CN105281362A - 电力系统消纳风电能力的评估方法 - Google Patents

电力系统消纳风电能力的评估方法 Download PDF

Info

Publication number
CN105281362A
CN105281362A CN201510629543.4A CN201510629543A CN105281362A CN 105281362 A CN105281362 A CN 105281362A CN 201510629543 A CN201510629543 A CN 201510629543A CN 105281362 A CN105281362 A CN 105281362A
Authority
CN
China
Prior art keywords
power
capacity
wind power
power grid
power consumption
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510629543.4A
Other languages
English (en)
Inventor
郝文波
徐冰亮
孙承志
陈晓光
于海洋
曹融
崔佳鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Heilongjiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Heilongjiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Heilongjiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510629543.4A priority Critical patent/CN105281362A/zh
Publication of CN105281362A publication Critical patent/CN105281362A/zh
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/76Power conversion electric or electronic aspects

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Wind Motors (AREA)

Abstract

电力系统消纳风电能力的评估方法,涉及电力系统消纳风电能力的评价技术。它为了解决现有技术中缺少评价电力系统消纳风电能力的评方法,导致无法有效提高风电消纳能力的问题。本发明首先获得相关参数,然后依次计算调峰容量、调峰裕度、风电消纳量、评价指标,最后根据评价指标来确定电力系统消纳风电的能力。本发明综合考虑了电网装机容量、机组类型、负荷水平、联络线负荷调节能力等多个因素,能够对电网的消纳能力进行科学、合理的评价,对比分析影响消纳能力的主要因素,为寻找提高风电消纳能力的相关措施提供依据,有效地提高风电消纳能力,适用于对电力系统消纳风电的能力进行评价。

