CN105279633A - Automatic material supply-demand matching device and method - Google Patents

Automatic material supply-demand matching device and method Download PDF

Info

Publication number
CN105279633A
CN105279633A CN201510858535.7A CN201510858535A CN105279633A CN 105279633 A CN105279633 A CN 105279633A CN 201510858535 A CN201510858535 A CN 201510858535A CN 105279633 A CN105279633 A CN 105279633A
Authority
CN
China
Prior art keywords
demand
supply
dismounting
information
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510858535.7A
Other languages
Chinese (zh)
Inventor
宋鹏
罗涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yonyou Network Technology Co Ltd
Original Assignee
Yonyou Network Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yonyou Network Technology Co Ltd filed Critical Yonyou Network Technology Co Ltd
Priority to CN201510858535.7A priority Critical patent/CN105279633A/en
Publication of CN105279633A publication Critical patent/CN105279633A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses an automatic material supply-demand matching device and method. The automatic material supply-demand matching device comprises a supply-demand matching module and a configuration module, wherein the configuration module is used to configure material package/unpackage rules, and the supply-demand matching module is used to analyze demand information obtained, get the material package/unpackage rules configured by the configuration module, and package/ unpackage materials. Supply and demand are automatically matched based on material configuration, thereby preventing business process interruption which may be caused due to supply-demand mismatching and guaranteeing the process integrity. By means of automatic processing, the business processing efficiency is enhanced and the experience is improved. According to the technical scheme of the invention, business processing and supply-demand matching belong to the same business, and demanded materials are locked, thereby preventing interference of concurrency to supply-demand matching in the prior art.

Description

The apparatus and method of the automatic supply-demand mode of material
Technical field
The present invention relates to ERP field, particularly, relate to the apparatus and method of the automatic supply-demand mode of a kind of material.
Background technology
In ERP system, the management (supply) of material is usually based on the packing unit of material, and the business (demand) of enterprise is again usually based on the service unit of material; In practical business, can occur that the packing unit of material and service unit are different situations frequently.In such a mode, just need to solve management (supply) unit of material and business (demand) unit inconsistent time supply-demand mode problem.
At present, a solution is: when there is the unmatched problem of above-mentioned supply and demand in business, flow process of suspending operation, by manual operations, tears/dress up the material managed under (packaging) unit open material under service unit.When tearing open/fill, based on the relation managing (supply) unit and business (demand) unit, number of computations.Complete by hand after tearing open/filling, then re-start business operation.
Following limitation is there is in this solution:
1, when supply and demand is not mated, need to suspend original operation flow, destroy the integrality of business;
2, manual operations is needed, cannot supply-demand mode automatically, service efficiency is low, complex operation;
3, manual dismounting and business operation cannot appear in affairs, in high concurrent system, there will be the material after tearing (dress) open and are used, the problem that own service still cannot mate.
Summary of the invention
The object of the invention is to, for the problems referred to above, propose the apparatus and method of the automatic supply-demand mode of a kind of material, to realize the advantage of material supply and demand efficiency.
For achieving the above object, the technical solution used in the present invention is:
A device for the automatic supply-demand mode of material, comprises supply-demand mode module and configuration module;
Described configuration module: configuration material dismounting rule;
Described supply-demand mode module: resolve the demand information obtained, and the material dismounting rule obtaining configuration module configuration, carry out dismounting to material.
Preferably, described supply-demand mode module comprises, demand resolution unit, lock unit, supply acquiring unit, dismounting unit, updating block and matching unit;
Described demand resolution unit: the legitimacy being responsible for the demand information that verification obtains, resolves to the material dimension of standard by demand information according to the input format set, obtain the demand information after resolving;
Described lock unit: exclusive lock is added to the demand information after above-mentioned parsing;
Described supply acquiring unit: carry out alternately with database, material supply information is obtained the material supply tables of data of preserving in database according to the demand information after above-mentioned interpolation exclusive lock, if the material supply in material supply tables of data is enough to coupling demand, directly matching result is returned; If the material supply in material supply tables of data is not enough to coupling demand, the dismounting rule of demand material is then obtained from configuration module, according to the material dimension in this rule and demand information, from material supply tables of data, obtain the material supply information of corresponding dimension, be supplied to dismounting unit and use;
Described dismounting unit: the regular material supply information obtained supply acquiring unit of the dismounting according to material is disassembled according to demand information or assembles, and obtains the information provision after dismounting;
Described updating block: the result of dismounting unit is updated in database;
Described matching unit: mate with the information provision after dismounting for demand information, by the formatted output of the result of coupling according to agreement.
Preferably, the demand information that described demand resolution unit obtains is that business module provides; The result that then matching unit exports returns to business module;
And if the material supply in above-mentioned material supply tables of data is enough to coupling demand, directly matching result is returned business module.
Preferably, the result of described matching unit coupling is according in the formatted output of arranging, and the form of agreement is XML.
Preferably, described lock unit adds exclusive lock, and according to the dimension of the material obtained for demand resolution unit, the material added after exclusive lock no longer allows other threads to operate, until this operation terminates, till exclusive lock being discharged.
Technical solution of the present invention discloses the method for the automatic supply-demand mode of a kind of material simultaneously, comprises,
The step of configuration material dismounting rule;
Resolve the demand information obtained, and the material dismounting rule obtained, material is carried out to the step of dismounting.
Preferably, the demand information of above-mentioned acquisition provides for business module.
Preferably, described demand information of resolving acquisition, and the material dismounting rule obtained, the step of material being carried out to dismounting specifically comprises:
Verify the legitimacy of the demand information obtained from business module, according to the input format set, demand information is resolved to the material dimension of standard, obtain the step of the demand information after resolving;
Demand information after above-mentioned parsing is added to the step of exclusive lock;
Carry out alternately with database, material supply information is obtained the material supply tables of data of preserving in database according to the demand information after above-mentioned interpolation exclusive lock, if the material supply in material supply tables of data is enough to coupling demand, directly matching result is returned business module; If the material supply in material supply tables of data is not enough to coupling demand, then obtains the dismounting rule of demand material, according to the material dimension in this rule and demand information, from material supply tables of data, obtain the step of the material supply information of corresponding dimension;
According to the dismounting rule of material the material supply information obtained disassembled according to demand information or assemble, obtaining the step of the information provision after dismounting;
Information provision after dismounting is updated to the step in database;
Mate with the information provision after dismounting for demand information, the result of coupling is returned to the step of business module according to the form of agreement.
Preferably, mate with the information provision after dismounting for demand information, return in the step of business module by the result of coupling according to the form of agreement, the form of agreement is XML.
Preferably, add the demand information after above-mentioned parsing in the step of exclusive lock and add exclusive lock, according to the dimension of the material obtained for demand resolution unit, the material added after exclusive lock no longer allows other threads to operate, until this operation terminates, till exclusive lock is discharged.
Technical scheme of the present invention has following beneficial effect:
Technical scheme of the present invention, based on the configuration Auto-matching supply and demand of material, can avoid supply and demand by automatic supply-demand mode and does not mate the operation flow interruption caused, ensure that the integrality of flow process; By automatic business processing, improve the treatment effeciency of business, promote and experience; Business processing and supply-demand mode are put in same affairs by technical solution of the present invention, by locking for demand material, avoid the concurrent interference to supply-demand mode in prior art.
Below by drawings and Examples, technical scheme of the present invention is described in further detail.
Accompanying drawing explanation
Fig. 1 is the theory diagram of the device of the automatic supply-demand mode of the material described in the embodiment of the present invention;
Fig. 2 is the theory diagram of the supply-demand mode module described in the embodiment of the present invention;
Fig. 3 is the process flow diagram of the method for the automatic supply-demand mode of the material described in the embodiment of the present invention.
Embodiment
Below in conjunction with accompanying drawing, the preferred embodiments of the present invention are described, should be appreciated that preferred embodiment described herein is only for instruction and explanation of the present invention, is not intended to limit the present invention.
As shown in Figure 1, the device of the automatic supply-demand mode of a kind of material, comprises supply-demand mode module and configuration module;
Configuration module: configuration material dismounting rule;
Supply-demand mode module: resolve the demand information obtained, and the material dismounting rule obtaining configuration module configuration, carry out dismounting to material.
As shown in Figure 2, supply-demand mode module comprises, demand resolution unit, lock unit, supply acquiring unit, dismounting unit, updating block and matching unit;
Demand resolution unit: the legitimacy being responsible for the demand information that verification obtains, resolves to the material dimension of standard by demand information according to the input format set, obtain the demand information after resolving;
Lock unit: exclusive lock is added to the demand information after above-mentioned parsing;
Supply acquiring unit: carry out alternately with database, material supply information is obtained the material supply tables of data of preserving in database according to the demand information after above-mentioned interpolation exclusive lock, if the material supply in material supply tables of data is enough to coupling demand, directly matching result is returned; If the material supply in material supply tables of data is not enough to coupling demand, the dismounting rule of demand material is then obtained from configuration module, according to the material dimension in this rule and demand information, from material supply tables of data, obtain the material supply information of corresponding dimension, be supplied to dismounting unit and use;
Dismounting unit: the regular material supply information obtained supply acquiring unit of the dismounting according to material is disassembled according to demand information or assembles, and obtains the information provision after dismounting;
Updating block: the result of dismounting unit is updated in database;
Matching unit: mate with the information provision after dismounting for demand information, by the formatted output of the result of coupling according to agreement.
Wherein, the demand information that demand resolution unit obtains is that business module provides; The result that then matching unit exports returns to business module;
And if the material supply in above-mentioned material supply tables of data is enough to coupling demand, directly matching result is returned business module.
Preferably, the result of matching unit coupling is according in the formatted output of arranging, and the form of agreement is XML.
Preferably, lock unit adds exclusive lock, and according to the dimension of the material obtained for demand resolution unit, the material added after exclusive lock no longer allows other threads to operate, until this operation terminates, till exclusive lock being discharged.
Technical solution of the present invention discloses the method for the automatic supply-demand mode of a kind of material simultaneously, comprises,
The step of configuration material dismounting rule;
Resolve the demand information obtained, and the material dismounting rule obtained, material is carried out to the step of dismounting.
Preferably, the demand information of above-mentioned acquisition provides for business module.
Preferably, resolve the demand information obtained, and the material dismounting rule obtained, the step of material being carried out to dismounting specifically comprises:
Verify the legitimacy of the demand information obtained from business module, according to the input format set, demand information is resolved to the material dimension of standard, obtain the step of the demand information after resolving;
Demand information after above-mentioned parsing is added to the step of exclusive lock;
Carry out alternately with database, material supply information is obtained the material supply tables of data of preserving in database according to the demand information after above-mentioned interpolation exclusive lock, if the material supply in material supply tables of data is enough to coupling demand, directly matching result is returned business module; If the material supply in material supply tables of data is not enough to coupling demand, then obtains the dismounting rule of demand material, according to the material dimension in this rule and demand information, from material supply tables of data, obtain the step of the material supply information of corresponding dimension;
According to the dismounting rule of material the material supply information obtained disassembled according to demand information or assemble, obtaining the step of the information provision after dismounting;
Information provision after dismounting is updated to the step in database;
Mate with the information provision after dismounting for demand information, the result of coupling is returned to the step of business module according to the form of agreement.
Preferably, mate with the information provision after dismounting for demand information, return in the step of business module by the result of coupling according to the form of agreement, the form of agreement is XML.
Preferably, add the demand information after above-mentioned parsing in the step of exclusive lock and add exclusive lock, according to the dimension of the material obtained for demand resolution unit, the material added after exclusive lock no longer allows other threads to operate, until this operation terminates, till exclusive lock is discharged.
This device provides the input format of agreement to business module, and business module is supplied to this device by this form demand information; This device resolves the demand information obtained, and obtains the configuration information of information provision and dismounting, carry out dismounting, obtain matching result, and matching result is returned to business module by certain form from database.This device adds lock unit, locks for demand information, thus gets rid of the concurrent interference to supply-demand mode in high concurrent system.
This device comprises following two modules:
1, configuration module:
This module is used for, for the rule of material configuration dismounting, being stored in database.Supply-demand mode module obtains the foundation (as material A can by unit " case " be disassembled as unit " box ", or material " A " can by unit " box " be assembled into unit " case ") of dismounting rule as supply-demand mode from the tables of data of configuration module.Its data structure can be as shown in table 1:
Material Unit Disassemble unit With disassemble unit conversion relation Assembly unit With assembly unit conversion relation Assembly unit
A Case Box 100 Bag 1/10 Bag
Table 1, configuration module data structure.
The configuration information that table 1 is illustrated represents, material A can disassemble into unit " box " by unit " case ", and it is 100 boxes that every case can be disassembled; Unit " bag " can be reassembled into by unit " case ", 1 bag (being assembled into 1/10 bag for 1 case) can be assembled into for 10 casees.
For convenience of describing, the unit that in the present embodiment, configuration module employs material illustrates as signal, but dismounting of the present invention rule is not limited to the unit of material, also can be goods yard, warehouse, batch etc. other dimensions, or the combination of these dimensions, or the formula of complexity.
2, supply-demand mode module:
This module in charge resolves demand information, obtains information provision and dismounting rule, carries out dismounting, obtain matching result and return to business module for the information obtained to material.Be illustrated in fig. 2 shown below
This module comprises following 6 unit:
1) demand resolution unit.Generally, the supply-demand mode of material need consider material, warehouse, goods yard, specification, model, batch etc. dimension.This unit is responsible for the legitimacy verifying the demand information that business module provides, and according to the input format of arranging, demand information is resolved to the material dimension of standard, for other follow-up unit provide foundation.
2) lock unit.This unit carries out adding exclusive lock for demand information, to get rid of the concurrent interference to supply-demand mode; The foundation locked is the dimension of the material that demand resolution unit obtains, and the material after locking no longer allows other threads to operate, until this operation terminates, till being discharged by lock.
3) acquiring unit is supplied.This unit needs to carry out alternately with database, is responsible for from material supply tables of data, obtaining material supply information according to demand information, if supply is enough to coupling demand, directly matching result is returned to business module; If under-supply to mate demand, this unit continues the supply-demand mode rule obtaining demand material from configuration module, according to the material dimension in this rule and demand information, from material supply tables of data, obtain the material supply information of corresponding dimension, be supplied to dismounting unit and use.
4) dismounting unit.This unit is responsible for the regular material supply information obtained supply acquiring unit of foundation supply-demand mode and is disassembled according to demand information or assemble.
5) updating block.This unit is responsible for the result of dismounting unit to be updated in database;
6) (coupling) unit is calculated.This unit mates with the information provision after dismounting for demand information, and the result of coupling is turned back to business module according to the form (as XML) of agreement.
The data citing of this plant running process is as shown in table 1, table 2, table 3, table 4 and table 5.
Material Warehouse Unit Quantity
A W Box 15
Table 2, demand information data structure.
Material Warehouse Unit Quantity
A W Box 1
A W Case 2
Table 3, original information provision data structure.
Material Warehouse Unit Quantity
A W Box 101
A W Case 1
Information provision data structure after table 4, dismounting.
Material Warehouse Unit Quantity
A W Box 86
A W Case 1
Information provision data structure in database after table 5, coupling.
The operational scheme of this device is as shown in Figure 3:
1. resolve the demand information of material: the pattern demand information of material being resolved to dimension+demand;
2. the demand information for material locks: the dimension of material for the dimension of material, can be assembled into a character string, serially add exclusive lock for this character by a kind of Lock mode;
3. carry out confession/need coupling: before dismounting, first will carry out a supply-demand mode, if supply can adaption demand, do not needed to carry out dismounting again, directly return the result of coupling;
4. from material allocation list, obtain the dismounting rule of material: if the 3rd step coupling is unsuccessful, need to carry out dismounting.First from dismounting allocation list, obtain the dismounting configuration information of demand material;
5. from tables of data, obtain the information provision of material: the dimension arranged in the dimension of information and dismounting rule according to demand, reorganizes the condition obtaining information provision, according to this condition, obtain material supply information from database;
6. follow according to supply/needing information and dismounting relation to carry out dismounting calculating to material: the conversion relation of foundation dismounting and demand get the quantity of the supply material needed for dismounting, carry out dismounting calculating for this quantity and conversion relation;
7. the information updating after dismounting is in tables of data: be updated in material supply information table by the dismounting result produced in step 6;
8. re-start supply-demand mode: again carry out supply-demand mode for the result after dismounting;
9. return and more need matching result (success or failure).
Through the above description of the embodiments, those skilled in the art can be well understood to the mode that the present invention can add required general hardware platform by software and realize, and can certainly pass through hardware, but in a lot of situation, the former is better embodiment.Based on such understanding, technical scheme of the present invention can embody with the form of software product the part that prior art contributes in essence in other words, this computer software product is stored in a storage medium, comprising some instructions in order to make a computer equipment (can be personal computer, server, or the network equipment etc.) perform method described in each embodiment of the present invention.
Be only several specific embodiment of the present invention above, but the present invention is not limited thereto, the changes that any person skilled in the art can think of all should fall into protection scope of the present invention.

Claims (10)

1. a device for the automatic supply-demand mode of material, is characterized in that, comprises supply-demand mode module and configuration module;
Described configuration module: configuration material dismounting rule;
Described supply-demand mode module: resolve the demand information obtained, and the material dismounting rule obtaining configuration module configuration, carry out dismounting to material.
2. the device of the automatic supply-demand mode of material according to claim 1, is characterized in that, described supply-demand mode module comprises, demand resolution unit, lock unit, supply acquiring unit, dismounting unit, updating block and matching unit;
Described demand resolution unit: the legitimacy being responsible for the demand information that verification obtains, resolves to the material dimension of standard by demand information according to the input format set, obtain the demand information after resolving;
Described lock unit: exclusive lock is added to the demand information after above-mentioned parsing;
Described supply acquiring unit: carry out alternately with database, material supply information is obtained the material supply tables of data of preserving in database according to the demand information after above-mentioned interpolation exclusive lock, if the material supply in material supply tables of data is enough to coupling demand, directly matching result is returned; If the material supply in material supply tables of data is not enough to coupling demand, the dismounting rule of demand material is then obtained from configuration module, according to the material dimension in this rule and demand information, from material supply tables of data, obtain the material supply information of corresponding dimension, be supplied to dismounting unit and use;
Described dismounting unit: the regular material supply information obtained supply acquiring unit of the dismounting according to material is disassembled according to demand information or assembles, and obtains the information provision after dismounting;
Described updating block: the result of dismounting unit is updated in database;
Described matching unit: mate with the information provision after dismounting for demand information, by the formatted output of the result of coupling according to agreement.
3. the device of the automatic supply-demand mode of material according to claim 2, is characterized in that, the demand information that described demand resolution unit obtains, and is that business module provides; The result that then matching unit exports returns to business module;
And if the material supply in above-mentioned material supply tables of data is enough to coupling demand, directly matching result is returned business module.
4. the device of the automatic supply-demand mode of material according to claim 2, is characterized in that,
The result of described matching unit coupling is according in the formatted output of arranging, and the form of agreement is XML.
5. the device of the automatic supply-demand mode of material according to claim 2, it is characterized in that, described lock unit adds exclusive lock, according to the dimension of the material obtained for demand resolution unit, the material added after exclusive lock no longer allows other threads to operate, until this operation terminates, till exclusive lock is discharged.
6. a method for the automatic supply-demand mode of material, is characterized in that, comprise,
The step of configuration material dismounting rule;
Resolve the demand information obtained, and the material dismounting rule obtained, material is carried out to the step of dismounting.
7. the method for the automatic supply-demand mode of material according to claim 6, is characterized in that, the demand information of above-mentioned acquisition provides for business module.
8. the method for the automatic supply-demand mode of material according to claim 7, is characterized in that, described demand information of resolving acquisition, and the material dismounting rule obtained, the step of material being carried out to dismounting specifically comprises:
Verify the legitimacy of the demand information obtained from business module, according to the input format set, demand information is resolved to the material dimension of standard, obtain the step of the demand information after resolving;
Demand information after above-mentioned parsing is added to the step of exclusive lock;
Carry out alternately with database, material supply information is obtained the material supply tables of data of preserving in database according to the demand information after above-mentioned interpolation exclusive lock, if the material supply in material supply tables of data is enough to coupling demand, directly matching result is returned business module; If the material supply in material supply tables of data is not enough to coupling demand, then obtains the dismounting rule of demand material, according to the material dimension in this rule and demand information, from material supply tables of data, obtain the step of the material supply information of corresponding dimension;
According to the dismounting rule of material the material supply information obtained disassembled according to demand information or assemble, obtaining the step of the information provision after dismounting;
Information provision after dismounting is updated to the step in database;
Mate with the information provision after dismounting for demand information, the result of coupling is returned to the step of business module according to the form of agreement.
9. the method for the automatic supply-demand mode of material according to claim 8, is characterized in that,
Mate with the information provision after dismounting for demand information, return in the step of business module by the result of coupling according to the form of agreement, the form of agreement is XML.
10. the method for the automatic supply-demand mode of material according to claim 8 or claim 9, it is characterized in that, demand information after above-mentioned parsing is added in the step of exclusive lock and add exclusive lock, according to the dimension of the material obtained for demand resolution unit, the material added after exclusive lock no longer allows other threads to operate, until this operation terminates, till exclusive lock is discharged.
CN201510858535.7A 2015-11-30 2015-11-30 Automatic material supply-demand matching device and method Pending CN105279633A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510858535.7A CN105279633A (en) 2015-11-30 2015-11-30 Automatic material supply-demand matching device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510858535.7A CN105279633A (en) 2015-11-30 2015-11-30 Automatic material supply-demand matching device and method

Publications (1)

Publication Number Publication Date
CN105279633A true CN105279633A (en) 2016-01-27

Family

ID=55148604

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510858535.7A Pending CN105279633A (en) 2015-11-30 2015-11-30 Automatic material supply-demand matching device and method

Country Status (1)

Country Link
CN (1) CN105279633A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107020248A (en) * 2016-02-02 2017-08-08 济南兰光机电技术有限公司 The auto-screening method and system of a kind of packaging detection method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1584895A (en) * 2003-08-22 2005-02-23 台湾积体电路制造股份有限公司 Method and system of matching customer demand with production capacity, recording medium and management system
CN102073931A (en) * 2010-12-31 2011-05-25 用友软件股份有限公司 Production plan adjustment method and device
CN103559558A (en) * 2013-11-07 2014-02-05 金蝶软件(中国)有限公司 Material reserved supply and demand matching method and device
CN103714068A (en) * 2012-09-29 2014-04-09 金蝶软件(中国)有限公司 Method and device for just-in-time data updating

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1584895A (en) * 2003-08-22 2005-02-23 台湾积体电路制造股份有限公司 Method and system of matching customer demand with production capacity, recording medium and management system
CN102073931A (en) * 2010-12-31 2011-05-25 用友软件股份有限公司 Production plan adjustment method and device
CN103714068A (en) * 2012-09-29 2014-04-09 金蝶软件(中国)有限公司 Method and device for just-in-time data updating
CN103559558A (en) * 2013-11-07 2014-02-05 金蝶软件(中国)有限公司 Material reserved supply and demand matching method and device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107020248A (en) * 2016-02-02 2017-08-08 济南兰光机电技术有限公司 The auto-screening method and system of a kind of packaging detection method
CN107020248B (en) * 2016-02-02 2019-02-15 济南兰光机电技术有限公司 A kind of auto-screening method and system of packaging detection method

Similar Documents

Publication Publication Date Title
EP3149551B1 (en) A method and system for configuration of devices of a control system
US9684680B2 (en) Version control methodology for network model
CN112184177B (en) Project supervision method, equipment and storage medium
US20120254849A1 (en) Ontology updating apparatus, method and system
Zhu et al. A bilayer resource model for cloud manufacturing services
CN106878363A (en) A kind of information processing method, apparatus and system
CN115993966B (en) Application development system and method
CN104573184A (en) Construction method and construction device for high speed train product meta-model
US9165090B2 (en) Concise modeling and architecture optimization
US20140095550A1 (en) Converting source objects to target objects
CN105279633A (en) Automatic material supply-demand matching device and method
WO2017045345A1 (en) Resource management method and apparatus, and multi-mode soft base station unified network management
CN109033452A (en) A kind of data warehouse is intelligent to construct stowage and system
CN103617513A (en) Computation flow engine method for supporting rule evolution
Ruiz et al. Towards a case-based reasoning approach for safety assurance reuse
CN106203954A (en) A kind of support operation flow to build, the intelligent apparatus testing and run and method
CN103577260A (en) Work scheduling method and system for cloud platform
Martinez-Mosquera et al. Conceptual modeling of big data extract processes with UML
Bulavsky et al. Estimation of time parameters of electronic document management
CN114462859A (en) Workflow processing method and device, computer equipment and storage medium
Chandra et al. Information technology support for integrated supply chain modeling
Yan Generation and verification of executable assurance case by model-based engineering
CN103777957A (en) Design method and system of model library with expandability
CN116560722B (en) Operation and maintenance flow processing method and device, electronic equipment and storage medium
CN101989263A (en) Method for realizing automatic data reconfiguration between isomeric systems

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160127