CN105296853B CN201510863527.1A CN201510863527A CN105296853B CN 105296853 B CN105296853 B CN 105296853B CN 201510863527 A CN201510863527 A CN 201510863527A CN 105296853 B CN105296853 B CN 105296853B
Authority
CN
China
Prior art keywords
rolling
cold
steel
meters
930mpa
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510863527.1A
Other languages
Chinese (zh)
Other versions
CN105296853A (en
Inventor
肖立军
王长生
张红雁
马庆水
邓兆征
袁成玺
李俊芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Shiheng Special Steel Group Co Ltd
Original Assignee
Shandong Shiheng Special Steel Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Shiheng Special Steel Group Co Ltd filed Critical Shandong Shiheng Special Steel Group Co Ltd
Priority to CN201510863527.1A priority Critical patent/CN105296853B/en
Publication of CN105296853A publication Critical patent/CN105296853A/en
Application granted granted Critical
Publication of CN105296853B publication Critical patent/CN105296853B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Metallurgy industry spiral production technical field of the present invention, more particularly to a kind of 930MPa high-intensity fine rollings screw-thread steel and its preparation technology.The composition of the 930MPa high-intensity fine rolling screw-thread steels is:C:0.40 0.50%, Mn:0.80 1.20%, Si:1.45 1.85%, V:0.120 0.220%, S≤0.030%, P≤0.030%, balance of Fe, preparation technology using " steel billet cold charge enter to heat the discontinuous control of stove heat+whole process low temperature controlled rolling+repeatedly it is cold+that pinch roll pinches tail steel+Double Dimension Flying Shears segmentation+cold bed cooling+interior stacking heap is cold " rolling process route.The 930MPa high-intensity fine rolling screw-thread steels low production cost, quality stability are high, and the preparation technology flow is short, finish rolling excellent effect, roller repairing effect is significant and do not damage or to reduce reinforcing bar quality, economic benefit and society notable.

Description

A kind of 930MPa high-intensity fine rollings screw-thread steel and its preparation technology
(1) technical field
The present invention relates to metallurgy industry spiral production technical field, more particularly to a kind of 930MPa high-intensity fine rollings spiral shell Line steel and its preparation technology.
(2) background technology
930MPa finish rolling deformed bars are at home and abroad generally produced using Tempering and Quenching mode at present.To this kind of When material product long is heat-treated, both at home and abroad from it is more be sensing heating mode of heating.Sensing heating is to utilize electromagnetic induction Inside workpiece produces vortex, the method that workpiece reaches estimating temperature by the Joule heat of these electric currents during principle makes alternating magnetic field. At home, the quenched once someone of sensing heating is carried out to large gauge ribbed bar and did research, the 930MPa grades of research and development of reinforcing bar of China's Anshan iron and steel plant Patent is exactly that the sensing heating for using is heat-treated.
At present, major part enterprise takes heat-treated offline process route to produce 930MPa high-intensity fine rolling screw-thread steels both at home and abroad Product, the technological process of production is:Feeding skid+dial steel device by root dials steel+conveyor roller+1# induction furnaces (being heated to 820 DEG C)+extensive Multiple section+2# induction furnaces (being heated to 920 DEG C)+recover section+quenching box treatment (water-cooled is to 400 DEG C)+recover section+3# induction furnaces (are returned Fire treatment is to 580-600 DEG C)+runout table+blanking rack+natural cooling+saw head, cut scale.This process route long flow path, High cost, product quality stability are limited, and cooling is cold by force using one-time continuous in its technique, and surface martensite is blocked up, is easily caused The problems such as elongation is unqualified.
The present invention proposes a kind of different from Heat Treatment technique and the new technology of offline quenching-and-tempering process Route, the 930MPa high-intensity fine rolling screw thread product made from steel of process route production is to realize that quality index is steady without heat-treated offline Fixed qualified, product quality is high, cost 300 yuan/t-500 units lower than heat-treated offline technique/t, remarkable in economical benefits.
(3) content of the invention
The present invention is in order to make up the deficiencies in the prior art, there is provided a kind of low production cost, quality stability are high 930MPa high-intensity fine rolling screw-thread steels, while also providing a kind of flow for preparing the 930MPa high-intensity fine rolling screw-thread steels Short, finish rolling excellent effect, roller repairing effect is significant and do not damage or reduce reinforcing bar quality, the technique of remarkable in economical benefits, solution Determine problems of the prior art.
The present invention is achieved through the following technical solutions:
A kind of 930MPa high-intensity fine rollings screw-thread steel, is made up of the composition of following percentage by weight:C:0.40-0.50%, Mn:0.80-1.20%, Si:1.45-1.85%, V:0.120-0.220%, S≤0.030%, P≤0.030%, balance of Fe.
The preparation technology of the 930MPa high-intensity fine rolling screw-thread steels, including following operating procedure:
It is prepared by A steel billets:
(1) converter is slightly refined:By molten iron, (main component is C, Si, Mn, P, S, and remaining is Fe elements, and constituent content control will Seek Si≤0.70%, P≤0.13%, S≤0.055%, other are without specific requirement) and steel scrap according to 9:1 weight turns than adding Stove blows 13-15 minutes;Blowing is finished, and controls endpoint carbon content >=0.06%, outlet temperature≤1680 DEG C;Add in tapping process Plus silicomangan and ferrovanadium nitride alloy element (element addition is adjusted accordingly according to C, Si, Mn actual content), it is ensured that Weight content≤0.35% of the C of terminal molten iron, weight content≤1.3% of Si, weight content≤0.70% of Mn;
(2) LF stoves refining:The molten steel that step (1) is tapped is hung to the refining of LF stoves, refining furnace uses carborundum and ferrosilicon powder Carry out making white slag operation, slag to be refined carries out trimming operation again after adjusting to white, it is ensured that composition is all in the model of above-mentioned elemental composition In enclosing;It is required that refining time >=30 minute, white slag retention time >=20 minute, are carried out after completing refining operation by 2 ± 0.1m/t Line feeding is operated.Ensure outer soft blow time >=15 minute of line.Tapping temperature control is at 1555 DEG C -1565 DEG C when refining furnace is tapped;Essence Carry out determining oxygen operation before furnace tapping, by free Control for Oxygen Content within 12ppm;
(3) continuous small-billet casting:Step (2) is hung to cast station through the molten steel that LF stoves are refined.Continuous casting production uses plug Rod bag is produced, and whole process protection cast, tundish temperature is controlled at 1505 DEG C -1525 DEG C, and casting speed control is in 1.3m/min-1.6m/ Min, it is desirable to which whole to draw the fluctuation of steel process pulling speed of continuous casting to be less than ± 0.01m/min, liquid level fluctuation of crystallizer is less than ± 3mm;Continuous casting Into small billet, the billet scaling of different length is cut into according to different rolling specs;
B is rolled:
The small billet cold charge that step A is poured into a mould is entered to heat stove heat, 1080 ± 30 DEG C of furnace temperature of heating furnace, small billet is in heating 960-1000 DEG C is heated in stove, rolling of being come out of the stove behind heat time >=1.5 hour;Using whole process stream low temperature controlled rolling:By what is come out of the stove Small billet sends into mill milling, and a de-scaling is first carried out to steel billet for removing the iron scale on small billet surface, subsequently into Roughing mill, rolls 6 passages, mill speed altogether:0.34m/s-1.75m/s;Rolling time 46-48s;Milling train in entering afterwards, 4 passages, mill speed are rolled altogether:2.40m/s-4.32m/s;Rolling time 46-48s;Finishing mill is finally entered, 4 are rolled altogether Individual passage, mill speed:5.50m/s-8.50m/s;Rolling time 46-48s;
C is post-processed:
The Finished rolled steel that step B is rolled is carried out into cooling treatment by the way of discontinuous control is cold, is supplied by roller-way after cooling To cold bed, then Double Dimension Flying Shears segmentation, cold bed tempering cooling, indoor stacking heap are cold, obtain final product;
Discontinuous control described in step C is cold cold first to wear the discontinuous control that recovers after water;
It is that first to wear the discontinuous control recovered after water three times cold that discontinuous control described in step C is cold;
First wear that the discontinuous control recovered after water is cold to be for described three times:
Recover section after first time Water cooling:Enter " 60-80 meters " recovery after controlled rolling " 4 meters+4 meters " two Water coolings Section;This section of temperature of Water cooling import is 800 ± 20 DEG C, and hydraulic pressure control is 0.40 ± 0.30MPa;
