CN105290145B - A kind of production method of 100 DEG C of ultralow temperature seamless steel pipes - Google Patents

A kind of production method of 100 DEG C of ultralow temperature seamless steel pipes Download PDF

Info

Publication number
CN105290145B
CN105290145B CN201510881339.1A CN201510881339A CN105290145B CN 105290145 B CN105290145 B CN 105290145B CN 201510881339 A CN201510881339 A CN 201510881339A CN 105290145 B CN105290145 B CN 105290145B
Authority
CN
China
Prior art keywords
temperature
blank
heating
seamless steel
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510881339.1A
Other languages
Chinese (zh)
Other versions
CN105290145A (en
Inventor
郭元蓉
胡茂会
涂露寒
吴红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pangang Group Chengdu Steel and Vanadium Co Ltd
Original Assignee
Pangang Group Chengdu Steel and Vanadium Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pangang Group Chengdu Steel and Vanadium Co Ltd filed Critical Pangang Group Chengdu Steel and Vanadium Co Ltd
Priority to CN201510881339.1A priority Critical patent/CN105290145B/en
Publication of CN105290145A publication Critical patent/CN105290145A/en
Application granted granted Critical
Publication of CN105290145B publication Critical patent/CN105290145B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C37/00Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
    • B21C37/06Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of tubes or metal hoses; Combined procedures for making tubes, e.g. for making multi-wall tubes

Abstract

The invention discloses a kind of production method of 100 DEG C of ultralow temperature seamless steel pipes, its technological process is as follows:VD continuous casting billets → blank excision → blank heating → perforation → MPM rolling pipes → hot saw end to end → cooling → aligning → finishing → size and surface quality inspection → packaging and storage.The present invention is for the service condition of seamless steel pipe and large, medium and small size heterogeneity research tube-rolling technique, ensure that the dimensional accuracy of produced seamless steel pipe meets ASTM/ASME demand of technical standard, develop geometric accuracy, inside and outside surface quality meets petrochemical industry low-temperature pressure container seamless steel pipe, realizes really production domesticization research.

Description

A kind of production method of -100 DEG C of ultralow temperature seamless steel pipes
Technical field
The present invention relates to the production method of ultralow temperature seamless steel pipe, and in particular to a kind of -100 DEG C of ultralow temperature seamless steel pipes Production method.
Background technology
As the petrochemical industry that puts into operation of Chinese large-sized oil plant and petrochemical industry project is greatly increased with the demand of seamless steel pipe, Seamless steel pipe demand dedicated for oil refining and petroleum chemical industry is gradually increased.Petrochemical equipment includes being hydrocracked, being hydrogenated with The special equipments such as refined, hydrogen manufacturing, reformation, catalysis, ethene, coking, which use substantial amounts of pipeline.There is part to constitute these pipes The seamless steel pipe in road is chronically at low-temperature degradation environment, causes tubing performance to decline, the especially decline of impact property.It is right For low-temperature (low temperature) vessel, stored medium temperature is lower, and the pressure that container is subjected to is just smaller, thus security reliability gets over It is good.Petrochemical industry, the Cryo Equipment of the industry such as chemical fertilizer needs the low temperature below -80 DEG C to make gas liquefaction, and 3.5Ni (i.e. Gr.3) is low At most, annual requirement is at 7000 tons or so for Wen Gang usage amount.
It is reported that claim Taiyuan steel mill once to develop 3.5Ni steel, but object performance has a long way to go with external product, and performance pole It is unstable, especially -100 DEG C low-temperature impact toughness, therefore fail to be produced in batches, thus 3.5Ni steel not yet can be in China Industrialized production is carried out, correlation engineering all relies on import with steel pipe.
To meet the market demand of -100 DEG C of ultra-low temperature container low temperature seamless steel pipes of petrochemical industry, it is low to develop cost, geometry Dimensional accuracy is high, and -100 DEG C of high ultra-low temperature containers of inside and outside surface quality are turned into when business with the production method of low temperature seamless steel pipe It is anxious.
The content of the invention
[technical problem to be solved]
Present invention aim to address above-mentioned problem of the prior art, there is provided a kind of -100 DEG C of ultralow temperature seamless steel pipes Production method.- 100 DEG C of ultralow temperature seamless steel pipe dimensional accuracies of this method production, inside and outside surface quality meets ASME/ASTM skills Art code requirement.
[technical scheme]
In order to reach above-mentioned technique effect, the present invention takes following technical scheme:
A kind of production method of -100 DEG C of ultralow temperature seamless steel pipes, its technological process is as follows:
VD continuous casting billets → blank cutting → blank heating → perforation → MPM rolling pipes → hot saw end to end → cooling → aligning → finishing → size and surface quality inspection → packaging and storage;
The blank heating is heated in annular furnace, not heat supply section temperature≤780 DEG C, the annular furnace in its annular furnace Middle holding reducing atmosphere, time of the blank heating is the blank come out of the stove after 320~360min, and the blank heating Temperature is 1235~1255 DEG C;
The perforation needs the hollow billet obtained after control punch straight, and total length external diameter is controlled in 428~432mm;
The MPM rolling pipes are that the hollow billet that the plug that temperature is 90~110 DEG C is inserted into temperature >=1100 DEG C is enterprising Row rolling, and it is 2.8~3.0m/s to need control milling train muzzle velocity in the operation of rolling, the retained speed of plug is 2.4~ 2.5m/s;Waste thickness of pipe wall extreme difference≤3.0mm that the MPM rolling pipes are obtained.
According to the present invention further technical scheme, during the blank heating, the blank with before and after blank The ranking of sky 6~8 is put, and the spacing of blank and blank is 860mm in annular furnace.
According to the present invention further technical scheme, the blank heating is divided into preheating section, bringing-up section and soaking zone.
According to the present invention further technical scheme, the rate of heat addition of the bringing-up section is 10~60 DEG C/h, described equal The rate of heat addition of hot arc is 5~5.45 DEG C/h.
According to the present invention further technical scheme, the preheating section is pre- under conditions of temperature is 565~785 DEG C Heat >=90min;The bringing-up section be divided into heating 1 section, heating 2 sections, heating 3 sections, it is described heating 1 section be temperature be 1160~ Under conditions of 1220 DEG C heat 40~50min, 2 sections of the heating be temperature be 1230~1240 DEG C under conditions of Jia 40~ 50min, 3 sections of the heating is to heat 40~50min under conditions of temperature is 1255~1265 DEG C;The soaking zone is in temperature For 110~120min of soaking under conditions of 1250~1260 DEG C.
According to the present invention further technical scheme, during the MPM rolling pipes, the plug is in position to be worn Temperature at 80 DEG C~100 DEG C.
According to the present invention further technical scheme, during the MPM rolling pipes, milling train muzzle velocity need to be controlled For 3.5m/s.
The present invention is will be described in detail below.
Blank is heated in annular furnace, and the blank is put with the ranking of sky 6~8 before and after blank, and the blank in annular furnace Be 860mm with the spacing of blank, be in order to ensure other blank temperatures do not influence heating the heating-up temperature of blank, and Heating needs uniform at a slow speed in ensureing heat in annular furnace, it is ensured that equal thermal effect, and heating must not occur producing the moon because heating is uneven Sunny side, impermeable heating, overheat, burn-off phenomenon;If production is abnormal and stops the time of rolling longer (more than 20min) temporarily, Ying Shi When reduction furnace temperature is to temperature≤1240 DEG C, reduction furnace temperature stops rolling more than 60min to temperature≤1230 DEG C when stopping rolling more than 40min When reduction furnace temperature to 1160 DEG C of temperature <, and often rotary furnace bottom.
The heat time of blank should be fully ensured that in the heating process of blank, if total heat time is less than 320min, Its steel billet tissue is unable to complete austenitizing;If total heat time is higher than 360min, autstenitic grain size can be caused thick, on Two kinds of situations are stated to low-temperature impact, especially -100 DEG C low-temperature impact influences are very big.
According to different production specifications, corresponding perforating head size is matched, needs to ensure that hollow billet is visually straight after perforation, entirely Long external diameter is in the same size.
During MPM limiting mandrel tandem rolling pipe machine rolling pipes are carried out, hollow billet is enclosed on the long plug by lubrication, Carry out continuously subtracting wall extensional in feeding MPM.The waste thickness of pipe wall extreme difference obtained after rolling is controlled into the scope in≤3.0mm It is interior, it is because the hollow forging geometric accuracy that the unit is produced directly influences the geometric accuracy of fished pipe.And When carrying out MPM rolling pipes, as far as possible using the measured mandrel rolling of matter, mandrel lubrication is good.And adjust each frame of tandem rolling tube machine Tension force, it is ensured that each frame rolling force curve of tandem rolling is normal.
[beneficial effect]
The present invention compared with prior art, with following beneficial effect:
- 100 DEG C of ultralow temperature seamless steel pipe physical dimension produced by the invention, inside and outside surface quality fully meets and is better than ASME/ASTM demand of technical standard.Simple production process of the present invention, lumber recovery is high, and cost is low, and production efficiency is high, realize- The localization of 100 DEG C of ultralow temperature seamless steel pipes.
Embodiment
With reference to embodiments of the invention, the invention will be further elaborated.
Embodiment:
The present embodiment purpose is to prepare external diameter for Φ 356mm, external diameter allowable tolerance (- 0.8mm ,+2.4mm), wall thickness 24mm, Length >=6mm, wall thickness allowable tolerance is ± 12.5%, and ovality≤1.5%, -100 DEG C of eccentricity≤3.0mm are ultralow Warm seamless steel pipe.
Technological process is as follows:
Φ 350mmVD continuous casting billets → blank excision → blank heating → perforation → 340mmMPM rolling pipes → hot saw is end to end → cooling → aligning → finishing → size and surface quality inspection → packaging and storage.Wherein, the blank heating is added in annular Blank spacing is placed for 860mm in empty 6 row, stove before and after the heating carried out in hot stove under reducing atmosphere, the blank.And institute It is specifically to include preheating section, bringing-up section and soaking zone to state blank heating.The preheating section is in the bar that temperature is 565~785 DEG C Preheating >=90min under part;The bringing-up section is divided into 1 section of heating, 2 sections of heating, 3 sections of heating, and 1 section of the heating is to be in temperature 40~50min is heated under conditions of 1160~1220 DEG C, 2 sections of the heating is added under conditions of temperature is 1230~1240 DEG C 40~50min, 3 sections of the heating is to heat 40~50min under conditions of temperature is 1255~1265 DEG C;The soaking zone exists Temperature is 110~120min of soaking under conditions of 1250~1260 DEG C.
The perforation is that, according to -100 DEG C of ultralow temperature seamless steel pipes of preparation, the piercing process parameter of selection is as follows:Ingot shape For Φ 350mm, capillary outer diameter be Φ 428mm, entrance guide internal diameter be 370mm, godet width be 304mm, come directly towards it is a diameter of 321mm, top length are 780mm, and a diameter of 320mm of push rod, de- pipe ring internal diameter are 357mm.
The continuous rolling-tube unit pass and size Control of the 340mmMPM rolling pipes are as follows:Specification be Φ 356mm × After 24mm, sawing length be 10~10.3m, outside diameter tolerance (- 0.5 ,+2.4) mm, wall thickness deviation be (- 8~+12.5) %, wall thickness Cross section extreme difference≤2.7mm, design of section of rolling mill are that Φ 382mm, plug are that Φ 334.7mm, winding arbor extraction press pass are Φ 366mm.
The rolling pipe design parameter prepared using the preparation method of the present embodiment is as shown in table 1.
The design parameter for the rolling pipe that the present embodiment preparation method of table 1 is prepared
And the heat treatment performance of the rolling pipe prepared using the preparation method of the present embodiment is as shown in table 2.
The heat treatment performance for the rolling pipe that the present embodiment preparation method of table 2 is prepared
Tube-making process of the invention by studying -100 DEG C of ultralow temperature seamless steel pipes, for service condition and large, medium and small rule Lattice Research on differences tube-rolling technique, it is ensured that the dimensional accuracy of the seamless steel pipe produced meets ASTM/ASME demand of technical standard, opens Geometric accuracy is sent, inside and outside surface quality meets petrochemical industry low-temperature pressure container seamless steel pipe, realizes real state Productionization is studied.
Although reference be made herein to invention has been described for explanatory embodiment of the invention, and above-described embodiment is only this hair Bright preferably embodiment, embodiments of the present invention are simultaneously not restricted to the described embodiments, it should be appreciated that people in the art Member can be designed that a lot of other modification and embodiment, and these modifications and embodiment will fall in principle disclosed in the present application Within scope and spirit.

Claims (4)

1. a kind of production method of -100 DEG C of ultralow temperature seamless steel pipes, its technological process is as follows:
VD continuous casting billets → blank cutting → blank heating → perforation → MPM rolling pipes → hot saw end to end → cooling → aligning → essence Whole → size and surface quality inspection → packaging and storage;
It is characterized in that:
The blank heating is heated in annular furnace, is protected in its annular furnace in not heat supply section temperature≤780 DEG C, the annular furnace Hold reducing atmosphere, time of the blank heating is the blank temperature come out of the stove after 320~360min, and the blank heating For 1235~1255 DEG C;
The perforation needs the hollow billet obtained after control punch straight, and total length external diameter is controlled in 428~432mm;
The MPM rolling pipes are that the plug that temperature is 90~110 DEG C is inserted on the hollow billet of temperature >=1100 DEG C to be rolled System, and need to control milling train muzzle velocity to be 2.8~3.0m/s in the operation of rolling, the retained speed of plug is 2.4~2.5m/s; Waste thickness of pipe wall extreme difference≤3.0mm that the MPM rolling pipes are obtained;During the blank heating, sky 6 before and after the blank ~8 rankings are put, and the spacing of blank and blank is 860mm in annular furnace.
2. the production method of -100 DEG C of ultralow temperature seamless steel pipe according to claim 1, it is characterised in that:The blank adds Heat is divided into preheating section, bringing-up section and soaking zone.
3. the production method of -100 DEG C of ultralow temperature seamless steel pipe according to claim 2, it is characterised in that:The bringing-up section The rate of heat addition be 10~60 DEG C/h, the rate of heat addition of the soaking zone is 5~5.45 DEG C/h.
4. the production method of -100 DEG C of ultralow temperature seamless steel pipe according to claim 2, it is characterised in that:The preheating section It is preheating >=90min under conditions of temperature is 565~785 DEG C;The bringing-up section is divided into 1 section of heating, 2 sections of heating, heating 3 Section, 1 section of the heating is to heat 40~50min under conditions of temperature is 1160~1220 DEG C, and 2 sections of the heating is in temperature Jia 40~50min under conditions of 1230~1240 DEG C, 3 sections of the heating is added under conditions of temperature is 1255~1265 DEG C 40~50min of heat;The soaking zone 110~120min of soaking under conditions of temperature is 1250~1260 DEG C.
CN201510881339.1A 2015-12-03 2015-12-03 A kind of production method of 100 DEG C of ultralow temperature seamless steel pipes Active CN105290145B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510881339.1A CN105290145B (en) 2015-12-03 2015-12-03 A kind of production method of 100 DEG C of ultralow temperature seamless steel pipes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510881339.1A CN105290145B (en) 2015-12-03 2015-12-03 A kind of production method of 100 DEG C of ultralow temperature seamless steel pipes

Publications (2)

Publication Number Publication Date
CN105290145A CN105290145A (en) 2016-02-03
CN105290145B true CN105290145B (en) 2017-08-29

Family

ID=55188345

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510881339.1A Active CN105290145B (en) 2015-12-03 2015-12-03 A kind of production method of 100 DEG C of ultralow temperature seamless steel pipes

Country Status (1)

Country Link
CN (1) CN105290145B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5344062A (en) * 1993-06-24 1994-09-06 The Idod Trust Method of forming seamed metal tube
CN101444793A (en) * 2008-12-19 2009-06-03 攀钢集团成都钢铁有限责任公司 Method for fabricating seamless steel pipes for large-diameter high-pressure gas cylinders used in trailer production
CN102039313A (en) * 2010-11-03 2011-05-04 攀钢集团钢铁钒钛股份有限公司 Method for producing large-diameter seamless steel pipe for gas cylinder
CN102861785A (en) * 2012-09-25 2013-01-09 攀钢集团成都钢钒有限公司 Nuclear power-used low-temperature seamless steel tube and production method therefore
CN104438334A (en) * 2014-09-19 2015-03-25 衡阳华菱钢管有限公司 Medium-caliber 9Ni low-temperature seamless steel tube and production method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5344062A (en) * 1993-06-24 1994-09-06 The Idod Trust Method of forming seamed metal tube
CN101444793A (en) * 2008-12-19 2009-06-03 攀钢集团成都钢铁有限责任公司 Method for fabricating seamless steel pipes for large-diameter high-pressure gas cylinders used in trailer production
CN102039313A (en) * 2010-11-03 2011-05-04 攀钢集团钢铁钒钛股份有限公司 Method for producing large-diameter seamless steel pipe for gas cylinder
CN102861785A (en) * 2012-09-25 2013-01-09 攀钢集团成都钢钒有限公司 Nuclear power-used low-temperature seamless steel tube and production method therefore
CN104438334A (en) * 2014-09-19 2015-03-25 衡阳华菱钢管有限公司 Medium-caliber 9Ni low-temperature seamless steel tube and production method

Also Published As

Publication number Publication date
CN105290145A (en) 2016-02-03

Similar Documents

Publication Publication Date Title
CN101426594B (en) Process for producing stainless-steel pipe
CN103736734B (en) Hot rolling CPE unit prepares the technique of the super 13Cr seamless steel pipe of high-chromium alloy
CN102039313B (en) Method for producing large-diameter seamless steel pipe for gas cylinder
CN103272845B (en) Hot rolling process of small-bore ultra-thin-wall seamless steel tube
CN111589871A (en) Production line and production process of small-caliber thick-wall seamless steel pipe
CN102626723A (en) Method for manufacturing steel pipe for bearing ring
CN102717233A (en) Method for manufacturing 304 precision stainless steel band of precision needle head
CN104259206A (en) Production method of titanium alloy seamless tubes used for tubing coupling
CN104818425A (en) Minor-caliber 9Ni seamless steel pipe for low-temperature service and production method thereof
CN105537315B (en) A kind of production method of liquefied natural gas low temperature seamless steel pipe
CN112024638A (en) Production line and production process of large-diameter high-performance stainless steel seamless pipe
CN105290145B (en) A kind of production method of 100 DEG C of ultralow temperature seamless steel pipes
CN215965531U (en) Cooling device for small-caliber thick-wall steel pipe after rolling
CN105983578A (en) Production process of hot-rolled steel tubes
CN104368623B (en) A kind of production method of large-caliber stainless steel seamless pipe
CN104841720A (en) Method for producing large-caliber and thick-wall Cr15 bushed bearing by using steel ingot
CN102247988B (en) Method for producing gas cylinder pipe with diameter of phi610 to 720 for natural gas underground storage well
CN108380801B (en) Manufacturing process of large pressure vessel tube plate forging
CN106552820A (en) The preparation method of hexagon cored steel
CN105983592A (en) Cold-drawn seamless steel tube production technology
CN103978038B (en) A kind of confession is cold rolling or the production method of the stainless-steel seamless pipe pipe of cold-drawn
CN104357633B (en) Preparation method of 7CrSiMnMoV diameter-expanding die sheet
CN101724793A (en) Process for producing non-quenched and tempered N80 steel grade petroleum pipeline
CN106238465B (en) A kind of preparation method of PH stainless steel seamless steel pipe
CN103343288B (en) Seamless steel tube for winding gas cylinder and manufacturing method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant