CN105299443B - Liquefied gas filling and replacement method - Google Patents

Liquefied gas filling and replacement method Download PDF

Info

Publication number
CN105299443B
CN105299443B CN201510811429.3A CN201510811429A CN105299443B CN 105299443 B CN105299443 B CN 105299443B CN 201510811429 A CN201510811429 A CN 201510811429A CN 105299443 B CN105299443 B CN 105299443B
Authority
CN
China
Prior art keywords
valve
tank
liquefied gas
gas
pipe valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510811429.3A
Other languages
Chinese (zh)
Other versions
CN105299443A (en
Inventor
吴松华
任建军
秦勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANTONG JIANGTIAN CHEMICAL CO Ltd
Original Assignee
NANTONG JIANGTIAN CHEMICAL CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANTONG JIANGTIAN CHEMICAL CO Ltd filed Critical NANTONG JIANGTIAN CHEMICAL CO Ltd
Priority to CN201510811429.3A priority Critical patent/CN105299443B/en
Publication of CN105299443A publication Critical patent/CN105299443A/en
Application granted granted Critical
Publication of CN105299443B publication Critical patent/CN105299443B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The invention discloses a liquefied gas filling and replacement method. The method is characterized in that a liquefied gas tank is connected with a finished product tank, a gas-phase pipe opening of the liquefied gas tank is connected with a gas-phase pipe opening of the finished product tank, a liquid-phase pipe opening of the liquefied gas tank is connected with a pumping outlet of the finished product tank, and a nitrogen pipeline and an exhaust suction pipeline are additionally arranged between the gas-phase pipe opening of the liquefied gas tank and the liquid-phase pipe opening of the liquefied gas tank. The liquefied gas filling and replacement method has the beneficial effects that replacement is convenient, exhaust and pressure relief of a tank car and replacement cleaning of the tank car are facilitated, and no potential safety hazard exists.

Description

Liquefied gas filling method of replacing
Technical field
The present invention relates to a kind of liquefied gas filling method of replacing.
Background technology
The storage tank or groove tank car for filling liquefied gas needs release to check annual test or carry out inert gas replacement protection every year.It is general Logical filling apparatus can only carry out fill or discharging, not possess storage tank aerofluxuss release or the function with inert gas replacement.Because Jing it is normal Dismounting and tank body adpting flange are needed, and potential safety hazard are brought to human users.
The content of the invention
The purpose of the present invention, is to overcome above-mentioned limitation, convenient so as to provide a kind of displacement, facilitates groove tank vehicle exhaust release And enter line replacement cleaning, the liquefied gas filling method of replacing without potential safety hazard to groove tank car.
The purpose of the present invention is achieved through the following technical solutions:A kind of liquefied gas filling method of replacing, by liquefied gas Body tank is connected with finished pot, and wherein the liquefied gas tank gas phase mouth of pipe is connected with the finished pot gas phase mouth of pipe, liquefied gas tank liquid The phase mouth of pipe is connected with finished pot pump discharge, and is increased between the liquefied gas tank gas phase mouth of pipe and the liquefied gas tank liquid phase mouth of pipe Nitrogen pipeline and tail gas absorption pipeline, comprise the following steps that:
A, when the normal fill of liquefied gas, open the liquefied gas tank gas phase mouth of pipe valve that is connected with groove tank car and liquefied gas Body tank liquid phase mouth of pipe valve, opens finished pot pump discharge valve turn on pump, opens and finished pot gas phase mouth of pipe valve;Simultaneously close off tail Aspiration pipe valve, nitrogen pipeline valve and shutoff valve, will the pan tank beginning that is connected with groove tank car it is normal canned;Work as filling Dress terminates rear termination of pumping, closes the liquid phase valve of liquefied gas tank, simultaneously closes off finished pot gas phase mouth of pipe valve and finished pot pump Outlet valve, then open tail gas absorption pipe valve and shutoff valve make after filling apparatus pressure release with groove tank car liquefied gas tank point From;
When release is needed to groove tank car liquefied gas tank after B, fill, close finished pot gas phase mouth of pipe valve, nitrogen pipeline Valve and finished pot pump discharge valve make groove tank car be connected with filling apparatus, open liquefied gas tank gas phase mouth of pipe valve and liquefaction Gas tank liquid phase mouth of pipe valve opens tail gas absorption pipe valve and shutoff valve simultaneously, and the liquid phase valve for opening groove tank car will Liquid gas in tank pass through tail gas absorption pipe valve blowdown pressure letdown;
C, when groove tank car needs to use inert gas replacement, close finished pot gas phase mouth of pipe valve, finished pot pump discharge valve Door and shutoff valve are opened liquefied gas tank gas phase mouth of pipe valve, liquefied gas tank liquid phase mouth of pipe valve valve, tail gas simultaneously and are inhaled Pipe valve and nitrogen pipeline valve are received, nitrogen is entered into groove tank car by liquid phase pipeline, groove tank car passes through liquefied gas tank gas Groove tank car nitrogen is entered line replacement by phase mouth of pipe valve and tail gas absorption pipe valve.
Preferably, nitrogen regulator is provided with nitrogen pipeline, nitrogen will be passed through into liquid phase after nitrogen pressure regulation to 6barg Pipeline enters groove tank car.
Preferably, pressure inductor, the pressure inductor and numeric display are provided with tail gas absorption pipe valve Connection, is provided with anti-reversing clutch in tail gas absorption pipe valve.
In sum, the present invention has advantages below:Displacement is convenient, facilitates the release of groove tank vehicle exhaust and groove tank car is entered Line replacement is cleaned, without potential safety hazard.
Description of the drawings
Fig. 1 is the connecting line figure of the present invention;
Label in figure:1- liquefied gas tank gas phase mouth of pipe valves, 2- liquefied gas tank liquid phase mouth of pipe valves, 3- finished pot gas Phase mouth of pipe valve, 4- tail gas absorption pipe valves, 5- nitrogen pipeline valves, 6- finished pot pump discharge valves, 7- shutoff valves.
Specific embodiment
In order to deepen the understanding of the present invention, below in conjunction with embodiment and accompanying drawing, the invention will be further described, should Embodiment is only used for the explanation present invention, does not constitute limiting the scope of the present invention.
A kind of liquefied gas filling method of replacing as shown in Figure 1, liquefied gas tank is connected with finished pot, wherein liquid Change the gas tank gas phase mouth of pipe to be connected with the finished pot gas phase mouth of pipe, the liquefied gas tank liquid phase mouth of pipe is connected with finished pot pump discharge Connect, and increase nitrogen pipeline and tail gas absorption pipeline between the liquefied gas tank gas phase mouth of pipe and the liquefied gas tank liquid phase mouth of pipe, Comprise the following steps that:When the normal fill of liquefied gas, the liquefied gas tank gas phase mouth of pipe valve 1 and liquid being connected with groove tank car is opened Change gas tank liquid phase mouth of pipe valve 2, open 6 turn on pump of finished pot pump discharge valve, open and finished pot gas phase mouth of pipe valve 3;Together When close tail gas absorption pipe valve 4, nitrogen pipeline valve 5 and shutoff valve 7, will pan tank be connected with groove tank car and just starting It is often canned;Termination of pumping after fill terminates, closes the liquid phase valve of liquefied gas tank, simultaneously closes off finished pot gas phase mouth of pipe valve 3 and finished pot pump discharge valve 6, then open tail gas absorption pipe valve 4 and shutoff valve 7 make after filling apparatus pressure release with groove tank Car liquefied gas tank is separated;When needing release to groove tank car liquefied gas tank after fill, closing finished pot gas phase mouth of pipe valve 3, Nitrogen pipeline valve 5 and finished pot pump discharge valve 6 make groove tank car be connected with filling apparatus, open the liquefied gas tank gas phase mouth of pipe Valve 1 and liquefied gas tank liquid phase mouth of pipe valve 2 open tail gas absorption pipe valve 4 and shutoff valve 7 simultaneously, open groove tank car Liquid phase valve by the liquid gas in tank by 4 blowdown pressure letdown of tail gas absorption pipe valve, in tail gas absorption pipe valve 4 Pressure inductor is provided with, the pressure inductor is connected with numeric display, in tail gas absorption pipe valve 4, is provided with anti-reverse dress Put;When groove tank car needs to use inert gas replacement, close finished pot gas phase mouth of pipe valve 3, finished pot pump discharge valve 6 and cut Only valve 7 opens liquefied gas tank gas phase mouth of pipe valve 1, liquefied gas tank liquid phase mouth of pipe valve valve 2, tail gas absorption pipe simultaneously Nitrogen is entered groove tank car by liquid phase pipeline by road valve 4 and nitrogen pipeline valve 5, and groove tank car passes through liquefied gas tank gas phase Groove tank car nitrogen is entered line replacement by mouth of pipe valve 1 and tail gas absorption pipe valve 4.Nitrogen pressure regulation dress is provided with nitrogen pipeline Put, nitrogen will be entered into groove tank car by liquid phase pipeline after nitrogen pressure regulation to 6barg.

Claims (3)

1. a kind of liquefied gas filling method of replacing, it is characterised in that liquefied gas tank is connected with finished pot, wherein liquefying The gas tank gas phase mouth of pipe is connected with the finished pot gas phase mouth of pipe, and the liquefied gas tank liquid phase mouth of pipe is connected with finished pot pump discharge, And increase nitrogen pipeline and tail gas absorption pipeline between the liquefied gas tank gas phase mouth of pipe and the liquefied gas tank liquid phase mouth of pipe, specifically Step is as follows:
A, when the normal fill of liquefied gas, open the liquefied gas tank gas phase mouth of pipe valve that is connected with groove tank car(1)And liquefied gas Body tank liquid phase mouth of pipe valve(2), open finished pot pump discharge valve(6)Turn on pump, opens and finished pot gas phase mouth of pipe valve(3); Simultaneously close off tail gas absorption pipe valve(4), nitrogen pipeline valve(5)And shutoff valve(7), will finished pot and groove tank car phase Company starts normal canned;Termination of pumping after fill terminates, closes the liquid phase valve of liquefied gas tank, simultaneously closes off finished pot gas phase Mouth of pipe valve(3)With finished pot pump discharge valve(6), then open tail gas absorption pipe valve(4)And shutoff valve(7)Make fill Separate with groove tank car liquefied gas tank after device pressure release;
When release is needed to groove tank car liquefied gas tank after B, fill, close finished pot gas phase mouth of pipe valve(3), nitrogen pipeline valve Door(5)With finished pot pump discharge valve(6)Make groove tank car be connected with filling apparatus, open liquefied gas tank gas phase mouth of pipe valve (1)With liquefied gas tank liquid phase mouth of pipe valve(2)Tail gas absorption pipe valve is opened simultaneously(4)And shutoff valve(7), open groove Liquid gas in tank are passed through tail gas absorption pipe valve by the liquid phase valve of tank car(4)Blowdown pressure letdown;
C, when groove tank car needs to use inert gas replacement, close finished pot gas phase mouth of pipe valve(3), finished pot pump discharge valve (6)And shutoff valve(7)Liquefied gas tank gas phase mouth of pipe valve is opened simultaneously(1), liquefied gas tank liquid phase mouth of pipe valve(2)、 Tail gas absorption pipe valve(4)With nitrogen pipeline valve(5), nitrogen is entered into groove tank car by liquid phase pipeline, groove tank car passes through Liquefied gas tank gas phase mouth of pipe valve(1)With tail gas absorption pipe valve(4)Groove tank car nitrogen is entered into line replacement.
2. liquefied gas filling method of replacing according to claim 1, it is characterised in that:Nitrogen is provided with the nitrogen pipeline Nitrogen will be entered groove tank car by liquid phase pipeline after nitrogen pressure regulation to 6barg by regulator.
3. liquefied gas filling method of replacing according to claim 1, it is characterised in that:The tail gas absorption pipe valve (4)Pressure inductor is provided with inside, the pressure inductor is connected with numeric display, tail gas absorption pipe valve(4)Inside it is provided with Anti-reversing clutch.
CN201510811429.3A 2015-11-23 2015-11-23 Liquefied gas filling and replacement method Active CN105299443B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510811429.3A CN105299443B (en) 2015-11-23 2015-11-23 Liquefied gas filling and replacement method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510811429.3A CN105299443B (en) 2015-11-23 2015-11-23 Liquefied gas filling and replacement method

Publications (2)

Publication Number Publication Date
CN105299443A CN105299443A (en) 2016-02-03
CN105299443B true CN105299443B (en) 2017-04-12

Family

ID=55197039

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510811429.3A Active CN105299443B (en) 2015-11-23 2015-11-23 Liquefied gas filling and replacement method

Country Status (1)

Country Link
CN (1) CN105299443B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106368655B (en) * 2016-10-27 2019-04-30 中国科学院力学研究所 A kind of cryogenic high pressure liquid CO2Displacement apparatus and its application method
CN108506733A (en) * 2018-05-10 2018-09-07 江苏南大光电材料股份有限公司 Material bulking device
CN109353983A (en) * 2018-10-18 2019-02-19 江阴江化微电子材料股份有限公司 A kind of Mobile automatic charging action of chemicals tank car
CN111156405B (en) * 2018-11-07 2021-04-20 北汽福田汽车股份有限公司 Hydrogen filling equipment

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1027394C (en) * 1990-12-21 1995-01-11 苏香瑞 Storaging and filling system of liquefied petroleum gas
JP5106979B2 (en) * 2007-10-15 2012-12-26 日本エア・リキード株式会社 Gas supply system
CN202132693U (en) * 2011-07-29 2012-02-01 广东顺德浦项钢板有限公司 Novel liquid ammonia filling system
CN202265399U (en) * 2011-09-30 2012-06-06 河南尚宇新能源股份有限公司 Trichlorosilane product loading equipment
CN103775827A (en) * 2013-11-04 2014-05-07 山东国塑慧科高分子材料有限公司 Liquid chlorine delivery system for producing chlorinated polyethylene
CN204717342U (en) * 2015-06-02 2015-10-21 石家庄市海森化工有限公司 A kind of closed loop oxidative ethane unloading unit

Also Published As

Publication number Publication date
CN105299443A (en) 2016-02-03

Similar Documents

Publication Publication Date Title
CN105299443B (en) Liquefied gas filling and replacement method
CN203671240U (en) Liquefied petroleum gas tank emptying device
CN209398890U (en) Pipeline with decompression function
CN203703605U (en) Liquid ammonia shipping device
CN205026397U (en) Take liquefied natural gas supercharging device of plunger pump
CN204021609U (en) A kind of storage colloid system
CN201999726U (en) Unloading arm capable of automatically returning air
CN205155542U (en) Modified torch gas divides fluid reservoir to press liquid system
CN206290966U (en) Removable bank base formula LNG loading systems
CN205994915U (en) A kind of automatic fire extinguisher used for buses
CN205165287U (en) Tubular dredge
CN205176548U (en) Tank car seabed valve automatic control system
CN210716928U (en) Sequence control valve group
CN203052196U (en) Recovery device for residual liquid in filing pipeline of cryogenic liquid tank lorry
CN204097068U (en) Liquid system got by container
CN208858327U (en) A kind of oil well chemical feeding device
CN104100535A (en) High suction distance self sucking pump
CN206860557U (en) A kind of quick sectional type water sprayer gas collecting apparatus
CN208003318U (en) A kind of horizontal water pot bottle valve of gas extrusion
CN110195818A (en) A kind of gas combustion automobile refueling system and method
CN205971914U (en) Measuring pump raffinate suction means
CN205361371U (en) Titration cell liquid supplementation device
CN204083792U (en) A kind of tank car is detained LNG collecting device
CN202483971U (en) Oil pressure pneumatic material extraction device
CN105508873B (en) A kind of low-temperature (low temperature) vessel vaporizer is from pressure charging system and method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant