CN105297885B - The be hinged stress check calculation node and its construction method with just tying of Steel corridor - Google Patents

The be hinged stress check calculation node and its construction method with just tying of Steel corridor Download PDF

Info

Publication number
CN105297885B
CN105297885B CN201510763659.7A CN201510763659A CN105297885B CN 105297885 B CN105297885 B CN 105297885B CN 201510763659 A CN201510763659 A CN 201510763659A CN 105297885 B CN105297885 B CN 105297885B
Authority
CN
China
Prior art keywords
steel column
steel
web
semicircle
ribbed stiffener
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510763659.7A
Other languages
Chinese (zh)
Other versions
CN105297885A (en
Inventor
刘明路
孙从永
张侃
王震
司坤
王馥琴
朱术文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
Shanghai Mcc No13 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Mcc No13 Construction Co Ltd filed Critical Shanghai Mcc No13 Construction Co Ltd
Priority to CN201510763659.7A priority Critical patent/CN105297885B/en
Publication of CN105297885A publication Critical patent/CN105297885A/en
Application granted granted Critical
Publication of CN105297885B publication Critical patent/CN105297885B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The present invention relates to field of steel structure, the be hinged switching node with just tying of specifically a kind of Steel corridor;It includes upper steel column, lower steel column, vestibule wind up girder steel and diagonal web member, vestibule girder steel end of winding up are connected with upper steel column, and the two junction is provided with diagonal web member, and the lower section of upper steel column is provided with lower steel column, it is characterized in that:Also include semicircle steel shaft and corresponding axle support, the semicircle steel shaft is located on the web of steel column bottom surface, axle support is located on lower steel column top surface web, and upper steel column is located on lower steel column, and the semicircle steel shaft on the web of upper steel column bottom surface is located in the axle support on lower steel column top surface web;Rotational action is realized by semicircle steel shaft and axle support between upper steel column and lower steel column.

Description

The be hinged stress check calculation node and its construction method with just tying of Steel corridor
Technical field
The present invention relates to field of steel structure, the be hinged and switching node just tied of specifically a kind of Steel corridor and its apply Work method.
Background technology
With expanding economy, Super High disjunctor steel construction is widely applied.The skybridge of conjoined structure is general Using steel construction.Because vestibule span is very big, the deformation of vestibule floor beam forms very big drawing to the high building main structure on both sides Power and pressure, it is very big to agent structure stressing influence, thus the post of agent structure and beam all accordingly increase, and cause body junction to construct Valency increases.
The content of the invention
It is an object of the present invention to provide a kind of be hinged-firm knot stress check calculation node by Steel corridor, it can subtract Influence of the small skybridge to main body.
In order to achieve the above object, the present invention is realized in:
A kind of be hinged stress check calculation node with just tying of Steel corridor, it includes upper steel column, lower steel column, vestibule and winded up Girder steel and diagonal web member, vestibule girder steel end of winding up are connected with upper steel column, and the two junction is provided with diagonal web member, is set below upper steel column There is lower steel column, in addition to semicircle steel shaft and corresponding axle support, the semicircle steel shaft are located on the web of steel column bottom surface, Axle support corresponding with semicircle steel shaft is located on lower steel column top surface web, and upper steel column is located on lower steel column, upper steel column bottom surface web On semicircle steel shaft be located in the axle support on lower steel column top surface web;Between upper steel column and lower steel column by semicircle steel shaft with Axle support realizes rotational action.
The be hinged and construction method for the stress check calculation node just tied of the Steel corridor, comprises the steps;
Step 1, lower steel column profiling construction;
Step 1.1, lower steel column top surface web cut into width and the similar breach of semicircle steel shaft width, the breach Symmetry axis alignd with the center line of lower steel column top surface web;
Step 1.2, lower, transverse ribbed stiffener, the lower, transverse ribbed stiffener both ends and the wing of lower steel column are set in lower steel column Edge connects;
Step 1.3, the vertical ribbed stiffener in bottom is set in lower steel column, the vertical ribbed stiffener bottom in the bottom adds with lower, transverse Strength rib connects;
Step 1.4, it will be connected at the top of the vertical ribbed stiffener of axle support and lower steel column top surface web and bottom;
Step 2, the construction of upper steel column;
Step 2.1, upper lateral ribbed stiffener, the vertical ribbed stiffener in top are set in upper steel column, wherein, top is vertically put more energy into Rib is connected with upper girder steel bottom surface web, and upper lateral ribbed stiffener is connected with the vertical ribbed stiffener of the coxostermum of upper girder steel two and top;
Step 2.2, inclined stiffener is set in place of upper steel column is connected with the girder steel that winds up;
Step 2.3, semicircle steel shaft is connected with upper girder steel bottom surface web outside;
Step 2.4, upper steel column and vestibule wind up girder steel it is assembled it is integral after, will be dropped down onto under it on lower steel column, it is ensured that semicircle Shape steel shaft is fallen into axle support;
Step 2.5, after Steel corridor is badly deformed, by the edge of a wing of upper steel column and lower steel column using groove welding one Rise, realize the node by being hinged to the stress check calculation of rigid connection.
The load of gallery structure can be delivered to main body by the present apparatus by rotating the contact surface of semicircle steel shaft and axle support In structure;By shape half rounds axis connection, the turning power of node is substantially increased, it is ensured that vestibule can be subtracted with Free Transform Small active force of the vestibule to agent structure.
Brief description of the drawings
Fig. 1 is the front view of the present invention.
Fig. 2 is A-A in Fig. 1 to profile.
Embodiment
The present invention is further illustrated below by way of specific embodiment.
As shown in Figure 1 and Figure 2, a kind of stress check calculation node be hinged-just tied for high-altitude steel structure vestibule, it includes Lower steel column, lower steel column transverse stiffener 1, vertical ribbed stiffener 2, curved plate 3, steel column top plate 4;Upper steel column, upper steel column bottom plate 13, Rotate semicircle steel shaft 6, vertical ribbed stiffener 7, transverse stiffener 8, transverse stiffener 9, inclined stiffener 10;Wind up girder steel 11, tiltedly Web member 12.
Above-mentioned node apparatus,
Lower steel column transverse stiffener 1 is the thick steel plates of 30mm, and vertical ribbed stiffener 2 is the thick steel plates of 30mm, and curved plate 3 is Steel plate thick 30mm, steel column top plate 4 are the thick steel plates of 50mm, and upper steel column bottom plate 13 is the thick steel plates of 50mm, rotates semicircle steel shaft 6 The semicircular solid rod iron for being 200mm for radius, vertical ribbed stiffener 7 are the thick steel plates of 30mm, transverse stiffener 8 is the thick steel of 30mm Plate, transverse stiffener 9 are the thick steel plates of 30mm, inclined stiffener 10 is the thick steel plates of 30mm.
The construction method of above-mentioned node apparatus:
1)Bottom steel column joint construction method
(1)The web of lower steel column is opened into nock of the shape with curved plate 3, its center line and web center line first Alignment;
(2)Transverse stiffener 1 is connected with the web of lower prop with the edge of a wing, using angle welding, leg size of fillet weld is 8mm;Transverse stiffener is two pieces, is arranged symmetrically relative to steel column web;
(3)Vertical ribbed stiffener 2 is connected with steel column web and transverse stiffener 1, using angle welding, Size of welds 8mm;
(4)Curved plate 3 is connected with steel column web and vertical ribbed stiffener 2, using angle welding, Size of welds 8mm;
(5)Top plate 4 is connected with steel column web, the edge of a wing and curved plate 3, using groove full penetration weld.
2)Upper steel Column border node construction method
(1)Bottom plate 13 is connected with the web of upper prop with the edge of a wing, using groove melt-through weld;
(2)Transverse stiffener 8 and transverse stiffener 9 are connected with the web of upper prop with the edge of a wing, using angle welding, leg chi Very little is 8mm;Transverse stiffener 8,9 is two pieces, is arranged symmetrically relative to steel column web;
(3)Inclined stiffener 10 is connected with steel column web, the edge of a wing, using angle welding, Size of welds 8mm;It is oblique to add Strength rib is two pieces, is arranged symmetrically relative to steel column web;
(4)Vertical ribbed stiffener 7 is connected with transverse stiffener 8 and bottom plate 13, using angle welding, weld size 8mm;
(5)Semicircle steel shaft 6 will be rotated to be connected with bottom plate 13, using groove full penetration weld, weld all around, 45 degree of bevel angle, Groove width 30mm.
3)After upper steel column node and vestibule assembly are integral, it will be dropped down onto under it on lower steel column node;
4)It is real by upper steel column and the edge of a wing of lower steel column using together with groove welding after Steel corridor is badly deformed Now the node is by being hinged to the stress check calculation of rigid connection.
In above-mentioned construction operation, step(1)—(2)It can complete in steel construction processing factory, be transported after the completion of batch production It is defeated to arrive building site, it is connected respectively with main structure steel column with vestibule during corridor construction.

Claims (2)

1. a kind of be hinged stress check calculation node with just tying of Steel corridor, it includes upper steel column, lower steel column, vestibule and winded up steel Beam and diagonal web member, vestibule girder steel end of winding up are connected with upper steel column, and the two junction is provided with diagonal web member, and the lower section of upper steel column is provided with Lower steel column, it is characterized in that:Also include semicircle steel shaft and corresponding axle support, the semicircle steel shaft is located at steel column bottom surface On web, axle support corresponding with semicircle steel shaft is located on lower steel column top surface web, and upper steel column is located on lower steel column, upper steel column bottom Semicircle steel shaft on the web of face is located in the axle support on lower steel column top surface web;Pass through semicircle between upper steel column and lower steel column Steel shaft realizes rotational action with axle support.
2. the be hinged and construction method for the stress check calculation node just tied of Steel corridor described in claim 1, it is characterized in that:Bag Include following step;
Step 1, lower steel column profiling construction;
Step 1.1, lower steel column top surface web cut into width and the similar breach of semicircle steel shaft width, pair of the breach Axle is claimed to be alignd with the center line of lower steel column top surface web;
Step 1.2, lower, transverse ribbed stiffener is set in lower steel column, the lower, transverse ribbed stiffener both ends and the edge of a wing of lower steel column connect Connect;
Step 1.3, the vertical ribbed stiffener in bottom, the vertical ribbed stiffener bottom in the bottom and lower, transverse ribbed stiffener are set in lower steel column Connection;
Step 1.4, it will be connected at the top of the vertical ribbed stiffener of axle support and lower steel column top surface web and bottom;
Step 2, the construction of upper steel column;
Step 2.1, upper lateral ribbed stiffener, the vertical ribbed stiffener in top are set in upper steel column, wherein, the vertical ribbed stiffener in top with The web connection of upper girder steel bottom surface, upper lateral ribbed stiffener are connected with the vertical ribbed stiffener of the coxostermum of upper girder steel two and top;
Step 2.2, inclined stiffener is set in place of upper steel column is connected with the girder steel that winds up;
Step 2.3, semicircle steel shaft is connected with upper girder steel bottom surface web outside;
Step 2.4, upper steel column and vestibule wind up girder steel it is assembled it is integral after, will be dropped down onto under it on lower steel column, it is ensured that semicircle steel Axle is fallen into axle support;
Step 2.5, after Steel corridor is badly deformed, by upper steel column and the edge of a wing of lower steel column using together with groove welding, Realize the node by being hinged to the stress check calculation of rigid connection.
CN201510763659.7A 2015-11-11 2015-11-11 The be hinged stress check calculation node and its construction method with just tying of Steel corridor Active CN105297885B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510763659.7A CN105297885B (en) 2015-11-11 2015-11-11 The be hinged stress check calculation node and its construction method with just tying of Steel corridor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510763659.7A CN105297885B (en) 2015-11-11 2015-11-11 The be hinged stress check calculation node and its construction method with just tying of Steel corridor

Publications (2)

Publication Number Publication Date
CN105297885A CN105297885A (en) 2016-02-03
CN105297885B true CN105297885B (en) 2017-12-29

Family

ID=55195638

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510763659.7A Active CN105297885B (en) 2015-11-11 2015-11-11 The be hinged stress check calculation node and its construction method with just tying of Steel corridor

Country Status (1)

Country Link
CN (1) CN105297885B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106906896B (en) * 2017-03-02 2020-05-22 深圳华森建筑与工程设计顾问有限公司 Construction method of conjoined structure building
CN106930557B (en) * 2017-03-02 2020-05-22 深圳华森建筑与工程设计顾问有限公司 Conjoined structure building
CN114319075A (en) * 2021-12-27 2022-04-12 中冶南方城市建设工程技术有限公司 Hidden steel stand top hinge joint
CN114687564A (en) * 2022-04-03 2022-07-01 上海泰大建筑科技有限公司 Connecting joint of upright post and horizontal component and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103061521A (en) * 2013-01-24 2013-04-24 中国水利水电第二工程局有限公司 Torque type mounting method for cantilever steel truss of large stadium
CN103541430A (en) * 2013-10-31 2014-01-29 同济大学建筑设计研究院(集团)有限公司 Support connection structure for steel structure corridor
CN203782883U (en) * 2014-01-16 2014-08-20 山东杭萧钢构有限公司 Steel pipe truss hinge joint device
CN205276461U (en) * 2015-11-11 2016-06-01 上海十三冶建设有限公司 Node is changed to articulated atress with just having tied of steel construction vestibule

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004263391A (en) * 2003-02-28 2004-09-24 Jfe Steel Kk Method for obtaining structural characteristic of bracket joint and method for designing framed structure having bracket joint

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103061521A (en) * 2013-01-24 2013-04-24 中国水利水电第二工程局有限公司 Torque type mounting method for cantilever steel truss of large stadium
CN103541430A (en) * 2013-10-31 2014-01-29 同济大学建筑设计研究院(集团)有限公司 Support connection structure for steel structure corridor
CN203782883U (en) * 2014-01-16 2014-08-20 山东杭萧钢构有限公司 Steel pipe truss hinge joint device
CN205276461U (en) * 2015-11-11 2016-06-01 上海十三冶建设有限公司 Node is changed to articulated atress with just having tied of steel construction vestibule

Also Published As

Publication number Publication date
CN105297885A (en) 2016-02-03

Similar Documents

Publication Publication Date Title
CN105297885B (en) The be hinged stress check calculation node and its construction method with just tying of Steel corridor
CN206279622U (en) A kind of connecting node of new H profile steel post and H profile steel beam
CN103866869B (en) A kind of steel pipe column-H-shaped beam connecting node of reinforcing
CN109826090B (en) Assembled type segmented bent cap and connecting method thereof
CN106593002A (en) Historic building timberwork beam-column system house composite strengthening method
CN204983171U (en) Prefabricated post connecting device
CN108412290A (en) Power transmission tower reinforcing device
CN105926855B (en) Reinforced concrete column and its construction method are not landed in a kind of Super High Core Walls Structure
CN105064512A (en) Connecting structure of circular steel tube concrete column and steel beam
CN203361167U (en) Enclosure purlin corner component for foundation pit supporting
CN205153536U (en) Structure is assembled to self -balancing integral template of reinforced concrete roof beam
CN104264792B (en) A kind of bean column node of layered assembling type steel structure
CN107447861A (en) A kind of assembling type steel structure square tube post beam column node connection device with diagonal brace
CN101967795B (en) Novel built-in cable-truss anchoring structure and construction method thereof
CN103774838B (en) A kind of construction of lift well assembling safe operation platform and using method
CN208858231U (en) A kind of steel tube tower in electric transmission line reinforcement of weld device
CN103669924B (en) A kind of substation framework square-section angle iron frame beam thread gripping-board novel joint structure
CN208056308U (en) A kind of dome structure for exempting from support installation
CN207363024U (en) A kind of portal frame structure
CN206070761U (en) A kind of H profile steel column space beam column end plate connecting node construction
CN202519791U (en) Steel framework H steel column node domain reinforcing equipment
CN202745208U (en) Joint connection of re-combined bamboo timber frame structure
CN210713199U (en) Hinged joint device of H-shaped steel beam and steel column
CN205276461U (en) Node is changed to articulated atress with just having tied of steel construction vestibule
CN203569485U (en) Steel truss beam elevation adjusting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Patentee after: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Patentee before: SHANGHAI MCC13 CONSTRUCTION Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190731

Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee after: CHINA MCC20 GROUP Corp.,Ltd.

Patentee after: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Patentee before: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.