end of road unit;After the step a is included in the extraction wire for connecting arrester electric current, by acquiring protection module sum number Preliminary detection is carried out to the electric current on lead according to collecting unit, when arrester electric current is less than or equal to 1 milliampere hour, acquisition protection mould Block is failure to actuate, and data acquisition unit starts and defeated by data processing unit to being passed through after electric current progress signal acquisition and data processing Go out;When arrester electric current is more than 1 milliampere hour, data acquisition unit is motionless, and acquires protection module startup, the detection device pair Input is presented high-impedance state and is not also exported by data processing unit at this time without signal acquisition and data processing;The circular casing Body includes a shield shell and the insulation shell that is set on the outside of the shield shell, and the magnetic core includes two symmetrically arranged Arc pellet and a fixing pipe, two arc pellets are respectively mutually abutted with one end, and pass through institute in the both sides of the abutted position It states fixing pipe to put on, the arc pellet is arc pellet made of nano amorphous material, and the fixing pipe is nano amorphous material Expect fixing pipe;The toroidal shell is set in the left shell half body and the right side that on the ground wire of arrester and it, which includes, mutually to dismantle Half shell.
2. special as described in claim 1 with hall sensing theory to the method for UHVDC Arrester leakage current collection Sign is:The step b includes when the direct current signal of arrester leakage current generates after first coil winding in magnetic core Magnetic field be focused into the two Hall circuit modules, since the position of the two Hall circuit module is different, thus produce Raw unequal Hall voltage, the two Hall circuit modules are connected via circuit in parallel and are closed according to the equivalent circuit of shunt capacitance The output valve of Cheng Hou, the voltage signal that the two Hall circuit modules generate are the arithmetic average of two Hall circuit module output valves Value, the output valve of the voltage signal is acted on through power amplifier conducting to generate Contrary compensation electric current in second coil winding, Compensate flow direction caused by magnetic flux and the arrester leakage current that electric current generates on the contrary, when both realization magnetic balance after, magnetic Core magnetic flux is zero, in second coil winding compensate electric current using after the test of circuit acquisition module to get go out arrester leakage The direct current signal value of electric current is hence into step c.
3. special as claimed in claim 2 with hall sensing theory to the method for UHVDC Arrester leakage current collection Sign is:The step b includes, when the direct current signal of arrester leakage current generates after first coil winding in magnetic core Magnetic field be focused on two Hall elements, since the position of the two Hall circuit module is different, thus generate unequal Hall voltage, the two Hall circuit modules via circuit in parallel connect according to shunt capacitance equivalent circuit synthesis after, two The output valve for the voltage signal that the Hall circuit module generates is the arithmetic mean of instantaneous value of two Hall circuit module output valves, the electricity Amplification of the output valve through operational amplifier of signal is pressed to complete the control of discharge to input power so that input power Positive interface exports Contrary compensation electric current in second coil winding, and the magnetic flux that compensation electric current generates is produced with arrester leakage current Raw flow direction makes the magnetic flux density in magnetic core be always on the contrary, control by operational amplifier to Contrary compensation electric current Definite value compensates electric current using ground is input to after measuring resistance R1, by ammeter to surveying at this time in second coil winding The current values to circulate in resistance R1 are measured, and carries out scale operation according to the current values and obtains the straight of leakage current of an arrester Signal value is flowed, hence into step c.
4. special as claimed in claim 3 with hall sensing theory to the method for UHVDC Arrester leakage current collection Sign is:Inert-gas diode and TVS diode are added in the extraction wire of arrester electric current, the TVS diode is anti- To series connection be grounded, in step a, when arrester electric current be higher than preset threshold value when, TVS diode can start rapidly into Row release current, later inert-gas diode started, sustained release electric current.
5. special as claimed in claim 4 with hall sensing theory to the method for UHVDC Arrester leakage current collection Sign is:Further include step f, step f runs through entire on-line checking process comprising to being loaded with exchange letter on the magnetic core Number, after upper AC signal is loaded on magnetic core, the magnetic flux density of magnetic core will magnetize and demagnetize back and forth in forward and reverse, at this A process can interrupt magnetic polarization process of the external electromagnetic field to magnetic material.
6. special as described in claim 1 with hall sensing theory to the method for UHVDC Arrester leakage current collection Sign is:The opening of the magnetic core is formed with an air gap, the two Hall circuit module parallel arranged for interval in the air gap, Volume occupied by the fixing pipe is a quarter of the accommodating space volume, is located at the arc core of the fixing pipe side The one third that the volume occupied by the part of fixing pipe is the accommodating space volume is not put in block, is located at the fixing pipe The one third that the volume occupied by the part of fixing pipe is the accommodating space volume is not put in the arc pellet of the other side, The second coil winding includes upper second coil around portion and descends the second coil around portion, and upper second coil is set around around portion The part of fixing pipe is not put in the arc pellet of the fixing pipe side, lower second coil is set around around portion to be located at The part of fixing pipe is not put in the arc pellet of the fixing pipe other side, upper second coil is around portion and lower second coil It is electrically connected to each other around portion, the first coil winding is set around the outside of the fixing pipe.
CN201510610686.0A 2015-09-23 2015-09-23 With hall sensing theory to the method for UHVDC Arrester leakage current collection Active CN105301325B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510610686.0A CN105301325B (en) 2015-09-23 2015-09-23 With hall sensing theory to the method for UHVDC Arrester leakage current collection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510610686.0A CN105301325B (en) 2015-09-23 2015-09-23 With hall sensing theory to the method for UHVDC Arrester leakage current collection

