CN105256711B - The lane device of hard basal plane declivity - Google Patents

The lane device of hard basal plane declivity Download PDF

Info

Publication number
CN105256711B
CN105256711B CN201510637062.8A CN201510637062A CN105256711B CN 105256711 B CN105256711 B CN 105256711B CN 201510637062 A CN201510637062 A CN 201510637062A CN 105256711 B CN105256711 B CN 105256711B
Authority
CN
China
Prior art keywords
pipe
ledge
declivity
panel
fixing hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510637062.8A
Other languages
Chinese (zh)
Other versions
CN105256711A (en
Inventor
任金瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yancheng Yongheng Asset Management Co.,Ltd.
Original Assignee
任金瑞
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 任金瑞 filed Critical 任金瑞
Priority to CN201510637062.8A priority Critical patent/CN105256711B/en
Publication of CN105256711A publication Critical patent/CN105256711A/en
Application granted granted Critical
Publication of CN105256711B publication Critical patent/CN105256711B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The lane device of hard basal plane declivity, is made up of ledge, pipe, cushion block, panel, ferrum is swollen screw, lock nut;It is characterized in that connecting firmly ledge at the declivity two swollen screw of end ferrum, to the sub-fixing hole of declivity drilling pipe on the basis of ledge, pipe fixing hole claims arrangement as two port and connects firmly pipe, welds cushion block or directly weld panel above pipe.

Description

The lane device of hard basal plane declivity
Technical field
The invention belongs to steep cliff construction field, particularly relate to the lane device of hard basal plane declivity.
Background technology
Overhanging cliff landform is special, and walking is by being inconvenient for, and some region only every the steep cliff of several meters, is not having passage In the case of, people then to detour current, especially in some mountains, TV is the most often play, and students study to be walked every day Several hours hill paths, wherein can't do without there is steep cliff passage, although government invests backroad energetically, but steep cliff passage, it is located in Dangerous, the most all in place deep in the mountains, vehicle cannot arrive at all, brings difficulty to construction operation.
Plank road construction on overhanging cliff, different from smooth construction site, being mainly reflected in big machinery cannot arrive Reach, building platform difficulty, it is therefore desirable to the wisdom of humanity goes to create simple and practical scheme, be conducive to accelerating building of mountain area steep cliff passage If solving the practical difficulty of mountain area trip.
Summary of the invention
The present invention is to solve the defect of prior art, it is provided that the lane device skill of a kind of declivity using parts to assemble Art scheme, it is possible to reduce mechanical work program, fast unit passage in the environment that complexity is dangerous, facilitate the mountain area people to pass through.
The lane device of the present invention hard basal plane declivity, by ledge, pipe, cushion block, panel, ferrum is swollen screw, lock nut Composition;It is characterized in that connecting firmly ledge at the declivity two swollen screw of end ferrum, fix to declivity drilling pipe on the basis of ledge Hole, pipe fixing hole claims arrangement as two port and connects firmly pipe, welds cushion block or directly weld panel above pipe.
The lane device of the present invention hard basal plane declivity, can be used for parts assembling formal construction, and technical staff can be real in advance Measure, carry out parts making after determining the length of structure and width, during construction, technical staff should first process steep cliff wall Smooth, then ledge is carried out symmetry and connects firmly, then carry out drawing hole as pipe, carry out after loading pipe pipe and ledge Connect firmly welding, above pipe, then lay panel and carry out welding of panel and pipe;The present invention is by ledge and pipe Combination, makes panel and all pipes, ledge composition one, the force born is drawn to pipe and ledge by panel, finally by The internal stress in rock stratum, uses this technology at the construction field (site) without more mechanized tools, it is only necessary to meets boring and can pacify with electric welding Fill firm, solid passage.
One embodiment of the lane device of the present invention hard basal plane declivity;Described ledge uses I-steel or channel-section steel As raw material, according to requiring to obtain concrete size made by connection on the spot;
In a kind of form, it is drilled with several pipe through holes and ferrum swollen screw fixing hole at ledge;
Further, technical staff should at least introduce two or the swollen screw hole of above ferrum is used for connecting firmly wall at steep cliff wall Frame;
Further, on the basis of ledge, all of pipe fixing hole and the swollen screw hole of ferrum are bored at steep cliff wall;
Further, connecting firmly of the swollen screw of ferrum and lock nut is made at ledge.
The length of described pipe should be greater than the distance more than 30 centimeters of declivity biend;
In a kind of form, pipe first should be loaded the pipe fixing hole of one end by technical staff, then refunds the symmetrical institute of loading Corresponding pipe fixing hole;
Further, technical staff tackles pipe and ledge connects firmly as welding.
Described panel is layed in above ledge, and panel welds with ledge and connects firmly;It is lined with cushion block at panel and pipe way, Cushion block welds with panel and pipe and connects firmly;
In alternative production program, face equipment is above pipe, and panel welds with pipe and connects firmly.
Described hard basal plane, it is characterised in that steep cliff wall is rock stratum.
Accompanying drawing explanation
Fig. 1 is schematic diagram of the present invention;
Fig. 2 is ledge schematic diagram.
Detailed description of the invention
The invention discloses the lane device of hard basal plane declivity, as shown in Figure 1, 2, by ledge 1, pipe 121, cushion block 1211, panel 2, ferrum is swollen screw 111, lock nut 1111 form;It is characterized in that at the declivity 3 two swollen screw of end ferrum 111 Connecting firmly ledge 1, to declivity 3 drilling pipe 121 fixing holes 31 on the basis of ledge 1, pipe 121 fixing hole 31 claims row as two port Arrange and connect firmly pipe 121, weld cushion block 1211 above pipe 121 or directly weld panel 2.
The lane device of the present invention hard basal plane declivity, can be used for parts assembling formal construction, and technical staff can be real in advance Measure, carry out parts making after determining the length of structure and width, during construction, technical staff should first process declivity 3 Face smooth, then carries out symmetry to ledge 1 and connects firmly, and then carries out making pipe 121 and draws hole, carries out pipe after loading pipe 121 Son 121 welds with connecting firmly of ledge 1, then laying panel 2 and carry out welding of panel 2 and pipe 121 above pipe 121. The present invention, by the combination of ledge 1 with pipe 121, makes panel 2 and all pipes 121, ledge 1 composition one, the power born Point is drawn to pipe 121 and ledge 1 by panel 2, finally by the internal stress in rock stratum, uses this technology at the construction field (site) need not be more Mechanized tool, it is only necessary to meet boring and can install firm, solid passage with electric welding.
One embodiment of the lane device of the present invention hard basal plane declivity;Described ledge 1 uses I-steel or groove Steel is as raw material, according to requiring to obtain concrete size made by connection on the spot;
In a kind of form, it is drilled with several pipe 121 through holes 12 and ferrum swollen screw 111 fixing hole 11 at ledge 1;
Further, technical staff should at least introduce two or the swollen screw hole of above ferrum 32 for solid in declivity 3 face Connection ledge 1;
Further, on the basis of ledge 1, all of pipe 121 fixing hole 31 and the swollen screw hole of ferrum 32 are bored declivity 3;
Further, connecting firmly of the swollen screw of ferrum 111 and lock nut 1111 is made at ledge 1.
The length of described pipe 121 should be greater than the distance more than 30 centimeters of declivity 3 biend;
In a kind of form, pipe 121 first should be loaded pipe 121 fixing hole 31 of one end by technical staff, then refunds dress Enter corresponding pipe 121 fixing hole 31 of symmetrical institute;
Further, technical staff tackles pipe 121 and ledge 1 connects firmly as welding.
Described panel 2 is layed in above ledge 1, and panel 2 welds with ledge 1 and connects firmly;Between panel 2 and pipe 121 Being lined with cushion block 1211, cushion block 1211 welds connect firmly with panel 2 and pipe 121;
In alternative production program, panel 2 is installed on above pipe 121, and panel 2 welds with pipe 121 and connects firmly.
Described hard basal plane, it is characterised in that declivity 3 is rock stratum.
Those of skill will appreciate that, without departing from the present invention, disclosed configuration can be carried out suitable tune Whole, that therefore examples described above is merely cited for rather than limits purpose, it will be apparent to those skilled in that recognizes In the case of inconspicuous change aforesaid operations, configuration or processing technology can be carried out the purpose that little amendment reaches identical, this Invention is restricted by claims.

Claims (1)

1. the lane device of hard basal plane declivity, by ledge (1), pipe (121), cushion block (1211), panel (2), ferrum is swollen screw (111), lock nut (1111) composition;It is characterized in that connecting firmly ledge at the swollen screw of declivity (3) two end ferrum (111) (1), to declivity (3) drilling pipe (121) fixing hole (31) on the basis of ledge (1), pipe (121) fixing hole (31) makees two ends Symmetric arrays and connect firmly pipe (121), pipe (121) top welding cushion block (1211) or directly weld panel (2);Ledge (1) use I-steel or channel-section steel as raw material, join made concrete size according to requiring on the spot to obtain;It is drilled with at ledge (1) Several pipes (121) through hole (12) and ferrum swollen screw (111) fixing hole (11);The swollen screw of ferrum (111) and lock is made at ledge (1) Connecting firmly of tight nut (1111);The length of described pipe (121) should be greater than the distance 30 centimeters of declivity (3) biend with On;First pipe (121) is loaded pipe (121) fixing hole (31) of one end, then refunds the corresponding pipe of the symmetrical institute of loading (121) fixing hole (31);Use the combination of ledge and pipe, make panel and all pipes, ledge composition one, the power born Point is drawn to pipe and ledge by panel, finally by the internal stress in rock stratum.
CN201510637062.8A 2015-10-03 2015-10-03 The lane device of hard basal plane declivity Active CN105256711B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510637062.8A CN105256711B (en) 2015-10-03 2015-10-03 The lane device of hard basal plane declivity

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510637062.8A CN105256711B (en) 2015-10-03 2015-10-03 The lane device of hard basal plane declivity

Publications (2)

Publication Number Publication Date
CN105256711A CN105256711A (en) 2016-01-20
CN105256711B true CN105256711B (en) 2016-11-30

Family

ID=55096627

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510637062.8A Active CN105256711B (en) 2015-10-03 2015-10-03 The lane device of hard basal plane declivity

Country Status (1)

Country Link
CN (1) CN105256711B (en)

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101157493B1 (en) * 2009-05-14 2012-06-22 화림에이치앤이 주식회사 The method which expands the pedestrian road
CN101936068B (en) * 2010-08-27 2011-12-28 山东高阳建设有限公司 Method for constructing cliff scaffold platform
GB2488983C (en) * 2011-03-08 2014-12-03 Suspended structure, scaffolding or formwork system
CN202626838U (en) * 2012-04-20 2012-12-26 中交第一公路工程局有限公司 Automatic spraying and preserving system device for high-pier blind spot-free plastic film
CN204139046U (en) * 2014-08-06 2015-02-04 成都佳美嘉科技有限公司 A kind of novel view plank road
CN204959585U (en) * 2015-10-03 2016-01-13 任金瑞 Channel device of hard base face declivity

Also Published As

Publication number Publication date
CN105256711A (en) 2016-01-20

Similar Documents

Publication Publication Date Title
CN109184700B (en) Construction method for clamping rock in soft surrounding rock small-clear-distance tunnel stability
CN104405399A (en) Construction method for excavating support body in tunnel by crossing quicksand stratum
CN106567599A (en) Power transmission tower reinforcing clamps, power transmission tower reinforcing device and power transmission tower reinforcing method
CN103821520B (en) The method of fixing mine vertical shaft shaft equipment
CN203583497U (en) Inversed operation steel pipe column perpendicularity collecting device
CN205171549U (en) Piping lane prefab and prefabricated formula utility tunnel
CN104847020A (en) Limb type circular tube node transferring structure and manufacturing method thereof
CN104912197A (en) Connecting node for steel pipe concrete post and outside U-shaped steel and concrete composite beam
CN103244143B (en) A kind of underground construction excavating construction method and underground station
CN105256711B (en) The lane device of hard basal plane declivity
CN106193334A (en) Assembling type steel structure beam through mortise and tenon type node structure and assemble method
CN207685996U (en) A kind of steel core concrete column and beam main tendon connecting node
CN104196261B (en) A kind of existed concrete bridge post and newly-increased steel beam connecting joint
CN103090107B (en) Construction method for rectangular large section steel structure assembled temporary support pipe joint jack-in mechanism
CN204959585U (en) Channel device of hard base face declivity
CN204825945U (en) A fixture for fixing buried bolt in advance
CN204959586U (en) Channel device of soft base face declivity
KR20180056085A (en) Automation Management Method for Data of Design and Maintenance of Tunnel
CN203881737U (en) Rack device for tunnel excavating and grouting model test
CN105133485B (en) The lane device of soft basal plane declivity
CN203347021U (en) Reticulated shell node of six-directional intersecting case-shaped cross section rod member
CN108825134A (en) A kind of drill bit guidance system and arc large scale piperoof construction method
CN104793262A (en) Stratum hierarchical displacement monitoring method
CN104847035B (en) The construction method of raw-soil body of wall is reinforced in a kind of cutting
CN208486829U (en) A kind of drill bit guidance system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190117

Address after: 354100 Nanping, Fujian province Wenchang city east section of the Finance Committee residential building 3 stories 302 rooms.

Patentee after: Shiny county and new equipment Technology Co., Ltd.

Address before: 354000 In-patient Charge Office of Municipal Hospital No. 10 Li Gang East Road, Shaowu City, Nanping City, Fujian Province

Patentee before: Ren Jinrui

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191206

Address after: Room 1602, B1 Floor, Lijinxiu Jiangnan (West District), east of Gouyun Road, north of Yinhe No. 2 Road, Suzhou City, Anhui Province

Patentee after: Suzhou Huiteng Intellectual Property Consulting Co., Ltd.

Address before: 354100 Nanping city of Fujian province Wenchang County East sheen FC 3 storey residential building Room 302

Patentee before: Shiny county and new equipment Technology Co., Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201223

Address after: 224006 12th floor, yanchuang building, 1 Zhenxing Road, Yandu District, Yancheng City, Jiangsu Province (d)

Patentee after: Yancheng Yongheng Asset Management Co.,Ltd.

Address before: Room 1602, B1 / F, Jinxiu Jiangnan (West District), east of Qingyun Road, north of Yinhe 2nd Road, Suzhou City, Anhui Province

Patentee before: Suzhou Teng Teng Intellectual Property Advisory Co.,Ltd.