Recover section after second Water cooling:Enter after 4 meters of Water coolings of controlled rolling one 4 meters of recover sections enter back into one 4 meters it is extensive Multiple section;This section of cooling water pressure≤0.60MPa of Water cooling;
Recover section after third time Water cooling:Enter after 2 meters of Water coolings of controlled rolling one 2 meters of recover sections enter back into one 4 meters it is extensive Multiple section;This section of temperature of Water cooling import is 550 ± 10 DEG C, and hydraulic pressure control is 0.20MPa ± 0.02.
Using the essence of " elliptical aperture+K1 finished holes of the K4 elliptical aperture+K3 edging pass for rolling+K2 with bottom land convexity " in step B rollings Rolling pass schedule carries out finish rolling.
Step C Double Dimension Flying Shears are segmented into " 5# flying shears " segmentation.
Using the essence of " elliptical aperture+K1 finished holes of the K4 elliptical aperture+K3 edging pass for rolling+K2 with bottom land convexity " in step B rollings Rolling pass schedule carries out finish rolling.
Step C cold beds temperature is 650-670 DEG C.
The beneficial effects of the invention are as follows:
Preparation technology of the present invention is both different from the sensing heating heat-treated offline technology road of domestic and international high cost technology path Line, also different from:The low quality technology path of Heat Treatment by Rolling Heat, by above-mentioned brand-new processing technology routine, takes one Series of processes and equipment technology innovative measure, cost are lower than sensing heating heat-treated offline 300-500 yuan/ton, quality stability Far above Heat Treatment by Rolling Heat processing technology routine, and realize that 930MPa is high-strength under the conditions of new low cost process technology path Spend the steady production and steady quality of finish rolling deformed bar.Major advantage and effect are as follows:
1st, implement first to wear the discontinuous control recovered after water for three times cold in post-processing step, it is to avoid the strong cold, tables of one-time continuous Elongation does not conform to problem caused by face martensite blocked up (more than 1.5mm), and interruption is ensure that by the control to hydraulic pressure and water The mitigation of the cold falling temperature gradient of formula control, it is to avoid the too fast generation abnormal structure of controlled rolling cooling velocity.
2nd, by the 4# flying shears of former Double Dimension Flying Shears, substituted using 5# flying shears, be exclusively used in the multiple length segmentation of 930MPa finish rolling screw threads, Overcome cold bed difficulty on former Double Dimension Flying Shears shear ability deficiency, tail steel, cause unstable properties because tail steel transporting velocity fluctuates Problem.
3rd, Double Dimension Flying Shears entrance sets pinch roll on new, implements tail steel clamp and send technique, realizes and rolls rear rebar full length constant speed Rolling, constant speed control are cold, ensure that the uniformity of rebar full length performance.
4th, the finishing pass sequence of " elliptical aperture+K1 finished holes of the K4 elliptical aperture+K3 edging pass for rolling+K2 with bottom land convexity ", it is real Show the high-precision control high, wide and cross rib height of reinforcing bar basic circle, meet the high accuracy connection between reinforcing bar and connector;Design Pass shears, make reinforcing bar in fixed size scissors shear history, bear three-dimensional compressive stress, solve the problems, such as bar cutting fragmentation.
5th, the yield strength of 930Mpa fining twisted steels obtained in preparation technology 50-120MPa high compared with GB 930MPa, Tensile strength 50-170MPa high compared with GB 1080MPa, elongation percentage is compared with the 1.0%-4.0% high of GB 6.0%, and quality stability is high, Product with stable quality.
Mechanical property Yield strength MPa Tensile strength MPa Elongation percentage %
Mechanical property numerical value 980-1050 1130-1250 7.0-10.0
(4) specific embodiment
With reference to embodiment, the invention will be further described, but the invention is not limited in this.
Embodiment 1:
A kind of preparation technology of 930MPa high-intensity fine rollings screw-thread steel:Using following operating procedure:
It is prepared by A steel billets:
(1) converter is slightly refined:By molten iron, (main component is C, Si, Mn, P, S, and remaining is Fe elements, and constituent content control will Seek Si≤0.70%, P≤0.13%, S≤0.055%, other are without specific requirement) and steel scrap according to 9:1 weight turns than adding Stove carries out blowing operation, and duration of blast 14 minutes, blowing is finished and requires endpoint carbon content >=0.06%, outlet temperature≤1680 ℃;(element addition is carried out according to C, Si, Mn actual content for addition silicomangan and ferrovanadium nitride alloy element in tapping process Corresponding adjustment), it is ensured that weight content≤0.35% of the C of terminal molten iron, weight content≤1.3% of Si, the weight content of Mn ≤ 0.70%.
(2) LF stoves refining:The molten steel that step (1) is tapped is hung to the refining of LF stoves:Refining furnace uses carborundum and ferrosilicon powder Carry out making white slag operation, slag to be refined carries out trimming operation again after adjusting to white, it is ensured that composition is all in the model of above-mentioned elemental composition In enclosing;Refining time 30 minutes, 20 minutes white slag retention times, line feeding operation is carried out after completing refining operation by 2m/t, it is ensured that The line outer 15 minutes soft blow time;Tapping temperature control is at 1555 DEG C when refining furnace is tapped;Carry out determining oxygen operation before refining furnace tapping, By free Control for Oxygen Content within 12ppm.
(3) continuous small-billet casting:Step (2) is hung to cast station through the molten steel that LF stoves are refined, continuous casting production uses plug Rod bag is produced, and whole process protection cast, tundish temperature is controlled at 1505 DEG C, and casting speed control is in 1.3m/min, it is desirable to entirely draw steel The fluctuation of process pulling speed of continuous casting is less than ± 0.01m/min, and liquid level fluctuation of crystallizer is less than ± 3mm;It is casting continuously to form 165mm × 165mm rule The small billet of lattice, the billet scaling of different length is cut into according to different rolling specs.The chemical composition of the steel billet is:C: 0.40%th, Mn:0.80%th, Si:1.45%th, V:0.120%th, S:0.030%th, P:0.030%, balance of Fe.
B is rolled:
The small billet cold charge that step A is poured into a mould is entered to heat stove heat, 1080 DEG C of furnace temperature of heating furnace, small billet is in heating furnace Be heated to 960 DEG C, heating is come out of the stove rolling after 1.5 hours;Using whole process stream low temperature controlled rolling:The small billet come out of the stove is sent into milling train Rolling, first carries out a de-scaling for removing the iron scale on small billet surface to steel billet, subsequently into roughing mill, 6 is rolled altogether Individual passage, mill speed:0.34m/s;Rolling time 46s;Milling train in entering afterwards, rolls 4 passages, mill speed altogether: 2.40m/s;Rolling time 46s;Finishing mill is finally entered, 4 passages, mill speed are rolled altogether:5.50m/s;Rolling time 46s;Finally give Finished rolled steel.
C is post-processed:
