The be hinged stress check calculation node and its construction method with just tying of Steel corridor
Technical field
The present invention relates to field of steel structure, the be hinged and switching node just tied of specifically a kind of Steel corridor and its apply
Work method.
Background technology
With expanding economy, Super High disjunctor steel construction is widely applied.The skybridge of conjoined structure is general
Using steel construction.Because vestibule span is very big, the deformation of vestibule floor beam forms very big drawing to the high building main structure on both sides
Power and pressure, it is very big to agent structure stressing influence, thus the post of agent structure and beam all accordingly increase, and cause body junction to construct
Valency increases.
The content of the invention
It is an object of the present invention to provide a kind of be hinged-firm knot stress check calculation node by Steel corridor, it can subtract
Influence of the small skybridge to main body.
In order to achieve the above object, the present invention is realized in:
A kind of be hinged stress check calculation node with just tying of Steel corridor, it includes upper steel column, lower steel column, vestibule and winded up
Girder steel and diagonal web member, vestibule girder steel end of winding up are connected with upper steel column, and the two junction is provided with diagonal web member, is set below upper steel column
There is lower steel column, in addition to semicircle steel shaft and corresponding axle support, the semicircle steel shaft are located on the web of steel column bottom surface,
Axle support corresponding with semicircle steel shaft is located on lower steel column top surface web, and upper steel column is located on lower steel column, upper steel column bottom surface web
On semicircle steel shaft be located in the axle support on lower steel column top surface web;Between upper steel column and lower steel column by semicircle steel shaft with
Axle support realizes rotational action.
The be hinged and construction method for the stress check calculation node just tied of the Steel corridor, comprises the steps;
Step 1, lower steel column profiling construction;
Step 1.1, lower steel column top surface web cut into width and the similar breach of semicircle steel shaft width, the breach
Symmetry axis alignd with the center line of lower steel column top surface web;
Step 1.2, lower, transverse ribbed stiffener, the lower, transverse ribbed stiffener both ends and the wing of lower steel column are set in lower steel column
Edge connects;
Step 1.3, the vertical ribbed stiffener in bottom is set in lower steel column, the vertical ribbed stiffener bottom in the bottom adds with lower, transverse
Strength rib connects;
Step 1.4, it will be connected at the top of the vertical ribbed stiffener of axle support and lower steel column top surface web and bottom;
Step 2, the construction of upper steel column;
Step 2.1, upper lateral ribbed stiffener, the vertical ribbed stiffener in top are set in upper steel column, wherein, top is vertically put more energy into
Rib is connected with upper girder steel bottom surface web, and upper lateral ribbed stiffener is connected with the vertical ribbed stiffener of the coxostermum of upper girder steel two and top;
Step 2.2, inclined stiffener is set in place of upper steel column is connected with the girder steel that winds up;
Step 2.3, semicircle steel shaft is connected with upper girder steel bottom surface web outside;
Step 2.4, upper steel column and vestibule wind up girder steel it is assembled it is integral after, will be dropped down onto under it on lower steel column, it is ensured that semicircle
Shape steel shaft is fallen into axle support;
Step 2.5, after Steel corridor is badly deformed, by the edge of a wing of upper steel column and lower steel column using groove welding one
Rise, realize the node by being hinged to the stress check calculation of rigid connection.
The load of gallery structure can be delivered to main body by the present apparatus by rotating the contact surface of semicircle steel shaft and axle support
In structure;By shape half rounds axis connection, the turning power of node is substantially increased, it is ensured that vestibule can be subtracted with Free Transform
Small active force of the vestibule to agent structure.
Brief description of the drawings
Fig. 1 is the front view of the present invention.
Fig. 2 is A-A in Fig. 1 to profile.
Embodiment
The present invention is further illustrated below by way of specific embodiment.
As shown in Figure 1 and Figure 2, a kind of stress check calculation node be hinged-just tied for high-altitude steel structure vestibule, it includes
Lower steel column, lower steel column transverse stiffener 1, vertical ribbed stiffener 2, curved plate 3, steel column top plate 4;Upper steel column, upper steel column bottom plate 13,
Rotate semicircle steel shaft 6, vertical ribbed stiffener 7, transverse stiffener 8, transverse stiffener 9, inclined stiffener 10;Wind up girder steel 11, tiltedly
Web member 12.
Above-mentioned node apparatus,
Lower steel column transverse stiffener 1 is the thick steel plates of 30mm, and vertical ribbed stiffener 2 is the thick steel plates of 30mm, and curved plate 3 is
Steel plate thick 30mm, steel column top plate 4 are the thick steel plates of 50mm, and upper steel column bottom plate 13 is the thick steel plates of 50mm, rotates semicircle steel shaft 6
The semicircular solid rod iron for being 200mm for radius, vertical ribbed stiffener 7 are the thick steel plates of 30mm, transverse stiffener 8 is the thick steel of 30mm
Plate, transverse stiffener 9 are the thick steel plates of 30mm, inclined stiffener 10 is the thick steel plates of 30mm.
The construction method of above-mentioned node apparatus:
1)Bottom steel column joint construction method
(1)The web of lower steel column is opened into nock of the shape with curved plate 3, its center line and web center line first
Alignment;
(2)Transverse stiffener 1 is connected with the web of lower prop with the edge of a wing, using angle welding, leg size of fillet weld is
8mm;Transverse stiffener is two pieces, is arranged symmetrically relative to steel column web;
(3)Vertical ribbed stiffener 2 is connected with steel column web and transverse stiffener 1, using angle welding, Size of welds 8mm;
(4)Curved plate 3 is connected with steel column web and vertical ribbed stiffener 2, using angle welding, Size of welds 8mm;
(5)Top plate 4 is connected with steel column web, the edge of a wing and curved plate 3, using groove full penetration weld.
2)Upper steel Column border node construction method
(1)Bottom plate 13 is connected with the web of upper prop with the edge of a wing, using groove melt-through weld;
(2)Transverse stiffener 8 and transverse stiffener 9 are connected with the web of upper prop with the edge of a wing, using angle welding, leg chi
Very little is 8mm;Transverse stiffener 8,9 is two pieces, is arranged symmetrically relative to steel column web;
(3)Inclined stiffener 10 is connected with steel column web, the edge of a wing, using angle welding, Size of welds 8mm;It is oblique to add
Strength rib is two pieces, is arranged symmetrically relative to steel column web;
(4)Vertical ribbed stiffener 7 is connected with transverse stiffener 8 and bottom plate 13, using angle welding, weld size 8mm;
(5)Semicircle steel shaft 6 will be rotated to be connected with bottom plate 13, using groove full penetration weld, weld all around, 45 degree of bevel angle,
Groove width 30mm.
3)After upper steel column node and vestibule assembly are integral, it will be dropped down onto under it on lower steel column node;
4)It is real by upper steel column and the edge of a wing of lower steel column using together with groove welding after Steel corridor is badly deformed
Now the node is by being hinged to the stress check calculation of rigid connection.
In above-mentioned construction operation, step(1)—(2)It can complete in steel construction processing factory, be transported after the completion of batch production
It is defeated to arrive building site, it is connected respectively with main structure steel column with vestibule during corridor construction.