CN105275492A - Temporary water retaining apparatus for rapidly handling problem of water and mud bursting in tunnel - Google Patents

Temporary water retaining apparatus for rapidly handling problem of water and mud bursting in tunnel Download PDF

Info

Publication number
CN105275492A
CN105275492A CN201510823719.XA CN201510823719A CN105275492A CN 105275492 A CN105275492 A CN 105275492A CN 201510823719 A CN201510823719 A CN 201510823719A CN 105275492 A CN105275492 A CN 105275492A
Authority
CN
China
Prior art keywords
water
air bag
hole
tunnel
capsula interna
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510823719.XA
Other languages
Chinese (zh)
Other versions
CN105275492B (en
Inventor
孙立强
郭伟
闫澍旺
聂雯
任宇晓
岳长喜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin University
Original Assignee
Tianjin University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin University filed Critical Tianjin University
Priority to CN201510823719.XA priority Critical patent/CN105275492B/en
Publication of CN105275492A publication Critical patent/CN105275492A/en
Application granted granted Critical
Publication of CN105275492B publication Critical patent/CN105275492B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/103Dams, e.g. for ventilation
    • E21F17/107Dams, e.g. for ventilation inflatable

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a temporary water retaining apparatus for rapidly handling the problem of water and mud bursting in a tunnel. The apparatus is provided with a water bag which is used for filling the inside with water for blocking gushing water or projecting mud soil generated in case of seepage in the tunnel and an air bag which is used for inflating air inwards for blocking the gushing water or the projecting mud soil generated in case of the seepage in the tunnel, and the water bag and the air bag are connected in an end-to-end manner and are connected through a flange connecting mechanism. The end, which is away from the air bag, of the water bag is respectively provided with a water filling port, a water pressure alarm for detecting water pressure inside the water bag and giving an alarm, and a front anchoring joint is disposed at the center for connection with an anchor pole or a fixation facility inside the tunnel. The end, which is close to the water bag, of the air bag is respectively provided with a gas injection port and a gas pressure alarm used for detecting gas pressure inside the air bag and giving an alarm, and a rear anchoring joint for connection with the anchor pole or the fixation facility in the tunnel is arranged at the center of the end, which is away from the water bag, of the air bag. The rubber bag capsule provided by the invention is simple in structure, convenient to manufacture and easy to operate, and can realize reutilization.

