CN105240030B - A kind of overlapping tunnel bracing members - Google Patents
A kind of overlapping tunnel bracing members Download PDFInfo
- Publication number
- CN105240030B CN105240030B CN201510720219.3A CN201510720219A CN105240030B CN 105240030 B CN105240030 B CN 105240030B CN 201510720219 A CN201510720219 A CN 201510720219A CN 105240030 B CN105240030 B CN 105240030B
- Authority
- CN
- China
- Prior art keywords
- bracing members
- steel
- support
- track
- support system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The invention belongs to the Steel Structural Design in civil engineering industry and manufacturing technology field, and in particular to a kind of overlapping tunnel bracing members.A kind of overlapping tunnel bracing members, it is characterised in that:It is mainly made up of multiple identical support systems and track, and multiple support system accommodated side-by-sides are in orbit;The support system is circular configuration, and bottom is provided with single-wheel edge, and single-wheel edge falls in orbit;It is fixedly connected between adjacent support system by some connectors;The bottom of a support system is latched provided with track most on side, and the track lock is connected with the support system by a horizontally disposed hydraulic jack, and the track lock fixing lock is in orbit.The overlapping tunnel bracing members have the characteristics that low cost, easily fabricated and dismounting, and more conventional support of tunnel equipment can protect bigger section of jurisdiction area in addition, especially more preferable to bottom section of jurisdiction protecting effect.
Description
Technical field
The invention belongs to the Steel Structural Design in civil engineering industry and manufacturing technology field, and in particular to a kind of overlapping tunnel
Road bracing members;The overlapping tunnel Construction of Supporting being mainly used in subway construction, the support especially suitable for downlink tunnel are protected.
Background technology
In Metro Construction, overlapping tunnel is common construction difficult problem to small spacing up and down.Power in shield-tunneling construction
Learn characteristic, typically take first driving downlink tunnel tunnel the method for uplink tunnel again and constructed.When constructing uplink tunnel, meeting
The periphery soil body and the descending tunnel being molded are had an impact, serious meeting make downlink tunnel produce different degrees of faulting of slab ends and
Leak.Typically hydraulic pressure support is taken to protect downlink tunnel in site operation.
Current hydraulic pressure support chassis is controlled using hydraulic power, multi-point support.This kind of supporting form easily produces branch
Stresses in segments is concentrated at support, so that section of jurisdiction locally produces rupture.Whole equipment manufacture difficulty is big, general small formed steel construction factory
It can not manufacture.In addition it is high, not easy to remove and insufficient to downlink tunnel protection also to there is manufacturing expense in existing hydraulic pressure support chassis
The shortcomings of.
The content of the invention
In order to solve the above-mentioned technical problem, it is an object of the invention to provide a kind of overlapping tunnel bracing members.It is described overlapping
Tunnel bracing members have the characteristics that low cost, easily fabricated and dismounting, and more conventional support of tunnel equipment can be protected bigger in addition
Section of jurisdiction area, it is especially more preferable to bottom section of jurisdiction protecting effect.
To achieve these goals, the technical solution used in the present invention is:
A kind of overlapping tunnel bracing members, it is characterised in that:It is mainly made up of multiple identical support systems and track, more
Individual support system accommodated side-by-side is in orbit;The support system is circular configuration, and bottom is provided with single-wheel edge, and single-wheel edge falls in-orbit
On road;It is fixedly connected between adjacent support system by some connectors;The bottom of a support system is set most on side
There is track lock, the track lock is connected with the support system by a horizontally disposed hydraulic jack, the track locks
It is in orbit to detain fixing lock.
The support system is mainly made up of upper support and lower support, and the upper support and lower support are half
Circular configuration, connected between upper support and lower support by hydraulic jack.
The upper support is mainly made up of the steel superstructure of two identical semicircular structures, described two upper steels
Parallelism structural is arranged symmetrically, and is fixedly connected between each other by multiple longitudinally connected I-steel;
The steel superstructure is from upper steel annulus, the vertical bracing members in top, horizontal to bracing members and oblique bracing members group
Into;The upper steel annulus is the semicircle that forms of steel plate bending, and the both ends of upper steel annulus are respectively with upper level to steel branch
The both ends of support are by being welded and fixed;In upper steel annulus and horizontal to being fixedly connected with two top vertical steel branch between bracing members
Support and two oblique bracing members, for supporting and reinforcing.
The lower support is mainly made up of two identical bottom steel construction Parallel Symmetric arrangements, two bottom steel constructions
Between be fixedly connected by multiple longitudinally connected I-steel;
The bottom steel construction is mainly from bottom steel annulus, the vertical bracing members in bottom, horizontal to bracing members and oblique steel branch
Support composition;The bottom steel annulus is the quadrant arc that steel plate bending forms;The level is led to one end of bracing members
Cross bottom steel annulus and bottom vertical steel supporting welding is to the other end of bracing members into one 90 degree of sector, the level
Symmetrical 90 degree of sector structures therewith;One end of the oblique bracing members is welded on the middle part of bottom steel annulus, other end weldering
It is connected on the horizontal angle to bracing members and the vertical bracing members in bottom.
The lower support is also mobile trolley used including one, and the mobile trolley used level that is located at is to the 90 of bracing members both ends
Spend between sector structure;It is described mobile trolley used mainly by four vertical I-steel, four horizontal I-steel and four longitudinal I-shapeds
The cuboid framework structure that steel is welded, mobile trolley used bottom are provided with four single-wheel edge;The track lock and mobile station
Car is connected by a horizontally disposed hydraulic jack.
The steel superstructure it is horizontal to being symmetrically welded with some limited blocks on bracing members.
The present invention has the advantages that:
(1)The invention provides a kind of new low cost, easily fabricated and dismounting overlapping tunnel support equipment.This is overlapping
Tunnel bracing members are using hydraulic jack as major impetus, using steel structural form.The more conventional support of tunnel of support equipment provided
Equipment can protect bigger section of jurisdiction area, especially more preferable to bottom section of jurisdiction protecting effect(It is thick using 20mm in design, 200mm
Wide circular steel plate round steel sheet protects the upper and lower part of section of jurisdiction respectively;The more conventional hydraulic pressure support form of this design strengthens pair
The protection of bottom section of jurisdiction;Point before instead of with face support supports);
(2)The present invention uses bracing members as main body stress and supporting construction, 22a I-steel used and M16 high intensity spiral shells
Bolt is easy to get, and it, which is assembled, uses the welding commonly used in steel construction and bolt connection.This new overlapping tunnel bracing members are easy to
Manufacture, low to Manufactures level requirement, required manufacturing time is 8 days, and only stoste pressure supports chassis manufacturing time
27%;Using traditional steel construction, the cost of whole equipment is 300,000, only the 30% of stoste pressure support chassis cost;
(2)In overlapping tunnel construction, can conveniently it be dismantled on the basis of section of jurisdiction is protected, technical difficulty is low.Dismantle speed
It is faster than uplink tunnel driving speed, does not influence uplink tunnel and normally tunnel.
Brief description of the drawings
Fig. 1 is the overall axonometric drawing of the present invention.
Fig. 2 is the overall side view of the present invention.
Fig. 3 is support system connection figure.
Fig. 4 is support system axonometric drawing.
Fig. 5 is support system front view.
Fig. 6 is upper support organigram.
Fig. 7 is steel superstructure organigram.
Fig. 8 is lower support organigram.
Fig. 9 is bottom steel structure schematic diagram.
Figure 10 is mobile trolley used organigram.
Schematic diagram when Figure 11 is working condition of the present invention.
Schematic diagram when Figure 12 is mobile status of the present invention.
Description of reference numerals:I-support system;II-track;1- upper supports;2- lower support;3- is mobile trolley used;
11- steel superstructures;21- bottoms steel construction;
101- upper steel annulus;The vertical bracing members in 102- tops;103- limited blocks;
201- bottoms steel annulus;The vertical bracing members in 202- bottoms;
The vertical I-steel of 301-;The horizontal I-steel of 302-;303- longitudinal directions I-steel;304- single-wheel edge(Refer to single-wheel edge car
Wheel);305- hydraulic jacks;306- tracks latch;
401- levels are to bracing members;The oblique bracing members of 402-;The longitudinally connected I-steel of 403-.
Embodiment
In order to be better understood from technical scheme, the present invention is carried out below by embodiment and accompanying drawing further
Explanation.
As shown in Figure 1, 2, 3, a kind of overlapping tunnel bracing members, it is characterised in that:It is mainly supported by multiple identicals
System I and track II form(The quantity of the support system I as the case may be depending on, five is excellent), multiple support systems I
(Vertically)Accommodated side-by-side is on track II;The support system I is circular configuration(The knot to match with overlapping tunnel section of jurisdiction
Structure), bottom is provided with single-wheel edge 304(Refer to single wheel flange wheel), single-wheel edge 304 falls on track II;Adjacent support system I it
Between be fixedly connected by some connectors(The connector is preferably channel-section steel);The bottom of a support system I most on side
Provided with track lock 306, the track lock 306 is connected with the support system I by a horizontally disposed hydraulic jack 305
(Hydraulic jack 305 is mainly used in providing thrust power), 306 fixing locks of the track lock are on track II.
As shown in Figure 4,5, the support system I is mainly made up of upper support 1 and lower support 2, the upper support 1
It is semicircular structure with lower support 2, is connected between upper support 1 and lower support 2 by hydraulic jack 305(The hydraulic pressure
Oil cylinder 305 primarily serves the effect that control upper support 1 lifts).
As shown in fig. 6, the upper support 1 is mainly made up of the steel superstructure 11 of two identical semicircular structures,
The described two Parallel Symmetric of steel superstructure 11 arrangements, are fixedly connected by multiple longitudinally connected I-steel 403 between each other;
As shown in fig. 7, the steel superstructure 11 is from upper steel annulus 101, the vertical bracing members 102 in top, horizontal to steel
Support 401 and oblique bracing members 402 form;The semicircle that the upper steel annulus 101 forms for steel plate bending, upper steel annulus
101 both ends respectively with upper level to the both ends of bracing members 401 by being welded and fixed;Upper steel annulus 101 and it is horizontal to
The vertical bracing members 102 in two tops and two oblique bracing members 402 are fixedly connected between bracing members 401(Two tops are vertical
Bracing members 102 and two oblique bracing members 402 are respectively welded on upper level at 1/3rd of bracing members 401 and three points
Two at), for supporting and reinforcing(Two steel superstructures 11 are fixedly connected by four longitudinally connected I-steel 403).
As shown in figure 8, the lower support 2 is mainly made up of two Parallel Symmetric of identical bottom steel construction 21 arrangements,
It is fixedly connected between two bottom steel constructions 21 by multiple longitudinally connected I-steel 403;
As shown in figure 9, the bottom steel construction 21 is mainly by bottom steel annulus 201, the vertical bracing members 202 in bottom, level
Formed to bracing members 401 and oblique bracing members 402;The bottom steel annulus 201 is the quarter circular arc that steel plate bending forms
Shape;The level is welded into one nine to one end of bracing members 401 by the vertical bracing members 202 of bottom steel annulus 201 and bottom
Ten degree of sector, the horizontal other end to bracing members 401 are symmetrical 90 degree of sector structures therewith;The oblique steel branch
One end of support 402 is welded on the middle part of bottom steel annulus 201, and the other end is welded on horizontal to bracing members 401 and bottom vertical steel
The angle of support 202(The vertical bracing members 202 in the bottom and oblique bracing members 402 in overall structure with steel superstructure
The 11 vertical bracing members 102 in top and oblique bracing members 402 are symmetrical above and below;Symmetrically connect between upper support 1 and lower support 2
It is connected to 4 hydraulic jacks 305).
As shown in Figure 10, the lower support 2 also includes one mobile trolley used 3, and described mobile trolley used 3 are located at level to steel
Between 90 degree of sector structures for supporting 401 both ends;Described mobile trolley used 3 mainly by four vertical 301, four levels of I-steel
The cuboid framework structure that I-steel 302 and four longitudinal I-steel 303 are welded, mobile trolley used 3 bottom are provided with four
Single-wheel edge 304;The track lock 306 is connected with mobile trolley used 3 by a horizontally disposed hydraulic jack 305(Track locks
Button 306 is connected with horizontal I-steel 302 by hydraulic jack 305).Vertical I-steel 301 divides front and rear 2 row, vertical in front and rear 2 row
Longitudinal I-steel 303 is connected between I-steel 301, the vertical top and bottom of I-steel 301 are respectively welded horizontal I-steel
302, symmetrically it is welded with single-wheel edge 304 on the horizontal I-steel 302 of bottom.
As shown in fig. 6, the steel superstructure 11 is horizontal to being symmetrically welded with some limited blocks 103 on bracing members 401.
The upper steel annulus 101 and bottom steel annulus 201 are thick using 20mm, and steel plate bending wide 200mm forms.Institute
I-steel is 22a I-steel.
As shown in Figure 11, Figure 12, the present invention can include two states:Working condition and mobile status.During working condition,
Vertical hydraulic jack 305 supports(Hydraulic jack 305 between upper support 1 and lower support 2), upper support 1 and bottom
For the expansion supporting of support 2 at the gap of section of jurisdiction, track lock 306 is locked.Need to open track lock 306 before mobile, by level
Hydraulic jack 305 is retracted to minimum(Hydraulic jack 305 between track lock 306 and support system I), afterwards again by track locks
It is locked to detain 306.During mobile status, first vertical hydraulic jack 305 is shunk, now upper support 1 and lower support 2 it is horizontal to
Bracing members 401 stick together, and are on the horizontal center line of section of jurisdiction, and it is whole that horizontal hydraulic pressure oil cylinder 305 then is strutted into promotion
Equipment is advanced.
The preferred scheme of the above example only present invention, rather than limitation of the present invention, the technology about technical field
Personnel, without departing from the spirit and scope of the present invention, various conversion or modification can also be made, thus it is all equivalent
Technical scheme, both fall within protection scope of the present invention.
Claims (4)
- A kind of 1. overlapping tunnel bracing members, it is characterised in that:It is mainly by multiple identical support systems(Ⅰ)And track(Ⅱ)Group Into multiple support systems(Ⅰ)Accommodated side-by-side is in track(Ⅱ)On;The support system(Ⅰ)For circular configuration, bottom is provided with single-wheel Edge(304), single-wheel edge(304)Fall in track(Ⅱ)On;Adjacent support system(Ⅰ)Between fixed by some connectors Connection;A support system most on side(Ⅰ)Bottom provided with track latch(306), the track lock(306)With the support system System(Ⅰ)Pass through a horizontally disposed hydraulic jack(305)Connection, the track lock(306)Fixing lock is in track(Ⅱ)On;The support system(Ⅰ)Mainly by upper support(1)And lower support(2)Composition, the upper support(1)With bottom branch Support(2)It is semicircular structure, upper support(1)And lower support(2)Between pass through hydraulic jack(305)Connection;The upper support(1)Mainly by the steel superstructure of two identical semicircular structures(11)Form, it is described two on Portion's steel construction(11)Parallel Symmetric is arranged, passes through multiple longitudinally connected I-steel between each other(403)It is fixedly connected;The steel superstructure(11)By upper steel annulus(101), the vertical bracing members in top(102), it is horizontal to bracing members(401) And oblique bracing members(402)Composition;The upper steel annulus(101)The semicircle formed for steel plate bending, upper steel annulus (101)Both ends respectively with upper level to bracing members(401)Both ends by being welded and fixed;In upper steel annulus(101)With It is horizontal to bracing members(401)Between be fixedly connected with two vertical bracing members in top(102)With two oblique bracing members(402), For supporting and reinforcing.
- A kind of 2. overlapping tunnel bracing members according to claim 1, it is characterised in that:The lower support(2)Mainly by Two identical bottom steel constructions(21)Parallel Symmetric arrangement composition, two bottom steel constructions(21)Between connected by multiple longitudinal directions Connect I-steel(403)It is fixedly connected;The bottom steel construction(21)Mainly by bottom steel annulus(201), the vertical bracing members in bottom(202), it is horizontal to bracing members (401)With oblique bracing members(402)Composition;The bottom steel annulus(201)The quadrant arc formed for steel plate bending; It is described horizontal to bracing members(401)One end pass through bottom steel annulus(201)With the vertical bracing members in bottom(202)It is welded into one 90 degree of sector, it is described horizontal to bracing members(401)The other end be symmetrical 90 degree of sector structures therewith;It is described oblique Bracing members(402)One end be welded on bottom steel annulus(201)Middle part, the other end is welded on horizontal to bracing members(401)With The vertical bracing members in bottom(202)Angle.
- A kind of 3. overlapping tunnel bracing members according to claim 2, it is characterised in that:The lower support(2)Also include One mobile trolley used(3), it is described mobile trolley used(3)Positioned at level to bracing members(401)Between 90 degree of sector structures at both ends; It is described mobile trolley used(3)Mainly by four vertical I-steel(301), four horizontal I-steel(302)With four longitudinal I-steel (303)The cuboid framework structure being welded, it is mobile trolley used(3)Bottom be provided with four single-wheel edge(304);The track locks Button(306)With it is mobile trolley used(3)Pass through a horizontally disposed hydraulic jack(305)Connection.
- A kind of 4. overlapping tunnel bracing members according to claim 1, it is characterised in that:The steel superstructure(11)Water Put down to bracing members(401)On be symmetrically welded with some limited blocks(103).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510720219.3A CN105240030B (en) | 2015-10-30 | 2015-10-30 | A kind of overlapping tunnel bracing members |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510720219.3A CN105240030B (en) | 2015-10-30 | 2015-10-30 | A kind of overlapping tunnel bracing members |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105240030A CN105240030A (en) | 2016-01-13 |
CN105240030B true CN105240030B (en) | 2017-12-15 |
Family
ID=55037821
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510720219.3A Active CN105240030B (en) | 2015-10-30 | 2015-10-30 | A kind of overlapping tunnel bracing members |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105240030B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109372540B (en) * | 2018-11-23 | 2020-08-04 | 贵州大学 | Steel support fixing device for tunnel construction |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101712323B (en) * | 2009-12-17 | 2012-10-03 | 中铁一局集团有限公司 | Movable wheel type trolley supporting system for long-distance overlapping shield tunnel of small clear distance |
CN203515600U (en) * | 2013-10-10 | 2014-04-02 | 张金誉 | Triple-changing steel die trolley |
CN203702190U (en) * | 2014-01-26 | 2014-07-09 | 宏润建设集团股份有限公司 | Supporting assembly for overlapped tunnel or short-range construction tunnel |
CN203769791U (en) * | 2014-04-01 | 2014-08-13 | 北京市政建设集团有限责任公司 | Small curvature radius steering sliding device for shield train equipment |
CN104265304B (en) * | 2014-09-24 | 2016-08-17 | 中铁第五勘察设计院集团有限公司 | Subway circular section strengthening construction equipment |
CN104612718B (en) * | 2015-02-12 | 2017-03-08 | 中国水利水电第十四工程局有限公司 | A kind of support chassis for overlapping shield tunnel construction and support table system |
-
2015
- 2015-10-30 CN CN201510720219.3A patent/CN105240030B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN105240030A (en) | 2016-01-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108119166B (en) | Across the large-scale activity fracture belt tunnel prefbricated tunnel lining structure in meizoseismal area and tunnel | |
CN106401614B (en) | One kind being used for big cross section Modelling of Tunnel Excavation in Soft Rock supporting construction and its construction method | |
CN102587689B (en) | Repairing and strengthening method for existing reinforced concrete beam-column joints | |
CN105297744B (en) | A kind of large deep foundation pit assembled type steel support system | |
CN106437724B (en) | Subway station and construction method using rectangular top pipe combination section shield-tunneling construction | |
CN113062354A (en) | Assembly method for prefabricated subway station of open-cut pile support system | |
CN103774543B (en) | A kind of deck type rope arch combination bridge | |
CN103061779B (en) | Novel mine tunnel supporting structure and construction method thereof | |
CN103334778A (en) | Construction technology of step temporary support and partial double side walls | |
CN204476428U (en) | The split type duct pieces of shield tunnel bracing frame of anti-soil disturbance | |
CN105240030B (en) | A kind of overlapping tunnel bracing members | |
CN215444085U (en) | High-strength flexible stainless steel part | |
CN203716044U (en) | Low bearing or middle bearing cable arch combined structural bridge | |
CN211950516U (en) | Rock pillar structure and system for replacing high-ground-stress soft rock large-deformation ultra-small-clear-distance tunnel | |
CN203795435U (en) | Diagonal bracing reinforcing structure | |
CN110080787B (en) | Construction method for in-station stacked shield station-crossing structural type of underground excavation station | |
CN103924981A (en) | Single-arch large-span shallow-buried excavation tunnel reinforcing system and construction method thereof | |
CN203684102U (en) | Supporting system for precast beam formed by connecting span erection of ramp bridge and main line bridge | |
CN206111215U (en) | Be used for big section weak surrounding rock tunnel construction supporting construction | |
CN207538042U (en) | A kind of lower anti-armored concrete stub | |
CN210087353U (en) | Bailey beam supporting system for subway station construction | |
CN102996142B (en) | Construction method of mine tunnel supporting structure with fixed hanging rings | |
CN109854276A (en) | A kind of small spacing multiple track tunnel hole support construction | |
CN203822326U (en) | Reinforcing system for single-arch and large-span type shallowly buried and darkly excavated tunnel | |
CN203716045U (en) | Deck type cable-arch combined structure bridge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20221011 Address after: 430040, No. 1, Soochow Road, Dongxihu District, Hubei, Wuhan Patentee after: CHINA CONSTRUCTION THIRD BUREAU FIRST ENGINEERING Co.,Ltd. Patentee after: CHINA CONSTRUCTION THIRD ENGINEERING BUREAU GREEN INDUSTRY INVESTMENT Co.,Ltd. Address before: 430040, No. 1, Soochow Road, Dongxihu District, Hubei, Wuhan Patentee before: CHINA CONSTRUCTION THIRD BUREAU FIRST ENGINEERING Co.,Ltd. |
|
TR01 | Transfer of patent right |