CN105239609B - Underground continuous wall leakage detection method - Google Patents

Underground continuous wall leakage detection method Download PDF

Info

Publication number
CN105239609B
CN105239609B CN201510669561.5A CN201510669561A CN105239609B CN 105239609 B CN105239609 B CN 105239609B CN 201510669561 A CN201510669561 A CN 201510669561A CN 105239609 B CN105239609 B CN 105239609B
Authority
CN
China
Prior art keywords
diaphram wall
resistivity
resistivity profile
leakage detection
pit dewatering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510669561.5A
Other languages
Chinese (zh)
Other versions
CN105239609A (en
Inventor
黄永进
马文亮
胡绕
唐坚
朱黎明
王水强
殷习容
贾兆磊
李风生
吴锋
何伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Survey Design And Research Institute Group Co ltd
Original Assignee
Shanghai Geotechnical Investigations and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Geotechnical Investigations and Design Institute Co Ltd filed Critical Shanghai Geotechnical Investigations and Design Institute Co Ltd
Priority to CN201510669561.5A priority Critical patent/CN105239609B/en
Publication of CN105239609A publication Critical patent/CN105239609A/en
Application granted granted Critical
Publication of CN105239609B publication Critical patent/CN105239609B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to the field of geotechnical engineering detection and test, in particular to an underground continuous wall leakage detection method. The method is characterized in that the inner side and the outer side of an underground continuous wall are each provided with multiple test holes; resistivity detection is conducted on two adjacent test holes in the same side in sequence before and after foundation pit dewatering, and the resistivity profiles between the two adjacent test holes are worked out according to the detection result; the resistivity profiles of the same position before and after foundation pit dewatering are compared, if it is found that low-resistance abnormality exists in the resistivity profile after foundation pit dewatering compared with the resistivity profile before foundation pit dewatering, it is judged that leakage occurs to the position, corresponding to the low-resistance abnormal resistivity profile, of the underground continuous wall. The underground continuous wall leakage detection method has the beneficial effects that the amount of collected data is large, the detection resolution ratio is high, sensitivity to the resistivity difference is high, and a good effect is achieved on the aspect of ground wall leakage detection; and leakage detection can be conducted on a certain segment of the underground continuous wall at a time, and meanwhile, no influence on the structural body of the underground continuous wall is generated.

Description

Diaphram wall leakage detection method
Technical field
The present invention relates to rock and soil engineering detection and field tests, and in particular to diaphram wall leakage detection method.
Background technology
As developing rapidly for urban underground space construction, foundation ditch project are more and more, not only foundation ditch area is gradually increased, Excavation of foundation pit depth is also increasingly deeper, and diaphram wall has been obtained extensively as a kind of good deep footing groove enclosing structure of combination property General application.It is limited to the factors such as construction technology, joint form, the ground environment impact of diaphram wall so that body of wall presence is oozed The probability increase of leakage hidden danger, seriously threatens the construction safety of foundation ditch.In recent years, as national all kinds of Large Foundation Pits build item Purpose constantly starts, and during excavation of foundation pit, because of diaphram wall seepage, caused all kinds of accidents are of common occurrence for various places. Therefore foundation pit enclosure structure how was found out before excavation of foundation pit with the presence or absence of hidden leakage defect, and necessity is taken before excavation, is had The reinforcement measure in advance of effect, it is to avoid because of the various risks of ground wall seepage generation during excavation, it has also become be badly in need of solving for one in industry A difficult problem.
At present the domestic method for diaphram wall leak detection mainly has boring and coring, sound wave transmission method etc..Drilling Core sample method needs to drill on diaphram wall body and extract concrete core sample, judges that underground connects by observing its appearance features Continuous wall is with the presence or absence of defects such as seepages.Acoustic wave transmission rule was needed before ground wall concrete casting, in its internal possible generation The pre-buried related test tube in structural weak position of seepage, after concrete casting, at two(Or it is multiple)Sound detecting pipe is respectively implanted sound Energy emitter and receptor, judge ground wall with the presence or absence of the defect for causing seepage according to the acoustic velocity and amplitude that measure.Two kinds Method can not integrally detect to diaphram wall, and wherein boring and coring belongs to and damages detection method, to wall body structure sheet Body has destruction, it is impossible to which large area is carried out;Sound wave transmission method needs pre-buried test tube, can increase construction cost, and affects work of constructing Phase.
The content of the invention
The purpose of the present invention is according to above-mentioned the deficiencies in the prior art, there is provided diaphram wall leakage detection method, is led to Cross and compare that base pit dewatering is forward and backward, resistivity between the hole of the instrument connection of diaphram wall both sides judges that diaphram wall whether there is The position and scope of seepage and breakthrough.
The object of the invention is realized being completed by technical scheme below:
A kind of diaphram wall leakage detection method, the seepage of the diaphram wall being arranged on for detection in foundation ditch, its It is characterised by:Some instrument connections are opened up respectively in the inside and outside both sides of the diaphram wall;In forward and backward point of the base pit dewatering Two not adjacent to homonymy successively instrument connections carry out Resistivity testing, and according to testing result two neighboring instrument connection is calculated Between resistivity profile;The resistivity profile at the forward and backward same position of the comparison base pit dewatering, if foundation ditch drop There is low-resistance exception compared to the resistivity profile before precipitation in resistivity profile after water, then position corresponding to the resistivity profile There is seepage in the diaphram wall put.
Solion hand-hole is opened up on the outside of the foundation ditch, it is continuous that the solion hand-hole is located at the underground The outside of the instrument connection on the outside of wall, injects low-resistance solion, the low-resistance ion in the solion hand-hole The injection process of solution with the foundation ditch Precipitation Process;The electricity at the forward and backward same position of the comparison base pit dewatering Resistance rate section, if there is low-resistance exception compared to the resistivity profile before precipitation in the resistivity profile after the base pit dewatering, There is seepage in the diaphram wall of position corresponding to the resistivity profile.
The resistivity profile at the forward and backward same position of the comparison base pit dewatering, judges that the diaphram wall is No position and the scope that there is seepage and breakthrough.
Line described in homonymy between instrument connection covers the section to be detected of the diaphram wall;Adjacent two of homonymy Line between instrument connection covers the seaming position of the diaphram wall.
The instrument connection is arranged in parallel in the both sides of the diaphram wall.
It is an advantage of the invention that:Gathered data amount is big, detection resolution is high, to advantages such as resistivity contrasts sensitivities, on ground Wall leak detection aspect achieves preferable effect;Disposably leak detection can be carried out to certain section of diaphram wall, while right The structure of diaphram wall itself does not produce any impact.
Description of the drawings
Fig. 1 is the first arrangement schematic diagram of the present invention;
Fig. 2 is second arrangement schematic diagram of the present invention;
Fig. 3 is the construction process figure of the present invention.
Specific embodiment
Below in conjunction with accompanying drawing feature of present invention and other correlated characteristics are described in further detail by embodiment, so as to In the understanding of technical staff of the same trade:
As Figure 1-3, labelling 1-4, A1-A4, B1-B4, Y1-Y2 are respectively in figure:Diaphram wall 1, cable 2, inspection Survey instrument 3, seam 4, instrument connection A1-A4, instrument connection B1-B4, solion hand-hole Y1-Y2.
Embodiment one:As shown in figure 1, diaphram wall 1 is arranged in foundation ditch(Foundation ditch is not shown), it is right that the present embodiment is used for Position and scope on the body of wall of diaphram wall with the presence or absence of seepage and breakthrough is detected.
The leakage detection method of diaphram wall 1 is comprised the following steps in the present embodiment:
1)Arrangement hole position:As shown in figure 1, in the inside and outside both sides of foundation ditch, apart from the both sides certain limit of diaphram wall 1 Inside open up instrument connection A1-A4, instrument connection B1-B4.Instrument connection A1-A4, B1-B4 of the inside and outside both sides of foundation ditch should connect respectively away from underground Continuous wall 1-2m, if the distance between instrument connection and diaphram wall are too remote, cannot the seepage region of wall over the ground carry out effectively Detection.The line of instrument connection A1-A4 and the line of instrument connection B1-B4 with the keeping parallelism of diaphram wall 1, and underground is continuous The position of the inside and outside both sides each two instrument connection of wall 1 relative to diaphram wall 1 in symmetrical laying, instrument connection A1-B1 in such as Fig. 1, A2-B2、A3-B3、A4-B4;So, resistivity imaging two dimensional cross-section result map between continuous measured hole hole can be formed, i.e., The resistivity profile of A1-B1 sections can be spliced with the resistivity profile of A2-B2 sections, form instrument connection A1-A2(B1-B2)Scope Interior resistivity profile, is easy to subsequently compare the resistivity contrasts of the inside and outside both sides of diaphram wall 1, so as to complete that underground is connected The positioning of breakthrough and form are recognized in the detection zone of continuous wall 1.Instrument connection opens up position while to ensure respectively located underground Line between the instrument connection of the inside and outside both sides of diaphragm wall 1 to cover detection in need diaphram wall section.
2)First time data acquisition:It is adjacent to the homonymy of the inside and outside both sides of diaphram wall 1 by cable and detecting instrument 3 Carry out across hole resistivity CT detection for the first time between two instrument connections respectively successively, that is, detect the resistivity value between instrument connection, And using this test result as normal resistance rate background value in stratum between instrument connection.As shown in figure 1, detection object includes:A1- A2、A2-A3、A3-A4、B1-B2、B2-B3、B3-B4。
3)Base pit dewatering.
4)Second data acquisition:After base pit dewatering is basically completed, again to the inside and outside both sides of diaphram wall 1 Carry out second across hole resistivity CT detection between the two neighboring instrument connection of homonymy respectively successively, that is, detect the electricity between instrument connection Values of resistivity.As shown in figure 1, detection object includes:A1-A2、A2-A3、A3-A4、B1-B2、B2-B3、B3-B4.
5)Data processing and judgement:The resistivity data of instrument connection twice to collecting carries out Inversion Calculation, obtains two Resistivity profile between the hole of individual instrument connection.Relatively base pit dewatering is forward and backward, the resistivity profile at same position, if a certain resistance The same position of rate section after drainage of foundation pit compared to drainage of foundation pit before there is low-resistance exception, then judge the resistivity profile In corresponding diaphram wall 1 there is seepage in a certain position of a certain section.And why can produce low-resistance and be because extremely, If seepage occurs in diaphram wall, due to the intervention of subsoil water, blowby area is relative to the structural integrity region of diaphram wall 1 Resistivity value is relatively low, especially after base pit dewatering relative to precipitation before low-resistance more project extremely.Contrast base pit dewatering is forward and backward Resistivity profile also can determine whether the scope of breakthrough.
Embodiment two:The present embodiment is compared to the difference of embodiment one:As shown in Fig. 2 opening on the outside of foundation ditch Solion hand-hole Y1, Y2 are provided with, outside the instrument connection A1-A3 in the solion hand-hole Y1-Y2 outsides of diaphragm wall 1 located underground Side.As shown in figure 3, after the completion of first time detection work, into solion hand-hole Y1, Y2 suitable concentration is injected separately into Low-resistance solion, while with the Precipitation Process in foundation ditch, the both sides for making diaphram wall 1 maintain certain differential water pressures, base Subsoil water on the outside of hole can flow into foundation ditch, if diaphram wall 1 has seepage, then solion injection on the outside of foundation ditch The low-resistance solion injected in hole Y1, Y2 can flow to foundation ditch inner side by the breakthrough of diaphram wall 1.So in " data Processing and when judging " resistivity profile that detects for second can more for the first time detect the relative normal resistance of section in the region There is low-resistance exception in rate background value, and the situation abnormal compared to the low-resistance of embodiment one is more notable, more accurate so as to realize Breakthrough position and scope judgement.
As shown in Fig. 2 the line between the adjacent instrument connection of homonymy covers the seam 4 of diaphram wall 1, such as seam 4 In instrument connection A1-A2(B1-B2)、A2-A3(B2-B3)Between, it is to avoid it is exactly in survey as the seam 4 of the suitable happening part of seepage On the vertical line direction of prospect hole and diaphram wall so that the resistivity profile figure between instrument connection can intuitively, significantly show Change in resistance at seam 4, so as to improve accuracy of detection, it is to avoid survey by mistake, leak hunting.
Above-described embodiment is in the specific implementation:Detecting instrument 3 can select in hole electrical instrument to gather between two instrument connections Voltage, current data, need to be laid respectively in the drilling of side relative two during data acquisition by certain intervals, quantity The multicore cable of electrode composition, multicore cable is connected to the instrument host on ground, and the electrode in an instrument connection is transmitting Electrode, the electrode in another corresponding instrument connection is receiving electrode.Electrode spacing in multicore cable is according to detection hole depth Degree selects 0.2m, 0.5m or 1.0m, and in the case where number of poles is certain, the size of electrode spacing is directly proportional to detection depth, visits The depth of survey is bigger, then electrode spacing is bigger.
Pitch of holes between instrument connection A1-A4, B1-B4 according to field condition and need to need to detect the scope of diaphram wall 1 Determine, generally equivalent to test the 1/3-1/2 of hole depth, but less than 10m, because if the pitch of holes of instrument connection is too big, then The propagation of electrical signals that emission electrode from an instrument connection sends away from too far away, and be located at the receiving electrode in another instrument connection will Useful signal cannot be received, last result of detection is affected.
The depth of instrument connection A1-A4, B1-B4 should determine according to the depth of diaphram wall to be checked 1, due to being located at two respectively Emission electrode and receiving electrode in instrument connection carries out at an angle the transmitting and reception of electric current, will be formed between instrument connection The mutually electric current ray pair of oblique, therefore the upper and lower certain distance between the hole that last inverting is obtained in resistivity profile The detection blind area of a triangle, i.e. false data inside can be formed, for the data profile bread depth containing maximum probe for obtaining detection All effective informations in degree, therefore test hole depth need to be more than the depth of diaphram wall to be checked 1 in engineering, typically require more than Ground to be checked wall 5m or so.Meanwhile, the depth of solion hand-hole Y1, Y2 should be shallower than the depth of instrument connection, if because ion Solution injection hole Y1, Y2 are too deep, are unfavorable for the Horizontal Movement of solion so as to which effect cannot be realized, and increase unnecessary Engineering cost.

Claims (5)

1. a kind of diaphram wall leakage detection method, the seepage of the diaphram wall being arranged on for detection in foundation ditch, it is special Levy and be:Some instrument connections are opened up respectively in the inside and outside both sides of the diaphram wall;In the forward and backward difference of the base pit dewatering Two adjacent to homonymy successively instrument connections carry out Resistivity testing, according to testing result be calculated two neighboring instrument connection it Between resistivity profile;The resistivity profile at the forward and backward same position of the comparison base pit dewatering, if the base pit dewatering There is low-resistance exception compared to the resistivity profile before precipitation in resistivity profile afterwards, then position corresponding to the resistivity profile The diaphram wall there is seepage.
2. a kind of diaphram wall leakage detection method according to claim 1, it is characterised in that:In the outer of the foundation ditch Side opens up solion hand-hole, and the solion hand-hole is located at the outer of the instrument connection on the outside of the diaphram wall Side, injects low-resistance solion in the solion hand-hole, and the injection process of the low-resistance solion is with described The Precipitation Process of foundation ditch;The resistivity profile at the forward and backward same position of the comparison base pit dewatering, if the base pit dewatering There is low-resistance exception compared to the resistivity profile before precipitation in resistivity profile afterwards, then position corresponding to the resistivity profile The diaphram wall there is seepage.
3. a kind of diaphram wall leakage detection method according to claim 1, it is characterised in that:The comparison foundation ditch drop The resistivity profile at the forward and backward same position of water, judges the diaphram wall with the presence or absence of seepage and breakthrough Position and scope.
4. a kind of diaphram wall leakage detection method according to claim 1, it is characterised in that:Instrument connection described in homonymy Between line cover the section to be detected of the diaphram wall;Line between two adjacent instrument connections of homonymy covers institute State the seaming position of diaphram wall.
5. a kind of diaphram wall leakage detection method according to claim 1, it is characterised in that:The instrument connection is parallel It is arranged in the both sides of the diaphram wall.
CN201510669561.5A 2015-10-16 2015-10-16 Underground continuous wall leakage detection method Active CN105239609B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510669561.5A CN105239609B (en) 2015-10-16 2015-10-16 Underground continuous wall leakage detection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510669561.5A CN105239609B (en) 2015-10-16 2015-10-16 Underground continuous wall leakage detection method

Publications (2)

Publication Number Publication Date
CN105239609A CN105239609A (en) 2016-01-13
CN105239609B true CN105239609B (en) 2017-05-03

Family

ID=55037408

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510669561.5A Active CN105239609B (en) 2015-10-16 2015-10-16 Underground continuous wall leakage detection method

Country Status (1)

Country Link
CN (1) CN105239609B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106013198B (en) * 2016-05-31 2018-05-08 中铁第四勘察设计院集团有限公司 Foundation pit enclosure structure gap pre-processes construction method
CN106838630B (en) * 2016-12-26 2021-11-26 上海勘察设计研究院(集团)有限公司 Method for detecting leakage of large-scale drainage pipe culvert
CN108760745A (en) * 2018-04-12 2018-11-06 上海建工集团股份有限公司 Diaphram wall seam leakage inspector and method
CN108844684A (en) * 2018-04-17 2018-11-20 中国矿业大学 A method of monitoring diaphram wall seam crossing leakage scenarios
CN109610525A (en) * 2018-12-04 2019-04-12 中国十七冶集团有限公司 A kind of method of quick judgement water-stop curtain construction quality
CN111535373A (en) * 2020-05-12 2020-08-14 中建六局水利水电建设集团有限公司 Deep foundation pit water-proof curtain leakage detection method
CN112924945B (en) * 2021-03-10 2023-09-22 大连理工大学 Underground continuous wall model test system based on cross-hole radar imaging

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5543719A (en) * 1994-07-29 1996-08-06 Ionex Corporation Barrier leak detection using electrokinetic ION transport
JP2006126108A (en) * 2004-11-01 2006-05-18 Taisei Corp Water leakage detecting method
CN102392461A (en) * 2011-09-09 2012-03-28 同济大学 Method for detecting hidden leakage point on waterproof curtain of foundation pit
CN102539478A (en) * 2011-12-15 2012-07-04 黄河水利委员会黄河水利科学研究院 Method for continuous detection of high polymer impermeable wall
CN102691286A (en) * 2012-06-19 2012-09-26 湖南继善高科技有限公司 Method and device for monitoring seepage of underground diaphragm wall of foundation ditch of building
CN103266638A (en) * 2013-06-14 2013-08-28 江苏方建工程质量鉴定检测有限公司 Detection method of leakage site position of underground concrete continuous wall
CN203502372U (en) * 2013-10-22 2014-03-26 王磊 Defect detection system for polymer grouting curtain of dam body

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5543719A (en) * 1994-07-29 1996-08-06 Ionex Corporation Barrier leak detection using electrokinetic ION transport
JP2006126108A (en) * 2004-11-01 2006-05-18 Taisei Corp Water leakage detecting method
CN102392461A (en) * 2011-09-09 2012-03-28 同济大学 Method for detecting hidden leakage point on waterproof curtain of foundation pit
CN102539478A (en) * 2011-12-15 2012-07-04 黄河水利委员会黄河水利科学研究院 Method for continuous detection of high polymer impermeable wall
CN102691286A (en) * 2012-06-19 2012-09-26 湖南继善高科技有限公司 Method and device for monitoring seepage of underground diaphragm wall of foundation ditch of building
CN103266638A (en) * 2013-06-14 2013-08-28 江苏方建工程质量鉴定检测有限公司 Detection method of leakage site position of underground concrete continuous wall
CN203502372U (en) * 2013-10-22 2014-03-26 王磊 Defect detection system for polymer grouting curtain of dam body

Also Published As

Publication number Publication date
CN105239609A (en) 2016-01-13

Similar Documents

Publication Publication Date Title
CN105239609B (en) Underground continuous wall leakage detection method
CN103790594B (en) A kind of shield construction detection and processing method in boulder hole, front
CN107829453B (en) Method and device for detecting leakage of vertical plastic-spreading impermeable curtain
CN105604066B (en) Application of the resistivity profiling in the detection of building foundation pit building enclosure percolating water
CN106324687B (en) A kind of buried irony pipeline detection and accurate positioning method
CN106088174B (en) A kind of soft clay area diaphram wall seepage detection system
CN102955174B (en) Method and device for detecting geological flaws at bottom of foundation pile holes through geological radar
CN106597568A (en) Large-scale drainage pipe culvert positioning method
CN102590874B (en) Method for detecting ground surface crack of upland coal-mining subsidence paddy field
CN108776175B (en) Ultrasonic detection method for average compressive strength of frozen wall
CN113029443B (en) Ultra-deep underground wall leakage risk detection method based on distributed optical fiber sensing
Gao et al. Dynamic monitoring of water in a working face floor using 2D electrical resistivity tomography (ERT)
CN108844684A (en) A method of monitoring diaphram wall seam crossing leakage scenarios
CN105700039A (en) Method for detecting underground pipe in urban road exploration construction
CN108132263A (en) Across the hole radar detection device of diaphram wall internal flaw and method
CN106838630A (en) A kind of method for large-scale draining pipe culvert leak detection
CN109944635B (en) Exploration and treatment method for deep hidden water guide structure of working face
CN112985718B (en) Waterproof curtain evaluation method based on high-density resistivity method
CN105040750B (en) A kind of pile foundation long detection method of stake based on thermal response
CN113703058A (en) Method for detecting underground obstacle by utilizing apparent conductivity and relative dielectric constant
CN205134393U (en) A drilling arrangement structure for detecting underground continuous wall seepage
CN105548362A (en) Acoustic reflection device and method for detecting pile hole base geological flaws
CN207661432U (en) Underground water seepage detection system based on electrochemistry
CN108797656A (en) A kind of detection method of pile foundation multilayer karst cave
CN108867606B (en) Foundation pit engineering pre-construction geological survey process based on TDR technology

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Huang Yongjin

Inventor after: Wu Feng

Inventor after: He Wei

Inventor after: Ma Wenliang

Inventor after: Hu Rao

Inventor after: Tang Jian

Inventor after: Zhu Liming

Inventor after: Wang Shuiqiang

Inventor after: Yin Xirong

Inventor after: Jia Zhaolei

Inventor after: Li Fengsheng

Inventor before: Hu Rao

Inventor before: Ma Wenliang

Inventor before: Huang Yongjin

Inventor before: Wang Shuiqiang

Inventor before: Tang Jian

COR Change of bibliographic data
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 200032 18, building 681, Xiao Mu Qiao Road, Xuhui District, Shanghai.

Patentee after: Shanghai Survey, Design and Research Institute (Group) Co.,Ltd.

Country or region after: China

Address before: 200032 18, building 681, Xiao Mu Qiao Road, Xuhui District, Shanghai.

Patentee before: SHANGHAI GEOTECHNICAL INVESTIGATIONS & DESIGN INSTITUTE Co.,Ltd.

Country or region before: China