CN105226645A - The statistical method of a kind of electric substation load - Google Patents

The statistical method of a kind of electric substation load Download PDF

Info

Publication number
CN105226645A
CN105226645A CN201510634047.8A CN201510634047A CN105226645A CN 105226645 A CN105226645 A CN 105226645A CN 201510634047 A CN201510634047 A CN 201510634047A CN 105226645 A CN105226645 A CN 105226645A
Authority
CN
China
Prior art keywords
load
power consumption
electric substation
consumption equipment
scaled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510634047.8A
Other languages
Chinese (zh)
Inventor
成国兴
张军委
刘建刚
宋彦清
房洁
王金国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
STATE GRID SHANDONG GUANGRAO COUNTY POWER SUPPLY Co Ltd
State Grid Corp of China SGCC
Dongying Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
STATE GRID SHANDONG GUANGRAO COUNTY POWER SUPPLY Co Ltd
State Grid Corp of China SGCC
Dongying Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by STATE GRID SHANDONG GUANGRAO COUNTY POWER SUPPLY Co Ltd, State Grid Corp of China SGCC, Dongying Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical STATE GRID SHANDONG GUANGRAO COUNTY POWER SUPPLY Co Ltd
Priority to CN201510634047.8A priority Critical patent/CN105226645A/en
Publication of CN105226645A publication Critical patent/CN105226645A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention provides the statistical method of a kind of electric substation load.Its technical scheme is: first by the power consumption equipment of enterprise, some groups are divided into according to the geographical position residing for production link and power consumption equipment, obtain calculated load and the load current parameter of each group of power consumption equipment respectively, during calculating, the load capacity of different operating is scaled the rated capacity under uniform operational system, single-phase load is scaled three-phase load, result of calculation is inserted in load statistical form, then calculate the total load of whole electric substation.Beneficial effect of the present invention: the load calculating electric substation accurately, formulates corresponding measure according to result of calculation, improves operating efficiency, has saved electric energy, is applicable to popularity and uses.

Description

The statistical method of a kind of electric substation load
Technical field
The present invention relates to power supply technique field, the statistical method of especially a kind of electric substation load.
Background technology
At present, supply line's total load of power supply station is a unknown number, and not through the calculating of system, this is all pole irresponsible behavior to electric company and user, also causes unnecessary loss to national wealth.
Summary of the invention
Object of the present invention is exactly the defect existed for prior art, provides the statistical method of a kind of electric substation load.Its technical scheme is: first by the power consumption equipment of enterprise, some groups are divided into according to the geographical position residing for production link and power consumption equipment, obtain calculated load and the load current parameter of each group of power consumption equipment respectively, during calculating, the load capacity of different operating is scaled the rated capacity under uniform operational system, single-phase load is scaled three-phase load, result of calculation is inserted in load statistical form, then calculate the total load of whole electric substation.
Beneficial effect of the present invention: the load calculating electric substation accurately, formulates corresponding measure according to result of calculation, improves operating efficiency, has saved electric energy, is applicable to popularity and uses.
Embodiment
First by the power consumption equipment of enterprise, some groups are divided into according to the geographical position residing for production link and power consumption equipment, obtain calculated load and the load current parameter of each group of power consumption equipment respectively, during calculating, the load capacity of different operating is scaled the rated capacity under uniform operational system, single-phase load is scaled three-phase load, result of calculation is inserted in load statistical form, then calculate the total load of whole electric substation.

Claims (1)

1. the statistical method of electric substation's load, it is characterized in that: first by the power consumption equipment of enterprise, some groups are divided into according to the geographical position residing for production link and power consumption equipment, obtain calculated load and the load current parameter of each group of power consumption equipment respectively, during calculating, the load capacity of different operating is scaled the rated capacity under uniform operational system, single-phase load is scaled three-phase load, result of calculation is inserted in load statistical form, then calculates the total load of whole electric substation.
CN201510634047.8A 2015-09-30 2015-09-30 The statistical method of a kind of electric substation load Pending CN105226645A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510634047.8A CN105226645A (en) 2015-09-30 2015-09-30 The statistical method of a kind of electric substation load

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510634047.8A CN105226645A (en) 2015-09-30 2015-09-30 The statistical method of a kind of electric substation load

Publications (1)

Publication Number Publication Date
CN105226645A true CN105226645A (en) 2016-01-06

Family

ID=54995437

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510634047.8A Pending CN105226645A (en) 2015-09-30 2015-09-30 The statistical method of a kind of electric substation load

Country Status (1)

Country Link
CN (1) CN105226645A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112488560A (en) * 2020-12-10 2021-03-12 国网辽宁省电力有限公司沈阳供电公司 Method for acquiring power capacity configuration
CN113381412A (en) * 2021-05-10 2021-09-10 中国建材国际工程集团有限公司 Load calculation method of float glass production line

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112488560A (en) * 2020-12-10 2021-03-12 国网辽宁省电力有限公司沈阳供电公司 Method for acquiring power capacity configuration
CN113381412A (en) * 2021-05-10 2021-09-10 中国建材国际工程集团有限公司 Load calculation method of float glass production line

Similar Documents

Publication Publication Date Title
CN102866360B (en) A kind of power battery pack allows discharge power predictor method
CN103871000A (en) Probability whole life cycle cost-based power transformer performance comprehensive evaluation method
CN105098777A (en) Low-voltage assistant decision method for rural distribution network
CN103560497B (en) A kind of short circuit current method for limiting based on power network topology adjustment
CN103500999A (en) Low voltage distribution area power supply radius optimization method based on real-time loss
RU2016108996A (en) METHOD FOR INPUT ELECTRIC POWER INTO THE POWER SUPPLY NETWORK
CN105226645A (en) The statistical method of a kind of electric substation load
CN103529265B (en) A kind of ore furnace secondary side Electric Power Measurement System and method
CN104485661A (en) Tidal current automatic regulating method based on node type conversion
CN105406465B (en) A kind of distribution net platform region state analysis method based on load moment nargin
CN104237673A (en) Method for estimating harmonic loss of transformer
CN104158177A (en) Method for calculating daily-running equivalent average load allocation of theoretical line loss of 10kV grid
CN104897945B (en) 380V Three-phase Power Systems short circuit current flow fair curve method for building up
CN107505570B (en) A kind of transformation and distribution system high-voltage circuitbreaker selection improved method
CN104410071A (en) 35KV high voltage distribution network loop-closing and loop-opening current estimation method
CN104201697A (en) Optimal reactive power compensation method for 110KV and 35KV power grids
CN204012716U (en) A kind of 10kV power distribution network optimization device based on phase difference
CN104143039B (en) A kind of method for obtaining system impedance
CN103795075A (en) Phase sequence arrangement adjustment method for three-phase current unbalanced wires of transmission lines in transformer substation
CN105426979A (en) Optimizing method for operation cost of transformer
CN104316805A (en) Testing device for high-capacity direct-current electric appliance
CN104376209A (en) Theoretical line loss computation method for high-voltage transmission long line provided with shunt reactors
CN205104994U (en) Transformer platform district load control ware
CN204391746U (en) A kind of electric block electric power-feeding structure
CN103915835A (en) Method for calculating transient voltage stability limit of direct current sending end island mode

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160106