Description

电力系统消纳风电能力的评估方法
技术领域
本发明涉及电力系统消纳风电能力的评价技术。
背景技术
风力发电经过近十年的快速发展,其装机容量在电网中已经占有相当的比例,尤其在东北和西北地区已经成为主要电源之一。在目前状况下,电网公司采取了多种措施来提高风电消纳能力。尽管如此,我国风能资源丰富地区的风电场大多距离负荷中心较远,并且由于风电出力具有随机性和间歇性的特点,仍然给电网调度和调峰带来巨大的困难,所以考虑系统调峰的各个因素并结合风电自身的特性去分析和评价电力系统对风电消纳的适应性非常重要。通过分析、评价不同区域电力系统消纳风电的能力,寻找提高风电消纳能力的相关措施,为风电的广泛应用提供支撑。
发明内容
本发明的目的是为了解决现有技术中缺少评价电力系统消纳风电能力的评估方法,导致无法有效提高风电消纳能力的问题,提供一种电力系统消纳风电能力的评估方法。
本发明所述的电力系统消纳风电能力的评估方法包括以下步骤:
步骤一、确定以下参数:厂用电率KGen、网损率KLoss、全网总备用容量Presver、全网用电负荷PLoad、联络线功率PTrans、联络线最小保证功率PTransmin、联络线可传输最大功率PTransmax、电网区域内的电源类型数量n、各型电源在相应运行方式下的开机容量Pi、各类型电源的调峰深度Kdepth.i、负荷曲线加联络线最大可变化功率Pf、电网日平均负荷PLave、风电预测出力Pwf、电网的等效装机容量PD、电网的变电容量SBR、电网日平均负荷PLave,i=1,2,……,n;
步骤二、计算调峰容量Ppeakload
P p e a k l o a d = P G N - P G N . min P G N = ( P G . r e a l . max + P r e s e r v e ) P G . r e a l . max = ( P L o a d . max + P T r a n s min ) / [ ( 1 - K L o s s ) ( 1 - K G e n ) ] P G N . min = P G N × ( 1 - K G . a d j u s t ) - - - ( 1 )
步骤三、计算调峰裕度Pm
Pm=Ppeakload-Pload+△PTrans(2)
其中,
△PTrans=PTransmax-PTransmin(3)
步骤四、计算风电消纳量PW
P w - P m P w f &GreaterEqual; P f P w = P W f P w f < P f - - - ( 4 )
步骤五、计算评价指标,所述评价指标包括βP、βS、βL及电网对风电消纳的适应度Ψ,根据Ψ来评价电力系统消纳风电的能力,
&beta; P = P W P D - - - ( 5 )
&beta; S = P W S B R - - - ( 7 )
&beta; L = P W P L a v e - - - ( 9 )
Ψ=a1βP+a2βS+a3βL(10)
其中a1、a2、a3为加权因子。
本发明所述的电力系统消纳风电能力的评估方法,重点围绕电网对风电的消纳能力分析、适应性科学评价两个核心内容来进行,即电网接纳风电能力分析和接纳能力评价。分析部分基于风电场和电网的运行数据,综合考虑电网装机容量、机组类型、负荷水平、联络线负荷调节能力等多个因素,周期性地分析、计算电网对风电的消纳能力。评价部分是通过构建一套评价指标,来对电网的消纳能力进行科学、合理的评价,对比分析影响消纳能力的主要因素,为寻找提高风电消纳能力的相关措施提供依据,有效地提高风电消纳能力。
附图说明
图1为具体实施方式一中的负荷特性曲线和联络线功率最大可变化功率在一天内的变化情况,图中1表示开机容量曲线,2表示日负荷特性曲线和联络线功率最大可变化功率,3表示风电预测曲线,4表示机组最低出力,风电预测曲线对应右侧坐标轴,其它三条曲线对应左侧坐标轴,单位均为万千瓦;
图2为具体实施方式一所述的方法的流程图。
具体实施方式
具体实施方式一:结合图1说明本实施方式,本实施方式所述的电力系统消纳风电能力的评估方法包括以下步骤:
步骤一、确定相关参数;
步骤二、计算调峰容量Ppeakload
P p e a k l o a d = P G N - P G N . min P G N = ( P G . r e a l . max + P r e s e r v e ) P G . r e a l . max = ( P L o a d . max + P T r a n s min ) / &lsqb; ( 1 - K L o s s ) ( 1 - K G e n ) &rsqb; P G N . min = P G N &times; ( 1 - K G . a d j u s t ) - - - ( 1 )
式中:Ppeakload—全网总调峰容量;
PGN—全网发电开机容量;
PGN.min—全网发电开机最低出力;
PG.real.max—全网最大发电负荷;
KGen—厂用电率,一般为8%~10%;
KLoss—网损率;
Presver—全网总备用容量,可采用常规的方法计算得到;
PLoad—全网用电负荷,可通过统计相关数据得到;
PTrans—联络线功率;
KG.adjust—全网发电平均可调出力;
K G . a d j u s t = &Sigma; i = 1 n ( P &times; K d e p t h . i ) / P G N ;
Pi—各类型电源在相应运行方式下的开机容量(常规水电、抽水蓄能、供热煤电、各容量等级常规煤电,n表示区域内的电源类型数量);
Kdepth.i—各类型电源在相应运行方式下的调峰深度;
步骤三、计算调峰裕度Pm
Pm=Ppeakload-Pload+△PTrans(2)
将当日负荷特性曲线和联络线功率最大可变化功率△PTrans引入到电网调峰容量中,可求出系统的调峰裕度。
△PTrans=PTransmax-PTransmin(3)
式中Pm—调峰裕度;
PTransmin—联络线最小保证功率;
PTransmax—联络线可传输最大功率;
步骤四、计算风电消纳量PW
P w - P m P w f &GreaterEqual; P f P w = P W f P w f < P f - - - ( 4 )
式中Pwf—风电预测出力;
PW—风电可消纳容量;
计算风电消纳量需要风电预测出力曲线与风电实际出力曲线。
引入日风电预测出力曲线,预测风电出力在负荷曲线与机组最低出力之间即认为此部分风电可消纳,当预测风电出力超过负荷曲线,即认为此时超出调峰裕度,需要弃风。
步骤五、计算评价指标,所述评价指标包括βP、βS、βL及电网对风电消纳的适应度Ψ,根据Ψ来评价电力系统消纳风电的能力。
定义4个评价指数如下:
βP,基于电网装机的风电消纳适应性评价指数,表征了电网在不同装机规模、不同电源结构下的风电消纳能力;
βS,基于电网规模的风电消纳适应性评价指数,表征了电网在不同输变电规模、不同电能输送能力下的风电消纳能力;
βL,基于电网用电负荷的风电消纳适应性评价指数,表征了电网在不同负荷水平、不同负荷特性下的风电消纳能力;
Ψ,电网对风电消纳适应性的综合评价指数,表征了电网综合考虑装机规模、电网输送规模以及负荷水平后的总体风电消纳能力。
不同电网的装机规模、机组类型存在较大差异,这种差异造成了电网间调峰能力的较大差别,由于调峰能力是电网接纳风电的最主要因素,因此定义基于电网装机的风电消纳适应性评价指数βP,来从装机角度对电网接纳风电能力进行评价,βP按下式计算:
&beta; P = P W P D - - - ( 5 )
式中:PW为系统计算出的电网可接纳风电容量,单位:万千瓦(兆瓦);
PD为电网的等效装机容量,单位:万千瓦(兆瓦);
从电网稳定运行角度考虑,风电接入电网还要受到电网传输能力的制约,不同的电网规模决定了传输能力的差别,进一步也决定了对风电接纳的能力差别,因此定义基于电网规模的风电消纳适应性评价指数βS,来从电网规模的角度评价对风电的接纳能力。βS按下式计算:
&beta; S = P W S B R - - - ( 7 )
式中PW为系统计算出的电网可接纳风电容量,单位:万千瓦(兆瓦);
SBR为电网的变电容量,单位万千伏安(兆伏安)。
负荷水平表征了电网的生产运行能力,也是电网“大小”的一个反映,不同的电网负荷水平也影响到电网对风电的需求、接纳能力不同,因此定义基于电网用电负荷的风电消纳适应性评价指数βL,来从电网用电负荷调度评价对风电的接纳能力。
βL按下式计算:
&beta; L = P W P L a v e - - - ( 9 )
式中PW为系统计算出的电网可接纳风电容量,单位:万千瓦(兆瓦);
PLave为电网日平均负荷,单位:万千瓦(兆瓦),可通过统计相关数据得到。
电网装机规模、用电负荷水平、电网规模是影响电网接纳风电的最主要因素,定义电网对风电消纳适应性的综合评价指数Ψ,从以上三个角度对电网接纳风力进行整体、综合评价。
Ψ按下式计算:
Ψ=a1βP+a2βS+a3βL(10)
式中Ψ为电网对风电消纳的适应度([0,1]之间),a1、a2、a3为加权因子。
计算得到Ψ后,对Ψ进行分析,根据经验将Ψ的取值划分为四个区间,即[ξ1,+∞]、[ξ2,ξ1)、[ξ3,ξ2)和(-∞,ξ3),
(1)当Ψ>ξ1,表明该电网对风电接纳适应性强。
(2)当Ψ落入[ξ2,ξ1)区间,则表明电网对风电接纳适应性较强。
(3)当Ψ落入[ξ3,ξ2)区间,则表明电网对风电接纳适应性较弱。
(4)当Ψ<ξ3,则表明电网对风电接纳适应性弱。
具体实施方式二:本实施方式是对实施方式一所述的电力系统消纳风电能力的评估方法的进一步限定,本实施方式中,步骤一中的电网的等效装机容量PD的获得方法为:
PD=2PC+PS+0.7PQ+0.5PM+0.2PR(6)
式中:PC为电网内抽水蓄能机组装机容量,单位万千瓦(兆瓦);
PS为电网内水电机组装机容量,单位万千瓦(兆瓦);
PQ为电网内燃油(气)机组装机容量,单位万千瓦(兆瓦);
PM为电网内燃煤机组装机容量,单位万千瓦(兆瓦);
PR为电网内供热机组装机容量,单位万千瓦(兆瓦)。
各省电网的装机容量以及机组类型存在差异,机组类型的不同直接导致电网调峰能力的不同,因此定义电网的等效装机容量PD。目前电网的机组类型从调峰角度主要分为:抽水蓄能机组、水电机组、燃油(汽)机组、燃煤机组、供热机组、核电机组、联络线功率以及风电机组。其中电网等效装机容量计算主要考虑各种类型机组的调峰能力,首先风电机组不参加计算,核电机组承担基荷、联络线功率无调峰能力,也不参加计算。剩下的抽水蓄能机组、水电机组、燃油(气)机组、燃煤机组、供热机组参加电网等效装机容量计算。抽水蓄能机组具有高峰时发电,低谷时抽水蓄能的特点,因此调峰深度可达到装机容量的200%;水电机组开机迅速灵活,调峰深度能达到装机容量100%;燃油(气)机组调峰深度可达到装机容量的70%;燃煤机组的调峰深度为装机容量的50%;供热机组调峰深度一般为装机容量的20%。因此电网的等效装机容量PD按公式(6)计算,由于目前电网内抽水蓄能机组装机容量较少,PD基本小于电网内的实际装机容量。计算电网等效装机容量后,即可得到基于电网装机的风电消纳适应性评价指数βP,由于不同类型机组的调峰深度不同,一般计算出来的基于电网装机的风电消纳适应性评价指数βP小于1。
具体实施方式三:本实施方式是对实施方式一所述的电力系统消纳风电能力的评估方法的进一步限定,本实施方式中,SBR主要考虑风电接入电网的变电容量,由于风电场主要在35千伏及以上电压等级接入,所以有下面计算公式:
SBR=S35+S110(66)+S220+S500(330)+S750(8)
式中S35、S110(66)、S220、S500(330)、S750分别为电网35千伏变电容量、110千伏或66千伏变电容量、220千伏变电容量、500千伏或330千伏变电容量、750千伏变电容量。
在计算得到变电容量后,即可求得基于电网规模的风电消纳适应性评价指数βS,通常计算出来的βS小于1。
具体实施方式四:本实施方式是对实施方式一所述的电力系统消纳风电能力的评估方法的进一步限定,本实施方式中,步骤一中加权因子a1、a2及a3采用德尔菲法获得。

Claims (4)

1.电力系统消纳风电能力的评估方法,其特征在于,该方法包括以下步骤:
步骤一、确定以下参数:厂用电率KGen、网损率KLoss、全网总备用容量Presver、全网用电负荷PLoad、联络线功率PTrans、联络线最小保证功率PTransmin、联络线可传输最大功率PTransmax、电网区域内的电源类型数量n、各型电源在相应运行方式下的开机容量Pi、各类型电源的调峰深度Kdepth.i、负荷曲线加联络线最大可变化功率Pf、电网日平均负荷PLave、风电预测出力Pwf、电网的等效装机容量PD、电网的变电容量SBR、电网日平均负荷PLave,i=1,2,……,n;
步骤二、计算调峰容量Ppeakload
{ P p e a k l o a d = P G N - P G N . min P G N = ( P G . r e a l , max + P r e s r v e ) P G . r e a l . max = ( P L o a d . max + P T r a n s min ) / &lsqb; ( 1 - K L o s s ) ( 1 - K G e n ) &rsqb; P G N . min = P G N &times; ( 1 - K G . a d j u s t ) - - - ( 1 )
步骤三、计算调峰裕度Pm
Pm=Ppeakload-Pload+ΔPTrans(2)
其中,
ΔPTrans=PTransmax-PTransmin(3)
步骤四、计算风电消纳量PW
P w = P m P w f &GreaterEqual; P f P w = P W f P w f < P f - - - ( 4 )
步骤五、计算评价指标,所述评价指标包括βP、βS、βL及电网对风电消纳的适应度Ψ,根据Ψ来评价电力系统消纳风电的能力,
&beta; P = P W P D - - - ( 5 )
&beta; S = P W S B R - - - ( 7 )
&beta; L = P W P L a v e - - - ( 9 )
Ψ=a1βP+a2βS+a3βL(10)
其中a1、a2、a3为加权因子。
2.根据权利要求1所述的电力系统消纳风电能力的评估方法,其特征在于,步骤一中的电网的等效装机容量PD的获得方法为:
PD=2PC+PS+0.7PQ+0.5PM+0.2PR(6)
式中:PC为电网内抽水蓄能机组装机容量;
PS为电网内水电机组装机容量;
PQ为电网内燃油或内燃气机组装机容量;
PM为电网内燃煤机组装机容量;
PR为电网内供热机组装机容量。
3.根据权利要求1所述的电力系统消纳风电能力的评估方法,其特征在于,步骤一中的电网的变电容量SBR的获得方法为:
SBR=S35+S110(66)+S220+S500(330)+S750(8)
式中S35、S110(66)、S220、S500(330)、S750分别为电网35千伏变电容量、110千伏或66千伏变电容量、220千伏变电容量、500千伏或330千伏变电容量、750千伏变电容量。
4.根据权利要求1所述的电力系统消纳风电能力的评估方法,其特征在于,步骤一中加权因子a1、a2及a3采用德尔菲法获得。
CN201510629543.4A 2015-09-28 2015-09-28 电力系统消纳风电能力的评估方法 Pending CN105281362A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510629543.4A CN105281362A (zh) 2015-09-28 2015-09-28 电力系统消纳风电能力的评估方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510629543.4A CN105281362A (zh) 2015-09-28 2015-09-28 电力系统消纳风电能力的评估方法

Publications (1)

Publication Number Publication Date
CN105281362A true CN105281362A (zh) 2016-01-27

Family

ID=55149908

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510629543.4A Pending CN105281362A (zh) 2015-09-28 2015-09-28 电力系统消纳风电能力的评估方法

Country Status (1)

Country Link
CN (1) CN105281362A (zh)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105914785A (zh) * 2016-05-12 2016-08-31 中国电力科学研究院 一种提升风电消纳能力的方法
CN105932711A (zh) * 2016-04-26 2016-09-07 国网电力科学研究院 一种风力发电-负荷实时协调消纳弃风的评估测算方法
CN106099991A (zh) * 2016-06-20 2016-11-09 广西电网有限责任公司电力科学研究院 一种电网风电消纳能力评估方法
CN106356897A (zh) * 2016-10-28 2017-01-25 国家电网公司 一种风电接纳能力动态评估方法
CN107017657A (zh) * 2017-03-07 2017-08-04 广西电网有限责任公司电力科学研究院 一种电网中期接纳可再生能源能力的评估方法
CN107609732A (zh) * 2017-07-31 2018-01-19 中国电力科学研究院 一种风电消纳潜力确定方法及系统
CN107730090A (zh) * 2017-09-25 2018-02-23 国网冀北电力有限公司张家口供电公司 一种基于调峰能力与容量约束的新能源接纳能力评估方法
CN109378857A (zh) * 2018-11-01 2019-02-22 国网辽宁省电力有限公司电力科学研究院 一种负荷尖峰时刻风电预测可信度风险计算方法
CN109424858A (zh) * 2017-08-29 2019-03-05 中国石油天然气股份有限公司 一种确定管道调峰能力的方法
CN109560542A (zh) * 2018-11-13 2019-04-02 中国电力科学研究院有限公司 一种应对馈入直流故障的电网综合稳定控制方法
CN109818347A (zh) * 2018-11-30 2019-05-28 华北电力大学 一种电力系统风电消纳能力的评估方法
CN110518633A (zh) * 2019-08-12 2019-11-29 苏州树森信息科技有限公司 考虑线路容量充裕度的电网节点新能源接纳容量获得方法
CN111401756A (zh) * 2020-03-19 2020-07-10 国家电网公司西南分部 一种涉及网、源、荷分析的风光消纳评价方法
CN113541195A (zh) * 2021-07-30 2021-10-22 国家电网公司华中分部 一种未来电力系统中高比例可再生能源的消纳方法
CN114997459A (zh) * 2022-04-02 2022-09-02 中国能源建设集团湖南省电力设计院有限公司 一种新能源消纳限制场景构建及抽水蓄能需求计算方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103219748A (zh) * 2012-01-20 2013-07-24 华北电力科学研究院有限责任公司 一种电网风电消纳能力的确定方法及系统
CN103248048A (zh) * 2013-05-22 2013-08-14 国家电网公司 一种弃风电量预估方法
CN104463378A (zh) * 2014-12-29 2015-03-25 国家电网公司 用于水电资源丰富地区省级电网风力发电消纳能力的算法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103219748A (zh) * 2012-01-20 2013-07-24 华北电力科学研究院有限责任公司 一种电网风电消纳能力的确定方法及系统
CN103248048A (zh) * 2013-05-22 2013-08-14 国家电网公司 一种弃风电量预估方法
CN104463378A (zh) * 2014-12-29 2015-03-25 国家电网公司 用于水电资源丰富地区省级电网风力发电消纳能力的算法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赵雷雷等: "区域电网对风电消纳适应性评价研究", 《黑龙江电力》 *

Cited By (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105932711B (zh) * 2016-04-26 2018-06-29 国网电力科学研究院 一种风力发电-负荷实时协调消纳弃风的评估测算方法
CN105932711A (zh) * 2016-04-26 2016-09-07 国网电力科学研究院 一种风力发电-负荷实时协调消纳弃风的评估测算方法
CN105914785A (zh) * 2016-05-12 2016-08-31 中国电力科学研究院 一种提升风电消纳能力的方法
CN105914785B (zh) * 2016-05-12 2022-04-29 中国电力科学研究院 一种提升风电消纳能力的方法
CN106099991B (zh) * 2016-06-20 2018-06-26 广西电网有限责任公司电力科学研究院 一种电网风电消纳能力评估方法
CN106099991A (zh) * 2016-06-20 2016-11-09 广西电网有限责任公司电力科学研究院 一种电网风电消纳能力评估方法
CN106356897A (zh) * 2016-10-28 2017-01-25 国家电网公司 一种风电接纳能力动态评估方法
CN107017657B (zh) * 2017-03-07 2019-06-04 广西电网有限责任公司电力科学研究院 一种电网中期接纳可再生能源能力的评估方法
CN107017657A (zh) * 2017-03-07 2017-08-04 广西电网有限责任公司电力科学研究院 一种电网中期接纳可再生能源能力的评估方法
CN107609732A (zh) * 2017-07-31 2018-01-19 中国电力科学研究院 一种风电消纳潜力确定方法及系统
CN107609732B (zh) * 2017-07-31 2022-09-02 中国电力科学研究院 一种风电消纳潜力确定方法及系统
CN109424858B (zh) * 2017-08-29 2020-02-14 中国石油天然气股份有限公司 一种确定管道调峰能力的方法
CN109424858A (zh) * 2017-08-29 2019-03-05 中国石油天然气股份有限公司 一种确定管道调峰能力的方法
CN107730090A (zh) * 2017-09-25 2018-02-23 国网冀北电力有限公司张家口供电公司 一种基于调峰能力与容量约束的新能源接纳能力评估方法
CN107730090B (zh) * 2017-09-25 2021-07-13 国网冀北电力有限公司张家口供电公司 一种基于调峰能力与容量约束的新能源接纳能力评估方法
CN109378857A (zh) * 2018-11-01 2019-02-22 国网辽宁省电力有限公司电力科学研究院 一种负荷尖峰时刻风电预测可信度风险计算方法
CN109378857B (zh) * 2018-11-01 2022-03-01 国网辽宁省电力有限公司电力科学研究院 一种负荷尖峰时刻风电预测可信度风险计算方法
CN109560542B (zh) * 2018-11-13 2021-11-02 中国电力科学研究院有限公司 一种应对馈入直流故障的电网综合稳定控制方法
CN109560542A (zh) * 2018-11-13 2019-04-02 中国电力科学研究院有限公司 一种应对馈入直流故障的电网综合稳定控制方法
CN109818347A (zh) * 2018-11-30 2019-05-28 华北电力大学 一种电力系统风电消纳能力的评估方法
CN110518633A (zh) * 2019-08-12 2019-11-29 苏州树森信息科技有限公司 考虑线路容量充裕度的电网节点新能源接纳容量获得方法
CN110518633B (zh) * 2019-08-12 2023-01-13 苏州树森信息科技有限公司 考虑线路容量充裕度的电网节点新能源接纳容量获得方法
CN111401756A (zh) * 2020-03-19 2020-07-10 国家电网公司西南分部 一种涉及网、源、荷分析的风光消纳评价方法
CN111401756B (zh) * 2020-03-19 2023-12-05 国家电网公司西南分部 一种涉及网、源、荷分析的风光消纳评价的方法
CN113541195A (zh) * 2021-07-30 2021-10-22 国家电网公司华中分部 一种未来电力系统中高比例可再生能源的消纳方法
CN113541195B (zh) * 2021-07-30 2022-08-02 国家电网公司华中分部 一种未来电力系统中高比例可再生能源的消纳方法
CN114997459A (zh) * 2022-04-02 2022-09-02 中国能源建设集团湖南省电力设计院有限公司 一种新能源消纳限制场景构建及抽水蓄能需求计算方法

Similar Documents

Publication Publication Date Title
CN105281362A (zh) 电力系统消纳风电能力的评估方法
Lu et al. Probabilistic flexibility evaluation for power system planning considering its association with renewable power curtailment
CN106874630B (zh) 基于电量消纳的区域电网新能源开发潜力评估方法
Borges et al. Small hydro power plants energy availability modeling for generation reliability evaluation
CN103138256A (zh) 一种新能源电力消纳全景分析系统及方法
CN109214655A (zh) 电网建设水平与经济结构及其增速评价指标体系的构建方法
CN103248048B (zh) 一种弃风电量预估方法
CN110264110B (zh) 基于配电网多应用场景的储能电站选址定容方法
CN110112790B (zh) 有源配电网运行效率的评价方法、装置、设备及存储介质
CN104037776A (zh) 随机惯性因子粒子群优化算法的电网无功容量配置方法
CN105279707A (zh) 一种综合考虑负荷与风电时序特性的随机生产模拟方法
CN105656026A (zh) 可再生能源的设备建设资源配置方法和系统
Zhang et al. Mid-long term optimal dispatching method of power system with large-scale wind-photovoltaic-hydro power generation
Wang et al. A novel security stochastic unit commitment for wind-thermal system operation
CN107359611B (zh) 考虑多种随机因素的配电网等值方法
CN110112779B (zh) 基于多状态概率分布的电采暖消纳风电测算模型
Ghaedi et al. Operation Studies of the Power Systems Containing Combined Heat and Power‎ Plants‎
Wen et al. ELCC-based capacity value estimation of combined wind-storage system using IPSO algorithm
CN108694475B (zh) 基于混合模型的短时间尺度光伏电池发电量预测方法
CN113991640A (zh) 基于火电的多能互补能源基地能源配置规划方法
Henke The open source energy model base for the European union (OSEMBE)
CN111342501B (zh) 一种含分布式电源微电网的无功功率控制方法
CN113313351A (zh) 计及多能耦合影响的电-气-热系统灵活性评估方法
Chowdhury et al. Optimal allocation of wind based DG for enhancement of technical, economic and social benefits using jaya algorithm for radial distribution networks
Li et al. Advances in Green Energy Systems and Smart Grid

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160127