CN105256935A - Connecting structure of suspended ceiling stone curtain wall system - Google Patents

Connecting structure of suspended ceiling stone curtain wall system Download PDF

Info

Publication number
CN105256935A
CN105256935A CN201510698734.6A CN201510698734A CN105256935A CN 105256935 A CN105256935 A CN 105256935A CN 201510698734 A CN201510698734 A CN 201510698734A CN 105256935 A CN105256935 A CN 105256935A
Authority
CN
China
Prior art keywords
connector
curtain wall
wall system
syndeton
connecting portion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510698734.6A
Other languages
Chinese (zh)
Other versions
CN105256935B (en
Inventor
王旭华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Zhongnan Construction Group Co Ltd
Original Assignee
Zhejiang Zhongnan Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Zhongnan Construction Group Co Ltd filed Critical Zhejiang Zhongnan Construction Group Co Ltd
Priority to CN201510698734.6A priority Critical patent/CN105256935B/en
Publication of CN105256935A publication Critical patent/CN105256935A/en
Application granted granted Critical
Publication of CN105256935B publication Critical patent/CN105256935B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention provides a connecting structure of a suspended ceiling stone curtain wall system. The suspended ceiling stone curtain wall system comprises a keel and a stone plate. The connecting structure comprises a first connector and a second connector, wherein the first connector is fixed with the keel, and the second connector is fixed at the back of the stone plate; the first connector and the second connector are connected through transverse insertion to allow the first connector to support the second connector, the second connector is provided with a transverse insertion groove, space is reserved in the opening of the insertion groove to allow the positions of the second connector to be adjustable relative to the first connector and in the depth direction of the insertion groove, and the first connector and the second connector are fixed and limited through a first screw after the adjustment. The connecting structure is simple and fast to mount, capable of being adjusted in multiple directions, and flexible and accurate to mount.

Description

Syndeton in a kind of furred ceiling stone curtain wall system
Technical field
The present invention relates to the syndeton in a kind of furred ceiling stone curtain wall system.
Background technology
In the past, the suspension member that stone ceiling curtain wall adopts carried out the fine setting of short transverse only for panel, and requisite space is larger.
Summary of the invention
Technical problem to be solved by this invention is to provide, the syndeton in a kind of furred ceiling stone curtain wall system.For this reason, the present invention is by the following technical solutions:
Syndeton in a kind of furred ceiling stone curtain wall system, described furred ceiling stone curtain wall system comprises keel and stone material plate, described syndeton comprises the first connector and the second connector, and described first connector and keel are fixed, and described second connector is fixed on the stone material plate back side; First connector and the second connector adopt the connection of transverse splicing to make the second connector obtain the support of the first connector, described second connector arranges transverse splicing groove, inserting groove notch leaves space, make the second connector can adjust position relative to described first connector on the depth direction of inserting groove, after adjustment, the first connector and the second connector are fixed by the first screw and spacing.
On the basis adopting technique scheme, the present invention also can adopt following further technical scheme:
First connector and the second connector are Al-alloy parts, the bottom of described first connector is provided with the insertion connecting portion with described transverse splicing slot fit, described first connector has and inserts the vertical connecting portion of connecting portion continuous print on insertion connecting portion, be provided with on vertical connecting portion and the vertical installation portion of vertical connecting portion continuous print, described second connector comprises transverse bottom plate, with securing member, transverse bottom plate is connected with stone material plate, described transverse bottom plate is formed continuous print bending structure, described continuous print bending structure first forms described transverse splicing groove with described transverse bottom plate and then to form and transverse splicing groove continuous print vertically reclines position, corresponding of the vertical connecting portion of described vertically recline position and the first connector, and with described first screw they to be fixed and spacing.
Described first connector is L-shaped.
Described first connector is the L shape matched with described continuous print bending structure, and forms the engagement fit interlocked with continuous print bending structure.
First connector is arranged on keel by the second screw, has the pad being with anti-slop serrations between described second screw and the first connector, and the lateral surface of described first connector bottom surface has the anti-slop serrations matched.
Pad is provided with between described first connector and keel.
The vertical installation portion of the first connector is provided with notch, can according to keel up-down adjustment.
Owing to adopting technique scheme, beneficial effect of the present invention is: simple and fast is installed in field of the present invention, can be able to regulate multi-direction simultaneously, flexible for installation, accurate.
Accompanying drawing explanation
Fig. 1 is a kind of furred ceiling stone material of the present invention aluminium alloys suspension member vertical cross section figure.
Fig. 2 is a kind of furred ceiling stone material of the present invention aluminium alloys suspension member transverse cross-sectional view.
Detailed description of the invention
With reference to accompanying drawing.Syndeton in a kind of furred ceiling stone curtain wall system, described furred ceiling stone curtain wall system comprises the 2mm thick fiberglass net 201 that keel 100, stone material plate 200 and stone material plate are pasted, described syndeton comprises the first connector 1 and the second connector 3, described first connector 1 fixes 100 with keel, and described second connector 3 is fixed on stone material plate 200 back side.First connector 1 and the second connector 3 adopt the connection of transverse splicing to make the second connection 3 obtain the support of the first connector 1, described second connector 3 arranges transverse splicing groove 30, inserting groove 30 notch leaves space, make the second connector 3 can adjust position relative to described first connector 1 on the depth direction of inserting groove 30, after adjustment, it is fixing and spacing that the first connector 1 and the second connector 3 pass through the first screw 6.
First connector 1 and the second connector 3 are Al-alloy parts, the bottom of described first connector 1 is provided with the insertion connecting portion 11 coordinated with described transverse splicing groove 30, described first connector 1 has and inserts the vertical connecting portion 12 of connecting portion 11 continuous print on insertion connecting portion 11, be provided with on vertical connecting portion 12 and the vertical installation portion of vertical connecting portion 12 continuous print, described second connector 3 comprises transverse bottom plate 31, with securing member 5, transverse bottom plate 31 is connected with stone material plate 200, described transverse bottom plate 31 forms continuous print bending structure, described continuous print bending structure is first with the described transverse splicing groove 30 of described transverse bottom plate shape 31 one-tenth and then to form and transverse splicing groove 30 continuous print vertically reclines position 32, corresponding of the vertical connecting portion 12 of described vertically recline position 32 and the first connector, and with described first screw 6 they to be fixed and spacing.
Described first connector 1 is L-shaped.
Described first connector 1 is the L shape matched with described continuous print bending structure, and forms the engagement fit interlocked with continuous print bending structure.As shown in Figure 1, the engagement fit of interlocking is formed.
First connector 1 to be arranged on keel 100 by the second screw 4, and have the pad 7 being with anti-slop serrations between described second screw 4 and the first connector, the lateral surface of described first connector 1 bottom surface has the anti-slop serrations matched.
Pad is provided with between described first connector and keel.
The vertical installation portion of the first connector is provided with notch 13, can according to keel 100 up-down adjustment.

Claims (7)

1. the syndeton in a furred ceiling stone curtain wall system, described furred ceiling stone curtain wall system comprises keel and stone material plate, it is characterized in that, described syndeton comprises the first connector and the second connector, described first connector and keel are fixed, and described second connector is fixed on the stone material plate back side; First connector and the second connector adopt the connection of transverse splicing to make the second connector obtain the support of the first connector, described second connector arranges transverse splicing groove, inserting groove notch leaves space, make the second connector can adjust position relative to described first connector on the depth direction of inserting groove, after adjustment, the first connector and the second connector are fixed by the first screw and spacing.
2. the syndeton in a kind of furred ceiling stone curtain wall system as claimed in claim 1, it is characterized in that, the first connector and the second connector are Al-alloy parts, the bottom of described first connector is provided with the insertion connecting portion with described transverse splicing slot fit, described first connector has and inserts the vertical connecting portion of connecting portion continuous print on insertion connecting portion, be provided with on vertical connecting portion and the vertical installation portion of vertical connecting portion continuous print, described second connector comprises transverse bottom plate, with securing member, transverse bottom plate is connected with stone material plate, described transverse bottom plate is formed continuous print bending structure, described continuous print bending structure first forms described transverse splicing groove with described transverse bottom plate and then to form and transverse splicing groove continuous print vertically reclines position, corresponding of the vertical connecting portion of described vertically recline position and the first connector, and with described first screw they to be fixed and spacing.
3. the syndeton in a kind of furred ceiling stone curtain wall system as claimed in claim 1, it is characterized in that, described first connector is L-shaped.
4. the syndeton in a kind of furred ceiling stone curtain wall system as claimed in claim 2, is characterized in that, described first connector is the L shape matched with described continuous print bending structure, and forms the engagement fit interlocked with continuous print bending structure.
5. the syndeton in a kind of furred ceiling stone curtain wall system as claimed in claim 1, it is characterized in that, first connector is arranged on keel by the second screw, have the pad being with anti-slop serrations between described second screw and the first connector, the lateral surface of described first connector bottom surface has the anti-slop serrations matched.
6. the syndeton in a kind of furred ceiling stone curtain wall system as claimed in claim 1, is characterized in that, be provided with pad between described first connector and keel.
7. the syndeton in a kind of furred ceiling stone curtain wall system as claimed in claim 1, it is characterized in that, the vertical installation portion of the first connector is provided with notch, can according to keel up-down adjustment.
CN201510698734.6A 2015-10-23 2015-10-23 A kind of connection structure in furred ceiling stone curtain wall system Active CN105256935B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510698734.6A CN105256935B (en) 2015-10-23 2015-10-23 A kind of connection structure in furred ceiling stone curtain wall system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510698734.6A CN105256935B (en) 2015-10-23 2015-10-23 A kind of connection structure in furred ceiling stone curtain wall system

Publications (2)

Publication Number Publication Date
CN105256935A true CN105256935A (en) 2016-01-20
CN105256935B CN105256935B (en) 2018-07-13

Family

ID=55096837

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510698734.6A Active CN105256935B (en) 2015-10-23 2015-10-23 A kind of connection structure in furred ceiling stone curtain wall system

Country Status (1)

Country Link
CN (1) CN105256935B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107060168A (en) * 2017-05-24 2017-08-18 杭州坤石建筑工程咨询有限公司 A kind of grid system in curtain wall system
CN111549967A (en) * 2020-04-23 2020-08-18 江苏兴业智慧建筑科技有限公司 Novel ceiling board connecting structure and construction process thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3232105A1 (en) * 1981-07-15 1984-03-01 BWM Dübel- u. Montagetechnik GmbH, 7022 Leinfelden-Echterdingen Connecting device for a curtain wall facing or suspended ceiling facing
CN202194280U (en) * 2011-07-06 2012-04-18 沈阳远大铝业工程有限公司 Adjustable unit curtain wall connecting system
CN202390972U (en) * 2011-12-29 2012-08-22 苏州市鑫泰建筑装璜有限公司 Hidden-frame glass curtain wall
CN103184777A (en) * 2012-09-29 2013-07-03 北京江河幕墙股份有限公司 Glass rib curtain wall system
CN103290962A (en) * 2012-12-20 2013-09-11 江苏鸿升装饰工程有限公司 Building curtain wall stone dry hanging structure
CN203626093U (en) * 2013-09-23 2014-06-04 浙江中南建设集团有限公司 Top connecting structure of stone curtain wall
CN205189211U (en) * 2015-10-23 2016-04-27 浙江中南建设集团有限公司 Connection structure in furred ceiling stone material curtain system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3232105A1 (en) * 1981-07-15 1984-03-01 BWM Dübel- u. Montagetechnik GmbH, 7022 Leinfelden-Echterdingen Connecting device for a curtain wall facing or suspended ceiling facing
CN202194280U (en) * 2011-07-06 2012-04-18 沈阳远大铝业工程有限公司 Adjustable unit curtain wall connecting system
CN202390972U (en) * 2011-12-29 2012-08-22 苏州市鑫泰建筑装璜有限公司 Hidden-frame glass curtain wall
CN103184777A (en) * 2012-09-29 2013-07-03 北京江河幕墙股份有限公司 Glass rib curtain wall system
CN103290962A (en) * 2012-12-20 2013-09-11 江苏鸿升装饰工程有限公司 Building curtain wall stone dry hanging structure
CN203626093U (en) * 2013-09-23 2014-06-04 浙江中南建设集团有限公司 Top connecting structure of stone curtain wall
CN205189211U (en) * 2015-10-23 2016-04-27 浙江中南建设集团有限公司 Connection structure in furred ceiling stone material curtain system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107060168A (en) * 2017-05-24 2017-08-18 杭州坤石建筑工程咨询有限公司 A kind of grid system in curtain wall system
CN111549967A (en) * 2020-04-23 2020-08-18 江苏兴业智慧建筑科技有限公司 Novel ceiling board connecting structure and construction process thereof

Also Published As

Publication number Publication date
CN105256935B (en) 2018-07-13

Similar Documents

Publication Publication Date Title
CN205189211U (en) Connection structure in furred ceiling stone material curtain system
US8453388B2 (en) Wall lining
CN104060745B (en) The three-dimensional adjustable fastener of steel construction conversion layer
CN103246093B (en) Liquid crystal display and structure for finely adjusting gap between liquid crystal module and middle frame
CN105256935A (en) Connecting structure of suspended ceiling stone curtain wall system
CN203247742U (en) Hanging piece for stone curtain wall
CN103216069A (en) Floor or wallboard clamping assembly
CN202945726U (en) Adjustable edge strip accommodation installation structure for indoor ceiling wall surface
CN105064588A (en) Novel duplex ceiling and mounting method thereof
CN102102417B (en) Exposed keel structural member
CN203834848U (en) Decorating assembly for exposed corner
CN102230332B (en) Unit-type curtain wall mounting suspender
CN204590382U (en) A kind of mounting structure of furred ceiling
CN103850381A (en) Decorative ceiling structure
CN203213512U (en) Adjustable connection hanging part for heat preservation and decoration integrated plate
CN103572879B (en) For the sky well construction of Integral ceiling
CN203703555U (en) Display wall hanging
CN102748580B (en) Aluminum profile of side column for combined cabinet/rack
CN207260411U (en) A kind of fixed structure of installation of ceiling connector and furred ceiling section bar
CN205063247U (en) Revetment pendant subassembly
CN205329915U (en) Glass partition plane connection structure
CN208396243U (en) A kind of Multi-functional ornamental moulding for Integral ceiling
CN204040275U (en) The three-dimensional adjustable fastener of steel work conversion layer
CN105484399B (en) indoor glass curtain wall system
CN103317946A (en) Wood carving picture frame installation structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant