CN105234568A - Whole plate thick penetration welding method for intersection joint of circular tube - Google Patents

Whole plate thick penetration welding method for intersection joint of circular tube Download PDF

Info

Publication number
CN105234568A
CN105234568A CN201510218557.7A CN201510218557A CN105234568A CN 105234568 A CN105234568 A CN 105234568A CN 201510218557 A CN201510218557 A CN 201510218557A CN 105234568 A CN105234568 A CN 105234568A
Authority
CN
China
Prior art keywords
pipe
intersection
backing plate
circular tube
cutpoint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510218557.7A
Other languages
Chinese (zh)
Other versions
CN105234568B (en
Inventor
娄峰
陈辉
赵文雅
阙子雄
傅建尧
陈君
张建平
杜冰冰
王涛
孙倩楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Jinggong Steel Structure Group Co Ltd
Original Assignee
Zhejiang Jinggong Steel Structure Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Jinggong Steel Structure Group Co Ltd filed Critical Zhejiang Jinggong Steel Structure Group Co Ltd
Priority to CN201510218557.7A priority Critical patent/CN105234568B/en
Publication of CN105234568A publication Critical patent/CN105234568A/en
Application granted granted Critical
Publication of CN105234568B publication Critical patent/CN105234568B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K31/00Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups
    • B23K31/02Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups relating to soldering or welding
    • B23K31/027Making tubes with soldering or welding

Abstract

The invention belongs to the technical field of steel tube welding and specifically relates to a whole plate thick penetration welding method for an intersection joint of a circular tube. The method comprises the following specific steps that a, the intersection circular tube is cut through a intersection line, and the position of a cutting starting point is marked; b, a starting point of a base plate is identical to the cutting starting point of the intersection circular tube, and an installation datum line is drawn on the outer side of the base plate with the cutting starting point as a datum; c, the intersection circular tube is assembled, and the precision of the installation dimensions of the circular tube is ensured; d, the special-shaped intersection base plate is assembled and stuffed in form the tail portion of the circular tube, and the installation datum line of the base plate is made coincide with the datum line of the inner wall of the circular tube; e, secondary groove machining is conducted, and a groove is polished through a polisher to make the groove face smooth after groove machining is finished; and f, groove machining is conducted, and the intersection joint can meet the requirement of a whole plate thick penetration welding line. According to the method, the conditions that the side portion and the root portion of the circular tube can not achieve full penetration are avoided.

Description

The full thickness of slab method for weld-penetration welding of a kind of Circular Tubular Joints
Technical field
The invention belongs to steel-pipe welding technical field, be specifically related to the full thickness of slab method for weld-penetration welding of a kind of Circular Tubular Joints.
Background technology
Construction steel structure industry is in the stage of high speed development now, and steel construction enterprise is male also rises, and the welding technique of enterprise is important channel and the developing goal of welding for steel structure industry competition.Current large span stadiums, in conference and exhibition center's structure steel fabrication, there is a large amount of continuous line welding nodes, because pipe intersecting mouth is special-shaped irregular weld seam, be difficult to add backing plate welding, pipe caliber (diameter D≤600mm) less than normal simultaneously, workman cannot carry out pipe inside and carry out back gouging, cause this type node cannot reach the welding requirements of full thickness of slab penetration, can not meet the structure stress requirement of design, (fabrication cycle is long can only to pass through to adopt steel-casting, cost improves in a large number), or concept transfer design of having to take the second best (structure change, sensorial effects changes, cost improves).
The angle that the present invention never changes project engineering node structure is set out, there is provided a kind of Circular Tubular Joints full thickness of slab method for weld-penetration welding, the problem of the full thickness of slab penetration weld of intersection is solved from the aspect formulating new welding procedure, meet the tubular joint structure Structural Design Requirement of current steel construction, this case produces thus.
Summary of the invention
The object of the present invention is to provide the full thickness of slab method for weld-penetration welding of a kind of Circular Tubular Joints, the problem of full thickness of slab penetration cannot be reached in order to solve special-shaped intersection welding seam, thus meet design engineer's intersection node structure force request, be applied in engineering under the mode making this node no longer adopt steel-casting to make.
For achieving the above object, concrete technical scheme provided by the invention is: the full thickness of slab method for weld-penetration welding of a kind of Circular Tubular Joints, comprise following concrete steps: the cutting of a, intersection passes through pipe mutually, identify cutpoint position, and draw datum line in inner vertical in axis, this plays cutpoint and backing plate, and to play cutpoint be same position; B, backing plate start position with pass through pipe mutually and rise and cut position consistency, outside backing plate, draw installation reference line to play cutpoint for benchmark; C, assembling are passed through pipe mutually, and are guaranteed pipe installation dimension precision; D, assembling abnormity pass through backing plate mutually, fill in, backing plate installation reference line is overlapped with round tube inner wall datum line from pipe afterbody; The mode of e, employing gouge carries out secondary retaining wall on slope, adopts sander to polish to groove, make groove face fairing after retaining wall on slope; F, routinely melt-through weld technique carry out retaining wall on slope, and tubular joint can reach the requirement of full thickness of slab melt-through weld.
Further, described steps d, pipe caliber is greater than 200mm, length adopts hand to stretch into pipe adjustment when being less than 500mm, if pipe caliber is not more than 200mm, length is not less than 500mm and adopts elongated bar adjustment, makes backing plate and passes through pipe groove profile mutually and fit, be adjacent to welded pipe, then from outside, weldering positioned to backing plate.
Further, described step a, intersection cutting passes through pipe mutually, has identified cutpoint position, and draw in inner vertical in axis the datum line that length is 100mm backward, and this plays cutpoint and backing plate, and to play cutpoint be same position.
The present invention is compared to the beneficial effect of prior art: one, solve first special-shaped intersection can not full thickness of slab penetration welding a difficult problem, make design in not change structure form, preparation method situation carries out the making of the full thickness of slab penetration of energy intersection node, technical capability reaches the designing requirement of the intersection structure of domestic and international design engineer, improves the competitiveness of the technology in this respect of enterprise.
Two, avoid employing cast steel and make node situation, reduce cost of manufacture, shorten the making duration.
Next, by reference to the accompanying drawings present pre-ferred embodiments is described in further details.
Accompanying drawing explanation
Fig. 1 is that new technology passes through pipe node full thickness of slab welding situation schematic diagram mutually;
Fig. 2 phase passes through pipe node toe region welding situation schematic diagram;
Fig. 3 phase passes through pipe node lateral zones welding situation schematic diagram;
Fig. 4 phase passes through pipe node root area welding situation schematic diagram.
Detailed description of the invention
As Figure 1-4, what the present invention disclosed is the full thickness of slab method for weld-penetration welding of a kind of Circular Tubular Joints, specifically comprise the steps: that the cutting of a, intersection passes through pipe mutually, identify cutpoint position, and draw 100mm position reference line in inner vertical in axis backward, this plays cutpoint and backing plate, and to play cutpoint be same position;
B, special-shaped intersection backing plate to be programmed, require this backing plate start position and pass through pipe mutually and rise and cut position consistency, outside backing plate, draw installation reference line to play cutpoint for benchmark;
C, routinely technology mode assembling passes through pipe mutually, guarantees pipe installation dimension precision;
D, assembling abnormity pass through backing plate mutually, fill in from pipe afterbody, backing plate installation reference line is overlapped with round steel inwall datum line, caliber is greater than 200mm, adopt hand to stretch into pipe adjustment when length is less than 500mm, other situations adopt elongated bar adjustment, make backing plate and pass through pipe groove profile mutually and fit, be adjacent to welded pipe, then from outside, weldering positioned to backing plate;
The mode of e, employing gouge carries out secondary retaining wall on slope, adopts sander to polish to groove, make groove face fairing after retaining wall on slope.
F, routinely melt-through weld technique carry out retaining wall on slope, and tubular joint can reach the requirement of full thickness of slab melt-through weld.
Above-described embodiment only illustrates inventive concept of the present invention for explaining, but not the restriction to rights protection of the present invention, all changes utilizing this design the present invention to be carried out to unsubstantiality, all should fall into protection scope of the present invention.

Claims (3)

1. the full thickness of slab method for weld-penetration welding of Circular Tubular Joints, it is characterized in that, comprise following concrete steps: the cutting of a, intersection passes through pipe mutually, has identified cutpoint position, and draw datum line in inner vertical in axis, this plays cutpoint and backing plate, and to play cutpoint be same position; B, backing plate start position with pass through pipe mutually and rise and cut position consistency, outside backing plate, draw installation reference line to play cutpoint for benchmark; C, assembling are passed through pipe mutually, and are guaranteed pipe installation dimension precision; D, assembling abnormity pass through backing plate mutually, fill in, backing plate installation reference line is overlapped with round tube inner wall datum line from pipe afterbody; The mode of e, employing gouge carries out secondary retaining wall on slope, adopts sander to polish to groove, make groove face fairing after retaining wall on slope; F, routinely melt-through weld technique carry out retaining wall on slope, and tubular joint can reach the requirement of full thickness of slab melt-through weld.
2. the full thickness of slab method for weld-penetration welding of a kind of Circular Tubular Joints according to claim 1, it is characterized in that: described steps d, pipe caliber is greater than 200mm, length adopts hand to stretch into pipe adjustment when being less than 500mm, if pipe caliber is not more than 200mm, length is not less than 500mm and adopts elongated bar adjustment, makes backing plate and passes through pipe groove profile mutually and fit, be adjacent to welded pipe, then from outside, weldering positioned to backing plate.
3. the full thickness of slab method for weld-penetration welding of a kind of Circular Tubular Joints according to claim 1, it is characterized in that: described step a, intersection cutting passes through pipe mutually, identify cutpoint position, and draw in inner vertical in axis the datum line that length is 100mm backward, this plays cutpoint and backing plate, and to play cutpoint be same position.
CN201510218557.7A 2015-04-30 2015-04-30 A kind of full thickness of slab method for weld-penetration welding of Circular Tubular Joints Active CN105234568B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510218557.7A CN105234568B (en) 2015-04-30 2015-04-30 A kind of full thickness of slab method for weld-penetration welding of Circular Tubular Joints

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510218557.7A CN105234568B (en) 2015-04-30 2015-04-30 A kind of full thickness of slab method for weld-penetration welding of Circular Tubular Joints

Publications (2)

Publication Number Publication Date
CN105234568A true CN105234568A (en) 2016-01-13
CN105234568B CN105234568B (en) 2017-12-01

Family

ID=55032519

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510218557.7A Active CN105234568B (en) 2015-04-30 2015-04-30 A kind of full thickness of slab method for weld-penetration welding of Circular Tubular Joints

Country Status (1)

Country Link
CN (1) CN105234568B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105672483A (en) * 2016-02-03 2016-06-15 安徽鸿路钢结构(集团)股份有限公司 Arc-shaped cross frame and round pipe connection quality control method
CN108453340A (en) * 2018-03-23 2018-08-28 上海拓直汽车科技有限公司 A kind of welding method of steel construction TKY nodes
CN109396678A (en) * 2018-10-17 2019-03-01 北京市机械施工有限公司 A kind of intersection welding seam welding method
CN109803788A (en) * 2016-06-02 2019-05-24 普列费特制造有限公司 Equipment, system and method for soldered fitting
CN109822199A (en) * 2019-04-22 2019-05-31 晋西工业集团有限责任公司 A kind of process of continuous line welding
CN111749130A (en) * 2019-03-26 2020-10-09 四川省公路规划勘察设计研究院有限公司 Design method for improving fatigue strength of steel pipe concrete intersecting welding joint
CN112411748A (en) * 2020-10-28 2021-02-26 上海二十冶建设有限公司 Method for assembling through opening of truss structure of spatial curved surface pipe
CN114160935A (en) * 2021-11-12 2022-03-11 四川川锅锅炉有限责任公司 Control method for preventing deformation of structural penetration groove

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1824450A (en) * 2005-02-22 2006-08-30 大连新船重工有限责任公司 Technological method of partly submerged type platform complex K type node welding
CN102059434A (en) * 2010-11-18 2011-05-18 上海气焊机厂有限公司 Intersecting line girth welding device
CN202062175U (en) * 2010-12-03 2011-12-07 北京工业大学 Parallel four-degree of freedom intersection line welding robot
KR20130016173A (en) * 2012-12-28 2013-02-14 현대중공업 주식회사 Main pipe and branch pipe welding method
CN103008841A (en) * 2012-09-17 2013-04-03 中铁宝桥集团有限公司 Method for welding of welding robot on circular seam of intersection line of steel pipes of arch bridge

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1824450A (en) * 2005-02-22 2006-08-30 大连新船重工有限责任公司 Technological method of partly submerged type platform complex K type node welding
CN102059434A (en) * 2010-11-18 2011-05-18 上海气焊机厂有限公司 Intersecting line girth welding device
CN202062175U (en) * 2010-12-03 2011-12-07 北京工业大学 Parallel four-degree of freedom intersection line welding robot
CN103008841A (en) * 2012-09-17 2013-04-03 中铁宝桥集团有限公司 Method for welding of welding robot on circular seam of intersection line of steel pipes of arch bridge
KR20130016173A (en) * 2012-12-28 2013-02-14 현대중공업 주식회사 Main pipe and branch pipe welding method

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105672483B (en) * 2016-02-03 2017-11-28 安徽鸿路钢结构(集团)股份有限公司 Arc cross and pipe quality of connection control method
CN105672483A (en) * 2016-02-03 2016-06-15 安徽鸿路钢结构(集团)股份有限公司 Arc-shaped cross frame and round pipe connection quality control method
CN109803788A (en) * 2016-06-02 2019-05-24 普列费特制造有限公司 Equipment, system and method for soldered fitting
CN109803788B (en) * 2016-06-02 2022-04-15 普列费特制造有限公司 Apparatus, system, and method for brazing joints
US10974348B2 (en) 2016-06-02 2021-04-13 Priefert Mfg. Co, Inc. Method for forming a brazed joint
CN108453340B (en) * 2018-03-23 2020-11-10 上海拓直汽车科技有限公司 Welding method of steel structure TKY node
CN108453340A (en) * 2018-03-23 2018-08-28 上海拓直汽车科技有限公司 A kind of welding method of steel construction TKY nodes
CN109396678A (en) * 2018-10-17 2019-03-01 北京市机械施工有限公司 A kind of intersection welding seam welding method
CN111749130A (en) * 2019-03-26 2020-10-09 四川省公路规划勘察设计研究院有限公司 Design method for improving fatigue strength of steel pipe concrete intersecting welding joint
CN111749130B (en) * 2019-03-26 2022-03-15 四川省公路规划勘察设计研究院有限公司 Design method for improving fatigue strength of steel pipe concrete intersecting welding joint
CN109822199A (en) * 2019-04-22 2019-05-31 晋西工业集团有限责任公司 A kind of process of continuous line welding
CN112411748A (en) * 2020-10-28 2021-02-26 上海二十冶建设有限公司 Method for assembling through opening of truss structure of spatial curved surface pipe
CN114160935A (en) * 2021-11-12 2022-03-11 四川川锅锅炉有限责任公司 Control method for preventing deformation of structural penetration groove

Also Published As

Publication number Publication date
CN105234568B (en) 2017-12-01

Similar Documents

Publication Publication Date Title
CN105234568A (en) Whole plate thick penetration welding method for intersection joint of circular tube
CN202117225U (en) Crossed steel column
CN108581259B (en) Method for manufacturing special-shaped complex Chinese character Wang' box-shaped column
WO2018152956A1 (en) Assembled-type round steel pipe casing fiber-reinforced concrete column connecting node and mounting method
CN101435334B (en) In-and-out hole segment pipe sheet connecting structure of shield method and construction method thereof
CN103993669B (en) A kind of affixed node of rectangular elements and assembling method thereof
CN109868470B (en) Laser cladding track planning method
CN105171199A (en) Manufacturing method for double-rhombus connection structure
CN109629680B (en) Assembly type connecting joint of end lap joint type beam and column
CN102658415B (en) Single-arc twin-wire pipeline welding method
CN105710551A (en) Welding method for double-layered tube
CN106245851A (en) Steel reinforcement abutting joints structure and docking calculation thereof and application in a kind of reinforced concrete
CN104846746A (en) Corrugated pipe locating and sealing method in concrete segment precast assembling
CN102615395B (en) Method for welding single-arc double-wire pipelines
KR20180130540A (en) Support structure for wind turbines
CN103286528B (en) Processing technology for longitudinal-seam narrow-gap welding groove of thick-walled barrels
CN108581378A (en) A kind of production method of hull elbow connection pipe
CN105351671A (en) Multi-pipe-piece splicing repair process and pipe repair structure
CN204081083U (en) A kind of variable-diameter joint dot structure of steel core concrete column
CN104841999A (en) Method for manually cutting irregular plate tube penetration hole of arc circular tube
CN209569014U (en) A kind of tubular tunnel segment structure suitable for Circular Shaft
CN110732795A (en) aircraft engine exhaust casing welding method
CN106150084A (en) A kind of mold method wearing muscle template and formwork erecting structure thereof
CN105817841B (en) Shape tube forming method
CN103276851A (en) Ribbed steel tube, concrete-filled ribbed steel tube column and designing method of ribbed steel tube

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Lou Feng

Inventor after: Zhang Jianping

Inventor after: Du Bingbing

Inventor after: Wang Tao

Inventor after: Sun Qiannan

Inventor after: Liu Yueqiang

Inventor after: Gao Liang

Inventor after: Gao Lingli

Inventor after: Chen Hui

Inventor after: Zhao Wenya

Inventor after: Chen Zhijiang

Inventor after: Jue Zixiong

Inventor after: Fu Jianyao

Inventor after: Chen Jun

Inventor after: Zhang Jinhui

Inventor after: Zhang Wei

Inventor before: Lou Feng

Inventor before: Sun Qiannan

Inventor before: Chen Hui

Inventor before: Zhao Wenya

Inventor before: Jue Zixiong

Inventor before: Fu Jianyao

Inventor before: Chen Jun

Inventor before: Zhang Jianping

Inventor before: Du Bingbing

Inventor before: Wang Tao

COR Change of bibliographic data
CI01 Publication of corrected invention patent application

Correction item: Inventor

Correct: Lou Feng Chen Hui Zhao Wenya Jue Zixiong Fu Jianyao Chen Jun Zhang Jianping Du Bingbing Wang Tao Sun Qiannan

False: Lou Feng Chen Hui Zhao Wenya Chen Zhijiang Jue Zixiong Fu Jianyao Chen Jun Zhang Jinhui Zhang Wei Zhang Jianping Du Bingbing Wang Tao Sun Qiannan Liu Yueqiang Gao Liang Gao Lingli

Number: 23

Volume: 32

ERR Gazette correction
CB03 Change of inventor or designer information

Inventor after: Lou Feng

Inventor after: Zhang Jianping

Inventor after: Du Bingbing

Inventor after: Wang Tao

Inventor after: Sun Qiannan

Inventor after: Liu Yueqiang

Inventor after: Gao Liang

Inventor after: Gao Lingli

Inventor after: Chen Hui

Inventor after: Zhao Wenyan

Inventor after: Chen Zhijiang

Inventor after: Jue Zixiong

Inventor after: Fu Jianyao

Inventor after: Chen Jun

Inventor after: Zhang Jinhui

Inventor after: Zhang Wei

Inventor before: Lou Feng

Inventor before: Sun Qiannan

Inventor before: Chen Hui

Inventor before: Zhao Wenya

Inventor before: Jue Zixiong

Inventor before: Fu Jianyao

Inventor before: Chen Jun

Inventor before: Zhang Jianping

Inventor before: Du Bingbing

Inventor before: Wang Tao

COR Change of bibliographic data
GR01 Patent grant