The Finished rolled steel that step B is rolled first is worn the cold mode of discontinuous control replied after water using three times and carried out at cooling Reason, including controlled rolling and controlled cooling and recover section arrangement, design parameter and operation:
Recover section after first time Water cooling:Enter one 80 meters of recover sections after controlled rolling " 4 meters+4 meters " two Water coolings;The section The temperature of Water cooling import is 800 DEG C, and hydraulic pressure control is 0.40MPa;
Recover section after second Water cooling:Enter after 4 meters of Water coolings of controlled rolling one 4 meters of recover sections enter back into one 4 meters it is extensive Multiple section;The cooling water pressure of this section of Water cooling is controlled to 0.60MPa;
Recover section after third time Water cooling:Enter after 2 meters of Water coolings of controlled rolling one 2 meters of recover sections enter back into one 4 meters it is extensive Multiple section;This section of temperature of Water cooling import is 550 DEG C, and hydraulic pressure control is 0.20MPa.
Quickly supplied by roller-way after above-mentioned three Water coolings to cold bed, pinch roll ensures reinforcing bar poker during pinching Velocity-stabilization, it is ensured that reinforcing bar poker velocity-stabilization, pinch process is pinched using automatic detection identification tail steel system;Then enter Row 5# Double Dimension Flying Shears are segmented, overcome that former Double Dimension Flying Shears shear ability is not enough, on tail steel cold bed it is difficult, because tail steel transporting velocity fluctuates Cause the problem of unstable properties;Cold bed tempering cooling, indoor stacking heap are carried out again cold 7 days, obtain final product a kind of 930MPa high intensity Fining twisted steel.
The chemical composition of the 930MPa high-intensity fine rolling screw-thread steel reinforcing bars that above-mentioned steps are obtained is:C:0.40%th, Mn: 0.80%th, Si:1.45%th, V:0.120%th, S:0.030%th, P:0.030%, balance of Fe.
Embodiment 2:
A kind of preparation technology of 930MPa high-intensity fine rollings screw-thread steel, using following operating procedure:
It is prepared by A steel billets:
(1) converter is slightly refined:By molten iron, (main component is C, Si, Mn, P, S, and remaining is Fe elements, and constituent content control will Seek Si≤0.70%, P≤0.13%, S≤0.055%, other are without specific requirement) and steel scrap according to 9:1 weight turns than adding Stove blows 13 minutes;Blowing is finished, and controls endpoint carbon content >=0.06%, outlet temperature≤1680 DEG C;Added in tapping process Silicomangan and ferrovanadium nitride alloy element (element addition is adjusted accordingly according to C, Si, Mn actual content), it is ensured that eventually Weight content≤0.35% of the C of point molten iron, weight content≤1.3% of Si, weight content≤0.70% of Mn;
(2) LF stoves refining:The molten steel that step (1) is tapped is hung to the refining of LF stoves, refining furnace uses carborundum and ferrosilicon powder Carry out making white slag operation, slag to be refined carries out trimming operation again after adjusting to white, it is ensured that composition is all in the model of above-mentioned elemental composition In enclosing;Refining time 50 minutes, 30 minutes white slag retention times, line feeding operation is carried out after completing refining operation by 1.9m/t.Protect Card line outer soft blow time >=minute.Tapping temperature control is at 1565 DEG C when refining furnace is tapped;Carry out determining oxygen behaviour before refining furnace tapping Make, by free Control for Oxygen Content within 12ppm;
(3) continuous small-billet casting:Step (2) is hung to cast station through the molten steel that LF stoves are refined.Continuous casting production uses plug Rod bag is produced, and whole process protection cast, tundish temperature is controlled at 1525 DEG C, and casting speed control is in 1.6m/min, it is desirable to entirely draw steel The fluctuation of process pulling speed of continuous casting is less than ± 0.01m/min, and liquid level fluctuation of crystallizer is less than ± 3mm;Small billet is casting continuously to form, according to difference Rolling specs cut into the billet scaling of different length;
B is rolled:
The small billet cold charge that step A is poured into a mould is entered to heat stove heat, 1110 DEG C of furnace temperature of heating furnace, small billet is in heating furnace 1000 DEG C are heated to, rolling of being come out of the stove after heating 2 hours;Using whole process stream low temperature controlled rolling:The small billet come out of the stove feeding milling train is rolled System, first carries out a de-scaling for removing the iron scale on small billet surface to steel billet, subsequently into roughing mill, 6 is rolled altogether Passage, mill speed:1.75m/s;Rolling time 48s;Milling train in entering afterwards, rolls 4 passages, mill speed altogether: 4.32m/s;Rolling time 48s;Finishing mill is finally entered, 4 passages, mill speed are rolled altogether:8.50m/s;Rolling time 48s;
C is post-processed:
The Finished rolled steel that step B is rolled first is worn the cold mode of discontinuous control replied after water using three times and carried out at cooling Reason, including controlled rolling and controlled cooling and recover section arrangement, design parameter and operation:
Recover section after first time Water cooling:Enter one 60 meters of recover sections after controlled rolling " 4 meters+4 meters " two Water coolings;The section The temperature of Water cooling import is 820 DEG C, and hydraulic pressure control is 0.70MPa;
Recover section after second Water cooling:Enter after 4 meters of Water coolings of controlled rolling one 4 meters of recover sections enter back into one 4 meters it is extensive Multiple section;This section of cooling water pressure≤0.60MPa of Water cooling;
Recover section after third time Water cooling:Enter after 2 meters of Water coolings of controlled rolling one 2 meters of recover sections enter back into one 4 meters it is extensive Multiple section;This section of temperature of Water cooling import is 560 DEG C, and hydraulic pressure control is 0.22MPa.
Quickly supplied by roller-way after above-mentioned three Water coolings to cold bed, pinch roll ensures reinforcing bar poker during pinching Velocity-stabilization, it is ensured that reinforcing bar poker velocity-stabilization, pinch process is pinched using automatic detection identification tail steel system;Then enter Row 5# Double Dimension Flying Shears are segmented, overcome that former Double Dimension Flying Shears shear ability is not enough, on tail steel cold bed it is difficult, because tail steel transporting velocity fluctuates Cause the problem of unstable properties;Cold bed tempering cooling, indoor stacking heap are carried out again cold 15 days, obtain final product a kind of 930MPa high intensity Fining twisted steel.
The chemical composition of the 930MPa high-intensity fine rolling screw-thread steel reinforcing bars that above-mentioned steps are obtained is:C:0.50%th, Mn: 1.20%th, Si:1.85%th, V:0.220%th, S:0.010%th, P:0.020%, balance of Fe.
Embodiment 3:
A kind of preparation technology of 930MPa high-intensity fine rollings screw-thread steel, using following operating procedure:
It is prepared by A steel billets:
(1) converter is slightly refined:By molten iron, (main component is C, Si, Mn, P, S, and remaining is Fe elements, and constituent content control will Seek Si≤0.70%, P≤0.13%, S≤0.055%, other are without specific requirement) and steel scrap according to 9:1 weight turns than adding Stove blows 15 minutes;Blowing is finished, and controls endpoint carbon content >=0.06%, outlet temperature≤1680 DEG C;Added in tapping process Silicomangan and ferrovanadium nitride alloy element (element addition is adjusted accordingly according to C, Si, Mn actual content), it is ensured that eventually Weight content≤0.35% of the C of point molten iron, weight content≤1.3% of Si, weight content≤0.70% of Mn;
(2) LF stoves refining:The molten steel that step (1) is tapped is hung to the refining of LF stoves, refining furnace uses carborundum and ferrosilicon powder Carry out making white slag operation, slag to be refined carries out trimming operation again after adjusting to white, it is ensured that composition is all in the model of above-mentioned elemental composition In enclosing;Refining time 45 minutes, 25 minutes white slag retention times, line feeding operation is carried out after completing refining operation by 2.1m/t.Protect Outer soft blow time >=15 minute of card line.Tapping temperature control is at 1560 DEG C when refining furnace is tapped;Carry out determining oxygen before refining furnace tapping Operation, by free Control for Oxygen Content within 12ppm;
(3) continuous small-billet casting:Step (2) is hung to cast station through the molten steel that LF stoves are refined.Continuous casting production uses plug Rod bag is produced, and whole process protection cast, tundish temperature is controlled at 1516 DEG C, and casting speed control is in 1.4m/min, it is desirable to entirely draw steel The fluctuation of process pulling speed of continuous casting is less than ± 0.01m/min, and liquid level fluctuation of crystallizer is less than ± 3mm;Small billet is casting continuously to form, according to difference Rolling specs cut into the billet scaling of different length;
B is rolled:
The small billet cold charge that step A is poured into a mould is entered to heat stove heat, 1050 DEG C of furnace temperature of heating furnace, small billet is in heating furnace 980 DEG C are heated to, rolling of being come out of the stove after heating 2.5 hours;Using whole process stream low temperature controlled rolling:The small billet come out of the stove feeding milling train is rolled System, first carries out a de-scaling for removing the iron scale on small billet surface to steel billet, subsequently into roughing mill, 6 is rolled altogether Passage, mill speed:1.04m/s;Rolling time 47s;Milling train in entering afterwards, rolls 4 passages, mill speed altogether: 3.36m/s;Rolling time 47s;Finishing mill is finally entered, 4 passages, mill speed are rolled altogether:7.0m/s;Rolling time 47s;
C is post-processed:
The Finished rolled steel that step B is rolled first is worn the cold mode of discontinuous control replied after water using three times and carried out at cooling Reason, including controlled rolling and controlled cooling and recover section arrangement, design parameter and operation:
Recover section after first time Water cooling:Enter one 70 meters of recover sections after controlled rolling " 4 meters+4 meters " two Water coolings;The section The temperature of Water cooling import is 780 DEG C, and hydraulic pressure control is 0.10MPa;
Recover section after second Water cooling:Enter after 4 meters of Water coolings of controlled rolling one 4 meters of recover sections enter back into one 4 meters it is extensive Multiple section;This section of cooling water pressure≤0.60MPa of Water cooling;
Recover section after third time Water cooling:Enter after 2 meters of Water coolings of controlled rolling one 2 meters of recover sections enter back into one 4 meters it is extensive Multiple section;This section of temperature of Water cooling import is 540 DEG C, and hydraulic pressure control is 0.18MPa.
Quickly supplied by roller-way after above-mentioned three Water coolings to cold bed, pinch roll ensures reinforcing bar poker during pinching Velocity-stabilization, it is ensured that reinforcing bar poker velocity-stabilization, pinch process is pinched using automatic detection identification tail steel system;Then enter Row 5# Double Dimension Flying Shears are segmented, overcome that former Double Dimension Flying Shears shear ability is not enough, on tail steel cold bed it is difficult, because tail steel transporting velocity fluctuates Cause the problem of unstable properties;Cold bed tempering cooling, indoor stacking heap are carried out again cold 12 days, obtain final product a kind of 930MPa high intensity Fining twisted steel.
The chemical composition of the 930MPa high-intensity fine rolling screw-thread steel reinforcing bars that above-mentioned steps are obtained is:C:0.47%th, Mn: 1.1%th, Si:1.63%th, V:0.170%th, S:0.022%th, P:0.016%, balance of Fe.
Embodiment 4
A kind of preparation technology of 930MPa high-intensity fine rollings screw-thread steel, using following operating procedure:
It is prepared by A steel billets:
(1) converter is slightly refined:By molten iron, (main component is C, Si, Mn, P, S, and remaining is Fe elements, and constituent content control will Seek Si≤0.70%, P≤0.13%, S≤0.055%, other are without specific requirement) and steel scrap according to 9:1 weight turns than adding Stove blows 14 minutes;Blowing is finished, and controls endpoint carbon content >=0.06%, outlet temperature≤1680 DEG C;Added in tapping process Silicomangan and ferrovanadium nitride alloy element (element addition is adjusted accordingly according to C, Si, Mn actual content), it is ensured that eventually Weight content≤0.35% of the C of point molten iron, weight content≤1.3% of Si, weight content≤0.70% of Mn;
(2) LF stoves refining:The molten steel that step (1) is tapped is hung to the refining of LF stoves, refining furnace uses carborundum and ferrosilicon powder Carry out making white slag operation, slag to be refined carries out trimming operation again after adjusting to white, it is ensured that composition is all in the model of above-mentioned elemental composition In enclosing;Refining time 40 minutes, 35 minutes white slag retention times, line feeding operation is carried out after completing refining operation by 2m/t.Ensure Outer soft blow time >=15 minute of line.Tapping temperature control is at 1562 DEG C when refining furnace is tapped;Carry out determining oxygen behaviour before refining furnace tapping Make, by free Control for Oxygen Content within 12ppm;
(3) continuous small-billet casting:Step (2) is hung to cast station through the molten steel that LF stoves are refined.Continuous casting production uses plug Rod bag is produced, and whole process protection cast, tundish temperature is controlled at 1510 DEG C, and casting speed control is in 1.5m/min, it is desirable to entirely draw steel The fluctuation of process pulling speed of continuous casting is less than ± 0.01m/min, and liquid level fluctuation of crystallizer is less than ± 3mm;Small billet is casting continuously to form, according to difference Rolling specs cut into the billet scaling of different length;
B is rolled:
The small billet cold charge that step A is poured into a mould is entered to heat stove heat, 1100 DEG C of furnace temperature of heating furnace, small billet is in heating furnace 970 DEG C are heated to, rolling of being come out of the stove after heating 3 hours;Using whole process stream low temperature controlled rolling:The small billet come out of the stove feeding milling train is rolled System, first carries out a de-scaling for removing the iron scale on small billet surface to steel billet, subsequently into roughing mill, 6 is rolled altogether Passage, mill speed:1.34m/s;Rolling time 46s;Milling train in entering afterwards, rolls 4 passages, mill speed altogether:3.5m/ s;Rolling time 47s;Finishing mill is finally entered, 4 passages, mill speed are rolled altogether:6.50m/s;Rolling time 48s;
