CN105275214A - Dome pipe truss rapid pre-assembling method - Google Patents

Dome pipe truss rapid pre-assembling method Download PDF

Info

Publication number
CN105275214A
CN105275214A CN201510699298.4A CN201510699298A CN105275214A CN 105275214 A CN105275214 A CN 105275214A CN 201510699298 A CN201510699298 A CN 201510699298A CN 105275214 A CN105275214 A CN 105275214A
Authority
CN
China
Prior art keywords
tubular truss
dome
supervisor
pipe
truss
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510699298.4A
Other languages
Chinese (zh)
Inventor
伍科亮
张强
倪志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201510699298.4A priority Critical patent/CN105275214A/en
Publication of CN105275214A publication Critical patent/CN105275214A/en
Pending legal-status Critical Current

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The invention discloses a dome pipe truss rapid pre-assembling method. The method comprises the step that an adjustable lifting device is manufactured. A fixing plate and a protecting plate are welded on an upright column, so that the adjustable lifting device can be formed; the fixing plate is fixedly installed at the middle section of the upright column; the protecting plate is installed at the upper end of the upright column; a pipe supporting plate is arranged between the protecting plate and the web of the upright column; the middle of the fixing plate is fixedly provided with a sleeve; a screw rod is installed in the sleeve; the upper end of the screw rod is fixedly connected with the pipe supporting plate; and the lower end of the screw rod is provided with a pin shaft. Based on the upward and downward movement height adjusting function of the adjustable lifting device, sizes required by drawings can be realized through fine adjustment when adjacent pipe trusses are not consistent in height, and it is not required that assembly jigs are made for individual pipe trusses respectively to pre-assemble the pipe trusses, and the pipe trusses can be reused, and therefore, the pre-assembling speed and efficiency of the whole dome pipe trusses can be improved, and product quality can be improved, and construction efficiency can be improved.

Description

The quick pre-assembly method of a kind of dome tubular truss
Technical field
The present invention relates to a kind of construction techniques, in particular, relate to the quick pre-assembly method of a kind of dome tubular truss.
Background technology
At present, a lot of employing dome tube truss structure form in long-span roofing structure, tubular truss is made up of many product inverted triangle truss, each point angle, highly all inconsistent, assembling difficulty, usual prepackage one product tubular truss makees moulding bed once again, time-consumingly to take a lot of work, affect the duration, also inconsistently can affect preassembled section precision because moulding bed is located, and not carry out deformation Check after installing, directly come into operation after installing, cause deforming in use installation process, reinstall, affect construction speed and construction safety.
Summary of the invention
The present invention is directed to the deficiencies in the prior art, and a kind of prepackage speed and the efficiency of accelerating dome tubular truss are provided, improve the quality of products, improve efficiency of construction, reduce the quick pre-assembly method of a kind of dome tubular truss of construction cost.
The quick pre-assembly method of a kind of dome tubular truss of the present invention, comprises following construction sequence:
Step one, making adjustable lifting gear, described adjustable lifting gear is by column being welded and fixed plate and backplate forms, described fixed head is fixedly mounted on the position, stage casing of column, described backplate is arranged on the upper end of column, described trustship plate, between backplate and the web of column, is installed with sleeve in the middle of described fixed head, is provided with screw mandrel in described sleeve, described screw mandrel upper end is fixedly connected with trustship plate, and described screw mandrel lower end is provided with bearing pin;
Step 2, be arranged on the operating platform of smoothing according to drawing requirement by adjustable lifting gear, the adjustable lifting gear according to drawing requirement difference position adjusts to corresponding height, for preparing in the tubular truss supervisor location of next step different angles;
Step 3, supervisor's position line is drawn by figure paper size in one end of tubular truss supervisor, pipe location-plate is fixedly mounted on the position line of tubular truss supervisor, the two ends lifting adopting the suspender on wire rope to be responsible for by tubular truss is to the conduit saddle Board position of adjustable lifting gear, the conduit saddle plate of pipe location-plate and adjustable lifting gear is adopted to position placement, realize supervisor location, other tubular truss supervisor all locates by above-mentioned method location, after all tubular truss supervisors location lifting is completed, the conduit saddle plate height of angle by drawing and Height Adjustment adjustable lifting gear, after the installation requirement passed examination of tubular truss supervisor, tubular truss supervisor draws stay tube and V-arrangement pipe position line, for preparing in next step stay tube and V-arrangement pipe location
The top of step 4, V-arrangement pipe is offered and can through the preformed hole of major diameter round steel, stay tube and V-arrangement pipe is fixed on tubular truss supervisor, for the lifting of next step major diameter round steel is prepared;
After step 5, V-arrangement pipe have been located, check that whether top preformed hole center line is at same straight line, bore a hole to V-arrangement pipe preformed hole position with wire rope handling major diameter round steel after passed examination, perforation employing two straddle trucks coordinate, do not need spot welding after having bored a hole, complete adjacent dome tubular truss prepackage work; Repeat above step and complete the assembled in advance of all dome tubular truss.
Further: the preformed hole of the end of described stay tube and V-arrangement pipe adopts intersection-line cutting machine to be made.
It is further: after described dome tubular truss pre-splicing installs into, loading test need be carried out, adopt straddle truck that dome tubular truss is hung ground, adopt sleeper by levelling for dome tubular truss two ends fixing, after fixing, simulation dome tubular truss is in the using state of installation process, mount stress sheet on dome tubular truss, suspender belt is sleeved on dome tubular truss, suspender belt installs pulling force sensor, after pulling suspender belt to arrive specified numeral, check whether dome tubular truss is out of shape by stress section, the personnel's centralized operation likely occurred in construction simulation process, loading test can be come into operation through observing after confirmation does not deform.
It is further: after described dome tubular truss pre-splicing installs into, after completing loading test, need travelling load test be carried out, dome tubular truss is set with slip cap, suspender belt is sleeved on slip cap, suspender belt installs pulling force sensor, after pulling suspender belt to arrive specified numeral, by stress section, mobile slip cap, checks whether dome tubular truss is out of shape, the personnel likely occurred in construction simulation process move operation, and travelling load examination can be come into operation through observing after confirmation does not deform.
The invention has the beneficial effects as follows: 1, utilize adjustable lifting gear to move up and down the function of adjustment height, drawing requirement size is reached by fine setting when adjacent tubes truss height is inconsistent, single truss structure is not needed to do separately moulding bed prepackage, can reuse simultaneously, accelerate prepackage speed and the efficiency of whole dome tubular truss, and improve the quality of products, improve efficiency of construction; 2, carry out deformation Check after installing, prevent from deforming in use installation process, reinstall, guarantee construction speed and construction safety.
Accompanying drawing explanation
Fig. 1 is that dome tubular truss proposed by the invention pre-installs adjustable lifting gear schematic diagram used;
Fig. 2 is fixing operation platform and adjustable lifting gear schematic diagram in the pre-process of assembling of dome tubular truss proposed by the invention;
Fig. 3 is tubular truss supervisor location schematic diagram in the pre-process of assembling of dome tubular truss proposed by the invention;
Fig. 4 is that in the pre-process of assembling of dome tubular truss proposed by the invention, tubular truss supervisor location completes schematic diagram;
Fig. 5 is that in the pre-process of assembling of dome tubular truss proposed by the invention, tubular truss stay tube has located schematic diagram;
Fig. 6 is that in the pre-process of assembling of dome tubular truss proposed by the invention, schematic diagram located by tubular truss V-arrangement pipe;
Fig. 7 is that in the pre-process of assembling of dome tubular truss proposed by the invention, V-arrangement pipe preformed hole schematic diagram worn by major diameter round steel;
Fig. 8 is that in the pre-process of assembling of dome tubular truss proposed by the invention, adjacent truss has pre-installed schematic diagram;
Fig. 9 is that in the pre-process of assembling of dome tubular truss proposed by the invention, adjacent truss has pre-installed side elevational view;
Figure 10 is that in the pre-process of assembling of dome tubular truss proposed by the invention, adjacent truss has pre-installed front elevation view;
Figure 11 is that in the pre-process of assembling of dome tubular truss proposed by the invention, schematic diagram is arranged in adjacent truss prepackage;
In figure: adjustable lifting gear 1, operating platform 2, tubular truss supervisor 3, pipe location-plate 4, suspender 5, wire rope 6, stay tube 7, V-arrangement pipe 8, major diameter round steel 9, straddle truck 10, column 1-1, fixed head 1-2, backplate 1-3, conduit saddle plate 1-4, sleeve pipe 1-5, screw mandrel 1-6, bearing pin 1-7.
Detailed description of the invention
Below in conjunction with accompanying drawing, the invention will be further described.
In the drawings, the quick pre-assembly method of a kind of dome tubular truss of the present invention, comprises following construction sequence:
Step one, as shown in Figure 1, make adjustable lifting gear 1, described adjustable lifting gear 1 is by column 1-1 being welded and fixed plate 1-2 and backplate 1-3 forms, described fixed head 1-2 is fixedly mounted on the position, stage casing of column 1-1, described backplate 1-3 is arranged on the upper end of column 1-1, described trustship plate 1-4 is between backplate 1-3 and the web of column 1-1, sleeve 1-5 is installed with in the middle of described fixed head 1-2, in described sleeve 1-5, screw mandrel 1-6 is installed, described screw mandrel 1-6 upper end is fixedly connected with trustship plate 1-4, and described screw mandrel 1-6 lower end is provided with bearing pin 1-7;
Step 2, as shown in Figure 2, according to drawing requirement, adjustable lifting gear 1 is arranged on the operating platform 2 of smoothing, adjustable lifting gear 1 according to drawing requirement difference position adjusts to corresponding height, for preparing in tubular truss supervisor 3 location of next step different angles;
Step 3, as Fig. 3, shown in 4, supervisor's position line is drawn by figure paper size in one end of tubular truss supervisor 3, pipe location-plate 4 is fixedly mounted on the position line of tubular truss supervisor 3, adopt the suspender 5 on wire rope 6 that the two ends of tubular truss supervisor 3 are lifted the conduit saddle plate 1-4 position to adjustable lifting gear 1, the conduit saddle plate 1-4 of pipe location-plate 4 and adjustable lifting gear 1 is adopted to position placement, realize supervisor location, other tubular truss supervisor 3 all locates by above-mentioned method location, after all tubular truss supervisors 3 location lifting is completed, the conduit saddle plate 1-4 height of angle by drawing and Height Adjustment adjustable lifting gear 1, after the installation requirement passed examination of tubular truss supervisor 3, tubular truss supervisor 3 draws stay tube 7 and V-arrangement pipe 8 position line, for preparing in next step stay tube 7 and V-arrangement pipe 8 location
Step 4, the as shown in Figure 5,6 top of V-arrangement pipe 8 are offered and can through the preformed hole of major diameter round steel 9, stay tube 7 and V-arrangement pipe 8 be fixed on tubular truss supervisor 3, for the lifting of next step major diameter round steel 9 is prepared;
Step 5, as illustrated in figures 7-11, after V-arrangement pipe 8 has been located, check that whether top preformed hole center line is at same straight line, bore a hole with wire rope 6 handling major diameter round steel 9 to V-arrangement pipe 8 preformed hole position after passed examination, perforation employing two straddle trucks 10 coordinate, do not need spot welding after having bored a hole, complete adjacent dome tubular truss prepackage work; Repeat above step and complete the assembled in advance of all dome tubular truss.
Embodiment 2
As different from Example 1, the preformed hole of the end of described stay tube 7 and V-arrangement pipe 8 adopts intersection-line cutting machine to be made.
Embodiment 3
As different from Example 1, after described dome tubular truss pre-splicing installs into, loading test need be carried out, adopt straddle truck 10 that dome tubular truss is hung ground, adopt sleeper by levelling for dome tubular truss two ends fixing, after fixing, simulation dome tubular truss is in the using state of installation process, mount stress sheet on dome tubular truss, suspender belt is sleeved on dome tubular truss, suspender belt installs pulling force sensor, after pulling suspender belt to arrive specified numeral, check whether dome tubular truss is out of shape by stress section, the personnel's centralized operation likely occurred in construction simulation process, loading test can be come into operation through observing after confirmation does not deform.
Embodiment 4
As different from Example 1, after described dome tubular truss pre-splicing installs into, after completing loading test, travelling load test need be carried out, dome tubular truss is set with slip cap, be sleeved on by suspender belt on slip cap, suspender belt installs pulling force sensor, after pulling suspender belt to arrive specified numeral, mobile slip cap, check whether dome tubular truss is out of shape, and the personnel likely occurred in construction simulation process move operation by stress section, travelling load examination can be come into operation through observing after confirmation does not deform.
The foregoing is only embodiments of the invention; not thereby the scope of the claims of the present invention is limited; every utilize manual of the present invention and accompanying drawing content to do equivalent structure or equivalent flow process conversion; or be directly or indirectly used in other relevant technical fields, be all in like manner included in scope of patent protection of the present invention.

Claims (4)

1. the quick pre-assembly method of dome tubular truss, is characterized in that, comprises following construction sequence:
Step one, make adjustable lifting gear (1), described adjustable lifting gear (1) is by column (1-1) being welded and fixed plate (1-2) and backplate (1-3) forms, described fixed head (1-2) is fixedly mounted on the position, stage casing of column (1-1), described backplate (1-3) is arranged on the upper end of column (1-1), described trustship plate (1-4) is positioned between the web of backplate (1-3) and column (1-1), sleeve (1-5) is installed with in the middle of described fixed head (1-2), screw mandrel (1-6) is installed in described sleeve (1-5), described screw mandrel (1-6) upper end is fixedly connected with trustship plate (1-4), described screw mandrel (1-6) lower end is provided with bearing pin (1-7),
Step 2, according to drawing requirement, adjustable lifting gear (1) is arranged on the operating platform (2) of smoothing, adjustable lifting gear (1) according to drawing requirement difference position adjusts to corresponding height, and the tubular truss for next step different angles is responsible for (3) location and is prepared;
Step 3, supervisor's position line is drawn by figure paper size in one end of tubular truss supervisor (3), pipe location-plate (4) is fixedly mounted on the position line of tubular truss supervisor (3), the suspender (5) on wire rope (6) is adopted tubular truss to be responsible for conduit saddle plate (1-4) position of two ends lifting to adjustable lifting gear (1) of (3), the conduit saddle plate (1-4) of pipe location-plate (4) and adjustable lifting gear (1) is adopted to position placement, realize supervisor location, other tubular truss supervisor (3) location is all located by above-mentioned method, after all tubular truss supervisor (3) location liftings are completed, the conduit saddle plate (1-4) of angle by drawing and Height Adjustment adjustable lifting gear (1) highly, after the installation requirement passed examination of tubular truss supervisor (3), tubular truss supervisor (3) draws stay tube (7) and V-arrangement pipe (8) position line, for preparing in next step stay tube (7) and V-arrangement pipe (8) location,
Preformed hole is offered on the top of step 4, V-arrangement pipe (8), and described preformed hole is provided with major diameter round steel (9), stay tube (7) and V-arrangement pipe (8) is fixed on tubular truss supervisor (3), for the lifting of next step major diameter round steel (9) is prepared;
After step 5, V-arrangement pipe (8) have been located, check that whether top preformed hole center line is at same straight line, bore a hole to V-arrangement pipe (8) preformed hole position by wire rope (6) handling major diameter round steel (9) after passed examination, perforation employing two straddle trucks (10) coordinate, do not need spot welding after having bored a hole, complete adjacent dome tubular truss prepackage work; Repeat above step and complete the assembled in advance of all dome tubular truss.
2. the quick pre-assembly method of a kind of dome tubular truss according to claim 1, is characterized in that, the preformed hole of the end of described stay tube (7) and V-arrangement pipe (8) adopts intersection-line cutting machine to be made.
3. the quick pre-assembly method of a kind of dome tubular truss according to claim 1, it is characterized in that, after described dome tubular truss pre-splicing installs into, loading test need be carried out, adopt straddle truck (10) that dome tubular truss is hung ground, adopt sleeper by levelling for dome tubular truss two ends fixing, after fixing, simulation dome tubular truss is in the using state of installation process, mount stress sheet on dome tubular truss, suspender belt is sleeved on dome tubular truss, suspender belt installs pulling force sensor, after pulling suspender belt to arrive specified numeral, check whether dome tubular truss is out of shape by stress section, the personnel's centralized operation likely occurred in construction simulation process, loading test can be come into operation through observing after confirmation does not deform.
4. the quick pre-assembly method of a kind of dome tubular truss according to claim 1, it is characterized in that, after described dome tubular truss pre-splicing installs into, after completing loading test, travelling load test need be carried out, dome tubular truss is set with slip cap, suspender belt is sleeved on slip cap, suspender belt installs pulling force sensor, after pulling suspender belt to arrive specified numeral, mobile slip cap, check whether dome tubular truss is out of shape by stress section, the personnel likely occurred in construction simulation process move operation, travelling load examination can be come into operation through observing after confirmation does not deform.
CN201510699298.4A 2015-10-26 2015-10-26 Dome pipe truss rapid pre-assembling method Pending CN105275214A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510699298.4A CN105275214A (en) 2015-10-26 2015-10-26 Dome pipe truss rapid pre-assembling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510699298.4A CN105275214A (en) 2015-10-26 2015-10-26 Dome pipe truss rapid pre-assembling method

Publications (1)

Publication Number Publication Date
CN105275214A true CN105275214A (en) 2016-01-27

Family

ID=55144964

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510699298.4A Pending CN105275214A (en) 2015-10-26 2015-10-26 Dome pipe truss rapid pre-assembling method

Country Status (1)

Country Link
CN (1) CN105275214A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112478080A (en) * 2020-12-09 2021-03-12 江南造船(集团)有限责任公司 Digital positioning method for hoisting container ship hatch cover

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1609363A (en) * 2004-08-11 2005-04-27 中国机械工业建设总公司 Building truss integral lifting method and equipment thereof
JP3814265B2 (en) * 2003-08-22 2006-08-23 株式会社竹中工務店 How to build tower buildings
CN101988308A (en) * 2010-09-30 2011-03-23 中国华西企业有限公司 Non-support installation method of long-span spatial bolt ball steel reticulated shell dome

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3814265B2 (en) * 2003-08-22 2006-08-23 株式会社竹中工務店 How to build tower buildings
CN1609363A (en) * 2004-08-11 2005-04-27 中国机械工业建设总公司 Building truss integral lifting method and equipment thereof
CN101988308A (en) * 2010-09-30 2011-03-23 中国华西企业有限公司 Non-support installation method of long-span spatial bolt ball steel reticulated shell dome

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
倪志等: "《大跨度双曲面管桁架快速预装施工技术》", 《安装》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112478080A (en) * 2020-12-09 2021-03-12 江南造船(集团)有限责任公司 Digital positioning method for hoisting container ship hatch cover
CN112478080B (en) * 2020-12-09 2022-03-08 江南造船(集团)有限责任公司 Digital positioning method for hoisting container ship hatch cover

Similar Documents

Publication Publication Date Title
CN106315389B (en) A kind of large scale prefabricated plate posture adjustment suspension bracket and its method
CN205527410U (en) Balanced heavy device of installing and removing by oneself of tower crane
CN105275214A (en) Dome pipe truss rapid pre-assembling method
CN105781210A (en) Taper tower rack and tool section auxiliary cross-core type integral lifting construction method thereof
CN210909721U (en) Bridge pipeline installation is with pulling positioning system
CN209194364U (en) A kind of Continuous Beam-arch Bridge sunpender bridge floor tensioning equipment
CN203497927U (en) C-shaped lifting hook and multi-lifting-point lifting appliance using same
CN206679701U (en) A kind of automatic delivering mechanism of cover assembly bound edge preformed member
CN217230001U (en) Combined type supporting and adjusting device for tower installation
CN216029086U (en) Installation equipment for vertical pipeline
CN101767753B (en) Method for hoisting by lifting belt vertically
CN204115461U (en) A kind of cylinder of rotary kiln docking Z-direction adjusting device
CN210967748U (en) Balanced bearing press for irregular large workpiece
CN208299335U (en) A kind of double thread-moving devices
CN106994495B (en) A kind of electronic strut pipe fitting riveting set of automobile tail gate
CN206678785U (en) A kind of centre carries the tricycle rear axle attachment means of differential mechanism
CN205892589U (en) Light gauge steel component hoist device
CN221029646U (en) Auxiliary beam penetrating working platform with adjustable height
KR200381787Y1 (en) Pin Jigger for easily adjusting it's Height
CN103884640A (en) Prestressed pipeline friction testing apparatus and installation method of apparatus
CN218780855U (en) Movable pipeline jacking consignment device
CN205187770U (en) Spiral undercut storehouse strengthening rib installation transmission bracket
CN113353787B (en) Hoisting method of waste heat boiler suspension type steam pocket
CN219543561U (en) Stop gear of automatic end mould mounting and dismounting platform
CN217102870U (en) High-altitude top-falling ultra-large heavy object device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160127

WD01 Invention patent application deemed withdrawn after publication