CN105279711A - Construction project planning and site selection system and method - Google Patents
Construction project planning and site selection system and method Download PDFInfo
- Publication number
- CN105279711A CN105279711A CN201510297449.3A CN201510297449A CN105279711A CN 105279711 A CN105279711 A CN 105279711A CN 201510297449 A CN201510297449 A CN 201510297449A CN 105279711 A CN105279711 A CN 105279711A
- Authority
- CN
- China
- Prior art keywords
- factor
- construction
- plot
- land
- site selection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 58
- 238000013439 planning Methods 0.000 title claims abstract description 25
- 238000000034 method Methods 0.000 title claims abstract description 16
- 238000002360 preparation method Methods 0.000 claims abstract description 5
- 238000011156 evaluation Methods 0.000 claims description 12
- 238000010187 selection method Methods 0.000 claims description 7
- 238000011161 development Methods 0.000 claims description 6
- 238000004364 calculation method Methods 0.000 claims description 3
- 238000010835 comparative analysis Methods 0.000 claims description 3
- 239000012467 final product Substances 0.000 claims description 3
- 230000001939 inductive effect Effects 0.000 claims description 3
- 239000000203 mixture Substances 0.000 claims description 3
- 238000012216 screening Methods 0.000 claims description 3
- 238000010586 diagram Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 4
- 238000004458 analytical method Methods 0.000 description 3
- 230000007613 environmental effect Effects 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000012141 concentrate Substances 0.000 description 1
- 238000013523 data management Methods 0.000 description 1
- 238000001914 filtration Methods 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 238000002844 melting Methods 0.000 description 1
- 230000008018 melting Effects 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000007619 statistical method Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention relates to a construction project planning and site selection system and method. The system comprises a basic data preparation module, an intented lot roughing module and a lot estimation, comparison and selection module. Various information such as planning and current situations is compared and analyzed, a construction-available land one-map database and a location model factor database are generated, related limiting factors and limiting conditions are set, satisfactory construction-available lots are rapdily filtered according to planning and construction requirements of a construction project, total points of intented lots are collected and calculated, and a site selection report is thus automatically generated. With adoption of the system and the method, all construction can meet town and country planning and planning layouts, land wastage is reduced, and efficiency of planning, site selection and managing work is promoted.
Description
Technical field
The present invention relates to construction project Site Selection system and its implementation
Background technology
Informationization technology is utilized to assist construction project Site Selection spininess to be that decision maker's project site selection provides foundation to planning information figure at present.Bei Lun branch office of Ningbo Planning Bureau started the sharing service platform set up in 2009, incorporate image, emulation map, three-dimensional refined model, E-Government figure, and it is trans-departmental, inter-tradely summarize various data message, get through the obstacle between each system of government department, in this platform, the land use situation of whole Beilun District and the area in concrete plot, character, tenure of use etc., various details can clearly present, the basic geological study that planning department provides and regulatory control data, the expropriation of land red line that land departments provides, the environmental protection thematic data etc. that environmental administration provides all concentrates on platform, plan for land condition is transparent, need not multidisciplinary intervention just can supporting item addressing.In October, 2010, frame model and 524 square kilometres of inner city present situation subtle three-dimensional models of 8494 square kilometres, the whole city were built up in Wuhan, it is the megalopolis of national first three-dimensional model main city zone all standing, on three-dimensional model, in conjunction with functions such as Municipal Underground Piping, terrain slope aspect analysis, analysis is compared to different addresses of planning to build, filter out suitable address, auxiliary construction project Site Selection.Beilun District, Ningbo City " figure " decision service platform, provides the figure melting all kinds of planning information to be that decision maker's project site selection provides foundation, is still in the starting stage, also has a segment distance from intelligent with wisdom; " Digital Wuhan " three-dimensional digital city model, can filter out suitable plot; But the several possibilities that must first identify project, internal analysis model and factor of influence are selected comparatively superficial simultaneously.
Generally speaking, utilize informationization technology means to carry out research and the realization of auxiliary construction project Site Selection at present, and in case few in number, the process of its whole addressing also lack organic integration, fully effectively can not be used, need a large amount of artificial participations.Through the examination of Novelty Search Reference center, Jiangsu Province, have no the report of Correlative plan site selection system.
Summary of the invention
1. goal of the invention
Construction project Site Selection is an important job complicated again, in order to overcome traditional cities city planning site selecting method, to there is efficiency low, workload is large, lack objective data and assist the problems such as science decision, the present invention is in conjunction with the actual Consideration of Site Selection and step, have studied a kind of fast finding purpose plot and the technical method for purpose plot marking evaluating selection, the early-stage Study method system of Innovation Construction project planning addressing, fully effectively utilize large data management statistical analysis technique and Information Technology Methods, realize intelligentized auxiliary programming site selection system, for project site selection provides science to support, realize the high-efficient disposition to town and country land resource and reasonable arrangement.
2. technical scheme
To achieve the above object of the invention, the present invention adopts following technical scheme to realize:
Described construction project Site Selection system, comprising: basic data preparation module, is made up of planning and presence information comparative analysis submodule, available land for construction chart database, site selection model factor data storehouse; Module is roughly selected in purpose plot, sets submodule, can build plot and choose submodule and form by restriction factor and restrictive condition; Plot is evaluated than modeling block, comprises factor of influence and evaluation points sets submodule, analyzes mark submodule and addressing report generation module.
Aforesaid construction project Site Selection system, described available land for construction chart database, mainly contain two parts land used data composition, one is inventory land database, main finger has used the part land used of construction, gets final product the database of the construction land of secondary development; Two is increment land used databases, is transferred to the land database of construction land supply by farmland.
Described construction project Site Selection method, comprises the following steps: basic data prepares, and is analyzed planning and presence information, and finding out in city can the plot of development & construction, and according to planned land use qualitative classification, sets up available land for construction chart database; Select the factor that all kinds of Location Selection of Construction Project is relevant, carry out information source and computing method that inducing classification finds out each factor, set up site selection model factor data storehouse; Purpose plot is roughly selected, and the restriction factor that setting is relevant and restrictive condition, choose the plot built satisfied condition; Plot is evaluated than choosing, for the purpose plot of roughly selecting out, according to the good and bad influence factor of construction project planning construction, set each factor of influence and evaluation points, significance level according to each factor of influence and evaluation points arranges weight, gathers the total score in calculating purpose plot, automatically generates addressing report.
Aforesaid construction project Site Selection method, described restriction factor and restrictive condition, refer to that, in the process of screening addressing plot, the restrictive factor that target plot must meet, as long as there is a limiting factor not meet, just gets rid of outside target plot.
Aforesaid construction project Site Selection method, described factor of influence and evaluation points calculate factor according to the height of target plot condition and factor requirements degree of conformity, for analyzing scoring, evaluates the quality in selected plot.
3. beneficial effect
Construction project Site Selection method and the Site Selection system realized based on the method, can be all kinds of facility custom-made by size construction lands, every construction is enable to meet urban and rural planning layout, reduce land wastage, improve the intensivism that land used utilizes, good economic benefit, social benefit and environmental benefit that each construction project is got, colleague can promote the usefulness of Site Selection management work greatly.
Accompanying drawing explanation
Fig. 1 construction project Site Selection system diagram;
Fig. 2 process flow diagram;
Fig. 3 pacing items setting example;
The restricted selecting predictors of Fig. 4 and condition set example;
Fig. 5 affects sex factor and selects example;
Fig. 6 filters out the plot example met the demands;
Fig. 7 target plot score example;
Fig. 8 addressing result evaluates sample report than choosing.
Embodiment
Below in conjunction with accompanying drawing and embodiment, technical scheme of the present invention is described in further detail:
Figure 1 shows that construction project Site Selection system diagram of the present invention.Comprise basic data preparation module, module is roughly selected in purpose plot and plot is evaluated than modeling block.