Description

A kind of provisional baffle device for water of mud problem of dashing forward for water burst in fast processing tunnel
Technical field
The present invention relates to and a kind ofly process water burst in tunnel and to dash forward the device of mud.Particularly relating to one can the provisional baffle device for water of mud problem of dashing forward for water burst in fast processing tunnel of water-filling (gas).
Background technology
In recent years, along with the exploitation of the underground space, Urban Underground railway construction and the safety problem in runing receive much concern.And tunnel institute to have aquifer or rock crack grow area unavoidably through area, seepage occurs during the construction in tunnel or operation, and even the dash forward probability of the problems such as mud of water burst is very large.This type of accident has the features such as sudden, high harmfulness, once occur, gently then floods or buries equipment, blocking tunnel, affects construction speed and Construction Plan, heavy then cause great casualties, property loss.Therefore, the processing method timely and effectively of this kind of problems such as mud of dashing forward for water burst is more and more subject to the attention of the parties concerned.
At present, for running into the region that rock crack is grown or water permeability is strong in constructing tunnel process, usually adopt cast-in-situ concrete dam body to carry out dash and speedily carry out rescue work, the methods such as recycling grouting carry out sealing to percolation zone.Although this water-retaining structure can play the effect of dash, there is following shortcoming: the investment that (1) steel concrete dam body builds needs is larger; (2) building concrete structure dam body needs the time cycle longer, can not meet the dangerous situation that water burst speed is larger, not accomplish that namely water block up; (3), before hardening of concrete, can be flushed away at flow action lower part concrete, cause certain waste, and the dash effect of impact expection; (4) after dangerous situation is eliminated, need to remove temporary water dash structure, not only waste the engineering time but also damage can be caused to existing tunnel section of jurisdiction, even affect the safe handling in tunnel.
In addition, the frequency that the factor such as global temperatures and environment change causes extreme weather to occur also gets more and more, and in tunnel operation process, due to emergency case such as heavy rains, big flood also happens occasionally, and has threat very large to the safe operation in tunnel.
Comprehensive above-mentioned introduction, seek a kind of fast, the water-retaining structure form of economy, safety and environmental protection, be the practical problem needing solution in current tunnel construction and operation badly, there is larger economic and social benefit.
Summary of the invention
Technical problem to be solved by this invention is, providing a kind of can quick solution treatment technology for tunnel seepage, water burst dash forward the provisional baffle device for water of mud problem of dashing forward for water burst in fast processing tunnel of the situations such as mud.
The technical solution adopted in the present invention is: a kind of provisional baffle device for water of mud problem of dashing forward for water burst in fast processing tunnel, comprise: for by internally to inflate or water-filling is blocked in tunnel and seepage occurs time the water burst that produces or the capsula interna of prominent mud, one end of described capsula interna is respectively arranged with for inflating or the gas injection port of water-filling or water filling port and for detecting capsula interna internal pressure and the water pressure alarm of reporting to the police or atmospheric pressure alarm, and the center at described capsula interna two ends is respectively provided with the anchoring joint for being connected with the anchor pole in tunnel or fixation means respectively.
Also be provided with the external capsule be wrapped in for the protection of capsula interna outside described capsula interna; and the flexible protective cover covered on outside described external capsule; described external capsule is having gas injection or the water filling through hole that can pass gas injection port or water filling port with the gas injection port on described capsula interna or water filling port corresponding section; having with the water pressure alarm on described capsula interna or atmospheric pressure alarm corresponding section the warning hole can passing water pressure alarm or atmospheric pressure alarm, having in the anchoring joint corresponding section with capsula interna two ends and can stretch out hole through the anchoring joint of anchoring joint.
Described anchoring joint includes the identical inner side and outer side being separately positioned on capsula interna same position of structure for clamping two circular metal plates of capsula interna, described circular metal plate is along the circumferential direction formed with multiple through hole for through bolt, also be provided with and link up with the arc-shaped be integrally formed on stator the hanging nose for being connected with the anchor pole in tunnel or fixation means formed by stator, described hanging nose is bolted to connection and is being positioned on the circular metal plate outside capsula interna, described two are also respectively arranged with waterproof gasket between circular metal plate and capsula interna, the circular metal plate be positioned at inside capsula interna set gradually, be positioned at the waterproof gasket inside capsula interna, capsula interna, the waterproof gasket be positioned at outside capsula interna is mutually permanently connected by bolt with the circular metal plate be positioned at outside capsula interna.
Described flexible protective cover to be fixedly connected with the hoop stirrup be arranged circumferentially along external capsule by the longitudinal stirrup axially arranged along external capsule to form; the center, two ends of described flexible protective cover has can through the through-hole structure of anchoring joint being arranged on capsula interna two ends; described through-hole structure is made up of through hole ring, and the two ends of described longitudinal stirrup are fixedly connected on corresponding through hole ring respectively.
A kind of provisional baffle device for water of mud problem of dashing forward for water burst in fast processing tunnel, comprise: the water pocket for the water burst by producing when internally water-filling is blocked in tunnel and seepage occurs or prominent mud that head and the tail connect and the air bag for the water burst that produces during by internally inflating and be blocked in tunnel and seepage occurs or prominent mud, be connected by Flange joint mechanism between described water pocket and air bag, described water pocket is respectively arranged with the water filling port for water filling away from one end of air bag, for detecting water pocket inside water pressure and the water pressure alarm of reporting to the police, and be positioned at center for anchoring joint before being connected with the anchor pole or fixation means in tunnel, one end that described air bag closes on water pocket is respectively arranged with the gas injection port for gas injection, for detecting inside air bag air pressure and the atmospheric pressure alarm of reporting to the police, described air bag is provided with the rear anchoring joint for being connected with the anchor pole in tunnel or fixation means away from the center, one end of water pocket.
Described Flange joint mechanism includes that structure is identical to be separately positioned on inside water pocket, between water pocket and air bag and inside air bag and three flange be positioned on same axis, described flange is along the circumferential direction formed for by bolt and nut) multiple bolt through holes that three flange and water pocket are fixedly connected with air bag, described water pocket and air bag are respectively arranged with waterproof gasket between be connected flange.
Described front anchoring joint is identical with rear anchoring joint design, include the identical inner side and outer side being separately positioned on water pocket or air bag same position of structure for clamping two circular metal plates of water pocket or air bag, described circular metal plate is along the circumferential direction formed with multiple through hole for through bolt, also be provided with and link up with the arc-shaped be integrally formed on stator the hanging nose for being connected with the anchor pole in tunnel or fixation means formed by stator, described hanging nose is bolted to connection and is being positioned on the circular metal plate outside water pocket or air bag, also waterproof gasket is respectively arranged with between two described circular metal plates and water pocket or air bag, the circular metal plate be positioned at inside water pocket or air bag set gradually, be positioned at the waterproof gasket inside water pocket or air bag, water pocket or air bag, be positioned at the waterproof gasket outside water pocket or air bag and the circular metal plate be positioned at outside water pocket or air bag is mutually permanently connected by bolt.
Also be provided with overall described water pocket and air bag are wrapped in for the protection of the outer protection capsule of water pocket and air bag, and cover on the outer mat of flexibility outside described outer protection capsule.
Described outer protection capsule stretches out hole having water injection hole, hydraulic pressure warning hole and the front anchoring joint that can pass water filling port, water pressure alarm and front anchoring joint with the water filling port on water pocket, water pressure alarm and front anchoring joint corresponding section, described outer protection capsule stretches out hole having injecting hole, air pressure alarm hole and the rear anchoring joint that can pass gas injection port, atmospheric pressure alarm and rear anchoring joint with the gas injection port on air bag, atmospheric pressure alarm and rear anchoring joint corresponding section.
The outer mat of described flexibility forms by protecting stirrup to be fixedly connected with along outer protection columella to the vertical protection stirrup arranged with the hoop be arranged circumferentially along outer protection capsule; the center, two ends of the outer mat of described flexibility has can through the front through-hole structure of anchoring joint before being arranged on water pocket front end and can through the rear through-hole structure of rear anchoring joint being arranged on air bag rear end; described front through-hole structure is identical with rear through-hole structure; be all be made up of through hole ring, the two ends of described vertical protection stirrup are fixedly connected on corresponding through hole ring respectively.
The provisional baffle device for water of a kind of mud problem of dashing forward for water burst in fast processing tunnel of the present invention, tool has the following advantages:
1, rubber bag tank plug makes material comparatively cheaply, has great economic advantages.
2, rubber bag tank plug structure is simple, easy to make, and is easy to operation.
3, by rapid water filling (gas) and sluicing (gas), rubber bag tank plug can realize recycling.
4, install and to charge the time shorter, several hours even shorter time can complete, and has great meaning for the dangerous situation of administering water burst speed.
5, after dangerous situation is eliminated, rubber bag tank can sluice (gas) at any time, then moves appointment to and deposits a little or carry out subway tunnel, and there is not dismounting affects problem to tunnel duct piece.
Accompanying drawing explanation
Fig. 1 is the structural representation of first embodiment of the invention capsula interna;
Fig. 2 is the structural representation of first embodiment of the invention external capsule;
Fig. 3 is the structural representation of first embodiment of the invention flexible protective cover;
Fig. 4 is the structural representation that the present invention first implements through-hole structure;
Fig. 5 is the structural representation that the present invention first implements anchoring joint;
Fig. 6 is the A-A sectional view of Fig. 5;
Fig. 7 is the structural representation of second embodiment of the invention water pocket and air bag;
Fig. 8 is the structural representation of second embodiment of the invention protection external capsule;
Fig. 9 is the structural representation of the outer mat of second embodiment of the invention flexibility;
Figure 10 is the structural representation that the present invention second implements front through-hole structure and rear through-hole structure;
Figure 11 is the structural representation that the present invention second implements flange bindiny mechanism;
Figure 12 is the B-B sectional view of Figure 11;
Figure 13 is the structural representation that the present invention second implements front anchoring joint and rear anchoring joint;
Figure 14 is the C-C sectional view of Figure 13;
Figure 15 is using state schematic diagram of the present invention.
In figure
1: capsula interna 2: external capsule
3: flexible protective cover 4: gas injection port or water filling port
5: water pressure alarm or atmospheric pressure alarm 6: anchoring joint
7: gas injection or water filling through hole 8: warning hole
9: anchoring joint stretches out hole 10: longitudinal stirrup
11: through-hole structure 12: through hole ring
13: hoop stirrup 14: circular metal plate
15: bolt 16: through hole
17: hanging nose 18: waterproof gasket
19: water pocket 20: air bag
21: protection external capsule 22: flexible outer mat
23: Flange joint mechanism 24: flange
25: bolt and nut 26: bolt through hole
27: waterproof gasket 28: water filling port
29: water pressure alarm 30: front anchoring joint
31: gas injection port 32: atmospheric pressure alarm
33: rear anchoring joint 34: circular metal plate
35: bolt 36: through hole
37: hanging nose 38: waterproof gasket
39: water injection hole 40: hydraulic pressure warning hole
41: front anchoring joint stretches out hole 42: injecting hole
43: air pressure alarm hole 44: rear anchoring joint stretches out hole
45: vertical protection stirrup 46: hoop protection stirrup
47: front through-hole structure 48: rear through-hole structure
49: through hole ring 50: rock-soil layer
51: baffle device for water 52: aquifer and seepage action of ground water passage
53: tunnel internal water accumulation
Detailed description of the invention
A kind ofly to be described in detail for the dash forward provisional baffle device for water of mud problem of water burst in fast processing tunnel of the present invention below in conjunction with embodiment and accompanying drawing.
As shown in Figure 1, the provisional baffle device for water of a kind of mud problem of dashing forward for water burst in fast processing tunnel of the present invention, comprise: for by internally to inflate or water-filling is blocked in tunnel and seepage occurs time the water burst that produces or the capsula interna 1 of prominent mud, one end of described capsula interna 1 is respectively arranged with for being inflated or the gas injection port of water-filling or water filling port 4 and for detecting capsula interna 1 internal pressure and the water pressure alarm of reporting to the police or atmospheric pressure alarm 5 (as the product of Chongqing hundred million Electronic Science and Technology Co., Ltd. of Li Xin section or the product of Hao Ming Electron equipment Co., Ltd of Foshan City), the center at described capsula interna 1 two ends is respectively provided with the anchoring joint 6 for being connected with the anchor pole in tunnel or fixation means respectively.
As Fig. 2, shown in Fig. 3, the external capsule 2 be wrapped in for the protection of capsula interna 1 outside described capsula interna 1 can also be provided with, and the flexible protective cover 3 covered on outside described external capsule 2, described external capsule 2 is having gas injection or the water filling through hole 7 that can pass gas injection port or water filling port 4 with the gas injection port on described capsula interna 1 or water filling port 4 corresponding section, the warning hole 8 can passing water pressure alarm or atmospheric pressure alarm 5 is being had with the water pressure alarm on described capsula interna 1 or atmospheric pressure alarm 5 corresponding section, have in anchoring joint 6 corresponding section with capsula interna 1 two ends and can stretch out hole 9 through the anchoring joint of anchoring joint 6.
As Fig. 5, shown in Fig. 6, described anchoring joint 6 includes the identical inner side and outer side being separately positioned on capsula interna 1 same position of structure for clamping two circular metal plates 14 of capsula interna 1, described circular metal plate 14 is along the circumferential direction formed with multiple through hole 16 for through bolt 15, also be provided with and link up with 171 hanging noses 17 for being connected with the anchor pole in tunnel or fixation means formed by stator 172 and the arc-shaped be integrally formed on stator 172, described hanging nose 17 is bolted to connection on the circular metal plate 14 be positioned at outside capsula interna 1, waterproof gasket 18 is also respectively arranged with between two described circular metal plates 14 and capsula interna 1, the circular metal plate 14 be positioned at inside capsula interna 1 set gradually, be positioned at the waterproof gasket 18 inside capsula interna 1, capsula interna 1, the waterproof gasket 18 be positioned at outside capsula interna 1 is mutually permanently connected by bolt 15 with the circular metal plate 14 be positioned at outside capsula interna 1.
As shown in Figure 3, Figure 4; described flexible protective cover 3 to be fixedly connected with the hoop stirrup 13 be arranged circumferentially along external capsule 2 by the longitudinal stirrup 10 axially arranged along external capsule 2 to form; the center, two ends of described flexible protective cover 3 has can through the through-hole structure 11 of anchoring joint 6 being arranged on capsula interna 1 two ends; described through-hole structure 11 is made up of through hole ring 12, and the two ends of described longitudinal stirrup 10 are fixedly connected on corresponding through hole ring 12 respectively.Described flexible protective cover 3 can select the material of safety belt: Silon (polyamidefibre), is also polyamide fibre, the nylon be namely commonly called as; Terylene, polypropylene fibre etc. can also be selected.
As shown in Figure 7, the provisional baffle device for water of a kind of mud problem of dashing forward for water burst in fast processing tunnel of the present invention, can also be comprise: the water pocket 19 for the water burst by producing when internally water-filling is blocked in tunnel and seepage occurs or prominent mud that head and the tail connect and the air bag 20 for the water burst that produces during by internally inflating and be blocked in tunnel and seepage occurs or prominent mud, be connected by Flange joint mechanism 23 between described water pocket 19 and air bag 20, described water pocket 19 is respectively arranged with the water filling port 28 for water filling away from one end of air bag 20, for detecting water pocket 19 inside water pressure and the water pressure alarm 29 (product as Hao Ming Electron equipment Co., Ltd of Foshan City) of reporting to the police, and be positioned at center for anchoring joint 30 before being connected with the anchor pole or fixation means in tunnel, one end that described air bag 20 closes on water pocket 19 is respectively arranged with the gas injection port 31 for gas injection, for detecting air bag 20 air pressure inside and the atmospheric pressure alarm 32 (as the product that Chongqing hundred million Electronic Science and Technology Co., Ltd. of Li Xin section produces) of reporting to the police, described air bag 20 is provided with the rear anchoring joint 33 for being connected with the anchor pole in tunnel or fixation means away from the center, one end of water pocket 19.
As shown in Figure 11, Figure 12, described Flange joint mechanism 23 includes that structure is identical to be separately positioned on inside water pocket 19, between water pocket 19 and air bag 20 and inside air bag 20 and three flange 24 be positioned on same axis, described flange 24 being along the circumferential direction formed with the multiple bolt through holes 26 for being fixedly connected with air bag 20 with water pocket 19 by three flange 24 with nut 25 by bolt, between be connected flange 24, being respectively arranged with waterproof gasket 27.
As Figure 13, shown in Figure 14, described front anchoring joint 30 is identical with rear anchoring joint 33 structure, include the identical inner side and outer side being separately positioned on water pocket 19 or air bag 20 same position of structure for clamping two circular metal plates 34 of water pocket 19 or air bag 20, described circular metal plate 34 is along the circumferential direction formed with multiple through hole 36 for through bolt 35, also be provided with and link up with 371 hanging noses 37 for being connected with the anchor pole in tunnel or fixation means formed by stator 372 and the arc-shaped be integrally formed on stator 372, described hanging nose 37 is bolted to connection and is being positioned on the circular metal plate 34 outside water pocket 19 or air bag 20, waterproof gasket 38 is also respectively arranged with between two described circular metal plates 34 and water pocket 19 or air bag 20, the circular metal plate 34 be positioned at inside water pocket 19 or air bag 20 set gradually, be positioned at the waterproof gasket 38 inside water pocket 19 or air bag 20, water pocket 19 or air bag 20, be positioned at the waterproof gasket 38 outside water pocket 19 or air bag 20 and the circular metal plate 34 be positioned at outside water pocket 19 or air bag 20 is mutually permanently connected by bolt 35.
As shown in Figure 7, Figure 8, can also be provided with overall described water pocket 19 and air bag 20 are wrapped in for the protection of the outer protection capsule 21 of water pocket 19 and air bag 20, and cover on the outer mat 22 of flexibility outside described outer protection capsule 21.
As shown in Figure 8, on described outer protection capsule 21 with the water filling port 28 on water pocket 19, water pressure alarm 29 and front anchoring joint 30 corresponding section have can pass water filling port 28, the water injection hole 39 of water pressure alarm 29 and front anchoring joint 30, hydraulic pressure warning hole 40 and front anchoring joint stretch out hole 41, on described outer protection capsule 21 with the gas injection port 31 on air bag 20, atmospheric pressure alarm 32 and rear anchoring joint 33 corresponding section have can pass gas injection port 31, the injecting hole 42 of atmospheric pressure alarm 32 and rear anchoring joint 33, air pressure alarm hole 43 and rear anchoring joint stretch out hole 44.
As Fig. 9, shown in Figure 10, the outer mat 22 of described flexibility protects stirrup 46 to be fixedly connected with by the vertical protection stirrup 45 axially arranged along outer protection capsule 21 and the hoop be arranged circumferentially along outer protection capsule 21 to form, the center, two ends of the outer mat 22 of described flexibility has can through the front through-hole structure of anchoring joint 30 47 before being arranged on water pocket 19 front end and can through the rear through-hole structure 48 of rear anchoring joint 33 being arranged on air bag 20 rear end, described front through-hole structure 47 is identical with rear through-hole structure 48, all be made up of through hole ring 49, the two ends of described vertical protection stirrup 45 are fixedly connected on corresponding through hole ring 49 respectively.
In the present invention, described gas injection port adopts two ends open and close type joint, can adopt product or U.S. DIXON industry joint (DIXONAIRKING air Special quick-adapter) of prosperous source, Wenzhou City metal product plant.Described water filling port can adopt two ends open and close type joint, and optional producer is as the product of Tengzhou City, Shandong Province Sheng Rong swivel joint Co., Ltd or Wenzhou City prosperous source metal product plant.
Of the present inventionly a kind ofly dash forward in the provisional baffle device for water of mud problem for water burst in fast processing tunnel, if the pressure that baffle device for water may be subject to is less, hole wall does not have sharp projection thing, described capsula interna, air bag and water pocket can select the elastomeric material of individual layer to make, or select multilayer Polyethylene film to make bonding to form, be directly used in dash; If the pressure that baffle device for water may be subject to is larger; or in order to avoid the too much wearing and tearing of described capsula interna, air bag and water pocket; external protection will be adopted; described capsula interna, air bag and water pocket can select the elastomeric material of individual layer to make; outer protection capsule can select the material that can meet requirements such as resistance to wearing, anti-aging, tensile strength is large; as canvas, add flexible outer mat, thus provide larger tensile strength and better durability for capsula interna, air bag and water pocket.
The provisional baffle device for water of a kind of mud problem of dashing forward for water burst in fast processing tunnel of the present invention, occur seepage, water burst dash forward the situation such as mud, flood backflush time, water burst speed is fast, groundwater table height time select the two capsule structure of aqueous vapor, when meeting water burst, fast to airbag aeration dash, connect water source increases stability from the two capsule of aqueous vapor to water pocket water-filling afterwards again.If water burst speed is comparatively slow, when groundwater table is also low, single capsule structure can be adopted.
As shown in figure 15, of the present inventionly a kind ofly fully can to fit with tunnel wall for the dash forward provisional baffle device for water of mud problem of water burst in fast processing tunnel, effective anti-water-stop body seepage.Stifled to ooze in conjunction with follow-up slip casting, the resolution such as draining, form resolution fast and effectively.After improvement terminates, discharge the water (gas) in baffle device for water, just can reclaim storage easily.

