CN105299823A - Method of controlling a device that for the humidification of the air and device for the humidification of air - Google Patents

Method of controlling a device that for the humidification of the air and device for the humidification of air Download PDF

Info

Publication number
CN105299823A
CN105299823A CN201510276101.6A CN201510276101A CN105299823A CN 105299823 A CN105299823 A CN 105299823A CN 201510276101 A CN201510276101 A CN 201510276101A CN 105299823 A CN105299823 A CN 105299823A
Authority
CN
China
Prior art keywords
boiler
liquid
heating element
liquid level
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510276101.6A
Other languages
Chinese (zh)
Other versions
CN105299823B (en
Inventor
J·布施勒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Binder GmbH
Original Assignee
Binder GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Binder GmbH filed Critical Binder GmbH
Publication of CN105299823A publication Critical patent/CN105299823A/en
Application granted granted Critical
Publication of CN105299823B publication Critical patent/CN105299823B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/0008Control or safety arrangements for air-humidification
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F3/00Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems
    • F24F3/12Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems characterised by the treatment of the air otherwise than by heating and cooling
    • F24F3/14Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems characterised by the treatment of the air otherwise than by heating and cooling by humidification; by dehumidification
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F6/00Air-humidification, e.g. cooling by humidification
    • F24F6/18Air-humidification, e.g. cooling by humidification by injection of steam into the air
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F6/00Air-humidification, e.g. cooling by humidification
    • F24F2006/008Air-humidifier with water reservoir

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Air Humidification (AREA)
  • Control Of Steam Boilers And Waste-Gas Boilers (AREA)

Abstract

The invention relates to a method of controlling a device that for the humidification of the air, comprising the steps of: a, closing a steam valve when liquid in a boiler at least fills a preset upper liquid level; b, connecting with a heating element and heating liquid so as to generate steam pressure, the steam pressure pressing the liquid into a liquid lifting pipe from the boiler; c, once the liquid is below a preset lower liquid level in the boiler, cutting off the heating element; d, determining the time length between connection and disconnection of the heating element, and the time length from the connection and disconnection of the heating element to the secondary arrival of the preset upper liquid level; and e, determining the basic load of the device according to the time length between connection and disconnection of the heating element, and the time length from the connection and disconnection of the heating element to the secondary arrival of the preset upper liquid level. The invention also relates to a device for the humidification of air in particular for an air conditioning cabinet.

Description

Control to be used for the method for equipment of air humidification and the equipment for air humidification
Technical field
The present invention relates to a kind of control for the method for the equipment of air humidification and a kind of equipment for air humidification.
Background technology
Become known for the equipment of air humidification, can be space (space as air-conditioning cabinet or environmental simulation cabinet) by this equipment and supply steam, to realize desired air humidity in space.Wish that response request signal makes the air humidity in space reach the value determined within the time short as far as possible.The steam of q.s can be provided, humidity desired value can be elevated to fast or can compensate the wetness loss such as when to open within the short time in this hope.
The usual continuous service of this equipment for air humidification, wishes long service life at this.Make every effort to the simple structure with the least possible element in addition, to reduce likelihood of failure.
Become known for the equipment of air humidification, wherein evaporating liquid in the boiler closed, steam can enter room from boiler when needed.But produce high steam overvoltage in the boiler at this.Because this system is with overvoltage work, therefore this equipment needs the operation expended to allow (Zulassung).
Not exclusively to close and the system that there is not overvoltage wherein or only there is little pressure (as being less than the pressure of 0.1 bar) more may account for main flow, because allow usually to need less expending for the operation of this system without pressing system, namely.
DD208207 discloses a kind of system substantially with no pressure.Equipment described here comprises evaporimeter, this evaporimeter has the heater that can switch step by step and the vapor block mechanism that regulates according to air humidity and dipping electrode adjusting device, in this case to maintain the vapor state in evaporimeter when steam output pipe is blocked, at least one heater stages turns on and off by dipping electrode according to steam pressure.This allows the steam pressure when full load is run and vapor output device blocks suddenly only slightly to rise and only maintain little steam pressure subsequently.Can to make in evaporimeter liquid continuous remains near boiling point for this system.
Summary of the invention
Task of the present invention is to develop a kind of equipment for air humidification, this equipment especially comprise can by heating element heats, for the boiler of liquid to be evaporated, this boiler has cap relief valve, can be outputted to space from boiler by this cap relief valve steam, thus especially realize the structure of simplification.In addition, task of the present invention is to provide a kind of method for controlling this equipment for air humidification, can determine in mode energy-conservation as far as possible by the method and compensate the energy loss of this equipment at run duration.
Task of the present invention has being solved for the method for the equipment of air humidification and a kind of equipment for air humidification with the feature of claim 11 for controlling of the feature of claim 1 by a kind of.
Advantageous scheme of the present invention and expansion scheme provide in the dependent claims.
According to of the present invention, for controlling for air humidification equipment, (this equipment comprises can by heating element heats, for the boiler of liquid to be evaporated, this boiler has cap relief valve, can output to space from boiler by this cap relief valve steam, this boiler to be connected with the first stalk road with the region be arranged in during liquid filling boiler below liquid level and to be provided with the device for determining liquid level in the boiler being usually in operation) method when comprising the steps: that step a) is at least filled to default upper liquid level in the boiler when liquid, close cap relief valve.Then in step b) in, connect heating element heater and heating liquid, produce steam pressure thus, liquid is pressed into stalk road from boiler by this steam pressure.In step c) in, once lower than the lower liquid level preset in boiler, then turn off heating element heater.According to steps d), determine duration between the turning on and off of heating element heater and heating element heater connection and close the duration of having no progeny between the moment again arriving default upper liquid level at heating element heater.Subsequently in step e) in, by the duration between the turning on and off of heating element heater and the base load determining this equipment in the connection of heating element heater and the ratio of duration that closes between the moment again arriving default upper liquid level of having no progeny at heating element heater.
Base load this heat loss corresponding to this equipment in other words for compensate this equipment heat loss needed for thermic load.By be switched in alternation and turn off heating element heater and heat time make liquid from boiler enter stalk road and cool time make liquid be back to boiler from stalk road, the liquid in boiler roughly can remain on boiling point, and does not produce high overvoltage in the boiler.There is provided a kind of open system by stalk road, therefore this system substantially works without pressure and therefore only needs the operation enabled condition of simplification.By determining that (on the one hand) duration between the turning on and off of heating element heater and (on the other hand) are closed the duration of having no progeny between the moment again arriving default upper liquid level in the connection of heating element heater with at heating element heater and determined that ratio can be determined the base load of this equipment in a straightforward manner and uses it for efficient and energy-conservation control this equipment subsequently.
Advantageously, water is used as liquid.
One of the present invention particularly preferred embodiment regulation, if continuous standby mode, so repeatedly repeats step b in standby mode) and c), preferred steps b) to e).Therefore, in the standby mode of cap relief valve closedown, minimum pressure is formed periodically in the boiler.Overvoltage in boiler is determined indirectly by the liquid level in boiler.Carry out when cap relief valve is closed heating until because the pressure in boiler raises by so many liquid press-in stalk, so that lower than the lower liquid level in boiler.So then boiler cools again based on heat loss and liquid can be back to boiler again from stalk.After arriving initial upper liquid level, heating element heater again activates and reheats liquid.This equipment heat loss in standby mode being used for air humidification can be determined in the following manner by evenly heat power, namely determines that the on-time of heating element heater accounts for the percentage of the duration (namely connecting the duration between the moment for two) of a circulation.This percentage due to the on-time corresponds to the base load of this equipment, therefore boiler can be remained on boiling temperature.
In standby mode, heating element heater can base load but also can arbitrary other thermic load run, preferably with higher than base load thermic load, such as run with the multiple of base load.Usually, thermic load is higher, circulates shorter.
Advantageously, in operational mode, cap relief valve is opened and with the previous base load determined, heating element heater adds that the thermic load determined by request signal is run.Advantageously, request signal is provided by control device, and which kind of humidity user should exist in such as setting space on control device.Once the humidity in space departs from desired value and especially lower than desired value, then this equipment to enter in operational mode and cap relief valve is opened.When heating element heater is only with the previous base load operation determined, the liquid in boiler remains on boiling point, but produces steam hardly.Therefore in order to produce steam, with the previous base load determined, heating element heater adds that the thermic load determined by request signal is run.
Advantageously, when there is request signal, operational mode is connected and is transformed into standby mode when no longer there is request signal in the duration preset.
Advantageously, when this equipment is connected, implementation step is a) to e) and preferably advantageously repeatedly repeating step b) to e), to determine the base load of this equipment when this equipment is connected and this equipment of control further can be used it for.
At repetition implementation step b) to time e), advantageously, determine the mean value of base load, to improve the accuracy of determined base load.Especially should note, when not just in time being positioned at liquid level in first circulation that the liquid level in boiler is connected at heating element heater, but during higher than upper liquid level, the base load value determined in the cycle is not considered or is just considered during liquid level from arrival, otherwise this value can cause determined base load inaccurate.
One of the present invention particularly preferred expansion scheme regulation, in step b) to before e), period or determine environment temperature afterwards and with step e) in determined base load be associated, be such as associated by jointly storing or otherwise store.Because base load is relevant with environment temperature, therefore to allow environment temperature to include in control and base load when this equipment such as runs under other environment temperature needed for corresponding adjust operation pattern.
Therefore a preferred embodiment of the invention regulation, when determining environment temperature and there is deviation during operational mode between determined environment temperature and the environment temperature be associated with base load to be used, adjust base load to be used according to determined environment temperature.This adjustment such as can be carried out as follows: by environment temperature, determined base load is standardized as reference environment temperature and the standardized base load of storage.
The particularly preferred embodiment of one according to the present invention, the device for tracer liquid liquid level is configured to switch.This switch has the sluggishness between cut-in point and pass breakpoint.According to the present invention, cut-in point is relevant to upper liquid level and close breakpoint and lower liquid level is correlated with, and makes a unique switch be enough to be used in monitoring liquid level in boiler and heating element heater can correspondingly switch simultaneously.
Advantageously, in rinse mode, cap relief valve is closed and is led to the liquid feed valve of boiler and opens, and be injected in boiler, so that liquid is forced out boiler by the first stalk road by this liquid feed valve liquid.Preferably rinse mode is implemented when heating element heater turns off at this.The equipment for air humidification comparatively long running time, in boiler liquid evaporation and liquid vapors entered in room by valve.But the impurity of liquid is residual in the boiler.The impurity of liquid is in the boiler stayed to increase with operation thus.Can rinse mode be realized by stalk road, and necessary heat-resisting flushing valve need not be directly set on heat boiler.By liquid feed valve liquid make-up in rinse mode, this liquid moreover more than so that not only again arrive default upper liquid level, and additional liquid also makes liquid be forced out boiler by the first stalk road.Water by the liquid diluting that supplementary impurity content is less in boiler and impurity are discharged by stalk road.
According to of the present invention, for the equipment of the especially air humidification of air-conditioning cabinet comprise can by heating element heats, for the boiler of liquid to be evaporated, this boiler has cap relief valve, can output to space from boiler by cap relief valve steam, it is characterized in that, this boiler to be connected with the first stalk road with the region be arranged in during liquid filling boiler below liquid level being usually in operation, and is only provided with the device for determining liquid level in the structure comprising boiler and stalk road in the boiler.This equipment has the element of negligible amounts and therefore can be manufactured simply and at low cost and not easy break-down.A kind of system substantially with no pressure is provided by stalk road.To be used for determining that the advantage that the device of liquid level is arranged in the boiler is, by one unique, for determining that the device of liquid level can be determined absolute liquid level on the one hand and also can determine the difference between upper liquid level and lower liquid level on the other hand, thus not only can control to the liquid supply in boiler but also turning on and off of heating element heater can be controlled.
The present invention specifies, described for determining that in boiler, the device of liquid level is configured to switch.Due to the sluggishness that switch has cut-in point and closes between breakpoint, so the device that can realize arranging in the boiler by especially simply by switch implements turning on and off of the heating rod of heating element heater and additional liquid level monitoring to judge whether to need liquid make-up.
Advantageously, determine the described height on stalk road and the size of diameter like this, make it possible to receive the volume extruded from boiler, this volume is relevant with the diameter of boiler and the difference between upper liquid level and lower liquid level.Guarantee thus according to of the present invention, heating element heater connection and again arrive on liquid level moment between circulation in liquid volume keep constant.
Advantageously, determining the described height on stalk road and the size of diameter like this, making it possible to produce the static pressure for the steam formed in boiler being pressed through cap relief valve.Allow steam can enter space from boiler when there is no add ons when cap relief valve is opened thus.
A preferred embodiment of the invention, this equipment comprises the drain vessel for collecting the condensate liquid gathered in space, this drain vessel is preferably connected with the second stalk road, and the first stalk road and the second stalk road are connected to each other on their upper end.Condensate liquid directly can enter drain vessel from space on the one hand.On the other hand can provide a kind of without pressing system by the coupling on two stalk roads, when the steam pressure in boiler is excessive, liquid to be entered in drain vessel and therefore pressure reduction by two stalk roads wherein.Finally, rinse mode can be realized in a straightforward manner by the connection on two stalk roads between boiler and drain vessel.
A preferred embodiment of the invention, is provided with the sensor for determining liquid level, especially switch in drain vessel, such as must the information of emptying drain vessel about when to obtain.
Preferably, drain vessel is connected with the draining pump for waste water being pumped drain vessel, so that can emptying drain vessel in a straightforward manner.A preferred embodiment of the invention, draining pump especially can regulate according to the liquid level in drain vessel.
The particularly preferred embodiment regulation of one of the present invention, described first stalk road and/or the second stalk road are configured to rise liquid hard tube or rise liquid flexible pipe.
Preferably, described boiler has the feed flow portion that can block by liquid feed valve.This allows regularly with liquid supplement boiler.Liquid feed valve is especially controlled, preferably controls according to the liquid level in boiler.
According to a kind of favourable expansion scheme of the present invention, this equipment has the temperature sensor for determining environment temperature and/or the temperature sensor for determining the fluid temperature in boiler.Run, because heat loss is relevant with environment temperature by determining environment temperature that this equipment can be made to be matched with environment temperature.By determining that the fluid temperature in boiler can determine base load more accurately.
Accompanying drawing explanation
Below with reference to the accompanying drawings the present invention is described in detail.Accompanying drawing is as follows:
Fig. 1 is the schematic diagram of a kind of embodiment of equipment for air humidification.
Detailed description of the invention
Fig. 1 illustrates the schematic diagram of the equipment 10 for air humidification.This equipment 10 comprises boiler 12, is equipped with and waits be in operation liquid 24, the preferred water of evaporating in this boiler.In boiler 12, be provided with heating element heater 14, can heat by this heating element heater and especially evaporating liquid 24.Boiler 12 especially at an upper portion thereof in region, such as in cap surface, have cap relief valve 16, can be outputted to space from boiler 12 by this cap relief valve steam, as in the space of air-conditioning cabinet or environmental simulation cabinet.
Equipment 10 also comprises the first stalk road 20, and it can be configured to rise liquid hard tube or rise liquid flexible pipe.The bottom on stalk road 20 passes into the region under the liquid level being arranged in liquid 24 when conventional operation of boiler 12.