Figure 2 shows that process flow diagram of the present invention.Basic data preparation module is by planning and presence information comparative analysis submodule, available land for construction chart database, site selection model factor data storehouse forms, input planning information and reading presence information, planning and presence information are analyzed, finding out in city can the plot of development & construction, and according to planned land use qualitative classification, set up available land for construction chart database, available land for construction chart database, mainly contain two parts land used data composition, one is inventory land database, main finger has used the part land used of construction, get final product the database of the construction land of secondary development, two is increment land used databases, is transferred to the land database of construction land supply by farmland, the factor that all kinds of Location Selection of Construction Project is relevant can also be selected, carry out information source and computing method that inducing classification finds out each factor, set up site selection model factor data storehouse.Module is roughly selected in purpose plot, set submodule by restriction factor and restrictive condition, plot can be built choose submodule and form, the restriction factor that setting is relevant and restrictive condition, choose the plot built satisfied condition, restriction factor and restrictive condition, refer in the process of screening addressing plot, the restrictive factor that target plot must meet, as long as there is a limiting factor not meet, just get rid of outside target plot, be illustrated in figure 3 pacing items setting example, Figure 4 shows that restricted selecting predictors and condition set example.Plot is evaluated than modeling block, comprise factor of influence and evaluation points sets submodule, analyze scoring submodule and addressing report generation module, for the purpose plot of roughly selecting out, according to the good and bad influence factor of construction project planning construction, set each factor of influence and evaluation points, significance level according to each factor of influence and evaluation points arranges weight, gather the total score in calculating purpose plot, automatic generation addressing report, Figure 6 shows that the plot example filtering out and meet the demands, Figure 7 shows that target plot score example, Figure 8 shows that addressing result evaluates sample report than choosing.Above-mentioned factor of influence and evaluation points calculate factor according to the height of target plot condition and factor requirements degree of conformity, for analyzing scoring, evaluates the quality in selected plot, Figure 5 shows that affecting sex factor selects example.
In addition to the implementation, the present invention can also have other embodiments.All employings are equal to the technical scheme of replacement or equivalent transformation formation, all drop on the protection domain of application claims.
Claims (5)
1. construction project Site Selection system, is characterized in that comprising:
Basic data preparation module, is made up of planning and presence information comparative analysis submodule, available land for construction chart database, site selection model factor data storehouse;
Module is roughly selected in purpose plot, sets submodule, can build plot and choose submodule and form by restriction factor and restrictive condition;
Plot is evaluated than modeling block, comprises factor of influence and evaluation points sets submodule, analyzes mark submodule and addressing report generation module.
2. construction project Site Selection system according to claim 1, it is characterized in that described available land for construction chart database, mainly contain two parts land used data composition, one is inventory land database, main finger has used the part land used of construction, gets final product the database of the construction land of secondary development; Two is increment land used databases, is transferred to the land database of construction land supply by farmland.
3. construction project Site Selection method, is characterized in that comprising the following steps:
Basic data prepares, and is analyzed planning and presence information, and finding out in city can the plot of development & construction, and according to planned land use qualitative classification, sets up available land for construction chart database; Select the factor that all kinds of Location Selection of Construction Project is relevant, carry out information source and computing method that inducing classification finds out each factor, set up site selection model factor data storehouse;
Purpose plot is roughly selected, and the restriction factor that setting is relevant and restrictive condition, choose the plot built satisfied condition;
Plot is evaluated than choosing, for the purpose plot of roughly selecting out, according to the good and bad influence factor of construction project planning construction, set each factor of influence and evaluation points, significance level according to each factor of influence and evaluation points arranges weight, gathers the total score in calculating purpose plot, automatically generates addressing report.
4. construction project Site Selection method according to claim 3, it is characterized in that described restriction factor and restrictive condition, refer in the process of screening addressing plot, the restrictive factor that target plot must meet, as long as there is a limiting factor not meet, just get rid of outside target plot.
5. construction project Site Selection method according to claim 3, is characterized in that described factor of influence and evaluation points, is to calculate factor according to the height of target plot condition and factor requirements degree of conformity, for analyzing scoring, evaluates the quality in selected plot.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510297449.3A CN105279711A (en) | 2015-05-29 | 2015-05-29 | Construction project planning and site selection system and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510297449.3A CN105279711A (en) | 2015-05-29 | 2015-05-29 | Construction project planning and site selection system and method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105279711A true CN105279711A (en) | 2016-01-27 |
Family
ID=55148665
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510297449.3A Pending CN105279711A (en) | 2015-05-29 | 2015-05-29 | Construction project planning and site selection system and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105279711A (en) |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106548290A (en) * | 2016-11-08 | 2017-03-29 | 北京信余科技有限公司 | A kind of urban area development decision-making supports system and method |
CN106600134A (en) * | 2016-12-08 | 2017-04-26 | 中冶京诚工程技术有限公司 | Line selection analysis method for urban comprehensive pipe gallery planning system |
CN107563624A (en) * | 2017-08-22 | 2018-01-09 | 广州市城市规划勘测设计研究院 | Location Selection of Construction Project method, apparatus and system based on " three rule unifications " |
CN107909245A (en) * | 2017-10-24 | 2018-04-13 | 星际空间(天津)科技发展有限公司 | A kind of production method of inventory land |
CN108629521A (en) * | 2018-05-10 | 2018-10-09 | 四川省冶地工程勘察设计有限公司 | A kind of mapping Planning preparation system for building system suitable for rustic home |
CN109118088A (en) * | 2018-08-15 | 2019-01-01 | 杨超 | A kind of construction management method and system based on wisdom building site |
CN110069589A (en) * | 2019-03-26 | 2019-07-30 | 江苏智途科技股份有限公司 | A kind of industrial space planning and distributing method based on more rule unifications |
CN110598921A (en) * | 2019-08-30 | 2019-12-20 | 泰华智慧产业集团股份有限公司 | Shortest path algorithm-based building project auxiliary site selection method and system |
CN112700045A (en) * | 2020-12-31 | 2021-04-23 | 武汉市土地利用和城市空间规划研究中心 | Intelligent site selection system based on land reserve implementation monitoring model |
CN114219350A (en) * | 2021-12-27 | 2022-03-22 | 山东光庭信息技术有限公司 | Intelligent site selection method and device for natural resource construction project |
CN116777168A (en) * | 2023-06-29 | 2023-09-19 | 浙江万维空间信息技术有限公司 | Intelligent land recommendation method for optimally utilizing space |
CN118627937A (en) * | 2024-08-09 | 2024-09-10 | 广州城市信息研究所有限公司 | Intelligent site selection method and system based on domain knowledge graph and electronic equipment |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101561903A (en) * | 2009-06-02 | 2009-10-21 | 天津大学 | Fully automatic substation locating and sizing method considering geographic information |
CN101604419A (en) * | 2009-07-16 | 2009-12-16 | 浙江大学 | A kind of construction project is intended the method that addressing is extracted automatically |
CN101950386A (en) * | 2010-09-13 | 2011-01-19 | 天津市星际空间地理信息工程有限公司 | Quick site selection method for construction projects |
CN102254282A (en) * | 2011-07-22 | 2011-11-23 | 江苏欧索软件有限公司 | System for planning, addressing and optimizing value of entity channel |
US20120179498A1 (en) * | 2011-01-07 | 2012-07-12 | Cruisewise, Inc. | Application of spatial dimension to cruise search and cabin selection |
CN103150412A (en) * | 2011-12-06 | 2013-06-12 | 泰瑞数创科技(北京)有限公司 | Method for address selecting of power facilities based on space data mining technique |
CN103337035A (en) * | 2013-03-19 | 2013-10-02 | 东南大学 | Method for determining site selection of urban center system based on quantitative evaluation |
CN104091215A (en) * | 2014-07-22 | 2014-10-08 | 上海建科工程咨询有限公司 | Project planning management system based on building information model |
-
2015
- 2015-05-29 CN CN201510297449.3A patent/CN105279711A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101561903A (en) * | 2009-06-02 | 2009-10-21 | 天津大学 | Fully automatic substation locating and sizing method considering geographic information |
CN101604419A (en) * | 2009-07-16 | 2009-12-16 | 浙江大学 | A kind of construction project is intended the method that addressing is extracted automatically |
CN101950386A (en) * | 2010-09-13 | 2011-01-19 | 天津市星际空间地理信息工程有限公司 | Quick site selection method for construction projects |
US20120179498A1 (en) * | 2011-01-07 | 2012-07-12 | Cruisewise, Inc. | Application of spatial dimension to cruise search and cabin selection |
CN102254282A (en) * | 2011-07-22 | 2011-11-23 | 江苏欧索软件有限公司 | System for planning, addressing and optimizing value of entity channel |
CN103150412A (en) * | 2011-12-06 | 2013-06-12 | 泰瑞数创科技(北京)有限公司 | Method for address selecting of power facilities based on space data mining technique |
CN103337035A (en) * | 2013-03-19 | 2013-10-02 | 东南大学 | Method for determining site selection of urban center system based on quantitative evaluation |
CN104091215A (en) * | 2014-07-22 | 2014-10-08 | 上海建科工程咨询有限公司 | Project planning management system based on building information model |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106548290A (en) * | 2016-11-08 | 2017-03-29 | 北京信余科技有限公司 | A kind of urban area development decision-making supports system and method |
CN106600134A (en) * | 2016-12-08 | 2017-04-26 | 中冶京诚工程技术有限公司 | Line selection analysis method for urban comprehensive pipe gallery planning system |
CN107563624A (en) * | 2017-08-22 | 2018-01-09 | 广州市城市规划勘测设计研究院 | Location Selection of Construction Project method, apparatus and system based on " three rule unifications " |
CN107909245B (en) * | 2017-10-24 | 2021-11-26 | 星际空间(天津)科技发展有限公司 | Method for manufacturing land used for storage |
CN107909245A (en) * | 2017-10-24 | 2018-04-13 | 星际空间(天津)科技发展有限公司 | A kind of production method of inventory land |
CN108629521A (en) * | 2018-05-10 | 2018-10-09 | 四川省冶地工程勘察设计有限公司 | A kind of mapping Planning preparation system for building system suitable for rustic home |
CN109118088A (en) * | 2018-08-15 | 2019-01-01 | 杨超 | A kind of construction management method and system based on wisdom building site |
CN110069589A (en) * | 2019-03-26 | 2019-07-30 | 江苏智途科技股份有限公司 | A kind of industrial space planning and distributing method based on more rule unifications |
CN110598921A (en) * | 2019-08-30 | 2019-12-20 | 泰华智慧产业集团股份有限公司 | Shortest path algorithm-based building project auxiliary site selection method and system |
CN112700045A (en) * | 2020-12-31 | 2021-04-23 | 武汉市土地利用和城市空间规划研究中心 | Intelligent site selection system based on land reserve implementation monitoring model |
CN112700045B (en) * | 2020-12-31 | 2022-05-13 | 武汉市土地利用和城市空间规划研究中心 | Intelligent site selection system based on land reserve implementation monitoring model |
CN114219350A (en) * | 2021-12-27 | 2022-03-22 | 山东光庭信息技术有限公司 | Intelligent site selection method and device for natural resource construction project |
CN116777168A (en) * | 2023-06-29 | 2023-09-19 | 浙江万维空间信息技术有限公司 | Intelligent land recommendation method for optimally utilizing space |
CN118627937A (en) * | 2024-08-09 | 2024-09-10 | 广州城市信息研究所有限公司 | Intelligent site selection method and system based on domain knowledge graph and electronic equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105279711A (en) | Construction project planning and site selection system and method | |
Wu et al. | Economic transition, spatial development and urban land use efficiency in the Yangtze River Delta, China | |
CN111222661B (en) | Urban planning implementation effect analysis and evaluation method | |
Sánchez-Lozano et al. | GIS-based photovoltaic solar farms site selection using ELECTRE-TRI: Evaluating the case for Torre Pacheco, Murcia, Southeast of Spain | |
CN105574259B (en) | A kind of Urban cognition ground drawing generating method based on internet word frequency | |
Swanwick | The assessment of countryside and landscape character in England: an overview | |
CN104200387B (en) | A kind of land use zoning method for taking geographical entity semantic similarity into account | |
Zhang et al. | Determination of priority nature conservation areas and human disturbances in the Yangtze River Basin, China | |
Agugiaro | First steps towards an integrated CityGML-based 3D model of Vienna | |
CN110298520A (en) | A kind of farmland construction difficulty determines method | |
He et al. | What is the developmental level of outlying expansion patches? A study of 275 Chinese cities using geographical big data | |
CN105760633A (en) | Green architectural design method applicable to information assistance | |
Giannopoulou et al. | Using GIS to record and analyse historical urban areas | |
CN114219350A (en) | Intelligent site selection method and device for natural resource construction project | |
CN115239281A (en) | BIM + GIS-based road migration management system, method and storage medium | |
CN113536492B (en) | Green channel network construction method, device and storage medium | |
Wang et al. | The impact of LUCC on the spatial pattern of ecological network during urbanization: A case study of Jinan City | |
Kirnbauer et al. | Allocating Urban Agricultural Reuse Strategies to Inventoried Vacant and Underutilized Land. | |
Sabri et al. | An innovative tool for optimised development envelope control (dec) analysis and scenario building in digital twin | |
Fan et al. | Analysis and Reconstruction Method of Spatial Characteristics of Traditional Chinese Villages Based on Parameterization | |
Wang | Spatial analysis of the Great Wall Ji Town military settlements in the Ming Dynasty: Research and conservation | |
CN106326613A (en) | Economic floor area ratio calculation method and system based on land economic mathematical model | |
De Lotto et al. | Planning support tool for rural architectural intensification | |
Wang | Check for updates Design and Analysis of Geotechnical Engineering Survey Integrated System Based on GIS | |
Haase et al. | Ecosystem services in urban landscapes: practical applications and governance implications–the URBES approach |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160127 |