C is post-processed:
The Finished rolled steel that step B is rolled first is worn the cold mode of discontinuous control replied after water using three times and carried out at cooling Reason, including controlled rolling and controlled cooling and recover section arrangement, design parameter and operation:
Recover section after first time Water cooling:Enter one 80 meters of recover sections after controlled rolling " 4 meters+4 meters " two Water coolings;The section The temperature of Water cooling import is 810 DEG C, and hydraulic pressure control is 0.60MPa;
Recover section after second Water cooling:Enter after 4 meters of Water coolings of controlled rolling one 4 meters of recover sections enter back into one 4 meters it is extensive Multiple section;This section of cooling water pressure≤0.60MPa of Water cooling;
Recover section after third time Water cooling:Enter after 2 meters of Water coolings of controlled rolling one 2 meters of recover sections enter back into one 4 meters it is extensive Multiple section;This section of temperature of Water cooling import is 545 DEG C, and hydraulic pressure control is 0.22MPa.
Quickly supplied by roller-way after above-mentioned three Water coolings to cold bed, pinch roll ensures reinforcing bar poker during pinching Velocity-stabilization, it is ensured that reinforcing bar poker velocity-stabilization, pinch process is pinched using automatic detection identification tail steel system;Then enter Row 5# Double Dimension Flying Shears are segmented, overcome that former Double Dimension Flying Shears shear ability is not enough, on tail steel cold bed it is difficult, because tail steel transporting velocity fluctuates Cause the problem of unstable properties;Cold bed tempering cooling, indoor stacking heap are carried out again cold 10 days, obtain final product a kind of 930MPa high intensity Fining twisted steel.
The chemical composition of the 930MPa high-intensity fine rolling screw-thread steel reinforcing bars that above-mentioned steps are obtained is:C:0.41%th, Mn: 0.97%th, Si:1.59%th, V:0.180%th, S:0.024%th, P:0.019%, balance of Fe.
Embodiment 5
A kind of preparation technology of 930MPa high-intensity fine rollings screw-thread steel, using following operating procedure:
It is prepared by A steel billets:
(1) converter is slightly refined:By molten iron, (main component is C, Si, Mn, P, S, and remaining is Fe elements, and constituent content control will Seek Si≤0.70%, P≤0.13%, S≤0.055%, other are without specific requirement) and steel scrap according to 9:1 weight turns than adding Stove blows 15 minutes;Blowing is finished, and controls endpoint carbon content >=0.06%, outlet temperature≤1680 DEG C;Added in tapping process Silicomangan and ferrovanadium nitride alloy element (element addition is adjusted accordingly according to C, Si, Mn actual content), it is ensured that eventually Weight content≤0.35% of the C of point molten iron, weight content≤1.3% of Si, weight content≤0.70% of Mn;
(2) LF stoves refining:The molten steel that step (1) is tapped is hung to the refining of LF stoves, refining furnace uses carborundum and ferrosilicon powder Carry out making white slag operation, slag to be refined carries out trimming operation again after adjusting to white, it is ensured that composition is all in the model of above-mentioned elemental composition In enclosing;It is required that refining time 35 minutes, 20 minutes white slag retention times, line feeding behaviour is carried out after completing refining operation by 1.9m/t Make.Ensure outer soft blow time >=15 minute of line.Tapping temperature control is at 1558 DEG C when refining furnace is tapped;Carried out before refining furnace tapping Oxygen operation is determined, by free Control for Oxygen Content within 12ppm;
(3) continuous small-billet casting:Step (2) is hung to cast station through the molten steel that LF stoves are refined.Continuous casting production uses plug Rod bag is produced, and whole process protection cast, tundish temperature is controlled at 1510 DEG C, and casting speed control is in 1.45m/min, it is desirable to entirely draw steel The fluctuation of process pulling speed of continuous casting is less than ± 0.01m/min, and liquid level fluctuation of crystallizer is less than ± 3mm;Small billet is casting continuously to form, according to difference Rolling specs cut into the billet scaling of different length;
B is rolled:
The small billet cold charge that step A is poured into a mould is entered to heat stove heat, 1090 DEG C of furnace temperature of heating furnace, small billet is in heating furnace 990 DEG C are heated to, rolling of being come out of the stove after 2.5 hours heat times;Using whole process stream low temperature controlled rolling:The small billet come out of the stove feeding is rolled Machine is rolled, and a de-scaling is first carried out to steel billet for removing the iron scale on small billet surface, subsequently into roughing mill, rolling altogether 6 passages, mill speed:1.58m/s;Rolling time 47s;Milling train in entering afterwards, rolls 4 passages, mill speed altogether: 2.9m/s;Rolling time 47s;Finishing mill is finally entered, 4 passages, mill speed are rolled altogether:7.50m/s;Rolling time 46s;
C is post-processed:
The Finished rolled steel that step B is rolled first is worn the cold mode of discontinuous control replied after water using three times and carried out at cooling Reason, including controlled rolling and controlled cooling and recover section arrangement, design parameter and operation:
Recover section after first time Water cooling:Enter one 80 meters of recover sections after controlled rolling " 4 meters+4 meters " two Water coolings;The section The temperature of Water cooling import is 790 DEG C, and hydraulic pressure control is 0.50MPa;
Recover section after second Water cooling:Enter after 4 meters of Water coolings of controlled rolling one 4 meters of recover sections enter back into one 4 meters it is extensive Multiple section;This section of cooling water pressure≤0.60MPa of Water cooling;
Recover section after third time Water cooling:Enter after 2 meters of Water coolings of controlled rolling one 2 meters of recover sections enter back into one 4 meters it is extensive Multiple section;This section of temperature of Water cooling import is 555 DEG C, and hydraulic pressure control is 0.19MPa.
Quickly supplied by roller-way after above-mentioned three Water coolings to cold bed, pinch roll ensures reinforcing bar poker during pinching Velocity-stabilization, it is ensured that reinforcing bar poker velocity-stabilization, pinch process is pinched using automatic detection identification tail steel system;Then enter Row 5# Double Dimension Flying Shears are segmented, overcome that former Double Dimension Flying Shears shear ability is not enough, on tail steel cold bed it is difficult, because tail steel transporting velocity fluctuates Cause the problem of unstable properties;Cold bed tempering cooling, indoor stacking heap are carried out again cold 9 days, obtain final product a kind of 930MPa high intensity Fining twisted steel.
The chemical composition of the 930MPa high-intensity fine rolling screw-thread steel reinforcing bars that above-mentioned steps are obtained is:C:0.43%th, Mn: 1.17%th, Si:1.74%th, V:0.210%th, S:0.017%th, P:0.025%, balance of Fe.

Claims (5)

1. a kind of preparation technology of 930MPa high-intensity fine rollings screw-thread steel, it is characterized in that:Including following operating procedure:
It is prepared by A steel billets:
(1) converter is slightly refined:
Molten iron:Chemical composition is C, Si, Mn, P, S, and remaining is Fe elements, and constituent content control requires Si≤0.70%, P≤ 0.13%, S≤0.055%, other are without specific requirement;
By above-mentioned molten iron and steel scrap according to 9:1 weight blow in converter than being added, blowing finish control endpoint carbon content >= 0.06%, outlet temperature≤1680 DEG C;Silicomangan and ferrovanadium nitride alloy element are added in tapping process, it is ensured that the C of molten iron Weight content≤0.35%, weight content≤1.3% of Si, weight content≤0.70% of Mn;
(2) LF stoves refining:The molten steel that step (1) is tapped is hung to the refining of LF stoves, refining furnace carries out making white slag operation, refining time >=30 minutes, white slag retention time >=20 minute carried out line feeding operation, it is ensured that outside line after completing refining operation by 1.9-2.1m/t Soft blow time >=15 minute;Refining furnace tapping temperature is controlled at 1555 DEG C -1565 DEG C;Carry out determining oxygen operation before refining furnace tapping, By free Control for Oxygen Content within 12ppm;
(3) continuous small-billet casting:Step (2) is hung to cast station through the molten steel that LF stoves are refined, continuous casting production uses stopper bag Production, whole process protection cast, tundish temperature control at 1505 DEG C -1525 DEG C, casting speed control in 1.3m/min-1.6m/min, It is required that entirely drawing steel process pulling speed of continuous casting fluctuation range ± 0.01m/min, liquid level fluctuation of crystallizer scope ± 3mm;It is casting continuously to form small Square billet, the billet scaling of different length is cut into according to different rolling specs;
B is rolled:
The small billet cold charge that step A is poured into a mould is entered to heat stove heat, 1080 ± 30 DEG C of furnace temperature of heating furnace, small billet is in heating furnace 960-1000 DEG C is heated to, rolling of being come out of the stove behind heat time >=1.5 hour;Using whole process stream low temperature controlled rolling:By the small side for coming out of the stove Base sends into mill milling, a de-scaling is first carried out to steel billet for removing the iron scale on small billet surface, subsequently into roughing Machine, rolls 6 passages, mill speed altogether:0.34m/s-1.75m/s;Rolling time 46-48s;Milling train in entering afterwards, rolls altogether 4 passages of system, mill speed:2.40m/s-4.32m/s;Rolling time 46-48s;Finishing mill is finally entered, 4 roads are rolled altogether It is secondary, mill speed:5.50m/s-8.50m/s;Rolling time 46-48s;
Using the finish rolling hole of " elliptical aperture+K1 finished holes of the K4 elliptical aperture+K3 edging pass for rolling+K2 with bottom land convexity " in step B rollings Type system carries out finish rolling;
C is post-processed:
By step B roll Finished rolled steel carry out cooling treatment by the way of discontinuous control is cold, after cooling by roller-way supply to Cold bed, then Double Dimension Flying Shears segmentation, cold bed tempering cooling, indoor stacking heap are cold, obtain final product;
The segmentation of step C Double Dimension Flying Shears is using " 5# flying shears " segmentation;
Discontinuous control described in step C is cold cold first to wear the discontinuous control that recovers after water;
930MPa high-intensity fine rolling screw-thread steels obtained by above-mentioned steps, are made up of the composition of following percentage by weight:C:0.40- 0.50%th, Mn:0.80-1.20%, Si:1.45-1.85%, V:0.120-0.220%, S≤0.030%, P≤0.030%, it is remaining It is Fe to measure.
2. the preparation technology of a kind of 930MPa high-intensity fine rollings screw-thread steel according to claim 1, it is characterized in that:Step C The cold controlled rolling and controlled cooling set gradually including several of discontinuous control and recover section.
3. the preparation technology of a kind of 930MPa high-intensity fine rollings screw-thread steel according to claim 1, it is characterized in that:Step C It is that first to wear the discontinuous control recovered after water three times cold that the discontinuous control is cold.
4. the preparation technology of a kind of 930MPa high-intensity fine rollings screw-thread steel according to claim 3, it is characterized in that:Described three It is secondary first to wear that the discontinuous control recovered after water is cold to be:
Recover section after first time Water cooling:Enter " 60-80 meters " recover section after controlled rolling " 4 meters+4 meters " two Water coolings;Should The temperature of section Water cooling import is 800 ± 20 DEG C, and hydraulic pressure control is 0.40 ± 0.30MPa;
Recover section after second Water cooling:After 4 meters of Water coolings of controlled rolling one 4 meters of recover sections are entered back into one 4 meters of recover sections; This section of cooling water pressure≤0.60MPa of Water cooling;
Recover section after third time Water cooling:After 2 meters of Water coolings of controlled rolling one 4 meters of recover sections are entered back into one 2 meters of recover sections; This section of temperature of Water cooling import is 550 ± 10 DEG C, and hydraulic pressure control is 0.20 ± 0.02MPa.
5. the preparation technology of a kind of 930MPa high-intensity fine rollings screw-thread steel according to claim 1, it is characterized in that:Step C Cold bed temperature is 650-670 DEG C.
CN201510863527.1A 2015-11-30 2015-11-30 A kind of 930MPa high-intensity fine rollings screw-thread steel and its preparation technology Active CN105296853B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510863527.1A CN105296853B (en) 2015-11-30 2015-11-30 A kind of 930MPa high-intensity fine rollings screw-thread steel and its preparation technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510863527.1A CN105296853B (en) 2015-11-30 2015-11-30 A kind of 930MPa high-intensity fine rollings screw-thread steel and its preparation technology

Publications (2)

Publication Number Publication Date
CN105296853A CN105296853A (en) 2016-02-03
CN105296853B true CN105296853B (en) 2017-07-04

Family

ID=55194664

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510863527.1A Active CN105296853B (en) 2015-11-30 2015-11-30 A kind of 930MPa high-intensity fine rollings screw-thread steel and its preparation technology

Country Status (1)

Country Link
CN (1) CN105296853B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106350733A (en) * 2016-09-19 2017-01-25 石横特钢集团有限公司 PSB1080 finish-rolled threaded bar and production process thereof
CN106734245A (en) * 2016-09-19 2017-05-31 石横特钢集团有限公司 The solution of Screw Steel Cold-Bended cracking
CN108526217A (en) * 2018-05-14 2018-09-14 盐城市联鑫钢铁有限公司 A kind of process and equipment improving rebar surface corrosion resistance
CN109731911B (en) * 2019-01-30 2020-07-17 福建泉州闽光钢铁有限责任公司 Method for improving performance of head of twisted steel wire rod
CN109778067B (en) * 2019-02-18 2020-07-31 西南交通大学 Preparation method of sleeper elastic strip
CN112126735A (en) * 2020-09-15 2020-12-25 石横特钢集团有限公司 Production process of high-strength finish-rolled threaded steel billet
CN112322985A (en) * 2020-11-18 2021-02-05 江苏永钢集团有限公司 Annealing-free PSB830 finish-rolled deformed steel bar and production process thereof
CN114564867A (en) * 2022-03-04 2022-05-31 广州众山精密科技有限公司 Hole pattern design method based on minimum resistance law

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100415925C (en) * 2004-11-05 2008-09-03 马鞍山钢铁股份有限公司 Steel for high strength shock-proof hot-rolled steel bar
CN1847435A (en) * 2006-05-13 2006-10-18 山东石横特钢集团有限公司 Super high strength hot rolled steel bar for mine resin roof bolt
CN100579680C (en) * 2007-06-18 2010-01-13 首钢总公司 Method for producing high-intensity fine rolling screwed reinforcement
KR100959475B1 (en) * 2007-10-29 2010-05-26 현대제철 주식회사 Producing method for reinforcing steel
CN102363832B (en) * 2011-11-07 2013-03-20 天津钢铁集团有限公司 Production technology of finish-rolled ribbed bars
CN104328338B (en) * 2014-10-30 2017-04-12 武汉钢铁(集团)公司 Small-scale finish-rolled twisted steel and production method thereof

Also Published As

Publication number Publication date
CN105296853A (en) 2016-02-03

Similar Documents

Publication Publication Date Title
CN105296853B (en) A kind of 930MPa high-intensity fine rollings screw-thread steel and its preparation technology
CN104032214B (en) A kind of non-hardened and tempered steel and production technique thereof
CN103752610B (en) A kind of 2250 hot continuous rolling process improving automobile exterior panel steel surface quality
US20180056348A1 (en) Method for Producing Polishing Bar Made of Valve Steel 53Cr21Mn9Ni4N
CN105401070B (en) A kind of production method of finish rolling deformed bar for prestressed concrete
CN104032226B (en) A kind of non-hardened and tempered steel and production technique thereof
CN104213033A (en) 60-steel hot rolling coil rod with high strength and high plasticity and production method thereof
CN110453149B (en) High-strength finish-rolled deformed steel bar and production process thereof
CN109554613A (en) A kind of production method of HRB500E high-strength anti-seismic steel bar
CN104451387A (en) 09MnNiDR ultra-thick low temperature container plate and production method thereof
CN101927432A (en) Manufacturing method of high-manganese strip steel with high strength and plasticity
CN104451386B (en) A kind of low yield strength ratio oil reserve is 610Mpa high-strength steel sheet and manufacture method thereof for tank body
CN103878178A (en) Method for producing ultrathin hot-rolled coils from sheet billets by continuous casting and rolling
CN104831167A (en) Q550E high-strength steel hot rolled coil and production method thereof
CN103484766A (en) Hardened and tempered high-strength and low-weld crack sensitivity steel plate for 600MPa-level water-power engineering and preparing method thereof
CN104988409A (en) Non-annealed cold forging steel hot-rolled wire rod and production method thereof
CN103725988A (en) Hot-rolled flat plate for production of high-grade thick specification pipe fitting from continuous casting billet and preparation method of hot-rolled flat plate
CN102965576B (en) Preparation method of pump shaft of oil feed pump
CN105441787A (en) Production method of hot rolled high-carbon steel wire rod for rope manufacturing
CN104233097B (en) Hot-rolled wire rod for manufacturing high-strength steel strand of strong and smart grid and production method of hot-rolled wire rod
CN104308111B (en) Reduce the method for bearing steel wire rod 1/2R place's gross segregation
CN104841701B (en) Method for controlling sheet coiling temperature during large-deceleration rolling of hot-rolled strip steel
CN105950972A (en) Thick-specification X80 pipeline steel plate with process time being shortened and manufacturing method thereof
CN104745925B (en) A kind of Φ 5.3mm 72A wire rods and preparation method
CN110814308B (en) High-strength deformed steel bar continuous casting and production process

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 271612 Feicheng City, Shandong Province Shi Heng Town

Applicant after: SHIHENG SPECIAL STEEL GROUP Co.,Ltd.

Address before: 271612 Shandong city of Tai'an province Feicheng Shi Heng Zhen Shandong Shiheng Special Steel Group Co. Ltd.

Applicant before: SHANDONG SHIHENG SPECIAL STEEL GROUP Co.,Ltd.

COR Change of bibliographic data
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A 930MPa high-strength precision rolled threaded steel and its preparation process

Effective date of registration: 20231222

Granted publication date: 20170704

Pledgee: Industrial and Commercial Bank of China Limited Feicheng sub branch

Pledgor: SHIHENG SPECIAL STEEL GROUP Co.,Ltd.

Registration number: Y2023980073806

PE01 Entry into force of the registration of the contract for pledge of patent right