In boiler 12, be provided with the device for determining liquid level, this device can be configured to switch 18.In addition, boiler 12 comprises feed flow portion 26, and this feed flow portion can block by liquid feed valve 28 in the ideal case.In one embodiment, flow regulator 29 can be set in feed flow portion 26.Replace flow regulator 29 also can arrange flow restrictor in feed flow portion 26, it is set to fixed value.
In a preferred embodiment, boiler 12 can comprise safety valve 22, when can produce too high overvoltage by this safety valve in boiler 12, pressure is discharged boiler 12.
Equipment 10 can comprise drain vessel 30.Especially the condensate liquid gathered in space is collected in drain vessel 30 by condensate liquid backflow portion 38.In addition, drain vessel 30 can have the second stalk road 32, and advantageously this second stalk road is configured to rise liquid hard tube or rise liquid flexible pipe.Second stalk road 32 to pass on its lower end in drain vessel 30 and thereon end is connected with the upper end on the first stalk road 20.
Can be provided with the device for determining liquid level in drain vessel 30, this device is especially configured to switch 36.In addition, drain vessel 30 can comprise the draining pump 34 for waste water to be pumped into delivery port from drain vessel 30.
Equipment 10 also can comprise temperature sensor 42, and this temperature sensor is testing environment temperature especially.Equipment 10 also can have unshowned, for determining the temperature sensor of liquid 24 temperature in boiler 12.
Equipment 10 comprises adjusting device 40.This adjusting device 40 especially turns on and off heating element heater 14, opens and closes cap relief valve 16, opens liquid feed valve 28, then may also adjust flux adjuster 29 as existed, and then preferably turns on and off draining pump 34 as existed.In addition as there is then adjusting device 40 also adjustable safety valve 22.Adjusting device 40 when consider especially detected by device, the i.e. switch 18 and possible temperature sensor 42 for determining liquid 24 liquid level in boiler 12 and the information transmitted implement described control.In a kind of expansion scheme, by for determining that the information that the device of the liquid level in drain vessel 30 detects also can be included in described adjusting device.
The base load of equipment 10 can be determined as follows: when liquid 24 is at least filled to default upper liquid level in boiler 12, cap relief valve 16 is closed.Heating element heater 14 is connected, so that heating liquid 24, produces steam pressure thus, and a part of liquid 24 is pressed into the first stalk road 20 from boiler 12 by this steam pressure.Once lower than the lower liquid level preset in boiler 12, then heating element heater 14 turns off.When for determining that the device of the liquid level in boiler 12 is configured to switch 18, upper liquid level is relevant to the first switching point of switch 18 and the lower switching point of lower liquid level and switch 18 relevant.Especially under arriving, send signal to turn off heating element heater 14 by switch 18 to adjusting device 40 when liquid level, and send signal to connect heating element heater by switch 18 to adjusting device 40 during liquid level on arriving.Such as determine duration between the turning on and off of heating element heater 14 by adjusting device 40 and in the connection of heating element heater 14 with close to have no progeny at heating element heater 14 and again arrive default upper liquid level and duration especially between moment of reclosing in several cycles of heating element heater 14.By the duration between the turning on and off of heating element heater 14 and in the connection of heating element heater 14 with close to have no progeny at heating element heater 14 and again arrive default upper liquid level and the ratio of duration especially between moment of reclosing of heating element heater 14 can determine base load, the i.e. heat loss of equipment 10.Preferably determine base load by multiple circulation, to improve the accuracy of determined base load.Especially preferably during standby mode, base load is determined when equipment 10 is connected first.
If liquid level exceedes liquid level when connecting first, then advise that the base load value determined in the cycle is not considered or just starts to be considered from the upper liquid level of arrival, otherwise this value can cause determined base load inaccurate.In addition for this reason can in the high heating period repeatedly, such as with stipulated number repeatedly arrive under liquid level time or be about to arrive on liquid level until arrive on liquid level time open cap relief valve 16, to make boiler 12 be vented.Just continue to close cap relief valve 16 to determine base load after the circulation of stipulated number.Due to liquid 24 by pressure raise be pressed into the first stalk road 20 and therefore especially switch 18 be in lower liquid level, therefore to let off steam by opening cap relief valve 16/air mixture and liquid 24 flows back to boiler 12 from stalk road 20.When arriving the upper liquid level in boiler 12, cap relief valve 16 is closed again.
Alternatively or additionally, temperature in boiler 12 can also be determined and when almost or completely arriving boiling temperature, cap relief valve 16 is just closed to determine base load.
Standby mode is especially connected when not existing and providing the request signal of steam to space, and therefore equipment 10 runs like this, makes to carry steam at any time in space when there is new request signal.In standby mode, advantageously equipment 10 is controlled as and makes to remain on boiling point to liquid 24 substantial constant in boiler 12.In boiler 12, do not produce overvoltage thus or only produce little overvoltage, but equipment 10 is ready, so that response request signal and by means of only by the thermic load of heating element heater 14 improve less value in heat boiler 12, just can produce steam immediately, then this steam can be outputted in space by cap relief valve 16 in operational mode.
In standby mode, liquid 24 remains essentially in boiling point in the following manner.Cap relief valve 16 is closed.Heating element heater 14 is connected and liquid 24 is heated, and produces steam pressure thus, and liquid 24 is pressed into the first stalk road 20 from boiler 12 by this steam pressure.Once lower than the lower liquid level preset in boiler 12, then heating element heater 14 turns off again.By being pressed into by liquid in the first stalk road 20, boiler 12 substantially keeps with no pressure and produce steam hardly in boiler 12, but liquid 24 can remain on boiling point substantially.Liquid 24 in boiler 12 is cooled again by heat loss, so that liquid 24 can be back to boiler 12 from stalk road 20 again, and the liquid level thus in boiler 12 raises again.Once again arrive upper liquid level, heating element heater 14 can be connected again.
In standby mode, duration between the turning on and off of heating element heater 14 can be determined and in the connection of heating element heater 14 with close to have no progeny at heating element heater 14 and again arrive default upper liquid level, duration namely especially between heating element heater 14 moment that can reclose, and subsequently can by the duration between the turning on and off of heating element heater 14 and in the connection of heating element heater 14 with close to have no progeny at heating element heater 14 and again arrive the ratio determination base load of default upper liquid level, duration namely especially between heating element heater 14 moment that can reclose.This base load is continuously applied to heating element heater 14 and is adjusted if desired again in operational mode, so that the heat loss in corresponding compensation boiler 12.
In a kind of expansion scheme of this control method, determine the environment temperature of equipment 10 by temperature sensor 42 and this environment temperature such as all associates with corresponding base load when determining base load at every turn, as being jointly stored.When environment temperature changes along with operation, also need to change base load to compensate heat loss.Such as once determine variation of ambient temperature, then can regulate base load to be applied again to compensate heat loss according to the environment temperature newly determined.
When determining by switch 18 to continue the lower liquid level lower than presetting, by feed flow portion 26 liquid make-up.Open liquid feed valve 28 and the corresponding adjust flux adjuster 29 of possibility for this reason.
Advantageously, determine the diameter on the first stalk road 20 and the size of volume like this, the volume be forced out from boiler 12 in standby mode can be received by the first stalk road 20, and liquid can not overflow the upper end on the first stalk road 20, otherwise this can cause the loss of the liquid 24 in boiler 12.Further advantageously, the height on stalk road 20 and the size of diameter can be determined like this, make it possible to the static pressure produced for the steam formed in boiler 12 to be pressed through cap relief valve 16 when cap relief valve 16 is opened.In one embodiment, boiler 12 can have the diameter of about 15cm and the height of about 20cm.Boiler 12 can be filled until only about half of by liquid 24.Upper liquid level in boiler 12 and the difference between lower liquid level are about 1mm.The diameter on the first stalk road 20 is about 1.5cm.The height on the first stalk road 20 is such as about 1m.
When equipment 10 runs, the impurity of the liquid 24 in boiler 12 increases, because only liquid vapors is discharged by cap relief valve 16, and impurity remains in boiler 12.In order to reduce impurity, advantageously rinse mode is set.In rinse mode, cap relief valve 16 is closed and preferably heating element heater 14 turns off.Liquid feed valve 28 is opened and liquid 24 enters in boiler 12 via feed flow portion 26.Because the volume of air in boiler 12 can only Limited compression, therefore when liquid feeds in boiler 12 liquid 24 be extruded by the first stalk road 20 and in the corresponding infeed boiler 12 of liquid time flow in drain vessel 30 especially by the second stalk road 32.In this way, the liquid 24 being rich in impurity at least partially in boiler 12 to substitute by fresh, containing less impurity liquid 24 and therefore liquid 24 is diluted and impurity is flushed away.This rinse mode can certain hour interval or implement when needed.
At run duration, rinse as also carried out when each standby mode starts or dilute.When at run duration, especially in several cycles or largely supply liquid 24 time, the volume be forced out in the heating period is so big, so that by the first stalk road 20 liquid is discharged boiler and realize in this way rinsing.
When gathered in drain vessel 30 a large amount of liquid 24, especially more than preset liquid level (this detects by the switch 36 be arranged in drain vessel 30) time, by draining pump 34, waste water can be discharged drain vessel 30.
In the operational mode set at response request signal, cap relief valve 16 is opened.Heating element heater 14 is not only loaded by base load, and is additionally loaded by the thermic load corresponding to request signal.Request signal determines should there is which kind of humidity in space.Steam is asked, until reach desired humidity by the humidity in respective sensor detection space.When producing desired humidity in space, just no longer send request signal.So equipment 10 can be transformed in standby mode again.
Reference numerals list
10 equipment
12 boilers
14 heating element heaters
16 cap relief valves
18 switches
20 first stalk roads
22 safety valves
24 liquid
26 feed flow portions
28 liquid feed valves
29 flow regulators
30 drain vessels
32 second stalk roads
34 draining pumps
36 switches
38 condensate liquid backflow portions
40 adjusting devices
42 temperature sensors

Claims (20)

1. one kind for controlling the method for the equipment (10) for air humidification, described equipment comprises and can to heat by heating element heater (14), for the boiler (12) of liquid (24) to be evaporated, this boiler has cap relief valve (16), can output to space from boiler (12) by this cap relief valve steam, wherein, the region that boiler (12) is arranged in when being usually in operation and filling boiler (12) with liquid (24) below liquid level is connected with the first stalk road (20) and is provided with the device (18) for determining liquid (24) liquid level at boiler (12), the method comprises the steps:
A) when liquid (24) is at least filled to default upper liquid level in boiler (12), cap relief valve (16) is closed,
B) connect heating element heater (14) and heating liquid (24), produce steam pressure thus, this steam pressure by liquid (24) from boiler (12) press-in stalk road (20),
C) once lower than the lower liquid level preset in boiler (12), then turn off heating element heater (14),
D) determine duration between the turning on and off of heating element heater (14) and heating element heater (14) connection and close the duration of having no progeny between the moment again arriving default upper liquid level at heating element heater (14),
E) by the duration between the turning on and off of heating element heater (14) and the base load determining described equipment (10) in the connection of heating element heater (14) and the ratio of duration that closes between the moment again arriving default upper liquid level of having no progeny at heating element heater (14).
2. method according to claim 1, is characterized in that, if continuous standby mode, then in standby mode, repeatedly repeats step b) and c), preferred steps b) to e).
3. according to the method one of the claims Suo Shu, it is characterized in that, in operational mode, cap relief valve (16) is opened and with the previous base load determined, heating element heater (14) adds that the thermic load determined by request signal is run.
4. according to the method one of the claims Suo Shu, it is characterized in that, when there is request signal, operational mode is connected and is transformed into standby mode when not inputting other request signal within the duration of presetting.
5. according to the method one of the claims Suo Shu, it is characterized in that, when described equipment (10) is connected, implementation step is a) to e), and preferably advantageously repeatedly repeats step b) to e).
6. according to the method one of the claims Suo Shu, it is characterized in that, at repetition implementation step b) to the mean value determining base load time e).
7. according to the method one of the claims Suo Shu, it is characterized in that, in step b) to before e), period or determine environment temperature afterwards and this environment temperature with in step e) in determined base load be associated.
8. according to the method one of the claims Suo Shu, it is characterized in that, during operational mode, determine environment temperature and determined environment temperature and different from the environment temperature that base load to be used is associated time base load to be used is matched with the adjustment of determined environment temperature.
9. according to the method one of the claims Suo Shu, it is characterized in that, for determining that the device (18) of liquid (24) liquid level in boiler (12) is configured to switch (18), this switch has in cut-in point and the sluggishness of closing between breakpoint, and cut-in point is relevant to upper liquid level and close breakpoint and lower liquid level is relevant.
10. according to the method one of the claims Suo Shu, it is characterized in that, in rinse mode, cap relief valve (16) is closed and is led to the liquid feed valve (28) of boiler (12) and opens, liquid (24) is injected in boiler (12) by this liquid feed valve, so that liquid (24) is forced out boiler (12) by the first stalk road (20), wherein, preferably rinse mode is implemented when heating element heater (14) turns off.
11. 1 kinds of equipment for the especially air humidification of air-conditioning cabinet, comprise and can to heat by heating element heater (14), for the boiler (12) of liquid (24) to be evaporated, this boiler has cap relief valve (16), can output to space from boiler (12) by cap relief valve steam, it is characterized in that, boiler (12) be usually in operation with liquid (24) fill boiler (12) time the region be arranged in below liquid level be connected with the first stalk road (20), in boiler (12), the device for determining liquid (24) liquid level is only provided with in the structure comprising boiler (12) and stalk road (20).
12. equipment according to claim 11 (10), is characterized in that, for determining that the device of liquid (24) liquid level is configured to switch (18).
13. according to claim 11 to the equipment (10) one of 12 described, it is characterized in that, determine the described height of stalk road (20) and the size of diameter like this, make it possible to receive the volume be forced out from boiler (12), this volume is relevant with the difference between upper liquid level and lower liquid level with the diameter of boiler (12).
14. according to claim 11 to the equipment (10) one of 13 described, it is characterized in that, determining the described height of stalk road (20) and the size of diameter like this, making it possible to the static pressure produced for the steam formed in boiler (12) being pressed through cap relief valve (16).
15. according to claim 11 to the equipment (10) one of 14 described, it is characterized in that, this equipment (10) comprises the drain vessel (30) for collecting the condensate liquid gathered in space, this drain vessel (30) is preferably connected with the second stalk road (32), and the first stalk road (20) and the second stalk road (32) are connected to each other on their upper end.
16. equipment according to claim 15 (10), is characterized in that, are provided with sensor, especially switch (36) for determining liquid level in drain vessel (30).
17. according to claim 15 to the equipment (10) one of 16 described, and it is characterized in that, described drain vessel (30) is connected with the draining pump (34) for waste water being pumped drain vessel (30).
18. according to claim 11 to the equipment (10) one of 17 described, and it is characterized in that, described first stalk road (20) and/or the second stalk road (32) are configured to rise liquid hard tube or rise liquid flexible pipe.
19. according to claim 11 to the equipment (10) one of 18 described, and it is characterized in that, described boiler (12) has the feed flow portion (26) that can block by liquid feed valve (28).
20. according to claim 11 to the equipment (10) one of 19 described, and it is characterized in that, this equipment (10) has the temperature sensor (42) for determining environment temperature.
CN201510276101.6A 2014-05-28 2015-05-26 Equipment of the control for the method for the equipment of air humidification and for air humidification Active CN105299823B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE201410107553 DE102014107553B3 (en) 2014-05-28 2014-05-28 Method for controlling a device for air humidification and device for air humidification
DE102014107553.6 2014-05-28

Publications (2)

Publication Number Publication Date
CN105299823A true CN105299823A (en) 2016-02-03
CN105299823B CN105299823B (en) 2019-02-22

Family

ID=52775476

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510276101.6A Active CN105299823B (en) 2014-05-28 2015-05-26 Equipment of the control for the method for the equipment of air humidification and for air humidification

Country Status (4)

Country Link
EP (1) EP2950009B1 (en)
CN (1) CN105299823B (en)
DE (1) DE102014107553B3 (en)
PL (1) PL2950009T3 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3584193A (en) * 1968-04-25 1971-06-08 Hans Badertscher Water vaporizers
DD208207A1 (en) * 1981-11-23 1984-03-28 Anton Prade DEVICE FOR REGULATING A STEAM HUMIDIFIER
CN2308832Y (en) * 1997-08-27 1999-02-24 刘文正 Steam humidifier
US20030016952A1 (en) * 2001-07-10 2003-01-23 Elphee David Andrew Low-maintenance humidifier
CN2711607Y (en) * 2004-07-16 2005-07-20 古晋光 Electric heating vapour humidifier

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1450833A (en) * 1921-10-06 1923-04-03 Bergeon Paul Steam-heating appliance
US2122573A (en) * 1935-08-14 1938-07-05 Powers Regulator Co Apparatus for evolving water vapor
US2562843A (en) * 1946-11-21 1951-07-31 Bohus Mek Verkst S Aktiebolag Electrical heating apparatus and method
GB2154896B (en) * 1984-03-02 1987-08-12 Atlas Air Australia Air humidifying apparatus
CH707162A1 (en) * 2012-11-06 2014-05-15 Condair Ag Evaporation apparatus.

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3584193A (en) * 1968-04-25 1971-06-08 Hans Badertscher Water vaporizers
DD208207A1 (en) * 1981-11-23 1984-03-28 Anton Prade DEVICE FOR REGULATING A STEAM HUMIDIFIER
CN2308832Y (en) * 1997-08-27 1999-02-24 刘文正 Steam humidifier
US20030016952A1 (en) * 2001-07-10 2003-01-23 Elphee David Andrew Low-maintenance humidifier
CN2711607Y (en) * 2004-07-16 2005-07-20 古晋光 Electric heating vapour humidifier

Also Published As

Publication number Publication date
PL2950009T3 (en) 2018-09-28
EP2950009A1 (en) 2015-12-02
DE102014107553B3 (en) 2015-04-23
CN105299823B (en) 2019-02-22
EP2950009B1 (en) 2018-05-02

Similar Documents

Publication Publication Date Title
KR101827199B1 (en) Heating and hot water supply system
FI58680C (en) FOERFARANDE FOER ALSTRING AV VATTENAONGA SAERSKILT FOER LUFTFUKTNING OCH AONGALSTRARE FOER GENOMFOERANDE AV FOERFARANDET
US2819371A (en) Heating apparatus
CN106031598A (en) Water heating device, water heating method and drinking water equipment
JP6032931B2 (en) Hot water system
CN107449144B (en) Electrode boiler control device and electrode boiler control method
CN205567273U (en) Water self -heating device is irrigated in greenhouse
EP2629020B1 (en) Heating system and method for its operation
CN101858643A (en) Instantaneous water heater capable of controlling heating temperature automatically
US11221150B2 (en) System and method of controlling a mixing valve of a heating system
US10480826B2 (en) System and method of controlling a mixing valve of a heating system
US2894109A (en) Commercial water heater
CN105299823A (en) Method of controlling a device that for the humidification of the air and device for the humidification of air
CN205897542U (en) Water tank heat accumulation formula heat pump system
DE3138803C2 (en) Heating control of an upright domestic hot water storage tank and device for implementing the control
CN106580069A (en) Pipeline-type intelligent steam machine
EP4119014A1 (en) An apparatus for heating and dispensing water
US20240077896A1 (en) Method for controlling a temperature of a liquid in a liquid container
US2170777A (en) Hot water heating radiator
JPS6045322B2 (en) Boiler feed water heater water level control device
CN201731638U (en) Instant water boiler capable of automatically controlling heating temperature
GB2043305A (en) Control arrangement in a circulating fluid heating system
JP5160255B2 (en) Hot water storage hot water supply system
JP4100355B2 (en) Hot water storage water heater
JP2023116913A (en) Hot water supply system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant