CN105256242B - A kind of manufacture method of marine petroleum exploitation equipment forging blank - Google Patents

A kind of manufacture method of marine petroleum exploitation equipment forging blank Download PDF

Info

Publication number
CN105256242B
CN105256242B CN201510684159.4A CN201510684159A CN105256242B CN 105256242 B CN105256242 B CN 105256242B CN 201510684159 A CN201510684159 A CN 201510684159A CN 105256242 B CN105256242 B CN 105256242B
Authority
CN
China
Prior art keywords
forging
temperature
roughing
hardness
manufacture method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510684159.4A
Other languages
Chinese (zh)
Other versions
CN105256242A (en
Inventor
葛辉
周勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Regham Hengrui Energy Equipment Engineering Co ltd
Original Assignee
LYGM SUBSEA OIL EQUIPMENT TECH Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LYGM SUBSEA OIL EQUIPMENT TECH Co Ltd filed Critical LYGM SUBSEA OIL EQUIPMENT TECH Co Ltd
Priority to CN201510684159.4A priority Critical patent/CN105256242B/en
Publication of CN105256242A publication Critical patent/CN105256242A/en
Application granted granted Critical
Publication of CN105256242B publication Critical patent/CN105256242B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of manufacture method of corrosion resistant marine petroleum exploitation equipment forging blank, including following technique step sequence:A. taking suitable raw material carries out forging base, and b first time roughing, c ultrasonic examination pre-tests are underproof to scrap, qualified entrance downstream, d normalizings, the first hardness tests of e, second roughing of f, you can obtain qualified forging blank, in case next step finished heat treatment is used.

Description

A kind of manufacture method of marine petroleum exploitation equipment forging blank
Technical field
The present invention relates to a kind of manufacture method of marine petroleum exploitation equipment forging blank.
Background technology
For the equipment of marine petroleum exploitation, in being chronically exposed to humid air salty, usually because of zero Part is corroded and damages.And these equipment are impacted due to being under continual working condition by alternate load, because And hardness, intensity to parts etc. has requirement higher, usually using the method manufacture workpiece of forging.
The content of the invention
The technical problems to be solved by the invention are:A kind of corrosion resistant marine petroleum exploitation equipment forging blank is provided Manufacture method.
In order to solve the above technical problems, the technical solution adopted in the present invention is:Marine petroleum exploitation equipment forging hair The manufacture method of base, including following technique step sequence:
A. taking composition by weight is:C:0.27~0.33%, Si:0.10~0.40%, Mn:0.65~1.05%, P:≤ 0.010%, S:≤ 0.010%, Cr:0.60~1.10%, Ni:0.60~0.99%, Mo:0.30~0.50%, Nb:≤ 0.04%, Al:≤ 0.03%, V:≤ 0.05%, remaining is Fe and other residual elements;Every other residual element content is added Summation≤1.0% of V, Al, Nb and wherein H:The base steel of≤1.6ppm is raw material, carries out forging base, and initial forging temperature is not more than 1200 DEG C, final forging temperature is not less than 900 DEG C, and Forge Heating holding temperature is 650 DEG C to 750 DEG C, pulls out forging ratio >=26, forging Room temperature is cooled to by final forging temperature in closed stove.
B first time roughing:Sawing is carried out to the blank after the completion of forging, first time roughing is carried out, it is unilateral to stay 8- The surplus of 10mm.
C ultrasonic examination pre-tests, inspection product whether there is defect, and such as hole, shrinkage cavity is underproof to scrap, and closes The entrance downstream of lattice.
D normalizings:Temperature range:900-955 DEG C, soaking time >=0.5T, soaking time is complete from the temperature of patch thermocouple Portion starts timing when reaching the temperature of setting, T is the maximum gauge value that workpiece is measured in inches, is then air cooled to room temperature.
The first hardness tests of e:Hardness test is carried out after the completion of normalizing, hardness number exceeds the scope of HBW269-330, again Normalizing flow is carried out, until hardness determination is qualified.
Second roughing of f:Second roughing is unilateral to stay the surplus of 4-6mm;Carry out ultrasonic examination to visit again, inspection is produced Product whether there is defect, such as hole, shrinkage cavity, and defective work is scrapped.
It is one of to set at least provided with two contact thermocouples in the heat treatment furnace as preferred scheme Between in a furnace, another is arranged on the corner of stove.
Used as preferred scheme, during normalizing, workpiece can only load one layer in heat treatment furnace.
The beneficial effects of the invention are as follows:This manufacture method is by each step such as blank raw material, forging technology, normalizing process Strict control ensure the workpiece blank steady quality for processing, good corrosion resistance can be suitably used for the severe use such as ocean Environment.
The characteristics of selected raw material has austenite and ferritic stainless steel concurrently, intensity is high and intergranular corrosion resistance and resistance to chloride should Power corrosion is significantly improved.
Initial forging temperature is not more than 1200 DEG C, and final forging temperature is not less than 900 DEG C, and Forge Heating holding temperature is 650 DEG C to 750 DEG C, this is that the temperature of forging is too high will to produce the defects such as overheat, burning, decarburization and severe oxidation due to starting;Final forging temperature Too low, the processing hardening of metal is serious, and resistance of deformation is sharply increased, and makes processing be difficult to carry out;And temperature is too low easily forges Crackle.
Normalizing temperature is 900-955 DEG C, soaking time >=0.5T, and T is the maximum gauge value measured in inches of workpiece, can be with Crystal grain refinement and distribution of carbides are homogenized, the internal stress of material is removed.
At least provided with two contact thermocouples in heat treatment furnace, one of them is arranged in the middle of stove, and another sets The corner in stove is put, can be comprehensively accurate to the detection of in-furnace temperature, prevent workpiece to be heated in stove inequality, influence workpiece heat The effect for the treatment of.
Soaking time when the temperature of patch thermocouple entirely reaches the temperature of setting timing, it is ensured that insulation duration, So that workpiece reaches preferable normalizing effect.
During normalizing, workpiece can only load one layer in heat treatment furnace, to ensure that workpiece can be completely heat-treated.
Specific embodiment
Specific embodiments of the present invention are described below.
The manufacture method of marine petroleum exploitation equipment forging blank, including following technique step sequence:
A. taking composition by weight is:C:0.27~0.33%, Si:0.10~0.40%, Mn:0.65~1.05%, P:≤ 0.010%, S:≤ 0.010%, Cr:0.60~1.10%, Ni:0.60~0.99%, Mo:0.30~0.50%, Nb:≤ 0.04%, Al:≤ 0.03%, V:≤ 0.05%, remaining is Fe and other residual elements;Every other residual element content is added Summation≤1.0% of V, Al, Nb and wherein H:The base steel of≤1.6ppm is raw material, carries out forging base, and initial forging temperature is not more than 1200 DEG C, final forging temperature is not less than 900 DEG C, and Forge Heating holding temperature is 700 DEG C, pulls out forging ratio >=26, and forging is closed Stove in room temperature is cooled to by final forging temperature.
B first time roughing:Sawing is carried out to the blank after the completion of forging, first time roughing is carried out, it is unilateral to stay 10mm Surplus.
C ultrasonic examination pre-tests, inspection product whether there is defect, and such as hole, shrinkage cavity is underproof to scrap, and closes The entrance downstream of lattice.
D normalizings:At least provided with two contact thermocouples in heat treatment furnace, one of them is arranged in the middle of stove, separately One corner for being arranged on stove.Workpiece can only load one layer, temperature range in heat treatment furnace:940 DEG C, soaking time >=0.5T, T are the maximum gauge value that workpiece is measured in inches, are then air cooled to room temperature, temperature of the soaking time from patch thermocouple Degree starts timing when entirely reaching the temperature of setting.
The first hardness tests of e:Hardness test is carried out after the completion of normalizing, hardness number exceeds the scope of HBW269-330, again Normalizing flow is carried out, until hardness determination is qualified.
Second roughing of f:Second roughing is unilateral to stay the surplus of 4mm.
G carries out ultrasonic examination and visits again, and inspection product whether there is defect, such as hole, shrinkage cavity.Qualified forging blank Standby next step finished heat treatment is used;Defective work scraps treatment.
The principle and its effect of the above embodiments only illustrative the invention, and the implementation that part uses Example, not for the limitation present invention;It should be pointed out that for the person of ordinary skill of the art, not departing from wound of the present invention On the premise of making design, various modifications and improvements can be made, these belong to protection scope of the present invention.

Claims (1)

1. the manufacture method of marine petroleum exploitation equipment forging blank, including following technique walks sequence:
A. taking composition by weight is:C:0.27~0.33%, Si:0.10~0.40%, Mn:0.65~1.05%, P:≤ 0.010%, S:≤ 0.010%, Cr:0.60~1.10%, Ni:0.60~0.99%, Mo:0.30~0.50%, Nb:≤ 0.04%, Al:≤ 0.03%, V:≤ 0.05%, remaining is Fe and other residual elements;Every other residual element content is added Summation≤1.0% of V, Al, Nb and wherein H:The base steel of≤1.6ppm is raw material, carries out forging base, and initial forging temperature is not more than 1200 DEG C, final forging temperature is not less than 900 DEG C, and Forge Heating holding temperature is 650 DEG C to 750 DEG C, pulls out forging ratio >=26, forging Room temperature is cooled to by final forging temperature in closed stove;
B first time roughing:Sawing is carried out to the blank after the completion of forging, first time roughing is carried out, it is unilateral to stay 8-10mm's Surplus;
C ultrasonic examination pre-tests, inspection product whether there is defect, underproof to scrap, qualified entrance downstream;
D normalizings:At least provided with two contact thermocouples in heat treatment furnace, one of them is arranged in the middle of stove, another The corner of stove is arranged on, workpiece can only load one layer, temperature range in heat treatment furnace:900-955 DEG C, soaking time >=0.5T, T are the maximum gauge value that workpiece is measured in inches, and soaking time entirely reaches setting from the temperature of patch thermocouple Start timing during temperature, be then air cooled to room temperature;
The first hardness tests of e:Hardness test is carried out after the completion of normalizing;If hardness number exceeds the scope of HBW269-330, again Carry out normalizing flow;Until hardness determination is qualified;
Second roughing of f:Second roughing is unilateral to stay the surplus of 4-6mm;Carry out ultrasonic examination to visit again, inspection product is No existing defects, and defective work is scrapped.
CN201510684159.4A 2015-10-21 2015-10-21 A kind of manufacture method of marine petroleum exploitation equipment forging blank Active CN105256242B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510684159.4A CN105256242B (en) 2015-10-21 2015-10-21 A kind of manufacture method of marine petroleum exploitation equipment forging blank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510684159.4A CN105256242B (en) 2015-10-21 2015-10-21 A kind of manufacture method of marine petroleum exploitation equipment forging blank

Publications (2)

Publication Number Publication Date
CN105256242A CN105256242A (en) 2016-01-20
CN105256242B true CN105256242B (en) 2017-07-07

Family

ID=55096167

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510684159.4A Active CN105256242B (en) 2015-10-21 2015-10-21 A kind of manufacture method of marine petroleum exploitation equipment forging blank

Country Status (1)

Country Link
CN (1) CN105256242B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105671431B (en) * 2016-01-27 2017-04-19 南京工程学院 Manufacturing method of steel and forge piece thereof for valve seat of deep sea oil extraction equipment
CN107988565B (en) * 2017-11-28 2019-09-27 钢铁研究总院 A kind of high toughness high hardenability high speed axle steel and its heat treatment method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102384266A (en) * 2011-10-21 2012-03-21 贵阳白云高原紧固件有限公司 Multifunctional crown block piston rod
CN103707019A (en) * 2013-12-12 2014-04-09 浙江浦江齿轮有限公司 Processing process of internal spline gear blank used in agricultural machinery equipment transmission case
CN104264066A (en) * 2014-10-11 2015-01-07 马钢(集团)控股有限公司 Niobium-vanadium containing steel for high-speed train axle
CN104372155A (en) * 2014-10-11 2015-02-25 马钢(集团)控股有限公司 Heat treatment process of high-speed train axle containing niobium

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030185700A1 (en) * 2002-03-26 2003-10-02 The Japan Steel Works, Ltd. Heat-resisting steel and method of manufacturing the same

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102384266A (en) * 2011-10-21 2012-03-21 贵阳白云高原紧固件有限公司 Multifunctional crown block piston rod
CN103707019A (en) * 2013-12-12 2014-04-09 浙江浦江齿轮有限公司 Processing process of internal spline gear blank used in agricultural machinery equipment transmission case
CN104264066A (en) * 2014-10-11 2015-01-07 马钢(集团)控股有限公司 Niobium-vanadium containing steel for high-speed train axle
CN104372155A (en) * 2014-10-11 2015-02-25 马钢(集团)控股有限公司 Heat treatment process of high-speed train axle containing niobium

Also Published As

Publication number Publication date
CN105256242A (en) 2016-01-20

Similar Documents

Publication Publication Date Title
CN104451082B (en) A kind of preparation method of the average grain size 304 austenitic stainless steels less than 100nm
CN106544494B (en) A kind of online soft annealing method suitable for 1Cr17Ni2 stainless steel cold pull wires
CN103014284B (en) Process for modifying GCr15 steel for manufacturing tapered roller
CN105714236A (en) Vacuum pulse carburizing method for martensitic stainless steel
US4404047A (en) Process for the improved heat treatment of steels using direct electrical resistance heating
Kumar et al. Modelling of flow stress and prediction of workability by processing map for hot compression of 43CrNi steel
CN103589839B (en) Heat treatment technique of high-carbon high-chromium stainless steel
CN105401091A (en) 42CrMo shaft part and heat treatment process thereof
CN105256242B (en) A kind of manufacture method of marine petroleum exploitation equipment forging blank
CN106623711B (en) The forging method of tungstenic austenitic heat-resistance steel pipe
US8377235B2 (en) Process for forming steel
CN106248715A (en) Thermal modeling test determines the test method of quenching rate of cooling
CN111445960A (en) Method for optimizing forging technological parameters of 14Cr17Ni2 steel
CN107755428A (en) A kind of preparation method of high-strength beta-titanium alloy thin plate
CN104099456A (en) Forging and heat treatment method of 9Cr18MoV steel forging
CN109868350A (en) A kind of alloy steel heat treatment process
CN110823733A (en) Method for measuring recrystallization temperature of cold-rolled sheet based on box-type resistance furnace
CN102560043A (en) Heat treatment process for large 35CrMo steel axis forgings
CN104404220A (en) 60Si2Mn steel spring heat treatment method
Brett et al. An investigation of the effect of pre-straining on the creep behaviour of a P91 steel at 600° C using impression creep testing
CN105642675B (en) Prevent phosphorus Non-equilibrium Grain Boundary Segregation hot rolling technology control method
CN113642212A (en) Design method and system for refined heat treatment process of large ultrahigh-strength steel shell
CN103849736A (en) Heat treatment process of high-chromium cast iron
CN108430661A (en) Hot rolling roller and its manufacturing method
CN103572022B (en) Heat-treatment method for H13 section steel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220617

Address after: 215636 Daxin Town Daxin village, Zhangjiagang City, Suzhou City, Jiangsu Province

Patentee after: Suzhou regham Hengrui energy equipment Engineering Co.,Ltd.

Address before: 215634 Suzhou regam offshore oil equipment Technology Co., Ltd., gangyang Road, Jingang town, Zhangjiagang City, Suzhou City, Jiangsu Province

Patentee before: SUZHOU LYGM SUBSEA OIL EQUIPMENT TECH. CO.,LTD.

TR01 Transfer of patent right