Publications (2)

Publication Number Publication Date
CN105301325A CN105301325A (en) 2016-02-03
CN105301325B true CN105301325B (en) 2018-10-30

Family

ID=55198826

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510610686.0A Active CN105301325B (en) 2015-09-23 2015-09-23 With hall sensing theory to the method for UHVDC Arrester leakage current collection

Country Status (1)

Country Link
CN (1) CN105301325B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111289919B (en) * 2020-04-03 2022-05-24 广州市扬新技术研究有限责任公司 Multi-range contact net leakage current detection device
CN113126001A (en) * 2021-04-20 2021-07-16 广东电网有限责任公司 Electromagnetic monitoring system and method

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201007846Y (en) * 2006-11-07 2008-01-16 西安神电电器有限公司 On-line monitoring system for lightning arrester
CN102004179A (en) * 2009-09-01 2011-04-06 天津市松正电动科技有限公司 Magnetic induction current sensor for electric vehicle controller
CN101702361B (en) * 2009-11-17 2011-08-10 武汉市长江电气发展有限公司 Ultra-low frequency alternating-current (AC) constant-current demagnetization device of large transformer or mutual inductor and demagnetization detection method
CN201732112U (en) * 2010-06-23 2011-02-02 长沙南车电气设备有限公司 Voltage sensor for locomotives
CN102012448B (en) * 2010-10-26 2012-07-04 西安交通大学 Rogowski current sensor
CN102323467A (en) * 2011-08-31 2012-01-18 清华大学 Giant magnetoresistive effect current sensor using amorphous alloy magnetic ring structure
CN202256454U (en) * 2011-10-12 2012-05-30 长沙南车电气设备有限公司 Current sensor
CN102998511B (en) * 2012-10-29 2016-04-20 中国电力科学研究院 A kind of lightning arrester discharge current monitoring device
CN103364612A (en) * 2013-07-05 2013-10-23 华中科技大学 Dual-Hall element current sensor
CN203479959U (en) * 2013-10-10 2014-03-12 泉州维盾电气有限公司 Lightning stroke positioning system disposed on power transmission line power
CN203759086U (en) * 2013-12-24 2014-08-06 北京嘉岳同乐极电子有限公司 Iron core grounding current online monitoring device
CN203658443U (en) * 2013-12-25 2014-06-18 深圳市合兴加能科技有限公司 Hall sensing device and three-phase current balance detection circuit
CN204439709U (en) * 2014-03-13 2015-07-01 达州市远东电器有限公司 A kind of information collecting device of electricity load management terminal
CN104698311B (en) * 2015-02-25 2018-05-18 中国南方电网有限责任公司超高压输电公司检修试验中心 A kind of DC line direct current arrester live detection method

Also Published As

Publication number Publication date
CN105301325A (en) 2016-02-03

Similar Documents

Publication Publication Date Title
CN105158543B (en) Based on double Hall elements to the collecting unit of UHVDC Arrester leakage current
CN105182044B (en) Using device of the Hall sensor as framework to UHVDC Arrester state-detection
CN105182163B (en) The online detecting system of UHVDC Arrester leakage current based on cloud
CN105467241B (en) A kind of distribution converter transformer DC magnetic bias detecting system and its detection method
CN103412176B (en) Real-time on-line monitoring sensor for current of alternating current-direct current arrester based on magnetoresistance
CN105301323B (en) The method that UHVDC Arrester Leakage Current is detected online using cloud
Huang et al. Innovative testing and measurement solutions for smart grid
CN205103292U (en) Acquisition unit based on two hall element reveal electric current to special high voltage direct current arrester
CN205103296U (en) Detection apparatus for reveal electric current with non - contact pick up to special high voltage direct current arrester
CN105158633B (en) The method of UHVDC Arrester state on-line checking data is shared with cloud platform
CN104297559A (en) Device and method for measuring induced voltage
CN103995171B (en) Contactless DC power transmission line current measuring method
CN105301325B (en) With hall sensing theory to the method for UHVDC Arrester leakage current collection
CN205103294U (en) Use device that hall sensor detected special high voltage direct current arrester state as framework
CN106645860B (en) Substation grounding equipment energy characteristic parameter detecting check system
CN205539205U (en) Measure transmission tower earth impedance's return circuit impedance test system
CN105182043B (en) Detection device with non-contact sensor to UHVDC Arrester leakage current
CN204925306U (en) System that listens on line of electric current is revealed to special high voltage direct current arrester based on cloud
CN205103356U (en) Use soft -magnetic piece as core to faint acquisition unit who reveals current signal of non -contact
CN107607888A (en) A kind of three-dimensional transient transcendence measuring system
CN105301324B (en) With magnetic balance theory to the method for UHVDC Arrester leakage current collection
CN204925224U (en) Use special high voltage direct current arrester state to detect big data platform of data as framework
Yuan et al. A three-core power cable online monitoring system based on phase current sensing
CN102590645B (en) Phase testing method for alternating current high-voltage power supply circuit by using single-pole phase testing device
CN105182162B (en) It is core to the acquisition unit of contactless faint leakage current signal using diskette

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 361001 one of the 1002 units of No. 3 Nantou Road, Siming District, Xiamen, Fujian.

Applicant after: Red phase Limited by Share Ltd

Address before: 361001 E 21 unit, Hai Guang building, 33 Narcissus Road, Siming Road, Xiamen, Fujian

Applicant before: Xiamen Red Phase Instruments Inc.

GR01 Patent grant