Claims (10)

1. the provisional baffle device for water of a mud problem of dashing forward for water burst in fast processing tunnel, it is characterized in that, comprise: for by internally to inflate or water-filling is blocked in tunnel and seepage occurs time the water burst that produces or the capsula interna (1) of prominent mud, one end of described capsula interna (1) is respectively arranged with for being inflated or the gas injection port of water-filling or water filling port (4) and for detecting capsula interna (1) internal pressure and the water pressure alarm of reporting to the police or atmospheric pressure alarm (5), the center at described capsula interna (1) two ends is respectively provided with the anchoring joint (6) for being connected with the anchor pole in tunnel or fixation means respectively.
2. the provisional baffle device for water of a kind of mud problem of dashing forward for water burst in fast processing tunnel according to claim 1, it is characterized in that, also be provided with and be wrapped in the external capsule (2) of described capsula interna (1) outside for the protection of capsula interna (1), and cover on the flexible protective cover (3) in described external capsule (2) outside, described external capsule (2) is having gas injection or the water filling through hole (7) that can pass gas injection port or water filling port (4) with the gas injection port on described capsula interna (1) or water filling port (4) corresponding section, the warning hole (8) can passing water pressure alarm or atmospheric pressure alarm (5) is being had with the water pressure alarm on described capsula interna (1) or atmospheric pressure alarm (5) corresponding section, have in anchoring joint (6) corresponding section with capsula interna (1) two ends and can stretch out hole (9) through the anchoring joint of anchoring joint (6).
3. the provisional baffle device for water of a kind of mud problem of dashing forward for water burst in fast processing tunnel according to claim 1, it is characterized in that, described anchoring joint (6) includes the identical inner side and outer side being separately positioned on capsula interna (1) same position of structure for clamping two circular metal plates (14) of capsula interna (1), described circular metal plate (14) is along the circumferential direction formed with multiple through hole for through bolt (15) (16), also be provided with and link up with by stator (172) and the arc-shaped that is integrally formed on stator (172) hanging nose (17) for being connected with the anchor pole in tunnel or fixation means that (171) formed, described hanging nose (17) is bolted to connection on the circular metal plate (14) being positioned at capsula interna (1) outside, waterproof gasket (18) is also respectively arranged with between two described circular metal plates (14) and capsula interna (1), the circular metal plate (14) being positioned at capsula interna (1) inner side set gradually, be positioned at the waterproof gasket (18) of capsula interna (1) inner side, capsula interna (1), the waterproof gasket (18) being positioned at capsula interna (1) outside and the circular metal plate (14) being positioned at capsula interna (1) outside are mutually permanently connected by bolt (15).
4. the provisional baffle device for water of a kind of mud problem of dashing forward for water burst in fast processing tunnel according to claim 2, it is characterized in that, described flexible protective cover (3) to be fixedly connected with the hoop stirrup (13) be arranged circumferentially along external capsule (2) by the longitudinal stirrup (10) axially arranged along external capsule (2) to form, the center, two ends of described flexible protective cover (3) has can through the through-hole structure (11) of anchoring joint (6) being arranged on capsula interna (1) two ends, described through-hole structure (11) is made up of through hole ring (12), the two ends of described longitudinal stirrup (10) are fixedly connected on corresponding through hole ring (12) respectively.
5. the provisional baffle device for water of a mud problem of dashing forward for water burst in fast processing tunnel, it is characterized in that, comprise: the water pocket (19) for the water burst by producing when internally water-filling is blocked in tunnel and seepage occurs or prominent mud that head and the tail connect and the air bag (20) for the water burst that produces during by internally inflating and be blocked in tunnel and seepage occurs or prominent mud, be connected by Flange joint mechanism (23) between described water pocket (19) and air bag (20), described water pocket (19) is respectively arranged with the water filling port (28) for water filling away from one end of air bag (20), for detecting water pocket (19) inside water pressure and the water pressure alarm (29) of reporting to the police, and be positioned at center for anchoring joint (30) before being connected with the anchor pole or fixation means in tunnel, one end that described air bag (20) closes on water pocket (19) is respectively arranged with the gas injection port (31) for gas injection, for detecting air bag (20) air pressure inside and the atmospheric pressure alarm (32) of reporting to the police, described air bag (20) is provided with the rear anchoring joint (33) for being connected with the anchor pole in tunnel or fixation means away from the center, one end of water pocket (19).
6. the provisional baffle device for water of a kind of mud problem of dashing forward for water burst in fast processing tunnel according to claim 5, it is characterized in that, described Flange joint mechanism (23) include structure identical be separately positioned on water pocket (19) inner side, between water pocket (19) and air bag (20) and air bag (20) inner side and three flange (24) be positioned on same axis, described flange (24) is along the circumferential direction formed with the multiple bolt through holes (26) for three flange (24) being fixedly connected with air bag (20) with water pocket (19) with nut (25) by bolt, described water pocket (19) and air bag (20) are respectively arranged with waterproof gasket (27) between be connected flange (24).
7. the provisional baffle device for water of a kind of mud problem of dashing forward for water burst in fast processing tunnel according to claim 5, it is characterized in that, described front anchoring joint (30) is identical with rear anchoring joint (33) structure, include the identical inner side and outer side being separately positioned on water pocket (19) or air bag (20) same position of structure for clamping two circular metal plates (34) of water pocket (19) or air bag (20), described circular metal plate (34) is along the circumferential direction formed with multiple through hole for through bolt (35) (36), also be provided with and link up with by stator (372) and the arc-shaped that is integrally formed on stator (372) hanging nose (37) for being connected with the anchor pole in tunnel or fixation means that (371) formed, described hanging nose (37) is bolted to connection on the circular metal plate (34) being positioned at water pocket (19) or air bag (20) outside, waterproof gasket (38) is also respectively arranged with between two described circular metal plates (34) and water pocket (19) or air bag (20), the circular metal plate (34) being positioned at water pocket (19) or air bag (20) inner side set gradually, be positioned at the waterproof gasket (38) of water pocket (19) or air bag (20) inner side, water pocket (19) or air bag (20), the waterproof gasket (38) being positioned at water pocket (19) or air bag (20) outside and the circular metal plate (34) being positioned at water pocket (19) or air bag (20) outside are mutually permanently connected by bolt (35).
8. the provisional baffle device for water of a kind of mud problem of dashing forward for water burst in fast processing tunnel according to claim 7; it is characterized in that; also be provided with overall described water pocket (19) and air bag (20) are wrapped in for the protection of the outer protection capsule (21) of water pocket (19) and air bag (20), and cover on the flexibility mat (22) outward outside described outer protection capsule (21).
9. the provisional baffle device for water of a kind of mud problem of dashing forward for water burst in fast processing tunnel according to claim 8, it is characterized in that, on described outer protection capsule (21) with the water filling port (28) on water pocket (19), water pressure alarm (29) and front anchoring joint (30) corresponding section have can pass water filling port (28), the water injection hole (39) of water pressure alarm (29) and front anchoring joint (30), hydraulic pressure warning hole (40) and front anchoring joint stretch out hole (41), on described outer protection capsule (21) with the gas injection port (31) on air bag (20), atmospheric pressure alarm (32) and rear anchoring joint (33) corresponding section have can pass gas injection port (31), the injecting hole (42) of atmospheric pressure alarm (32) and rear anchoring joint (33), air pressure alarm hole (43) and rear anchoring joint stretch out hole (44).
10. the provisional baffle device for water of a kind of mud problem of dashing forward for water burst in fast processing tunnel according to claim 7, it is characterized in that, the outer mat (22) of described flexibility protects stirrup (46) to be fixedly connected with by the vertical protection stirrup (45) axially arranged along outer protection capsule (21) and the hoop be arranged circumferentially along outer protection capsule (21) to form, the center, two ends of the outer mat (22) of described flexibility have can through be arranged on water pocket (19) front end front anchoring joint (30) front through-hole structure (47) and can through the rear through-hole structure (48) of rear anchoring joint (33) being arranged on air bag (20) rear end, described front through-hole structure (47) is identical with rear through-hole structure (48), all be made up of through hole ring (49), the two ends of described vertical protection stirrup (45) are fixedly connected on corresponding through hole ring (49) respectively.
CN201510823719.XA 2015-11-24 2015-11-24 A kind of provisional baffle device for water for being used to quickly handle the prominent mud problem of water burst in tunnel Active CN105275492B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510823719.XA CN105275492B (en) 2015-11-24 2015-11-24 A kind of provisional baffle device for water for being used to quickly handle the prominent mud problem of water burst in tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510823719.XA CN105275492B (en) 2015-11-24 2015-11-24 A kind of provisional baffle device for water for being used to quickly handle the prominent mud problem of water burst in tunnel

Publications (2)

Publication Number Publication Date
CN105275492A true CN105275492A (en) 2016-01-27
CN105275492B CN105275492B (en) 2017-08-22

Family

ID=55145224

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510823719.XA Active CN105275492B (en) 2015-11-24 2015-11-24 A kind of provisional baffle device for water for being used to quickly handle the prominent mud problem of water burst in tunnel

Country Status (1)

Country Link
CN (1) CN105275492B (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105909310A (en) * 2016-06-23 2016-08-31 河北拓为工程设计有限公司 Antiknock partition wall
CN106640191A (en) * 2016-11-30 2017-05-10 天津大学 Self-locking water tank and gas tank rubber bag device for tunnel flood-fighting and emergency-rescuing
CN106761924A (en) * 2016-12-29 2017-05-31 中国人民解放军63926部队 A kind of anti-water gushing out with high pressure air bag of pressure self-balancing
CN107060841A (en) * 2017-05-31 2017-08-18 天津大学 A kind of annular baffle device for water of segment type for being used to quickly administer treatment technology for tunnel seepage water problems
CN108548010A (en) * 2018-06-29 2018-09-18 成都金玉雄辉建筑工程有限公司 Improve security performance push-bench
CN108691567A (en) * 2017-04-07 2018-10-23 天津轨道交通集团有限公司 A kind of temporary blocking device speedily carried out rescue work for shield tunnel water leak accident
CN108708748A (en) * 2018-05-22 2018-10-26 牟勇忠 A kind of punishment Karst Tunnel gushes the constructing structure of mud gushing water geological disaster
CN108798781A (en) * 2018-06-26 2018-11-13 中铁隧道局集团有限公司 A kind of shield tunnel waterproof method for blocking
CN108868884A (en) * 2018-06-26 2018-11-23 中铁隧道局集团有限公司 A kind of plugging device for shield tunnel
CN109024635A (en) * 2018-07-27 2018-12-18 中国华冶科工集团有限公司 A kind of detachable foundation pit water-tight device
CN110107353A (en) * 2019-04-22 2019-08-09 太原理工大学 A kind of gushing water emergency shutoff method and its water blocking device
CN110821562A (en) * 2018-08-07 2020-02-21 栗磊 Stacked bag type rapid tunnel closing system and using method thereof
CN113137257A (en) * 2021-04-08 2021-07-20 苏州中车建设工程有限公司 Treatment structure for transfinite convergence deformation in shield tunnel operation period and construction method thereof
CN113944508A (en) * 2021-11-19 2022-01-18 中铁建大桥工程局集团第五工程有限公司 Tunnel mud burst early warning blocking device
CN114136267A (en) * 2021-11-15 2022-03-04 天津大学 Measurement and control integrated soil deformation dynamic control system based on composite capsule

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2302111A2 (en) * 1975-02-25 1976-09-24 Sema Temporary gallery sealing balloon - has internal water filled compartment increasing resistance to sliding along floor
CN103306725A (en) * 2013-06-26 2013-09-18 安徽理工大学 Flexible airbags for coal working face and method adopting same to block off corners
CN203257467U (en) * 2013-03-30 2013-10-30 孔妍 Air-bag-type quick air-tight door
CN203463147U (en) * 2013-07-01 2014-03-05 北京神州广安科技股份有限公司 Laneway plugging airbag
CN205349422U (en) * 2015-11-24 2016-06-29 天津大学 A provisional water retaining device that is arranged in rapidly transacting tunnel to gush shuitu mud problem

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2302111A2 (en) * 1975-02-25 1976-09-24 Sema Temporary gallery sealing balloon - has internal water filled compartment increasing resistance to sliding along floor
CN203257467U (en) * 2013-03-30 2013-10-30 孔妍 Air-bag-type quick air-tight door
CN103306725A (en) * 2013-06-26 2013-09-18 安徽理工大学 Flexible airbags for coal working face and method adopting same to block off corners
CN203463147U (en) * 2013-07-01 2014-03-05 北京神州广安科技股份有限公司 Laneway plugging airbag
CN205349422U (en) * 2015-11-24 2016-06-29 天津大学 A provisional water retaining device that is arranged in rapidly transacting tunnel to gush shuitu mud problem

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105909310A (en) * 2016-06-23 2016-08-31 河北拓为工程设计有限公司 Antiknock partition wall
CN105909310B (en) * 2016-06-23 2018-04-03 河北拓为工程设计有限公司 A kind of antiknock partition wall
CN106640191A (en) * 2016-11-30 2017-05-10 天津大学 Self-locking water tank and gas tank rubber bag device for tunnel flood-fighting and emergency-rescuing
CN106761924A (en) * 2016-12-29 2017-05-31 中国人民解放军63926部队 A kind of anti-water gushing out with high pressure air bag of pressure self-balancing
CN108691567A (en) * 2017-04-07 2018-10-23 天津轨道交通集团有限公司 A kind of temporary blocking device speedily carried out rescue work for shield tunnel water leak accident
CN107060841A (en) * 2017-05-31 2017-08-18 天津大学 A kind of annular baffle device for water of segment type for being used to quickly administer treatment technology for tunnel seepage water problems
CN108708748A (en) * 2018-05-22 2018-10-26 牟勇忠 A kind of punishment Karst Tunnel gushes the constructing structure of mud gushing water geological disaster
CN108798781A (en) * 2018-06-26 2018-11-13 中铁隧道局集团有限公司 A kind of shield tunnel waterproof method for blocking
CN108868884A (en) * 2018-06-26 2018-11-23 中铁隧道局集团有限公司 A kind of plugging device for shield tunnel
CN108548010A (en) * 2018-06-29 2018-09-18 成都金玉雄辉建筑工程有限公司 Improve security performance push-bench
CN109024635A (en) * 2018-07-27 2018-12-18 中国华冶科工集团有限公司 A kind of detachable foundation pit water-tight device
CN109024635B (en) * 2018-07-27 2020-09-25 中国华冶科工集团有限公司 Can dismantle foundation ditch watertight fittings
CN110821562A (en) * 2018-08-07 2020-02-21 栗磊 Stacked bag type rapid tunnel closing system and using method thereof
CN110107353A (en) * 2019-04-22 2019-08-09 太原理工大学 A kind of gushing water emergency shutoff method and its water blocking device
CN113137257A (en) * 2021-04-08 2021-07-20 苏州中车建设工程有限公司 Treatment structure for transfinite convergence deformation in shield tunnel operation period and construction method thereof
CN113137257B (en) * 2021-04-08 2022-04-26 苏州中车建设工程有限公司 Treatment structure for transfinite convergence deformation in shield tunnel operation period and construction method thereof
CN114136267A (en) * 2021-11-15 2022-03-04 天津大学 Measurement and control integrated soil deformation dynamic control system based on composite capsule
CN114136267B (en) * 2021-11-15 2022-09-02 天津大学 Measurement and control integrated soil deformation dynamic control system based on composite capsule
CN113944508A (en) * 2021-11-19 2022-01-18 中铁建大桥工程局集团第五工程有限公司 Tunnel mud burst early warning blocking device
CN113944508B (en) * 2021-11-19 2024-03-22 中铁建大桥工程局集团第五工程有限公司 Tunnel mud-bursting early warning blocking device

Also Published As

Publication number Publication date
CN105275492B (en) 2017-08-22

Similar Documents

Publication Publication Date Title
CN105275492A (en) Temporary water retaining apparatus for rapidly handling problem of water and mud bursting in tunnel
CN201705359U (en) Tail shield sealed water-proof structure of shield machine
CN102900848B (en) A kind of shield machine belt pressure warehouse entry airbag sealing unit and method
CN102051896B (en) Dam piping rescue high polymer closed grouting method
CN111119998A (en) Underwater tunnel prevents gushing water installation fast
CN205349422U (en) A provisional water retaining device that is arranged in rapidly transacting tunnel to gush shuitu mud problem
CN106761924B (en) A kind of anti-water gushing out with high pressure air bag of pressure self-balancing
CN102588609A (en) Emergency tail seal device for shield machine and mounting structure thereof
CN106640191B (en) A kind of double cabin rubber bag apparatus of self-locking aqueous vapor for tunnel flood-fighting
CN103148752B (en) A kind of engineering explosion integrated protection device
CN107060841B (en) A segmentation formula annular water retaining device for administering tunnel percolating water problem fast
CN113585181B (en) Dam upstream hydraulic self-seeking through type piping plugging device, system and method
CN110258766A (en) A kind of safe plugging structure and its installation and method for dismounting
CN210118126U (en) Emergency tool changing structure for high-water-pressure shield tunnel in sea area
CN105221164B (en) A kind of sealing tool and assemble method for deep tunnel slip casting reparation
KR20120038099A (en) Grouting shielding apparatus for preventing pollution of groundwater
CN210661351U (en) Air-filled sealing protective air bag of shield machine
CN113431071B (en) Rescue pipe and emergency rescue pipe fitting for dam piping accident and using method thereof
CN210217779U (en) Movable tunnel device that blocks water
CN104695327A (en) Beam-end embedded pipe sealing structure for stayed cable and sling
CN210739593U (en) Recycled concrete pipe with good sealing performance
CN206409756U (en) A kind of urban planning municipal drainage pipeline
CN208982104U (en) A kind of emergency sealing avoiding device applied in tunnel
CN209780919U (en) Shield constructs portal block structure
CN110307015A (en) A kind of packaged type tunnel waterproofing device and method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Sun Liqiang

Inventor after: Zhang Liming

Inventor after: Wang Qidong

Inventor after: Tang Yang

Inventor after: Guo Wei

Inventor after: Yan Shuwang

Inventor after: Nie Wen

Inventor after: Ren Yuxiao

Inventor after: Yue Changxi

Inventor after: Zhu Ganping

Inventor after: Zheng Xiyu

Inventor after: Yang Zhendan

Inventor before: Sun Liqiang

Inventor before: Guo Wei

Inventor before: Yan Shuwang

Inventor before: Nie Wen

Inventor before: Ren Yuxiao

Inventor before: Yue Changxi

COR Change of bibliographic data
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: 300350 District, Jinnan District, Tianjin Haihe Education Park, 135 beautiful road, Beiyang campus of Tianjin University

Patentee after: Tianjin University

Address before: 300072 Tianjin City, Nankai District Wei Jin Road No. 92

Patentee before: Tianjin University

CP02 Change in the address of a patent holder