CN105226555B - A kind of electric stringing cross-line device - Google Patents
A kind of electric stringing cross-line device Download PDFInfo
- Publication number
- CN105226555B CN105226555B CN201410259843.3A CN201410259843A CN105226555B CN 105226555 B CN105226555 B CN 105226555B CN 201410259843 A CN201410259843 A CN 201410259843A CN 105226555 B CN105226555 B CN 105226555B
- Authority
- CN
- China
- Prior art keywords
- rod
- auxiliary
- upper cover
- main
- hinged
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Processing Of Terminals (AREA)
- Electric Cable Installation (AREA)
Abstract
本发明公开了一种电力架线跨线器,包括固设在绝缘杆上端的底座和铰接扣合在底座上的上盖,底座的底座槽内安装有底轮,上盖的上盖槽内通过调节装置安装有辅助轮,底座外壁上固设有支撑杆,支撑杆末端铰接有传动杆,传动杆上端铰接有上连杆,上连杆上端与上盖外壁对应铰接在一起,传动杆下段上滑动套装有上滑套,上滑套中部铰接有沿绝缘杆向下延伸的绝缘棒,绝缘杆上固设有与绝缘棒轴向滑动配合的中滑套,绝缘杆上部设有与传动杆下段配合的摆动腔。可以快速组装或架设,能够在地面完成跨线、挑线、引线功能,操作简单、无需登高,安全性高。
The invention discloses a power line jumper, which comprises a base fixed on the upper end of an insulating rod and an upper cover hingedly fastened on the base, a bottom wheel is installed in the base groove of the base, and a bottom wheel is installed in the upper cover groove of the upper cover. Auxiliary wheels are installed through the adjustment device, a support rod is fixed on the outer wall of the base, a transmission rod is hinged at the end of the support rod, and an upper link is hinged at the upper end of the drive rod. The upper sliding sleeve has an upper sliding sleeve, and the middle part of the upper sliding sleeve is hinged with an insulating rod extending downward along the insulating rod. The insulating rod is fixed with a middle sliding sleeve that slides axially with the insulating rod. The lower section fits the swing cavity. It can be quickly assembled or erected, and can complete the functions of jumping, picking up and leading wires on the ground. It is easy to operate, does not need to climb high, and has high safety.
Description
技术领域technical field
本发明涉及一种电力架线跨线器。The invention relates to a power line jumper.
背景技术Background technique
在输电线路检修工作中,常常遇到更换导地线和拆除导地线的工作,在工作中如何处理和保护下跨10KV及以上电力线路往往是一个核心问题,在以往的施工中,常常采用以下集中处理方法:In the maintenance work of transmission lines, the work of replacing and removing the ground wire is often encountered. How to deal with and protect the power line of 10KV and above in the work is often a core issue. In the past construction, it is often used The following centralized processing methods:
松线法:上跨线(待铺设或待更换的线路)施工前将下跨线(带铺设或待更换线路下方需要跨越的线路)松到地面,待上跨线施工完成后再恢复下跨线路。此方法安全可靠,但需协调下跨线的所有人或管理单位,可实施性较低。Line Loosening Method: Before the construction of the upper span (the line to be laid or replaced), loosen the lower span (the line that needs to be crossed under the laid or replaced line) to the ground, and restore the lower span after the construction of the upper span is completed line. This method is safe and reliable, but it needs to coordinate the owner or management unit of the cross-line, and the implementability is low.
跨越架法:在下跨点处搭建跨越架,跨越架分为单边式跨越架和封闭式跨越架(封闭式跨越架多用于带电跨越施工)。此方法在线路持续跨线时比较稳定,仅适合较长线路或大批量线路的跨线施工,但架设过程复杂,而且需要登高操作,存在跌落危险和就近触电危险,还受地形,下跨线路对地高度等影响,局限性大,施工耗时、耗费多。Spanning frame method: build a spanning frame at the lower span point, and the spanning frame is divided into a single-sided spanning frame and a closed spanning frame (the closed spanning frame is mostly used for live spanning construction). This method is relatively stable when the line continues to cross the line. It is only suitable for the cross-line construction of long lines or large-scale lines. However, the erection process is complicated and requires climbing operations. The impact on the height of the ground has great limitations, and the construction is time-consuming and expensive.
吊环法:用吊环、绳索在跨越点处采用以线吊线(导线吊地线、地线吊导线、导线吊导线)的方法,使导地线远离下跨的线路,从而起到保护作用。此方法与跨越架法类似,需要架设吊线装置,操作相对繁琐,而且此法需要由人登高将上跨线插入吊环中进行挑线和引线,不但操作麻烦而且存在登高危险。Ring method: use rings and ropes at the crossing point to use the method of hanging the wire (the wire hangs the ground wire, the ground wire hangs the wire, and the wire hangs the wire) to keep the ground wire away from the line under the span, so as to play a protective role. This method is similar to the spanning method, requiring the erection of a suspension wire device, and the operation is relatively cumbersome, and this method requires a person to ascend the height and insert the upper span wire into the suspension ring to take up and lead the wire, which is not only cumbersome to operate but also has the danger of climbing.
目前,城市中居民供电基本由地下管道供电代替了传统的架空线路供电,但是在城乡结合部及农村依然是架空线路供电。在城乡结合部及农村进行新线路架设及旧线路改造过程中,一般都会遇到跨线(已有线路)架线的问题。由于在城乡结合部及农村,下跨线的种类很多,如市电供电线、电话线、广电广播线、宽带上网线等等,因此如果采用上述松线法,则需要多部门配合,难度大、工期长,可实施性极小;如果采用上述跨越架法或吊环法,则依然存在着需要架设跨越架或吊线装置,操作繁琐,施工耗时、耗费多的弊端。At present, the power supply for residents in cities is basically replaced by underground pipelines instead of traditional overhead lines, but overhead lines are still used in urban-rural fringe areas and rural areas. During the erection of new lines and the reconstruction of old lines in the urban-rural fringe areas and rural areas, the problem of cross-line (existing line) erection is generally encountered. Since there are many types of crossover lines in the urban-rural fringe area and rural areas, such as mains power supply lines, telephone lines, radio and television broadcasting lines, broadband Internet access lines, etc., if the above-mentioned loosening method is used, it will require the cooperation of multiple departments, which is very difficult , The construction period is long, and the implementability is extremely small; If the above-mentioned spanning frame method or the suspension ring method is adopted, there are still disadvantages that a spanning frame or a hanging wire device needs to be erected, the operation is cumbersome, and the construction is time-consuming and expensive.
发明内容Contents of the invention
本发明就是针对上述不足,提出一种结构合理,体积小,可以快速组装或架设,能够在地面完成跨线、挑线、引线功能,操作简单、无需登高,安全性高的电力架线跨线器。The present invention aims at the above-mentioned deficiencies, and proposes a kind of electric power straddle jumper with reasonable structure, small volume, fast assembly or erection, capable of completing the functions of crossing, picking up and leading wires on the ground, simple operation, no need to climb high, and high safety. device.
为解决上述问题,本电力架线跨线器的结构特点是:包括与绝缘杆上端固接的底座,底座上部设有贯通底座前后两端的底座槽,底座槽内安装有托载电缆的底轮,底座边侧通过铰轴铰接有能扣合到底座上端的上盖,上盖上设有与底座槽对应的上盖槽,上盖槽内通过调节装置安装有辅助轮,调节装置能够调节辅助轮在上盖槽内的深度,底轮和辅助轮外周上设有与电缆配合的环槽,铰轴下方的底座外壁上固设有支撑杆,支撑杆末端铰接有传动杆,传动杆上端铰接有上连杆,上连杆上端与铰轴上方的上盖外壁对应铰接在一起,传动杆下段上滑动套装有上滑套,上滑套中部铰接有沿绝缘杆向下延伸的绝缘棒,绝缘杆上固设有与绝缘棒轴向滑动配合的中滑套,绝缘杆上部设有与传动杆下段配合的摆动腔,绝缘棒下段设有驱动绝缘棒轴向移动的操作件。In order to solve the above problems, the structural features of this power line jumper are: it includes a base fixed to the upper end of the insulating rod, the upper part of the base is provided with a base groove that runs through the front and rear ends of the base, and a bottom wheel for supporting cables is installed in the base groove , the side of the base is hinged with an upper cover that can be fastened to the upper end of the base through a hinge shaft. The upper cover is provided with an upper cover groove corresponding to the base groove, and an auxiliary wheel is installed in the upper cover groove through an adjustment device. The adjustment device can adjust the auxiliary wheel. The depth of the wheel in the groove of the upper cover, the outer circumference of the bottom wheel and the auxiliary wheel is provided with a ring groove that matches the cable, the outer wall of the base below the hinge shaft is fixed with a support rod, the end of the support rod is hinged with a transmission rod, and the upper end of the transmission rod is hinged There is an upper connecting rod, the upper end of the upper connecting rod is hinged with the outer wall of the upper cover above the hinge shaft, the upper sliding sleeve of the lower part of the transmission rod is equipped with an upper sliding sleeve, and the middle part of the upper sliding sleeve is hinged with an insulating rod extending downward along the insulating rod. The rod is fixed with a middle sliding sleeve that slides axially with the insulating rod, the upper part of the insulating rod is provided with a swing chamber that cooperates with the lower part of the transmission rod, and the lower part of the insulating rod is provided with an operating part that drives the insulating rod to move axially.
本电力架线跨线器是通过可调节夹紧式滚动支撑结构来实现可以快速组装或架设,能够在地面完成跨线、挑线、引线功能,操作简单、无需登高,安全性高的。This power line straddling device can be quickly assembled or erected through an adjustable clamping rolling support structure. It can complete the functions of crossing, picking up and leading wires on the ground. It is easy to operate, does not need to climb high, and has high safety.
可调节夹紧式滚动支撑结构主要包括由绝缘杆支撑的底座和铰接在底座上的上盖,上盖可以绕铰轴转动以实现扣合在底座上或从底座上掀开的功能。底座上设有底座槽,底座槽水平延伸并贯通底座两端,底座槽主要为穿过的电缆提供穿越空间。为方便叙述,在水平面内,将底座槽所贯通的两端方向分别称为前和后,其连接方向称为纵向,底座槽两侧的方向分别称为左和右,其连接的方向称为横向,将垂直水平面的方向称为竖向或垂直方向。底座槽内安装有底轮,底轮转轴的轴心线横向设置。滚轮将起到滚动支撑所穿过电缆的作用,减小了穿过摩擦力,提高了穿过顺畅性并保证了电缆表皮的完整性。上盖上也设有与底座槽对应的上盖槽,上盖槽也贯通上盖两端设置。当上盖扣合到底座上时,上盖槽和底座槽将上下连接成一体。为方便叙述将上盖槽和底座槽上下连接成一体的腔道或贯通槽称为“传送槽”或“全槽”,将上盖和底座扣合在一起的状态称为扣合状态或闭合状态,将上盖从底座上掀开的状态称为掀开状态或开启状态。上盖槽内设置有辅助轮,辅助轮通过调节装置安装在上盖上。辅助轮的转轴轴心线也是左右延伸设置或者横向设置,这样,在扣合状态时,辅助轮转轴和底轮转轴平行设置。因为底轮和辅助轮外周上设有与电缆配合的环槽,所以,在扣合状态时辅助轮和底轮之间将形成一个类似圆形的间隙或空腔,该间隙或空腔就是传送电缆时电缆通过的空腔。为方便叙述,将该空腔称为“传送腔”或“电缆腔”。调节装置的主要作用,是对辅助轮在上盖槽内的深浅位置进行调节,就是调节扣合状态时辅助轮和底轮的间距,也就是调节传送腔的大小或粗细。当传送腔比上跨线电缆粗时,电缆与底轮、辅助轮的滚动配合使电缆在传送腔内顺畅传送。为方便叙述,将辅助轮和底轮的这种配合状态称为“传送状态”或“顺畅状态”。The adjustable clamping rolling support structure mainly includes a base supported by insulating rods and an upper cover hinged on the base. The upper cover can rotate around the hinge axis to realize the function of being fastened on the base or lifted from the base. The base is provided with a base groove, the base groove extends horizontally and runs through both ends of the base, and the base groove mainly provides passing space for passing cables. For the convenience of description, in the horizontal plane, the directions of the two ends through which the base groove penetrates are respectively called front and rear, and the connecting direction is called longitudinal direction, and the directions on both sides of the base groove are called left and right, respectively, and the connecting direction is called Transversely, the direction perpendicular to the horizontal plane is referred to as the vertical or vertical direction. A bottom wheel is installed in the base groove, and the axis line of the bottom wheel rotating shaft is arranged horizontally. The rollers will play the role of rolling support for the passing cables, reducing the passing friction, improving the passing smoothness and ensuring the integrity of the cable skin. The upper cover is also provided with an upper cover groove corresponding to the base groove, and the upper cover groove is also provided through two ends of the upper cover. When the upper cover is fastened on the base, the upper cover groove and the base groove will be connected up and down as a whole. For the convenience of description, the cavity or through groove that connects the upper cover groove and the base groove up and down is called "transfer groove" or "full groove", and the state where the upper cover and the base are fastened together is called the buckled state or closed state. State, the state that the upper cover is lifted from the base is called the lifted state or the open state. An auxiliary wheel is arranged in the slot of the upper cover, and the auxiliary wheel is installed on the upper cover through the adjustment device. The axis line of the rotating shaft of the auxiliary wheel is also extended from left to right or arranged laterally, so that in the buckled state, the rotating shaft of the auxiliary wheel is arranged parallel to the rotating shaft of the bottom wheel. Because the outer circumference of the bottom wheel and the auxiliary wheel is provided with a ring groove that matches the cable, a similar circular gap or cavity will be formed between the auxiliary wheel and the bottom wheel in the fastened state, and this gap or cavity is the transmission The cavity through which the cable passes. For the convenience of description, this cavity is called "transmission cavity" or "cable cavity". The main function of the adjusting device is to adjust the depth of the auxiliary wheel in the groove of the upper cover, that is, to adjust the distance between the auxiliary wheel and the bottom wheel in the buckled state, that is, to adjust the size or thickness of the transmission cavity. When the transmission cavity is thicker than the upper jumper cable, the rolling cooperation of the cable with the bottom wheel and the auxiliary wheel makes the cable smoothly transmitted in the transmission cavity. For convenience of description, this cooperative state of auxiliary wheel and bottom wheel is called " transmission state " or " smooth state ".
在本电力架线跨线器中,底座上还固设有支撑杆,支撑杆位于上盖和底座之间连接铰轴的下方。支撑杆末端铰接有一根传动杆,传动杆上端铰接有上连杆,上连杆上端与铰轴上方的上杆部分对应铰接在一起。因为上连杆和传动杆所上铰接配合个各个铰轴一般都是与上盖和底座之间的铰轴平行设置的,而不是垂直设置的,因此当上下摆动传动杆下端时,传动杆上端也会驱动上连杆下端上下摆动,又因为支撑杆和铰轴是相对固定不动的,因此上连杆下端的上下摆动只能通过上连杆上端驱动上盖绕铰轴左右摆动,这样也就实现了驱动上盖的扣合或敞开。传动杆下段上滑动套装有上滑套,上滑套上铰接有向下竖直延伸的绝缘棒,绝缘杆上固设有滑动套装绝缘棒的中滑套,这样中滑套就将绝缘棒的动作限定为只能上下滑动。绝缘棒下端设置有操作件,通过移动操作件可以很方便地驱动绝缘棒上下移动,此时绝缘棒上端的上滑套会将绝缘棒的上下滑动的力分为驱动传动杆下段上下移动的力和使上滑套沿传动杆上下滑动的力,这样就可以通过传动杆和上连杆的传动驱动上盖完成扣合或敞开动作。详细而言,在地面上通过操作件驱动绝缘棒向上移动时,绝缘棒上端将驱动传动杆下端上移并使传动杆上端下移,此时传动杆上端将通过上连杆将上盖从底座上拉起,也就完成了在地面上控制绝缘杆上方的上盖敞开或开盖动作。反之,当通过操作件驱动绝缘棒下移时,支撑杆将通过上连杆驱动上盖扣合到底座上,也就完成了在地面上控制绝缘杆上方的上盖扣合或扣盖动作。为方便叙述,将在地面上控制绝缘杆上方的上盖进行开盖或扣盖动作的所有传动机构称为远控机构。In the power line jumper, a support rod is also fixed on the base, and the support rod is located below the connecting hinge shaft between the upper cover and the base. A drive rod is hinged at the end of the support rod, and an upper link is hinged at the upper end of the drive rod, and the upper end of the upper link is hinged with the upper rod part above the hinge shaft correspondingly. Because the hinges on which the upper connecting rod and the transmission rod are hinged are generally arranged parallel to the hinge shaft between the upper cover and the base, rather than vertically, so when the lower end of the transmission rod is swung up and down, the upper end of the transmission rod It will also drive the lower end of the upper link to swing up and down, and because the support rod and the hinge shaft are relatively fixed, the up and down swing of the lower end of the upper link can only be driven by the upper end of the upper link to swing the upper cover around the hinge axis. The fastening or opening of the drive loam cake has just been realized. The upper sliding sleeve of the lower part of the transmission rod has an upper sliding sleeve, and the upper sliding sleeve is hinged with an insulating rod extending vertically downward. Actions are limited to sliding up and down only. The lower end of the insulating rod is provided with an operating part, which can be conveniently driven to move the insulating rod up and down by moving the operating part. At this time, the upper sliding sleeve at the upper end of the insulating rod will divide the force of the insulating rod sliding up and down into the force driving the lower part of the transmission rod to move up and down. And the force that makes the upper sliding sleeve slide up and down along the transmission rod, so that the upper cover can be driven by the transmission of the transmission rod and the upper connecting rod to complete the fastening or opening action. In detail, when the insulating rod is driven upward by the operating part on the ground, the upper end of the insulating rod will drive the lower end of the transmission rod to move up and the upper end of the transmission rod will move down. At this time, the upper end of the transmission rod will move the upper cover from the base through the upper link. Pull up, just finished the loam cake on the control insulation bar top on the ground and open or uncap action. Conversely, when the insulating rod is driven down by the operating member, the support rod will drive the upper cover to snap onto the base through the upper connecting rod, thus completing the upper cover buckling or buckling action on the ground to control the insulating rod. For the convenience of description, all transmission mechanisms that control the upper cover above the insulating rod on the ground to open or buckle the cover are called remote control mechanisms.
当远控机构与调节装置配合时,便可以实现三种功能:固定夹持住上跨线电缆头从下跨线电缆一侧跨越到下跨线电缆另一侧(跨线或越线)、固定夹持住上跨线电缆头并向前引导、拽拉上跨线电缆(引线)、将上跨线电缆挑高到下跨线上方并保持与上跨线电缆顺畅、稳定的托举关系(挑线)。When the remote control mechanism cooperates with the adjustment device, three functions can be realized: fixedly clamping the upper jumper cable head and crossing from one side of the lower jumper cable to the other side of the lower jumper cable (jumping or jumping), Fix and hold the upper jumper cable head and guide it forward, pull the upper jumper cable (lead wire), lift the upper jumper cable above the lower jumper and maintain a smooth and stable lifting relationship with the upper jumper cable (pick the thread).
通过操作调节装置,可以控制传送腔的粗细。当传送腔比上跨线电缆粗时,电缆与底轮、辅助轮的滚动配合使电缆在传送腔内顺畅传送。详细而言,当需要电缆在传送腔内顺畅传送时,将上盖和底座切换到扣合状态,通过调节装置将辅助轮向上调节,也就是向上盖槽槽底方向调节,此时传送腔横截面变大,比所传送电缆要粗。当电缆在电缆腔内传送时,受电缆重力作用,一般只有底轮会通过其环槽对电缆下部及下部两侧进行滚动支撑及限位,只有在电缆向上晃动而脱离底轮时,辅助轮才会通过其环槽对电缆上部及上部两侧进行滚动支撑及限位,因此电缆四周都会受到辅助轮和底轮比较有“弹性”的滚动支撑及滚动限位作用,电缆在传送腔内的活动范围比较大,这样电缆就可以在传送腔内顺畅移动,还可以通过底座和上盖自由抬高或降低传送腔内电缆且不会影响电缆的传送速度和表皮完整性。传送状态适合在上跨线电缆已经跨过下跨线且上跨线已经插装到传送腔内时滚动支撑电缆快速传送使用。为方便叙述,将辅助轮和底轮的这种配合状态称为“传送状态”或“顺畅状态”。By operating the regulating device, the thickness of the transmission cavity can be controlled. When the transmission cavity is thicker than the upper jumper cable, the rolling cooperation of the cable with the bottom wheel and the auxiliary wheel makes the cable smoothly transmitted in the transmission cavity. In detail, when the cable needs to be smoothly transmitted in the transmission chamber, the upper cover and the base are switched to the buckled state, and the auxiliary wheel is adjusted upward through the adjustment device, that is, the direction of the bottom of the upper cover groove is adjusted. At this time, the transmission chamber is horizontal. The section becomes larger and thicker than the conveying cable. When the cable is conveyed in the cable cavity, due to the gravity of the cable, generally only the bottom wheel will roll and support and limit the lower part of the cable and the two sides of the lower part through its ring groove. Only when the cable shakes upwards and leaves the bottom wheel, the auxiliary wheel The upper part of the cable and the two sides of the upper part will be supported and limited by rolling through its ring groove. Therefore, the surroundings of the cable will be supported and limited by the "elastic" rolling support and rolling position of the auxiliary wheel and the bottom wheel. The movement of the cable in the transmission cavity The range of motion is relatively large, so that the cables can move smoothly in the transmission cavity, and the cables in the transmission cavity can be raised or lowered freely through the base and the upper cover without affecting the transmission speed and skin integrity of the cables. The transmission state is suitable for rapid transmission of the rolling support cable when the upper jumper cable has crossed the lower jumper and the upper jumper has been inserted into the transfer cavity. For convenience of description, this cooperative state of auxiliary wheel and bottom wheel is called " transmission state " or " smooth state ".
当传送腔比上跨线电缆细时,在远控机构的驱动下,上盖压紧在底座上,辅助轮和底轮将上跨线电缆夹持住,此时上跨线电缆相对固定在传送腔内。详细而言,操作调节装置将扣合状态下的辅助轮向下移动,也就是将辅助轮从上盖槽槽底抬升,此时辅助轮和底轮间距缩小,传送腔变得比要传送电缆也就是上跨线电缆要细。这样,在扣合状态下,辅助轮和底轮将对上跨线电缆产生上下“夹持力”而将上跨线电缆夹持传送腔内,上跨线电缆与底座、上杆相对固定在一起,此时可以通过绝缘杆将夹持住的上跨线电缆头由下跨线一侧跨越到另一侧。为方便叙述,将此辅助轮和底轮的这种配合状态称为“夹持状态”或“夹紧状态”。When the transmission cavity is thinner than the upper jumper cable, driven by the remote control mechanism, the upper cover is pressed tightly on the base, and the auxiliary wheel and the bottom wheel clamp the upper jumper cable. At this time, the upper jumper cable is relatively fixed on the inside the transmission chamber. In detail, operating the adjusting device will move the auxiliary wheel in the buckled state downward, that is, the auxiliary wheel will be lifted from the bottom of the upper cover groove, at this time, the distance between the auxiliary wheel and the bottom wheel will be reduced, and the transmission cavity will become larger than the cable to be transported. That is, the upper jumper cable should be thinner. In this way, in the buckled state, the auxiliary wheel and the bottom wheel will produce an up and down "clamping force" on the upper jumper cable to clamp the upper jumper cable into the transmission cavity, and the upper jumper cable is relatively fixed on the base and the upper rod. At the same time, at this time, the clamped upper jumper cable head can be spanned from one side of the lower jumper to the other side through the insulating rod. For convenience of description, this cooperative state of the auxiliary wheel and the bottom wheel is called "clamping state" or "clamping state".
在架线需要跨线时,一般需要两套本电力架线跨线器配合工作。第一步将两套套电力架线跨线器都调节成夹紧状态,再操作第一套电力架线跨线器的远控机构使其夹紧上跨线电缆前部,然后上举绝缘杆将上跨线电缆前部由下跨线电缆一侧(后方)跨越到下跨线电缆另一侧(前方),这样就实现了跨线或越线。第二步操作第二套电力架线跨线器的远控机构夹持住跨越到下跨线电缆前方的上跨线电缆前部(相当于完成了引线功能)。第三步将第一套电力架线跨线器从上跨线电缆上撤下并操作调节装置使其切换到传送状态,最后将其上盖和底座套装到上跨线电缆上,这样就完成了对上跨线电缆的顺畅挑线。在第一套电力架线跨线器的挑线托举作用下,举着第二套电力架线跨线器向前移动时,便可将上跨线电缆从下跨线一侧(后方)远远不断地向另一侧(前方)跨线或越线。When the wiring needs to be crossed, generally two sets of this electric power wiring crossing device are required to work together. The first step is to adjust the two sets of power overhead line jumpers to the clamping state, and then operate the remote control mechanism of the first set of electric power overhead line jumpers to clamp the front part of the upper jumper cable, and then lift the insulating rod The front part of the upper jumper cable is crossed from one side (rear) of the lower jumper cable to the other side (front) of the lower jumper cable, so that the jumper or jumper is realized. The second step is to operate the remote control mechanism of the second set of power line jumper to clamp the front part of the upper jumper cable that crosses to the front of the lower jumper cable (equivalent to completing the leading function). The third step is to remove the first set of power jumper from the upper jumper cable and operate the adjustment device to switch to the transmission state, and finally put its upper cover and base on the upper jumper cable, which is completed This ensures smooth take-up of the jumper cables. Under the lifting action of the first set of power overhead jumpers, when the second set of power overhead jumpers is held and moved forward, the upper jumper cable can be pulled from the lower jumper side (rear) Continuously crossing or crossing the line to the other side (forward).
作为一种实现方式,所述调节装置包括框架,框架包括两根平行设置的纵杆和设置在纵杆对应端部之间横杆,横杆两端通过横轴与纵杆连接在一起,横杆绕横轴转动,辅助轮对应安装在两纵杆之间,还包括贯通上盖内外的螺孔及与螺孔配合的螺杆,螺杆上端面上设有驱动槽,螺杆下端同轴固设有延伸杆,延伸杆下端同轴固设有直径比延伸杆大的圆盘,横杆中部设有与延伸杆、圆盘转动配合的横腔。As an implementation, the adjustment device includes a frame, the frame includes two parallel longitudinal bars and a cross bar arranged between the corresponding ends of the longitudinal bars, the two ends of the cross bar are connected with the longitudinal bar through a transverse shaft, and The rod rotates around the horizontal axis, and the auxiliary wheel is correspondingly installed between the two longitudinal rods. It also includes a screw hole passing through the inside and outside of the upper cover and a screw that matches the screw hole. There is a driving groove on the upper end of the screw, and a coaxial fixed An extension rod, the lower end of the extension rod is coaxially fixed with a disc with a diameter larger than that of the extension rod, and the middle part of the cross bar is provided with a transverse cavity that is rotatably matched with the extension rod and the disc.
因为框架包括由横轴连接而成的两根纵杆和两根横杆,且辅助轮安装在两纵杆之间,所以当框架升降时,辅助轮也必然随之升降。横杆中部设有横腔,横腔内盛装有螺杆下端的延伸杆和圆盘。因为螺杆、延伸杆和圆盘都是同轴设置的,而且圆盘的直径大于延伸杆直径,所以螺杆只能通过延伸杆和圆盘相对横杆绕螺杆轴心线转动,而不能沿螺杆轴心线上下滑动。上盖上设有两个螺孔,框架两端的两根螺杆分别与两个螺孔对应螺接配合,所以,当螺杆旋进对应螺孔内时,框架将通过两根螺杆吊装在上盖的上盖槽内。螺杆外端设有驱动槽,当从上盖外侧推动驱动槽转动时,螺杆将相对螺孔旋进或旋出。此时由于框架不能随螺杆一起转动,所以框架只能在圆盘和延伸杆的带动下沿螺杆轴向移动,也就是深入上盖槽槽底或远离上盖槽槽底,也就实现了辅助轮的升降。因为横杆通过横轴与纵轴铰接配合,因此在旋动螺杆时,两根螺杆可以不同步,即先升降框架一端再升降框架另一端,避免了同步旋动螺杆时的不便捷性。Because the frame includes two longitudinal bars and two cross bars connected by transverse shafts, and the auxiliary wheels are installed between the two longitudinal bars, so when the frame is raised and lowered, the auxiliary wheels must also be raised and lowered thereupon. The middle part of the cross bar is provided with a transverse cavity, and the extension rod and the disc at the lower end of the screw rod are contained in the transverse cavity. Because the screw, extension rod and disc are coaxially arranged, and the diameter of the disc is larger than the diameter of the extension rod, the screw can only rotate around the axis of the screw relative to the cross bar through the extension rod and the disc, but not along the axis of the screw. The heart line slides up and down. There are two screw holes on the upper cover, and the two screw rods at both ends of the frame are respectively screwed and matched with the two screw holes. Therefore, when the screw rods are screwed into the corresponding screw holes, the frame will be hoisted on the upper cover through the two screw rods. In the cover slot. The outer end of the screw rod is provided with a driving groove, and when the driving groove is pushed to rotate from the outside of the upper cover, the screw rod will be screwed in or out relative to the screw hole. At this time, because the frame cannot rotate with the screw, the frame can only move axially along the screw under the drive of the disc and the extension rod, that is, go deep into the bottom of the groove of the upper cover or away from the bottom of the groove of the upper cover. Wheel lift. Because the horizontal bar is hinged with the vertical axis through the horizontal axis, when the screw rods are rotated, the two screw rods can be asynchronous, that is, one end of the frame is lifted first and then the other end of the frame is lifted, which avoids the inconvenience of synchronously rotating the screw rods.
作为改进,纵杆外侧固设有滑块,滑块的长度方向与纵杆的长度方向垂直设置且与螺杆轴向平行设置,上盖槽槽壁上设有与滑块对应滑动配合的滑槽。As an improvement, a slider is fixed on the outside of the longitudinal rod, the length direction of the slider is perpendicular to the length direction of the longitudinal rod and parallel to the axial direction of the screw rod, and the groove wall of the upper cover is provided with a sliding groove corresponding to the slider .
在纵杆外侧设置滑块,并在上盖槽侧壁上设置与滑块滑动配合的滑槽,可以起到对框架升降时进行前后方向相对限位作用,而且在将框架安装到上盖槽内时,还可以起到引导作用。因为滑块的长度方向与螺杆轴向平行设置,因此滑块与滑槽的滑动配合可以保证在螺杆的驱动下框架只能做稳定的升降运动。A slider is provided on the outside of the longitudinal rod, and a chute that is slidably matched with the slider is provided on the side wall of the upper cover groove, which can play a role of relative positioning in the front and rear directions when the frame is raised and lowered, and when the frame is installed in the upper cover groove When inside, it can also play a guiding role. Because the length direction of the slide block is arranged parallel to the axial direction of the screw rod, the sliding cooperation between the slide block and the chute can ensure that the frame can only perform stable lifting motion under the drive of the screw rod.
作为进一步改进,上盖外壁上设有环螺孔设置的刻度环,驱动槽一端的螺杆外端面上设有基准件,螺杆外端面与上盖外壁平齐时基准件靠近的驱动槽一端指向刻度环零点。As a further improvement, the outer wall of the upper cover is provided with a scale ring with ring screw holes, and a reference piece is provided on the outer end surface of the screw at one end of the driving groove. When the outer end surface of the screw rod is flush with the outer wall of the upper cover, the end of the driving groove close to the reference piece points to the scale. ring zero.
螺杆旋转一周,螺杆在轴向上进给一个螺距。如果螺杆旋转不是整整的一周,则很难准确判断螺杆轴向进给了多少。所以在上盖外壁上设置环螺孔设置的刻度环可以起到指示轴向进给量的作用,有效保证了两根螺杆轴向进给的一致性。驱动槽一端的基准件可以起到标识起始位置和终止位置的作用,避免驱动槽两端引起混淆,有助于快速判断进给量。在实际生产时,基准件既可以是孔,可以是凸块。The screw rotates once, and the screw feeds a pitch in the axial direction. If the screw does not make a full revolution, it is difficult to tell exactly how much the screw has advanced axially. Therefore, the scale ring provided by the ring screw hole on the outer wall of the upper cover can play the role of indicating the axial feed amount, effectively ensuring the consistency of the axial feed of the two screws. The reference piece at one end of the drive slot can mark the start position and end position, avoid confusion at both ends of the drive slot, and help to quickly judge the feed rate. In actual production, the reference piece can be either a hole or a bump.
作为一种实现方式,所述操作件包括铰接在绝缘杆下段上的操作杆,操作杆中部铰接有变向杆,变向杆上端与绝缘棒下端通过下铰轴铰接在一起,变向杆两侧的绝缘杆下段上固设有与下铰轴滑动配合的滑轨,滑轨长度方向与绝缘棒长度方向平行设置。As an implementation, the operating part includes an operating rod hinged on the lower section of the insulating rod. The lower part of the insulation rod on the side is fixedly provided with a slide rail slidingly matched with the lower hinge shaft, and the length direction of the slide rail is arranged parallel to the length direction of the insulation rod.
因为操作杆一端铰接在绝缘杆上,操作杆中部与变向杆下端铰接,所以当推动操作杆另一端时,就相当于用杠杆推动变向杆移动,非常省力。推动操作杆向下摆动时,操作杆通过变向杆将绝缘棒下拉,此时上摆的传动杆上端将通过上连杆推动上盖扣合到底座上。反之,推动操作杆上摆时,下摆的传动杆上端将通过上连杆将上盖从底座上拉开,完成开盖动作,操作非常简单。变向杆上端通过下铰轴与绝缘棒下端铰接,而绝缘杆下段上又设有与下铰轴两端滑动配合的滑轨,且滑轨的延伸方向与绝缘棒延伸方向一致,因此滑轨可以起到对下铰轴导向和限位的作用,也就是对变向杆上端导向和限位的作用,这样变向杆就能起到将操作杆摆动力变为绝缘棒上下滑动力的作用。Because one end of the operating rod is hinged on the insulating rod, and the middle part of the operating rod is hinged to the lower end of the steering rod, so when the other end of the operating rod is pushed, it is equivalent to pushing the steering rod to move with a lever, which is very labor-saving. When the operating rod is pushed to swing downwards, the operating rod pulls down the insulating rod through the direction changing rod, and the upper end of the upwardly swinging transmission rod will push the upper cover through the upper connecting rod to snap onto the base. Conversely, when the operating lever is pushed to swing up, the upper end of the transmission rod of the lower swing will pull the upper cover away from the base through the upper link to complete the action of opening the cover. The operation is very simple. The upper end of the reversing rod is hinged to the lower end of the insulating rod through the lower hinge shaft, and the lower section of the insulating rod is provided with a slide rail that slides and fits with both ends of the lower hinge shaft, and the extension direction of the slide rail is consistent with the extension direction of the insulation rod, so the slide rail It can play the role of guiding and limiting the lower hinge shaft, that is, guiding and limiting the upper end of the direction change rod, so that the direction change rod can change the swing force of the operating rod into the up and down force of the insulating rod .
作为改进,所述绝缘杆包括从上向下依次螺接在一起的一根主上杆、若干根主中杆和一根主下杆,主上杆下端和主中杆下端设有相同的内螺孔,主中杆上端和主下杆上端设有与内螺孔螺接配合的外螺段,所述绝缘棒包括从上向下依次螺接在一起的一根副上杆、若干根副中杆和一根副下杆,副上杆下端和副中杆下端设有相同的副内螺孔,副中杆上端和副下杆上端设有与副内螺孔螺接配合的副外螺段,还包括能将副中杆安装在主中杆上、将副下杆安装在主下杆上,且能在外螺段拧紧到内螺孔内时能使副上杆、副中杆和副下杆同轴设置的双杆定向装置。As an improvement, the insulating rod includes a main upper rod, several main middle rods and a main lower rod which are screwed together sequentially from top to bottom, and the lower end of the main upper rod and the lower end of the main middle rod are provided with the same inner Screw holes, the upper end of the main middle rod and the upper end of the main lower rod are provided with an outer screw section that is screwed and matched with the inner screw hole. The insulating rod includes an auxiliary upper rod, several auxiliary The middle rod and one auxiliary lower rod, the lower end of the auxiliary upper rod and the lower end of the auxiliary middle rod are provided with the same auxiliary internal screw hole, and the upper end of the auxiliary middle rod and the upper end of the auxiliary lower rod are provided with an auxiliary outer screw that is screwed and matched with the auxiliary inner screw hole. Section, also includes the ability to install the auxiliary middle rod on the main middle rod, the auxiliary lower rod on the main lower rod, and when the outer screw section is tightened into the inner screw hole, the auxiliary upper rod, auxiliary middle rod and auxiliary A double-rod orientation device with coaxial arrangement of the lower rods.
因为主上杆、主中杆下端设有相同的内螺孔,主中杆和主下杆上端设有与内螺孔相配合的外螺段,所以不论是主下杆还是哪根主中杆都可以螺接到主上杆下端,而且主下杆可以螺接上任意一根主中杆下端,而且任意两根或多根主中杆都可以上下螺接在一起,因此绝缘杆的主上杆、主中杆和主下杆,可以根据下跨线的实际高度,自由组合、自由装配,非常方便。与之相对应的,副上杆、副中杆和副下杆也可以自由组合、自由装配,其组合或组装结构、组合或组装原理类似,在此不再细述。Because the main upper rod and the lower end of the main middle rod are provided with the same inner screw hole, and the upper ends of the main middle rod and the main lower rod are provided with an outer screw section that matches the inner screw hole, so whether it is the main lower rod or which main middle rod can be screwed to the lower end of the main upper pole, and the main lower pole can be screwed to the lower end of any main middle pole, and any two or more main middle poles can be screwed together up and down, so the main upper pole of the insulating rod The rod, the main middle rod and the main lower rod can be freely combined and assembled according to the actual height of the lower span, which is very convenient. Correspondingly, the auxiliary upper pole, auxiliary middle pole and auxiliary lower pole can also be combined and assembled freely, and their combination or assembly structure and principle of combination or assembly are similar and will not be described in detail here.
在本电力架设跨线器中还包括双杆定向装置,双杆定向装置在结构上将副中杆安装在主中杆上、将副下杆安装在主下杆上。为方便叙述,将主上杆和副上杆的组合结构称为上杆,将主中杆和副中杆的组合结构称为中杆,将主下杆和副下杆的组合结构称为下杆。双杆定向装置不但能起到上述安装连接作用,还具有使中杆对应安装到上杆上、使中杆对应安装到另一个中杆上,及使下杆对应安装到中杆或上杆上的作用。具体而言,当主中杆外螺段完全拧紧到主上杆内螺孔内时,可以很轻松地使副中杆与副上杆上下对齐,这样就能很轻易地将副中杆对应拧紧到副上杆下端,起到了在对接或定向主上杆和主中杆的时候就能快速对接或定向副上杆和副中杆的作用。由于副中杆安装在主中杆上、副下杆安装在主下杆上,所以上述对接后,绝缘杆与绝缘棒相互嵌位或限位,起到了互锁作用,从结构上避免了在托举或把握绝缘杆时,因为无意转动绝缘杆而造成主中杆与主上杆的逆向旋脱现象,或者主中杆与主中杆的逆向旋脱现象,或者主中杆与主下杆的逆向旋脱现象,或者主上杆与主下杆的逆向旋脱现象,也就保证了绝缘杆分段螺接的可靠性及绝缘棒分段螺接的可靠性。The electric power erection jumper also includes a double-rod orientation device. The double-rod orientation device structurally installs the auxiliary middle rod on the main middle rod, and installs the auxiliary lower rod on the main lower rod. For the convenience of description, the combined structure of the main upper rod and the auxiliary upper rod is called the upper rod, the combined structure of the main middle rod and the auxiliary lower rod is called the middle rod, and the combined structure of the main lower rod and the auxiliary lower rod is called the lower rod. pole. The double-rod orientation device can not only play the above-mentioned installation and connection functions, but also have the functions of making the middle rod correspondingly installed on the upper rod, making the middle rod correspondingly installed on another middle rod, and making the lower rod correspondingly installed on the middle rod or upper rod role. Specifically, when the outer screw section of the main middle rod is fully tightened into the inner screw hole of the main upper rod, the auxiliary middle rod and the auxiliary upper rod can be easily aligned up and down, so that the auxiliary middle rod can be easily tightened to the corresponding position. The lower end of the auxiliary upper pole plays a role in quickly docking or orienting the auxiliary upper pole and the auxiliary middle pole when docking or orienting the main upper pole and the main middle pole. Since the auxiliary middle rod is installed on the main middle rod and the auxiliary lower rod is installed on the main lower rod, after the above-mentioned docking, the insulating rod and the insulating rod are mutually embedded or limited, which plays an interlocking role, and structurally avoids the When lifting or holding the insulating rod, the reverse rotation of the main middle rod and the main upper rod is caused by unintentional rotation of the insulating rod, or the reverse rotation of the main middle rod and the main middle rod, or the main middle rod and the main lower rod. The reverse unscrewing phenomenon, or the reverse unscrewing phenomenon of the main upper rod and the main lower rod, also ensures the reliability of the segmental screw connection of the insulating rod and the reliability of the segmental screw connection of the insulating rod.
作为一种实现方式,所述双杆定向装置包括设置在主中杆上部和下部并与副中杆上下滑动配合的中套,副中杆中部同轴固设有中螺母,主下杆上部设有与副下杆上下滑动配合的下套,主中杆上端和主下杆上端同轴固设有光轴段,光轴段外壁上固设有定位滑块,内螺孔底部同轴延伸设有与光轴段配合的光轴腔,内螺孔内壁上设有与定位滑块轴向滑动配合的定位滑槽,光轴腔内壁上设有与定位滑槽内端联接的定位滑道,定位滑道与内螺孔的螺纹同向螺旋设置且与定位滑块螺旋滑动配合,定位滑块转动到定位滑道末端时,副上杆、副中杆和副下杆同轴设置,主上杆和主中杆外壁下端固设有与定位滑槽对应的标志块,副下杆包括与变向杆铰接的下副下杆和与副中杆螺接的上副下杆,下副下杆上端同轴固接有直杆,直杆上端同轴固接有转盘,上副下杆下部设有与直杆、转盘转动配合的转腔,上副下杆上同轴固设有下螺母。As an implementation, the double-rod orientation device includes a middle sleeve arranged on the upper and lower parts of the main middle rod and slidingly matched with the auxiliary middle rod up and down, the middle part of the auxiliary middle rod is coaxially fixed with a middle nut, and the upper part of the main lower rod There is a lower sleeve that slides up and down with the auxiliary lower rod. The upper end of the main middle rod and the upper end of the main lower rod are coaxially fixed with an optical axis section. The outer wall of the optical axis section is fixed with a positioning slider. There is an optical axis cavity matched with the optical axis section, and the inner wall of the inner screw hole is provided with a positioning chute cooperating axially with the positioning slider, and the inner wall of the optical axis cavity is provided with a positioning slideway connected with the inner end of the positioning chute. The positioning slideway is screwed in the same direction as the thread of the inner screw hole and cooperates with the positioning slider. When the positioning slider rotates to the end of the positioning slideway, the auxiliary upper rod, auxiliary middle rod and auxiliary lower rod are coaxially arranged. The lower end of the outer wall of the rod and the main middle rod is fixed with a sign block corresponding to the positioning chute. The upper end is coaxially fixed with a straight rod, and the upper end of the straight rod is coaxially fixed with a turntable. The lower part of the upper and lower rods is provided with a rotating chamber that cooperates with the rotation of the straight rod and the turntable. The upper and lower rods are coaxially fixed with a lower nut.
主中杆上设有两个中套,分别位于主中杆的两端,且副中杆插装在两个中套中上下滑动配合,因此,受设置在副中杆中部的中螺母作用,副中杆只能沿中套上下滑动而不会滑脱,这样也就保证了副中杆在周向上固定安装在主中杆上却又能在纵向上相对主中杆运动。中螺母具有三个作用:一是起限位作用,防止副中杆从上下两个中套滑出,二是为副中杆上下移动提供活动空间,这样副中杆在与副上杆或上方的副中杆螺接时就非常方便,三是可以通过扳手驱动中螺母而实现将副中杆拧紧到副上杆或上方的副中杆上。There are two middle sleeves on the main middle rod, which are respectively located at both ends of the main middle rod, and the auxiliary middle rod is inserted into the two middle sleeves to slide up and down. Therefore, under the action of the middle nut arranged in the middle of the auxiliary middle rod, The auxiliary middle rod can only slide up and down along the middle sleeve without slipping off, so that the auxiliary middle rod is fixedly installed on the main middle rod in the circumferential direction but can move relative to the main middle rod in the longitudinal direction. The middle nut has three functions: one is to limit the position and prevent the auxiliary middle rod from slipping out of the upper and lower middle sleeves; It is very convenient when the auxiliary middle rod is screwed. The third is that the middle nut can be driven by a wrench to tighten the auxiliary middle rod to the auxiliary upper rod or the upper auxiliary middle rod.
主中杆和主下杆上端设有光轴段,也就是外周没有螺纹的圆柱段,这样主中杆和主下杆上部就设有一个光轴段和一个外螺段。光轴段和外螺段的位置关系是,光轴段在上外螺段在下,两者自然衔接配合。与之对应的,主上杆和主中杆下端的内螺孔内设有一个光轴腔,光轴腔为圆柱形腔,位于内螺孔底部,与内螺孔同轴设置。在尺寸上,光轴腔直径与光轴段直径相同,但要小于内螺孔内径,以保证光轴段可以顺利通过内螺孔插装进光轴腔。光轴段外壁上固设有一个定位滑块,内螺孔和光轴腔内壁上设有一根与定位滑块对应的轴向延伸设置的定位滑槽。在尺寸上,定位滑块外壁距离光轴段轴心线的距离要大于内螺孔内径,这样就保证只有把定位滑块对应滑入定位滑槽时,光轴段才能且只能顺利插入内螺孔及光轴腔内。因为定位滑块相对外螺段的位置是固定的、定位滑槽相对内螺孔的位置也是固定的,因此当定位滑块对应滑入定位滑槽内时,外螺段和内螺孔的对应关系也就确定了,当定位滑块滑入定位滑槽底部时,外螺段螺纹初始端正好对齐内螺孔螺纹的始入端,起到了快速对齐外螺段和内螺孔的作用。光轴腔内壁上设有与定位滑块配合的定位滑道,定位滑道下端与定位滑槽上端也就是内端对应连接,定位滑道呈与内螺孔螺旋旋向相同的螺旋状,因此,当定位滑块滑入定位滑槽底部也就是内端时,也就正好进入了定位滑道的下端或初始端。当沿内螺孔旋向旋转主中杆或主下杆时,不但外螺段会旋入内螺孔内,定滑块也会沿定位滑道对应滑动,此时固设在主中杆上的副中杆会随之同步转动,固定在主下杆上的副下杆也随之转动。当定位滑块滑到定位滑道末端时,定位滑块和外螺段同步停止旋进,此时副中杆正好与副上杆同轴设置、副下杆正好与副上杆同轴设置,这样就实现了副上杆、副中杆和副下杆的快速同轴定位或定向。然后将副中杆对应旋进副上杆或上方的副中杆中、将副下杆对应旋进副上杆或副中杆中,组装非常快速,操作非常简单。绝缘杆和绝缘棒旋紧后,两者互相锁定,保证了旋紧的可靠性。The upper end of the main middle rod and the main lower rod is provided with an optical axis section, that is, a cylindrical section without threads on the outer circumference, so that the main middle rod and the upper part of the main lower rod are provided with an optical axis section and an outer screw section. The positional relationship between the optical axis section and the external screw section is that the optical axis section is on the top and the external screw section is on the bottom, and the two are naturally connected and matched. Correspondingly, an optical axis cavity is provided in the internal screw holes at the lower ends of the main upper rod and the main middle rod. The optical axis cavity is a cylindrical cavity, located at the bottom of the internal screw hole, and coaxially arranged with the internal screw hole. In terms of size, the diameter of the optical axis cavity is the same as that of the optical axis section, but smaller than the inner diameter of the inner screw hole, so as to ensure that the optical axis section can be smoothly inserted into the optical axis cavity through the inner screw hole. A positioning slider is fixed on the outer wall of the optical axis section, and an axially extending positioning chute corresponding to the positioning slider is provided on the inner screw hole and the inner wall of the optical axis cavity. In terms of size, the distance between the outer wall of the positioning slider and the axis of the optical axis section is greater than the inner diameter of the inner screw hole, so as to ensure that only when the positioning slider is slid into the positioning chute, the optical axis section can and can only be inserted into the inner hole smoothly. Inside the screw hole and optical axis cavity. Because the position of the positioning slider relative to the outer screw segment is fixed, and the position of the positioning chute relative to the inner screw hole is also fixed, so when the positioning slider slides into the positioning chute, the corresponding position between the outer screw segment and the inner screw hole The relationship is determined. When the positioning slider slides into the bottom of the positioning chute, the initial end of the thread of the outer thread segment is just aligned with the beginning end of the thread of the inner screw hole, which plays a role in quickly aligning the outer thread segment and the inner screw hole. The inner wall of the optical axis cavity is provided with a positioning slideway that cooperates with the positioning slider. The lower end of the positioning slideway is connected to the upper end of the positioning slideway, that is, the inner end. The positioning slideway is in the same helical shape as the inner screw hole. , when the positioning slider slides into the bottom of the positioning chute, which is the inner end, it just happens to enter the lower end or initial end of the positioning slide. When the main middle rod or the main lower rod is rotated along the inner screw hole, not only the outer screw section will be screwed into the inner screw hole, but also the fixed slider will slide correspondingly along the positioning slideway. The auxiliary middle rod will rotate synchronously thereupon, and the auxiliary lower rod fixed on the main lower rod will also rotate thereupon. When the positioning slider slides to the end of the positioning slideway, the positioning slider and the outer screw section stop screwing in synchronously. At this time, the auxiliary middle rod is just set coaxially with the auxiliary upper rod, and the auxiliary lower rod is just set coaxially with the auxiliary upper rod. In this way, the fast coaxial positioning or orientation of the auxiliary upper rod, the auxiliary middle rod and the auxiliary lower rod is realized. Then screw the auxiliary middle pole into the auxiliary upper pole or the upper auxiliary middle pole, and screw the auxiliary lower pole into the auxiliary upper pole or the auxiliary middle pole. The assembly is very fast and the operation is very simple. After the insulating rod and the insulating rod are screwed tightly, the two lock each other to ensure the reliability of screwing.
在主中杆和副中杆下端设置与定位滑槽对应的标志块,可以指示定位滑槽的位置,这样就可以在外观上快速判断定位滑槽的入口位置,保证了快速插入定位滑块及旋紧。At the lower end of the main middle pole and the auxiliary middle pole, a sign block corresponding to the positioning chute can be set, which can indicate the position of the positioning chute, so that the entrance position of the positioning chute can be quickly judged from the appearance, ensuring the rapid insertion of the positioning slider and Tighten.
副下杆分为两部分,即上部的上副下杆和下部的下副下杆,上副下杆下端设有转腔,转腔内盛装有下副下杆上端的直杆和转盘。因为直杆、转盘、转腔、绝缘棒皆同轴设置且转盘直径大于直杆直径,因此上副下杆和下副下杆只能绕其轴心线相对转动配合而不能上下相对运动。这样设置,是为了方便副下杆上端能够螺接到副上杆或副中杆上。上副下杆上也同轴固设有下螺母,也是为了拧紧而设置的。在本电力架线跨线器中,中套和下套通过转套安装在主中杆和主下杆上,不单单是为了能将副中杆与主中杆构成一体结构、将副下杆与主下杆构成一体结构,更是为了在主中杆/主下杆与上方的主上杆/主中杆螺接后能够方便副中杆/副下杆对齐上方的副上杆/副中杆而设置的,这样有助于实现快速组装。The auxiliary lower rod is divided into two parts, that is, the upper upper lower rod and the lower lower lower rod. Because the straight rod, turntable, rotary cavity and insulating rod are all arranged coaxially and the diameter of the turntable is larger than the diameter of the straight rod, the upper and lower rods can only rotate relative to each other around their axes but cannot move up and down relative to each other. Such setting is for convenience that the upper end of the auxiliary lower rod can be screwed to the auxiliary upper rod or the auxiliary middle rod. The upper and lower rods are also coaxially fixed with lower nuts, which are also provided for tightening. In this power line jumper, the middle sleeve and the lower sleeve are installed on the main middle pole and the main lower pole through the rotating sleeve, not only for the purpose of forming an integrated structure between the auxiliary middle pole and the main middle pole, and integrating the auxiliary lower pole It forms an integrated structure with the main lower rod, and it is more convenient for the auxiliary middle rod/secondary lower rod to align with the upper auxiliary upper rod/secondary center after the main middle rod/main lower rod is screwed to the upper main upper rod/main middle rod. rod, which facilitates quick assembly.
作为改进,铰轴上套装有能使上盖弹性压紧在底座上的扭簧。As an improvement, the hinge shaft is sleeved with a torsion spring that can elastically compress the upper cover on the base.
设置弹簧后,操作件在不受外力作用下(自然状态下),上盖可以弹簧弹力作用下自动扣合到底座上,具有开盖后自动扣合或自动复位的作用,避免了操作人员来回推动操作杆。After the spring is set, the upper cover can be automatically fastened to the base under the action of the spring force when the operating part is not affected by external force (in a natural state), which has the function of automatic buckling or automatic reset after opening the cover, avoiding the operator's back and forth Push the joystick.
作为进一步改进,所述操作杆末段固设有与绝缘杆外周贴合的弧板,弧板端部设有定位孔,绝缘杆下端铰接有在弧板贴紧绝缘杆下端时与定位孔钩挂配合的挂钩。As a further improvement, the end section of the operating rod is fixed with an arc plate that fits the outer circumference of the insulating rod, and the end of the arc plate is provided with a positioning hole. Hang with matching hooks.
将操作杆末段设置成弧板,可以在扣合状态时,也就是将操作杆向下摆动到绝缘杆下端时能够使弧板的内弧面贴紧到绝缘杆外壁上,这样操作者为保持住扣合状态而攥握住绝缘杆下段和操作杆时手感将非常舒适,有助于长期保持扣合状态。将绝缘杆下端铰接的挂钩钩挂到扣合状态时弧板末端的定位孔上,可以起到锁紧弧板的作用,这样人们就不用一直用手攥着绝缘杆和弧板,更加省力。The end section of the operating rod is set as an arc plate, which can make the inner arc surface of the arc plate close to the outer wall of the insulating rod in the fastened state, that is, when the operating rod is swung down to the lower end of the insulating rod. It will be very comfortable to hold the lower section of the insulating rod and the operating rod while maintaining the snap-fit state, which helps to maintain the snap-fit state for a long time. Hooking the hinged hook at the lower end of the insulating rod to the positioning hole at the end of the arc plate in the buckled state can play a role in locking the arc plate, so that people don’t have to hold the insulating rod and the arc plate with their hands all the time, which saves more effort.
作为改进,所述绝缘杆下端设有内螺纹孔,绝缘杆下端螺接有下端呈锥形的定位锥,绝缘杆上部均匀环设有三个定位环,定位环上连接有定位绳,定位绳下端连接有能嵌入地下的固定锥。As an improvement, the lower end of the insulating rod is provided with an internal threaded hole, the lower end of the insulating rod is screwed with a positioning cone with a tapered lower end, and the upper even ring of the insulating rod is provided with three positioning rings. The connection has a fixed cone that can be embedded in the ground.
当本电力架线跨线器需要做较长时间的跨线时,或者施工人手不够时,可以将定位锥拧紧到绝缘杆下端并将定位锥插入地下,然后用定位绳连接绝缘杆上部的定位环和地面上的固定锥并将固定锥插入或埋入地下,即可将绝缘杆保持竖立状态地固定在地面上,也就实现了自动支撑或自动跨线的功能。因为三个定位环均匀环设在绝缘杆上部,因此三根定位绳可以保证绝缘杆在外周任意方向受力均匀,也就保证了绝缘杆的竖直状态。When the power line jumper needs to do long-term jumping, or when the construction manpower is insufficient, the positioning cone can be tightened to the lower end of the insulating rod and inserted into the ground, and then the positioning rope is used to connect the positioning of the upper part of the insulating rod. The ring and the fixing cone on the ground and inserting or burying the fixing cone in the ground can keep the insulating rod upright and fixed on the ground, which realizes the function of automatic support or automatic crossing. Because the three positioning rings are evenly arranged on the top of the insulating rod, the three positioning ropes can ensure that the insulating rod is evenly stressed in any direction on the periphery, thus ensuring the vertical state of the insulating rod.
综上所述,本电力架线跨线器结构合理,体积小,可以快速组装或架设,在地面上就能带电完成对上跨线电缆的跨线、挑线、引线操作,操作简单、无需登高,既避免了登高操作的触点隐患,又解决了登高操作的高空跌落问题,大大提高了工作效率。To sum up, this power line jumper has a reasonable structure, small size, and can be assembled or erected quickly. It can complete the jumping, picking up and leading operations of the upper jumper cable with electricity on the ground, and the operation is simple and does not require Ascending heights not only avoids the hidden dangers of contact points in ascending operations, but also solves the problem of falling from high altitudes in ascending operations, greatly improving work efficiency.
附图说明Description of drawings
下面结合附图对本发明作进一步详细叙述。The present invention is described in further detail below in conjunction with accompanying drawing.
图1为上盖扣合在底座上时与绝缘杆、绝缘棒的配合结构示意图;Figure 1 is a schematic diagram of the cooperation structure between the upper cover and the insulating rod and the insulating rod when it is fastened on the base;
图2为上盖从底座上掀起一半时与绝缘棒的配合结构示意图;Figure 2 is a schematic diagram of the cooperation structure between the upper cover and the insulating rod when it is lifted halfway from the base;
图3为上盖从底座上完全掀起时与绝缘棒的配合结构示意图;Figure 3 is a schematic diagram of the cooperation structure between the upper cover and the insulating rod when it is completely lifted from the base;
图4为主上杆、主中杆和主下杆的配合结构示意图;Figure 4 is a schematic diagram of the cooperation structure of the main upper pole, the main middle pole and the main lower pole;
图5为主中杆和副中杆对齐配合的结构示意图;Fig. 5 is a structural schematic diagram of the alignment and cooperation of the main middle pole and the auxiliary middle pole;
图6为副中杆相对主中杆向下滑动时的结构示意图;Fig. 6 is a schematic diagram of the structure when the auxiliary middle pole slides downward relative to the main middle pole;
图7为副中杆相对主中杆向上滑动时的结构示意图;Fig. 7 is a schematic diagram of the structure when the auxiliary middle pole slides upward relative to the main middle pole;
图8为主下杆和副下杆、定位锥的配合结构示意图;Figure 8 is a schematic diagram of the cooperation structure of the main lower rod, the auxiliary lower rod, and the positioning cone;
图9为辅助轮和框架的配合结构示意图;Fig. 9 is a schematic diagram of the cooperative structure of the training wheel and the frame;
图10为辅助轮和框架安装到上盖后的配合结构示意图;Fig. 10 is a schematic diagram of the cooperative structure after the auxiliary wheel and the frame are installed on the upper cover;
图11为螺杆和刻度环的配合结构示意图;Fig. 11 is a schematic diagram of the cooperation structure of the screw rod and the scale ring;
图12为底轮和底座的配合结构示意图;Fig. 12 is a schematic diagram of the cooperative structure of the bottom wheel and the base;
图13为外螺段、光轴段、定位滑块、标志块的配合结构示意图;Fig. 13 is a schematic diagram of the cooperation structure of the external screw section, the optical axis section, the positioning slider, and the marker block;
图14为图13的局部透视图;Figure 14 is a partial perspective view of Figure 13;
图15为定位滑块滑入定位滑槽末端时的配合结构示意图;Figure 15 is a schematic diagram of the matching structure when the positioning slider slides into the end of the positioning chute;
图16为定位滑块转到定位滑道末端时的配合结构示意图;Fig. 16 is a schematic diagram of the cooperation structure when the positioning slider is transferred to the end of the positioning slideway;
图17为图16中副外螺段旋入副内螺孔时的配合结构示意图。Fig. 17 is a schematic diagram of the matching structure when the auxiliary outer screw segment in Fig. 16 is screwed into the auxiliary inner screw hole.
具体实施方式Detailed ways
如图所示,该电力架线跨线器包括竖直延伸的绝缘杆1,绝缘杆1上端固接有底座2,底座上部设有贯通底座2前后两端的底座槽3,底座槽3内安装有托载电缆的底轮4。底座2边侧通过铰轴12铰接有能扣合到底座上端的上盖5,上盖5上设有与底座槽3对应的上盖槽6。上盖槽6内通过调节装置安装有辅助轮7,调节装置能够调节辅助轮在上盖槽内的深度。底轮4和辅助轮7外周上设有与电缆配合的环槽64,环槽64槽壁圆滑过渡。铰轴12下方的底座外壁上固设有支撑杆8,支撑杆8末端铰接有传动杆9。传动杆9上端铰接有上连杆10,上连杆10上端与铰轴12上方的上盖外壁对应铰接在一起。传动杆下段上滑动套装有上滑套63,上滑套63中部铰接有沿绝缘杆向下延伸的绝缘棒11。绝缘杆1上固设有与绝缘棒11轴向滑动配合的中滑套13,绝缘杆上部设有与传动杆下段配合的摆动腔14,绝缘棒下段设有驱动绝缘棒轴向移动的操作件15。As shown in the figure, the electric wire jumper includes a vertically extending insulating rod 1. The upper end of the insulating rod 1 is fixed with a base 2. The upper part of the base is provided with a base groove 3 that runs through the front and rear ends of the base 2. The base groove 3 is installed The bottom wheel 4 of carrying cable is arranged. The side of the base 2 is hinged by a hinge shaft 12 with an upper cover 5 that can be fastened to the upper end of the base. The upper cover 5 is provided with an upper cover groove 6 corresponding to the base groove 3 . In the loam cake groove 6, auxiliary wheel 7 is installed by adjusting device, and the adjusting device can regulate the depth of auxiliary wheel in the loam cake groove. Bottom wheel 4 and auxiliary wheel 7 periphery are provided with the ring groove 64 that cooperates with cable, and ring groove 64 groove walls are smoothly transitioned. A support rod 8 is fixed on the outer wall of the base below the hinge shaft 12, and a transmission rod 9 is hinged at the end of the support rod 8. The upper end of the transmission rod 9 is hinged with an upper connecting rod 10, and the upper end of the upper connecting rod 10 is hinged with the upper cover outer wall above the hinge shaft 12 correspondingly. An upper sliding sleeve 63 is arranged on the upper sliding sleeve of the lower section of the transmission rod, and the middle part of the upper sliding sleeve 63 is hinged with an insulating rod 11 extending downward along the insulating rod. The insulating rod 1 is fixed with a middle sliding sleeve 13 which slides axially with the insulating rod 11, the upper part of the insulating rod is provided with a swing chamber 14 which cooperates with the lower part of the transmission rod, and the lower part of the insulating rod is provided with an operating part which drives the insulating rod to move axially. 15.
该电力架线跨线器的主体结构包括由绝缘杆1支撑的底座2和铰接在底座上的上盖5,上盖可以绕铰轴转动以实现扣合在底座上或从底座上掀开的功能。底座上设有底座槽,底座槽水平延伸并贯通底座两端,底座槽主要为穿过的电缆提供穿越空间。为方便叙述,在水平面内,将底座槽所贯通的两端方向分别称为前和后,其连接方向称为纵向,底座槽两侧的方向分别称为左和右,其连接的方向称为横向,将垂直水平面的方向称为竖向或垂直方向。底座槽内安装有底轮,底轮转轴的轴心线横向设置。滚轮将起到滚动支撑所穿过电缆的作用,减小了穿过摩擦力,提高了穿过顺畅性并保证了电缆表皮的完整性。上盖上也设有与底座槽对应的上盖槽,上盖槽也贯通上盖两端设置。当上盖扣合到底座上时,上盖槽和底座槽将上下连接成一体。为方便叙述将上盖槽和底座槽上下连接成一体的腔道或贯通槽称为“传送槽”或“全槽”,将上盖和底座扣合在一起的状态称为扣合状态或闭合状态,将上盖从底座上掀开的状态称为掀开状态或开启状态。上盖槽内设置有辅助轮,辅助轮通过调节装置安装在上盖上。辅助轮的转轴轴心线也是左右延伸设置或者横向设置,这样,在扣合状态时,辅助轮转轴和底轮转轴平行设置。因为底轮和辅助轮外周上设有与电缆配合的环槽,所以,在扣合状态时辅助轮和底轮之间将形成一个类似圆形的间隙或空腔,该间隙或空腔就是传送电缆时电缆通过的空腔。为方便叙述,将该空腔称为“传送腔”或“电缆腔”。调节装置的主要作用,是对辅助轮在上盖槽内的深浅位置进行调节,就是调节扣合状态时辅助轮和底轮的间距,也就是调节传送腔的大小或粗细。当传送腔比上跨线电缆粗时,电缆与底轮、辅助轮的滚动配合使电缆在传送腔内顺畅传送。为方便叙述,将辅助轮和底轮的这种配合状态称为“传送状态”或“顺畅状态”。The main structure of the power line jumper includes a base 2 supported by an insulating rod 1 and an upper cover 5 hinged on the base. The upper cover can be rotated around the hinge to realize buckling on the base or lifting from the base. Function. The base is provided with a base groove, the base groove extends horizontally and runs through both ends of the base, and the base groove mainly provides passing space for passing cables. For the convenience of description, in the horizontal plane, the directions of the two ends through which the base groove penetrates are respectively called front and rear, and the connecting direction is called longitudinal direction, and the directions on both sides of the base groove are called left and right, respectively, and the connecting direction is called Transversely, the direction perpendicular to the horizontal plane is referred to as the vertical or vertical direction. A bottom wheel is installed in the base groove, and the axis line of the bottom wheel rotating shaft is arranged horizontally. The rollers will play the role of rolling support for the passing cables, reducing the passing friction, improving the passing smoothness and ensuring the integrity of the cable skin. The upper cover is also provided with an upper cover groove corresponding to the base groove, and the upper cover groove is also provided through two ends of the upper cover. When the upper cover is fastened on the base, the upper cover groove and the base groove will be connected up and down as a whole. For the convenience of description, the cavity or through groove that connects the upper cover groove and the base groove up and down is called "transfer groove" or "full groove", and the state where the upper cover and the base are fastened together is called the buckled state or closed state. State, the state that the upper cover is lifted from the base is called the lifted state or the open state. An auxiliary wheel is arranged in the slot of the upper cover, and the auxiliary wheel is installed on the upper cover through the adjustment device. The axis line of the rotating shaft of the auxiliary wheel is also extended from left to right or arranged laterally, so that in the buckled state, the rotating shaft of the auxiliary wheel is arranged parallel to the rotating shaft of the bottom wheel. Because the outer circumference of the bottom wheel and the auxiliary wheel is provided with a ring groove that matches the cable, a similar circular gap or cavity will be formed between the auxiliary wheel and the bottom wheel in the fastened state, and this gap or cavity is the transmission The cavity through which the cable passes. For the convenience of description, this cavity is called "transmission cavity" or "cable cavity". The main function of the adjusting device is to adjust the depth of the auxiliary wheel in the groove of the upper cover, that is, to adjust the distance between the auxiliary wheel and the bottom wheel in the buckled state, that is, to adjust the size or thickness of the transmission cavity. When the transmission cavity is thicker than the upper jumper cable, the rolling cooperation of the cable with the bottom wheel and the auxiliary wheel makes the cable smoothly transmitted in the transmission cavity. For convenience of description, this cooperative state of auxiliary wheel and bottom wheel is called " transmission state " or " smooth state ".
在本电力架线跨线器中,底座上还固设有支撑杆,支撑杆位于上盖和底座之间连接铰轴的下方。支撑杆末端铰接有一根传动杆,传动杆上端铰接有上连杆,上连杆上端与铰轴上方的上杆部分对应铰接在一起。因为上连杆和传动杆所上铰接配合个各个铰轴一般都是与上盖和底座之间的铰轴平行设置的,而不是垂直设置的,因此当上下摆动传动杆下端时,传动杆上端也会驱动上连杆下端上下摆动,又因为支撑杆和铰轴是相对固定不动的,因此上连杆下端的上下摆动只能通过上连杆上端驱动上盖绕铰轴左右摆动,这样也就实现了驱动上盖的扣合或敞开。传动杆下段上滑动套装有上滑套,上滑套上铰接有向下竖直延伸的绝缘棒,绝缘杆上固设有滑动套装绝缘棒的中滑套,这样中滑套就将绝缘棒的动作限定为只能上下滑动。绝缘棒下端设置有操作件,通过移动操作件可以很方便地驱动绝缘棒上下移动,此时绝缘棒上端的上滑套会将绝缘棒的上下滑动的力分为驱动传动杆下段上下移动的力和使上滑套沿传动杆上下滑动的力,这样就可以通过传动杆和上连杆的传动驱动上盖完成扣合或敞开动作。详细而言,在地面上通过操作件驱动绝缘棒向上移动时,绝缘棒上端将驱动传动杆下端上移并使传动杆上端下移,此时传动杆上端将通过上连杆将上盖从底座上拉起,也就完成了在地面上控制绝缘杆上方的上盖敞开或开盖动作。反之,当通过操作件驱动绝缘棒下移时,支撑杆将通过上连杆驱动上盖扣合到底座上,也就完成了在地面上控制绝缘杆上方的上盖扣合或扣盖动作。为方便叙述,将在地面上控制绝缘杆上方的上盖进行开盖或扣盖动作的所有传动机构称为远控机构。In the power line jumper, a support rod is also fixed on the base, and the support rod is located below the connecting hinge shaft between the upper cover and the base. A drive rod is hinged at the end of the support rod, and an upper link is hinged at the upper end of the drive rod, and the upper end of the upper link is hinged with the upper rod part above the hinge shaft correspondingly. Because the hinges on which the upper connecting rod and the transmission rod are hinged are generally arranged parallel to the hinge shaft between the upper cover and the base, rather than vertically, so when the lower end of the transmission rod is swung up and down, the upper end of the transmission rod It will also drive the lower end of the upper link to swing up and down, and because the support rod and the hinge shaft are relatively fixed, the up and down swing of the lower end of the upper link can only be driven by the upper end of the upper link to swing the upper cover around the hinge axis. The fastening or opening of the drive loam cake has just been realized. The upper sliding sleeve of the lower part of the transmission rod has an upper sliding sleeve, and the upper sliding sleeve is hinged with an insulating rod extending vertically downward. Actions are limited to sliding up and down only. The lower end of the insulating rod is provided with an operating part, which can be conveniently driven to move the insulating rod up and down by moving the operating part. At this time, the upper sliding sleeve at the upper end of the insulating rod will divide the force of the insulating rod sliding up and down into the force driving the lower part of the transmission rod to move up and down. And the force that makes the upper sliding sleeve slide up and down along the transmission rod, so that the upper cover can be driven by the transmission of the transmission rod and the upper connecting rod to complete the fastening or opening action. In detail, when the insulating rod is driven upward by the operating part on the ground, the upper end of the insulating rod will drive the lower end of the transmission rod to move up and the upper end of the transmission rod will move down. At this time, the upper end of the transmission rod will move the upper cover from the base through the upper link. Pull up, just finished the loam cake on the control insulation bar top on the ground and open or uncap action. Conversely, when the insulating rod is driven down by the operating member, the support rod will drive the upper cover to snap onto the base through the upper connecting rod, thus completing the upper cover buckling or buckling action on the ground to control the insulating rod. For the convenience of description, all transmission mechanisms that control the upper cover above the insulating rod on the ground to open or buckle the cover are called remote control mechanisms.
当远控机构与调节装置配合时,便可以实现三种功能:固定夹持住上跨线电缆头从下跨线电缆一侧跨越到下跨线电缆另一侧(跨线或越线)、固定夹持住上跨线电缆头并向前引导、拽拉上跨线电缆(引线)、将上跨线电缆挑高到下跨线上方并保持与上跨线电缆顺畅、稳定的托举关系(挑线)。When the remote control mechanism cooperates with the adjustment device, three functions can be realized: fixedly clamping the upper jumper cable head and crossing from one side of the lower jumper cable to the other side of the lower jumper cable (jumping or jumping), Fix and hold the upper jumper cable head and guide it forward, pull the upper jumper cable (lead wire), lift the upper jumper cable above the lower jumper and maintain a smooth and stable lifting relationship with the upper jumper cable (pick the thread).
通过操作调节装置,可以控制传送腔的粗细。当传送腔比上跨线电缆粗时,电缆与底轮、辅助轮的滚动配合使电缆在传送腔内顺畅传送。详细而言,当需要电缆在传送腔内顺畅传送时,将上盖和底座切换到扣合状态,通过调节装置将辅助轮向上调节,也就是向上盖槽槽底方向调节,此时传送腔横截面变大,比所传送电缆要粗。当电缆在电缆腔内传送时,受电缆重力作用,一般只有底轮会通过其环槽对电缆下部及下部两侧进行滚动支撑及限位,只有在电缆向上晃动而脱离底轮时,辅助轮才会通过其环槽对电缆上部及上部两侧进行滚动支撑及限位,因此电缆四周都会受到辅助轮和底轮比较有“弹性”的滚动支撑及滚动限位作用,电缆在传送腔内的活动范围比较大,这样电缆就可以在传送腔内顺畅移动,还可以通过底座和上盖自由抬高或降低传送腔内电缆且不会影响电缆的传送速度和表皮完整性。传送状态适合在上跨线电缆已经跨过下跨线且上跨线已经插装到传送腔内时滚动支撑电缆快速传送使用。为方便叙述,将辅助轮和底轮的这种配合状态称为“传送状态”或“顺畅状态”。By operating the regulating device, the thickness of the transmission cavity can be controlled. When the transmission cavity is thicker than the upper jumper cable, the rolling cooperation of the cable with the bottom wheel and the auxiliary wheel makes the cable smoothly transmitted in the transmission cavity. In detail, when the cable needs to be smoothly transmitted in the transmission chamber, the upper cover and the base are switched to the buckled state, and the auxiliary wheel is adjusted upward through the adjustment device, that is, the direction of the bottom of the upper cover groove is adjusted. At this time, the transmission chamber is horizontal. The section becomes larger and thicker than the conveying cable. When the cable is conveyed in the cable cavity, due to the gravity of the cable, generally only the bottom wheel will roll and support and limit the lower part of the cable and the two sides of the lower part through its ring groove. Only when the cable shakes upwards and leaves the bottom wheel, the auxiliary wheel The upper part of the cable and the two sides of the upper part will be supported and limited by rolling through its ring groove. Therefore, the surroundings of the cable will be supported and limited by the "elastic" rolling support and rolling position of the auxiliary wheel and the bottom wheel. The movement of the cable in the transmission cavity The range of motion is relatively large, so that the cables can move smoothly in the transmission cavity, and the cables in the transmission cavity can be raised or lowered freely through the base and the upper cover without affecting the transmission speed and skin integrity of the cables. The transmission state is suitable for rapid transmission of the rolling support cable when the upper jumper cable has crossed the lower jumper and the upper jumper has been inserted into the transfer cavity. For convenience of description, this cooperative state of auxiliary wheel and bottom wheel is called " transmission state " or " smooth state ".
当传送腔比上跨线电缆细时,在远控机构的驱动下,上盖压紧在底座上,辅助轮和底轮将上跨线电缆夹持住,此时上跨线电缆相对固定在传送腔内。详细而言,操作调节装置将扣合状态下的辅助轮向下移动,也就是将辅助轮从上盖槽槽底抬升,此时辅助轮和底轮间距缩小,传送腔变得比要传送电缆也就是上跨线电缆要细。这样,在扣合状态下,辅助轮和底轮将对上跨线电缆产生上下“夹持力”而将上跨线电缆夹持传送腔内,上跨线电缆与底座、上杆相对固定在一起,此时可以通过绝缘杆将夹持住的上跨线电缆头由下跨线一侧跨越到另一侧。为方便叙述,将此辅助轮和底轮的这种配合状态称为“夹持状态”或“夹紧状态”。When the transmission cavity is thinner than the upper jumper cable, driven by the remote control mechanism, the upper cover is pressed tightly on the base, and the auxiliary wheel and the bottom wheel clamp the upper jumper cable. At this time, the upper jumper cable is relatively fixed on the inside the transmission chamber. In detail, operating the adjusting device will move the auxiliary wheel in the buckled state downward, that is, the auxiliary wheel will be lifted from the bottom of the upper cover groove, at this time, the distance between the auxiliary wheel and the bottom wheel will be reduced, and the transmission cavity will become larger than the cable to be transported. That is, the upper jumper cable should be thinner. In this way, in the buckled state, the auxiliary wheel and the bottom wheel will produce an up and down "clamping force" on the upper jumper cable to clamp the upper jumper cable into the transmission cavity, and the upper jumper cable is relatively fixed on the base and the upper rod. At the same time, at this time, the clamped upper jumper cable head can be spanned from one side of the lower jumper to the other side through the insulating rod. For convenience of description, this cooperative state of the auxiliary wheel and the bottom wheel is called "clamping state" or "clamping state".
在架线需要跨线时,一般需要两套本电力架线跨线器配合工作。第一步将两套套电力架线跨线器都调节成夹紧状态,再操作第一套电力架线跨线器的远控机构使其夹紧上跨线电缆前部,然后上举绝缘杆将上跨线电缆前部由下跨线电缆一侧(后方)跨越到下跨线电缆另一侧(前方),这样就实现了跨线或越线。第二步操作第二套电力架线跨线器的远控机构夹持住跨越到下跨线电缆前方的上跨线电缆前部(相当于完成了引线功能)。第三步将第一套电力架线跨线器从上跨线电缆上撤下并操作调节装置使其切换到传送状态,最后将其上盖和底座套装到上跨线电缆上,这样就完成了对上跨线电缆的顺畅挑线。在第一套电力架线跨线器的挑线托举作用下,举着第二套电力架线跨线器向前移动时,便可将上跨线电缆从下跨线一侧(后方)远远不断地向另一侧(前方)跨线或越线。When the wiring needs to be crossed, generally two sets of this electric power wiring crossing device are required to work together. The first step is to adjust the two sets of power overhead line jumpers to the clamping state, and then operate the remote control mechanism of the first set of electric power overhead line jumpers to clamp the front part of the upper jumper cable, and then lift the insulating rod The front part of the upper jumper cable is crossed from one side (rear) of the lower jumper cable to the other side (front) of the lower jumper cable, so that the jumper or jumper is realized. The second step is to operate the remote control mechanism of the second set of power line jumper to clamp the front part of the upper jumper cable that crosses to the front of the lower jumper cable (equivalent to completing the leading function). The third step is to remove the first set of power jumper from the upper jumper cable and operate the adjustment device to switch to the transmission state, and finally put its upper cover and base on the upper jumper cable, which is completed This ensures smooth take-up of the jumper cables. Under the lifting action of the first set of power overhead jumpers, when the second set of power overhead jumpers is held and moved forward, the upper jumper cable can be pulled from the lower jumper side (rear) Continuously crossing or crossing the line to the other side (forward).
在本实施例中,所述调节装置包括框架16,框架包括两根平行设置的纵杆17和设置在纵杆对应端部之间横杆18。横杆18两端通过横轴19与纵杆连接在一起,横杆绕横轴转动,辅助轮7对应安装在两纵杆之间。还包括贯通上盖内外的螺孔20及与螺孔配合的螺杆21,螺杆上端面上设有驱动槽22。螺杆下端同轴固设有延伸杆,延伸杆下端同轴固设有直径比延伸杆大的圆盘,横杆中部设有与延伸杆、圆盘转动配合的横腔。因为框架包括由横轴连接而成的两根纵杆和两根横杆,且辅助轮安装在两纵杆之间,所以当框架升降时,辅助轮也必然随之升降。横杆中部设有横腔,横腔内盛装有螺杆下端的延伸杆和圆盘。因为螺杆、延伸杆和圆盘都是同轴设置的,而且圆盘的直径大于延伸杆直径,所以螺杆只能通过延伸杆和圆盘相对横杆绕螺杆轴心线转动,而不能沿螺杆轴心线上下滑动。上盖上设有两个螺孔,框架两端的两根螺杆分别与两个螺孔对应螺接配合,所以,当螺杆旋进对应螺孔内时,框架将通过两根螺杆吊装在上盖的上盖槽内。螺杆外端设有驱动槽,当从上盖外侧推动驱动槽转动时,螺杆将相对螺孔旋进或旋出。此时由于框架不能随螺杆一起转动,所以框架只能在圆盘和延伸杆的带动下沿螺杆轴向移动,也就是深入上盖槽槽底或远离上盖槽槽底,也就实现了辅助轮的升降。因为横杆通过横轴与纵轴铰接配合,因此在旋动螺杆时,两根螺杆可以不同步,即先升降框架一端再升降框架另一端,避免了同步旋动螺杆时的不便捷性。In this embodiment, the adjusting device comprises a frame 16, which includes two parallel longitudinal bars 17 and a cross bar 18 arranged between corresponding ends of the longitudinal bars. The two ends of the cross bar 18 are connected together with the longitudinal bar through the transverse shaft 19, and the cross bar rotates around the transverse shaft, and the auxiliary wheels 7 are correspondingly installed between the two longitudinal bars. It also includes a screw hole 20 passing through the inside and outside of the upper cover and a screw rod 21 matched with the screw hole, and a driving groove 22 is provided on the upper end surface of the screw rod. The lower end of the screw rod is coaxially fixed with an extension rod, and the lower end of the extension rod is coaxially fixed with a disc with a diameter larger than that of the extension rod, and the middle part of the cross bar is provided with a transverse cavity that is rotatably matched with the extension rod and the disc. Because the frame includes two longitudinal bars and two cross bars connected by transverse shafts, and the auxiliary wheels are installed between the two longitudinal bars, so when the frame is raised and lowered, the auxiliary wheels must also be raised and lowered thereupon. The middle part of the cross bar is provided with a transverse cavity, and the extension rod and the disc at the lower end of the screw rod are contained in the transverse cavity. Because the screw, extension rod and disc are coaxially arranged, and the diameter of the disc is larger than the diameter of the extension rod, the screw can only rotate around the axis of the screw relative to the cross bar through the extension rod and the disc, but not along the axis of the screw. The heart line slides up and down. There are two screw holes on the upper cover, and the two screw rods at both ends of the frame are respectively screwed and matched with the two screw holes. Therefore, when the screw rods are screwed into the corresponding screw holes, the frame will be hoisted on the upper cover through the two screw rods. In the cover slot. The outer end of the screw rod is provided with a driving groove, and when the driving groove is pushed to rotate from the outside of the upper cover, the screw rod will be screwed in or out relative to the screw hole. At this time, because the frame cannot rotate with the screw, the frame can only move axially along the screw under the drive of the disc and the extension rod, that is, go deep into the bottom of the groove of the upper cover or away from the bottom of the groove of the upper cover. Wheel lift. Because the horizontal bar is hinged with the vertical axis through the horizontal axis, when the screw rods are rotated, the two screw rods can be asynchronous, that is, one end of the frame is lifted first and then the other end of the frame is lifted, which avoids the inconvenience of synchronously rotating the screw rods.
纵杆外侧固设有滑块26,滑块的长度方向与纵杆17的长度方向垂直设置且与螺杆21轴向平行设置,上盖槽槽壁上设有与滑块对应滑动配合的滑槽27。在纵杆外侧设置滑块,并在上盖槽侧壁上设置与滑块滑动配合的滑槽,可以起到对框架升降时进行前后方向相对限位作用,而且在将框架安装到上盖槽内时,还可以起到引导作用。因为滑块的长度方向与螺杆轴向平行设置,因此滑块与滑槽的滑动配合可以保证在螺杆的驱动下框架只能做稳定的升降运动。A slide block 26 is fixed on the outer side of the longitudinal bar, the length direction of the slide block is perpendicular to the length direction of the longitudinal bar 17 and arranged parallel to the axial direction of the screw rod 21, and the groove wall of the upper cover is provided with a chute correspondingly slidingly matched with the slide block 27. A slider is provided on the outside of the longitudinal rod, and a chute that is slidably matched with the slider is provided on the side wall of the upper cover groove, which can play a role of relative positioning in the front and rear directions when the frame is raised and lowered, and when the frame is installed in the upper cover groove When inside, it can also play a guiding role. Because the length direction of the slide block is arranged parallel to the axial direction of the screw rod, the sliding cooperation between the slide block and the chute can ensure that the frame can only perform stable lifting motion under the drive of the screw rod.
在该电力架线跨线器中,上盖5外壁上设有环螺孔设置的刻度环28,驱动槽一端的螺杆外端面上设有基准件29,螺杆外端面与上盖外壁平齐时基准件靠近的驱动槽一端指向刻度环零点。螺杆旋转一周,螺杆在轴向上进给一个螺距。如果螺杆旋转不是整整的一周,则很难准确判断螺杆轴向进给了多少。所以在上盖外壁上设置环螺孔设置的刻度环可以起到指示轴向进给量的作用,有效保证了两根螺杆轴向进给的一致性。驱动槽一端的基准件可以起到标识起始位置和终止位置的作用,避免驱动槽两端引起混淆,有助于快速判断进给量。在实际生产时,基准件既可以是孔,可以是凸块。In this power line jumper, the outer wall of the upper cover 5 is provided with a scale ring 28 provided with a ring screw hole, and a reference member 29 is provided on the outer end surface of the screw at one end of the driving groove. When the outer end surface of the screw is flush with the outer wall of the upper cover The end of the drive slot close to the reference member points to the zero point of the scale ring. The screw rotates once, and the screw feeds a pitch in the axial direction. If the screw does not make a full revolution, it is difficult to tell exactly how much the screw has advanced axially. Therefore, the scale ring provided by the ring screw hole on the outer wall of the upper cover can play the role of indicating the axial feed amount, effectively ensuring the consistency of the axial feed of the two screws. The reference piece at one end of the drive slot can mark the start position and end position, avoid confusion at both ends of the drive slot, and help to quickly judge the feed rate. In actual production, the reference piece can be either a hole or a bump.
在本实施例中,所述操作件包括铰接在绝缘杆下段上的操作杆30,操作杆中部铰接有变向杆31,变向杆上端与绝缘棒下端通过下铰轴32铰接在一起,变向杆两侧的绝缘杆下段上固设有与下铰轴滑动配合的滑轨33,滑轨长度方向与绝缘棒长度方向平行设置。因为操作杆一端铰接在绝缘杆上,操作杆中部与变向杆下端铰接,所以当推动操作杆另一端时,就相当于用杠杆推动变向杆移动,非常省力。推动操作杆向下摆动时,操作杆通过变向杆将绝缘棒下拉,此时上摆的传动杆上端将通过上连杆推动上盖扣合到底座上。反之,推动操作杆上摆时,下摆的传动杆上端将通过上连杆将上盖从底座上拉开,完成开盖动作,操作非常简单。变向杆上端通过下铰轴与绝缘棒下端铰接,而绝缘杆下段上又设有与下铰轴两端滑动配合的滑轨,且滑轨的延伸方向与绝缘棒延伸方向一致,因此滑轨可以起到对下铰轴导向和限位的作用,也就是对变向杆上端导向和限位的作用,这样变向杆就能起到将操作杆摆动力变为绝缘棒上下滑动力的作用。In this embodiment, the operating member includes an operating rod 30 hinged on the lower section of the insulating rod. A direction changing rod 31 is hinged in the middle of the operating rod. A slide rail 33 that is slidably matched with the lower hinge shaft is fixed on the lower section of the insulating rod on both sides of the rod, and the length direction of the slide rail is parallel to the length direction of the insulating rod. Because one end of the operating rod is hinged on the insulating rod, and the middle part of the operating rod is hinged to the lower end of the steering rod, so when the other end of the operating rod is pushed, it is equivalent to pushing the steering rod to move with a lever, which is very labor-saving. When the operating rod is pushed to swing downwards, the operating rod pulls down the insulating rod through the direction changing rod, and the upper end of the upwardly swinging transmission rod will push the upper cover through the upper connecting rod to snap onto the base. Conversely, when the operating lever is pushed to swing up, the upper end of the transmission rod of the lower swing will pull the upper cover away from the base through the upper link to complete the action of opening the cover. The operation is very simple. The upper end of the reversing rod is hinged to the lower end of the insulating rod through the lower hinge shaft, and the lower section of the insulating rod is provided with a slide rail that slides and fits with both ends of the lower hinge shaft, and the extension direction of the slide rail is consistent with the extension direction of the insulation rod, so the slide rail It can play the role of guiding and limiting the lower hinge shaft, that is, guiding and limiting the upper end of the direction change rod, so that the direction change rod can change the swing force of the operating rod into the up and down force of the insulating rod .
在该电力架线跨线器中,绝缘杆1为可连接可拆卸的多节结构,这样不但占用空间小,方便携带,而且在施工时也非常方便。绝缘杆包括从上向下依次螺接在一起的一根主上杆34、若干根主中杆35和一根主下杆36,主上杆下端和主中杆下端设有相同的内螺孔37,主中杆上端和主下杆上端设有与内螺孔螺接配合的外螺段38。所述绝缘棒包括从上向下依次螺接在一起的一根副上杆39、若干根副中杆40和一根副下杆41,副上杆下端和副中杆下端设有相同的副内螺孔42,副中杆上端和副下杆上端设有与副内螺孔螺接配合的副外螺段43。还包括能将副中杆安装在主中杆上、将副下杆安装在主下杆上,且能在外螺段拧紧到内螺孔内时能使副上杆、副中杆和副下杆同轴设置的双杆定向装置。In the power line jumper, the insulating rod 1 is a connectable and detachable multi-section structure, which not only occupies a small space, is convenient to carry, but also is very convenient during construction. The insulating rod includes a main upper rod 34, several main middle rods 35 and a main lower rod 36 which are screwed together from top to bottom, and the lower end of the main upper rod and the lower end of the main middle rod are provided with the same inner screw hole 37. The upper end of the main middle rod and the upper end of the main lower rod are provided with an outer screw segment 38 that is screwed and matched with the inner screw hole. The insulating rod includes a secondary upper rod 39, several secondary middle rods 40 and a secondary lower rod 41 which are screwed together sequentially from top to bottom. The lower end of the secondary upper rod and the lower end of the secondary middle rod are provided with the same secondary The inner screw hole 42, the upper end of the auxiliary middle rod and the upper end of the auxiliary lower rod are provided with an auxiliary outer screw segment 43 which is screwed and matched with the auxiliary inner screw hole. It also includes the ability to install the auxiliary middle rod on the main middle rod and the auxiliary lower rod on the main lower rod, and when the outer screw section is tightened into the inner screw hole, the auxiliary upper rod, auxiliary middle rod and auxiliary lower rod Coaxially arranged twin-rod orienting device.
因为主上杆、主中杆下端设有相同的内螺孔,主中杆和主下杆上端设有与内螺孔相配合的外螺段,所以不论是主下杆还是哪根主中杆都可以螺接到主上杆下端,而且主下杆可以螺接上任意一根主中杆下端,而且任意两根或多根主中杆都可以上下螺接在一起,因此绝缘杆的主上杆、主中杆和主下杆,可以根据下跨线的实际高度,自由组合、自由装配,非常方便。与之相对应的,副上杆、副中杆和副下杆也可以自由组合、自由装配,其组合或组装结构、组合或组装原理类似,在此不再细述。Because the main upper rod and the lower end of the main middle rod are provided with the same inner screw hole, and the upper ends of the main middle rod and the main lower rod are provided with an outer screw section that matches the inner screw hole, so whether it is the main lower rod or which main middle rod can be screwed to the lower end of the main upper pole, and the main lower pole can be screwed to the lower end of any main middle pole, and any two or more main middle poles can be screwed together up and down, so the main upper pole of the insulating rod The rod, the main middle rod and the main lower rod can be freely combined and assembled according to the actual height of the lower span, which is very convenient. Correspondingly, the auxiliary upper pole, auxiliary middle pole and auxiliary lower pole can also be combined and assembled freely, and their combination or assembly structure and principle of combination or assembly are similar and will not be described in detail here.
在本电力架设跨线器中还包括双杆定向装置,双杆定向装置在结构上将副中杆安装在主中杆上、将副下杆安装在主下杆上。为方便叙述,将主上杆和副上杆的组合结构称为上杆,将主中杆和副中杆的组合结构称为中杆,将主下杆和副下杆的组合结构称为下杆。双杆定向装置不但能起到上述安装连接作用,还具有使中杆对应安装到上杆上、使中杆对应安装到另一个中杆上,及使下杆对应安装到中杆或上杆上的作用。具体而言,当主中杆外螺段完全拧紧到主上杆内螺孔内时,可以很轻松地使副中杆与副上杆上下对齐,这样就能很轻易地将副中杆对应拧紧到副上杆下端,起到了在对接或定向主上杆和主中杆的时候就能快速对接或定向副上杆和副中杆的作用。由于副中杆安装在主中杆上、副下杆安装在主下杆上,所以上述对接后,绝缘杆与绝缘棒相互嵌位或限位,起到了互锁作用,从结构上避免了在托举或把握绝缘杆时,因为无意转动绝缘杆而造成主中杆与主上杆的逆向旋脱现象,或者主中杆与主中杆的逆向旋脱现象,或者主中杆与主下杆的逆向旋脱现象,或者主上杆与主下杆的逆向旋脱现象,也就保证了绝缘杆分段螺接的可靠性及绝缘棒分段螺接的可靠性。The electric power erection jumper also includes a double-rod orientation device. The double-rod orientation device structurally installs the auxiliary middle rod on the main middle rod, and installs the auxiliary lower rod on the main lower rod. For the convenience of description, the combined structure of the main upper rod and the auxiliary upper rod is called the upper rod, the combined structure of the main middle rod and the auxiliary lower rod is called the middle rod, and the combined structure of the main lower rod and the auxiliary lower rod is called the lower rod. pole. The double-rod orientation device can not only play the above-mentioned installation and connection functions, but also have the functions of making the middle rod correspondingly installed on the upper rod, making the middle rod correspondingly installed on another middle rod, and making the lower rod correspondingly installed on the middle rod or upper rod role. Specifically, when the outer screw section of the main middle rod is fully tightened into the inner screw hole of the main upper rod, the auxiliary middle rod and the auxiliary upper rod can be easily aligned up and down, so that the auxiliary middle rod can be easily tightened to the corresponding position. The lower end of the auxiliary upper pole plays a role in quickly docking or orienting the auxiliary upper pole and the auxiliary middle pole when docking or orienting the main upper pole and the main middle pole. Since the auxiliary middle rod is installed on the main middle rod and the auxiliary lower rod is installed on the main lower rod, after the above-mentioned docking, the insulating rod and the insulating rod are mutually embedded or limited, which plays an interlocking role, and structurally avoids the When lifting or holding the insulating rod, the reverse rotation of the main middle rod and the main upper rod is caused by unintentional rotation of the insulating rod, or the reverse rotation of the main middle rod and the main middle rod, or the main middle rod and the main lower rod. The reverse unscrewing phenomenon, or the reverse unscrewing phenomenon of the main upper rod and the main lower rod, also ensures the reliability of the segmental screw connection of the insulating rod and the reliability of the segmental screw connection of the insulating rod.
在本实施例中,所述双杆定向装置包括设置在主中杆35上部和下部并与副中杆40上下滑动配合的中套66。副中杆40中部同轴固设有中螺母67,主下杆36上部设有与副下杆41上下滑动配合的下套68,主中杆35上端和主下杆36上端同轴固设有光轴段44,光轴段44外壁上固设有定位滑块45,内螺孔37底部同轴延伸设有与光轴段44配合的光轴腔46,内螺孔37内壁上设有与定位滑块45轴向滑动配合的定位滑槽47,光轴腔46内壁上设有与定位滑槽47内端联接的定位滑道65,定位滑道65与内螺孔37的螺纹同向螺旋设置且与定位滑块45螺旋滑动配合,定位滑块45转动到定位滑道65末端时,副上杆39、副中杆40和副下杆41同轴设置,主上杆和主中杆外壁下端固设有与定位滑槽47对应的标志块69,副下杆41包括与变向杆31铰接的下副下杆48和与副中杆40螺接的上副下杆49,下副下杆48上端同轴固接有直杆50,直杆50上端同轴固接有转盘51,上副下杆49下部设有与直杆50、转盘51转动配合的转腔52,上副下杆49上同轴固设有下螺母53。In this embodiment, the double rod orientation device includes middle sleeves 66 arranged on the upper and lower parts of the main middle rod 35 and slidingly matched with the auxiliary middle rod 40 up and down. The middle part of the auxiliary middle rod 40 is coaxially fixed with a middle nut 67, the upper part of the main lower rod 36 is provided with a lower sleeve 68 which slides up and down with the auxiliary lower rod 41, and the upper end of the main middle rod 35 and the upper end of the main lower rod 36 are coaxially fixed with a The optical axis section 44 is fixed with a positioning slider 45 on the outer wall of the optical axis section 44, and the bottom of the inner screw hole 37 is coaxially extended to be provided with an optical axis cavity 46 cooperating with the optical axis section 44, and the inner wall of the inner screw hole 37 is provided with a The positioning slider 45 is axially slidably matched with the positioning chute 47, and the inner wall of the optical axis cavity 46 is provided with a positioning slideway 65 connected with the inner end of the positioning chute 47, and the positioning slideway 65 and the screw thread of the inner screw hole 37 spiral in the same direction. Set and cooperate with the positioning slider 45 spiral sliding, when the positioning slider 45 rotates to the end of the positioning slideway 65, the auxiliary upper rod 39, the auxiliary middle rod 40 and the auxiliary lower rod 41 are coaxially arranged, and the outer wall of the main upper rod and the main middle rod The lower end is fixedly provided with a sign block 69 corresponding to the positioning chute 47. The auxiliary lower rod 41 includes a lower auxiliary lower rod 48 hinged with the direction changing rod 31 and an upper auxiliary lower rod 49 screwed to the auxiliary middle rod 40. The upper end of the rod 48 is coaxially fixed with a straight rod 50, and the upper end of the straight rod 50 is coaxially fixed with a turntable 51. The lower part of the upper and lower rods 49 is provided with a rotating cavity 52 that is rotatably matched with the straight rod 50 and the turntable 51. The upper and lower rods 49 upper coaxial fixedly are provided with lower nut 53.
主中杆上设有两个中套,分别位于主中杆的两端,且副中杆插装在两个中套中上下滑动配合,因此,受设置在副中杆中部的中螺母作用,副中杆只能沿中套上下滑动而不会滑脱,这样也就保证了副中杆在周向上固定安装在主中杆上却又能在纵向上相对主中杆运动。中螺母具有三个作用:一是起限位作用,防止副中杆从上下两个中套滑出,二是为副中杆上下移动提供活动空间,这样副中杆在与副上杆或上方的副中杆螺接时就非常方便,三是可以通过扳手驱动中螺母而实现将副中杆拧紧到副上杆或上方的副中杆上。There are two middle sleeves on the main middle rod, which are respectively located at both ends of the main middle rod, and the auxiliary middle rod is inserted into the two middle sleeves to slide up and down. Therefore, under the action of the middle nut arranged in the middle of the auxiliary middle rod, The auxiliary middle rod can only slide up and down along the middle sleeve without slipping off, so that the auxiliary middle rod is fixedly installed on the main middle rod in the circumferential direction but can move relative to the main middle rod in the longitudinal direction. The middle nut has three functions: one is to limit the position and prevent the auxiliary middle rod from slipping out of the upper and lower middle sleeves; It is very convenient when the auxiliary middle rod is screwed. The third is that the middle nut can be driven by a wrench to tighten the auxiliary middle rod to the auxiliary upper rod or the upper auxiliary middle rod.
主中杆和主下杆上端设有光轴段,也就是外周没有螺纹的圆柱段,这样主中杆和主下杆上部就设有一个光轴段和一个外螺段。光轴段和外螺段的位置关系是,光轴段在上外螺段在下,两者自然衔接配合。与之对应的,主上杆和主中杆下端的内螺孔内设有一个光轴腔,光轴腔为圆柱形腔,位于内螺孔底部,与内螺孔同轴设置。在尺寸上,光轴腔直径与光轴段直径相同,但要小于内螺孔内径,以保证光轴段可以顺利通过内螺孔插装进光轴腔。光轴段外壁上固设有一个定位滑块,内螺孔和光轴腔内壁上设有一根与定位滑块对应的轴向延伸设置的定位滑槽。在尺寸上,定位滑块外壁距离光轴段轴心线的距离要大于内螺孔内径,这样就保证只有把定位滑块对应滑入定位滑槽时,光轴段才能且只能顺利插入内螺孔及光轴腔内。因为定位滑块相对外螺段的位置是固定的、定位滑槽相对内螺孔的位置也是固定的,因此当定位滑块对应滑入定位滑槽内时,外螺段和内螺孔的对应关系也就确定了,当定位滑块滑入定位滑槽底部时,外螺段螺纹初始端正好对齐内螺孔螺纹的始入端,起到了快速对齐外螺段和内螺孔的作用。光轴腔内壁上设有与定位滑块配合的定位滑道,定位滑道下端与定位滑槽上端也就是内端对应连接,定位滑道呈与内螺孔螺旋旋向相同的螺旋状,因此,当定位滑块滑入定位滑槽底部也就是内端时,也就正好进入了定位滑道的下端或初始端。当沿内螺孔旋向旋转主中杆或主下杆时,不但外螺段会旋入内螺孔内,定滑块也会沿定位滑道对应滑动,此时固设在主中杆上的副中杆会随之同步转动,固定在主下杆上的副下杆也随之转动。当定位滑块滑到定位滑道末端时,定位滑块和外螺段同步停止旋进,此时副中杆正好与副上杆同轴设置、副下杆正好与副上杆同轴设置,这样就实现了副上杆、副中杆和副下杆的快速同轴定位或定向。然后将副中杆对应旋进副上杆或上方的副中杆中、将副下杆对应旋进副上杆或副中杆中,组装非常快速,操作非常简单。绝缘杆和绝缘棒旋紧后,两者互相锁定,保证了旋紧的可靠性。The upper end of the main middle rod and the main lower rod is provided with an optical axis section, that is, a cylindrical section without threads on the outer circumference, so that the main middle rod and the upper part of the main lower rod are provided with an optical axis section and an outer screw section. The positional relationship between the optical axis section and the external screw section is that the optical axis section is on the top and the external screw section is on the bottom, and the two are naturally connected and matched. Correspondingly, an optical axis cavity is provided in the internal screw holes at the lower ends of the main upper rod and the main middle rod. The optical axis cavity is a cylindrical cavity, located at the bottom of the internal screw hole, and coaxially arranged with the internal screw hole. In terms of size, the diameter of the optical axis cavity is the same as that of the optical axis section, but smaller than the inner diameter of the inner screw hole, so as to ensure that the optical axis section can be smoothly inserted into the optical axis cavity through the inner screw hole. A positioning slider is fixed on the outer wall of the optical axis section, and an axially extending positioning chute corresponding to the positioning slider is provided on the inner screw hole and the inner wall of the optical axis cavity. In terms of size, the distance between the outer wall of the positioning slider and the axis of the optical axis section is greater than the inner diameter of the inner screw hole, so as to ensure that only when the positioning slider is slid into the positioning chute, the optical axis section can and can only be inserted into the inner hole smoothly. Inside the screw hole and optical axis cavity. Because the position of the positioning slider relative to the outer screw segment is fixed, and the position of the positioning chute relative to the inner screw hole is also fixed, so when the positioning slider slides into the positioning chute, the corresponding position between the outer screw segment and the inner screw hole The relationship is determined. When the positioning slider slides into the bottom of the positioning chute, the initial end of the thread of the outer thread segment is just aligned with the beginning end of the thread of the inner screw hole, which plays a role in quickly aligning the outer thread segment and the inner screw hole. The inner wall of the optical axis cavity is provided with a positioning slideway that cooperates with the positioning slider. The lower end of the positioning slideway is connected to the upper end of the positioning slideway, that is, the inner end. The positioning slideway is in the same helical shape as the inner screw hole. , when the positioning slider slides into the bottom of the positioning chute, which is the inner end, it just happens to enter the lower end or initial end of the positioning slide. When the main middle rod or the main lower rod is rotated along the inner screw hole, not only the outer screw section will be screwed into the inner screw hole, but also the fixed slider will slide correspondingly along the positioning slideway. The auxiliary middle rod will rotate synchronously thereupon, and the auxiliary lower rod fixed on the main lower rod will also rotate thereupon. When the positioning slider slides to the end of the positioning slideway, the positioning slider and the outer screw section stop screwing in synchronously. At this time, the auxiliary middle rod is just set coaxially with the auxiliary upper rod, and the auxiliary lower rod is just set coaxially with the auxiliary upper rod. In this way, the fast coaxial positioning or orientation of the auxiliary upper rod, the auxiliary middle rod and the auxiliary lower rod is realized. Then screw the auxiliary middle pole into the auxiliary upper pole or the upper auxiliary middle pole, and screw the auxiliary lower pole into the auxiliary upper pole or the auxiliary middle pole. The assembly is very fast and the operation is very simple. After the insulating rod and the insulating rod are screwed tightly, the two lock each other to ensure the reliability of screwing.
在主中杆和副中杆下端设置与定位滑槽对应的标志块,可以指示定位滑槽的位置,这样就可以在外观上快速判断定位滑槽的入口位置,保证了快速插入定位滑块及旋紧。At the lower end of the main middle pole and the auxiliary middle pole, a sign block corresponding to the positioning chute can be set, which can indicate the position of the positioning chute, so that the entrance position of the positioning chute can be quickly judged from the appearance, ensuring the rapid insertion of the positioning slider and Tighten.
副下杆分为两部分,即上部的上副下杆和下部的下副下杆,上副下杆下端设有转腔,转腔内盛装有下副下杆上端的直杆和转盘。因为直杆、转盘、转腔、绝缘棒皆同轴设置且转盘直径大于直杆直径,因此上副下杆和下副下杆只能绕其轴心线相对转动配合而不能上下相对运动。这样设置,是为了方便副下杆上端能够螺接到副上杆或副中杆上。上副下杆上也同轴固设有下螺母,也是为了拧紧而设置的。在本电力架线跨线器中,中套和下套通过转套安装在主中杆和主下杆上,不单单是为了能将副中杆与主中杆构成一体结构、将副下杆与主下杆构成一体结构,更是为了在主中杆/主下杆与上方的主上杆/主中杆螺接后能够方便副中杆/副下杆对齐上方的副上杆/副中杆而设置的,这样有助于实现快速组装。The auxiliary lower rod is divided into two parts, that is, the upper upper lower rod and the lower lower lower rod. Because the straight rod, turntable, rotary cavity and insulating rod are all arranged coaxially and the diameter of the turntable is larger than the diameter of the straight rod, the upper and lower rods can only rotate relative to each other around their axes and cannot move up and down relative to each other. Such setting is for convenience that the upper end of the auxiliary lower rod can be screwed to the auxiliary upper rod or the auxiliary middle rod. The upper and lower rods are also coaxially fixed with lower nuts, which are also provided for tightening. In this power line jumper, the middle sleeve and the lower sleeve are installed on the main middle pole and the main lower pole through the rotating sleeve, not only for the purpose of forming an integrated structure between the auxiliary middle pole and the main middle pole, and integrating the auxiliary lower pole It forms an integrated structure with the main lower rod, and it is more convenient for the auxiliary middle rod/secondary lower rod to align with the upper auxiliary upper rod/secondary center after the main middle rod/main lower rod is screwed to the upper main upper rod/main middle rod. rod, which facilitates quick assembly.
铰轴上套装有能使上盖弹性压紧在底座上的扭簧54。设置弹簧后,操作件在不受外力作用下(自然状态下),上盖可以弹簧弹力作用下自动扣合到底座上,具有开盖后自动扣合或自动复位的作用,避免了操作人员来回推动操作杆。A torsion spring 54 that can make the loam cake elastically compressed on the base is sleeved on the hinge shaft. After the spring is set, the upper cover can be automatically fastened to the base under the action of the spring force when the operating part is not affected by external force (in a natural state), which has the function of automatic buckling or automatic reset after opening the cover, avoiding the operator's back and forth Push the joystick.
在本实施例中,所述操作杆末段固设有与绝缘杆外周贴合的弧板55,弧板端部设有定位孔56,绝缘杆下端铰接有在弧板贴紧绝缘杆下端时与定位孔钩挂配合的挂钩57。将操作杆末段设置成弧板,可以在扣合状态时,也就是将操作杆向下摆动到绝缘杆下端时能够使弧板的内弧面贴紧到绝缘杆外壁上,这样操作者为保持住扣合状态而攥握住绝缘杆下段和操作杆时手感将非常舒适,有助于长期保持扣合状态。将绝缘杆下端铰接的挂钩钩挂到扣合状态时弧板末端的定位孔上,可以起到锁紧弧板的作用,这样人们就不用一直用手攥着绝缘杆和弧板,更加省力。In this embodiment, the end section of the operating rod is fixed with an arc plate 55 that fits the outer circumference of the insulating rod, and the end of the arc plate is provided with a positioning hole 56, and the lower end of the insulating rod is hinged with a Hook 57 that cooperates with positioning hole hook. The end section of the operating rod is set as an arc plate, which can make the inner arc surface of the arc plate close to the outer wall of the insulating rod in the fastened state, that is, when the operating rod is swung down to the lower end of the insulating rod. It will be very comfortable to hold the lower section of the insulating rod and the operating rod while maintaining the snap-fit state, which helps to maintain the snap-fit state for a long time. Hooking the hinged hook at the lower end of the insulating rod to the positioning hole at the end of the arc plate in the buckled state can play a role in locking the arc plate, so that people don’t have to hold the insulating rod and the arc plate with their hands all the time, which saves more effort.
所述绝缘杆下端设有内螺纹孔58,绝缘杆下端螺接有下端呈锥形的定位锥59,绝缘杆上部均匀环设有三个定位环60,定位环上连接有定位绳61,定位绳下端连接有能嵌入地下的固定锥62。当本电力架线跨线器需要做较长时间的跨线时,或者施工人手不够时,可以将定位锥拧紧到绝缘杆下端并将定位锥插入地下,然后用定位绳连接绝缘杆上部的定位环和地面上的固定锥并将固定锥插入或埋入地下,即可将绝缘杆保持竖立状态地固定在地面上,也就实现了自动支撑或自动跨线的功能。因为三个定位环均匀环设在绝缘杆上部,因此三根定位绳可以保证绝缘杆在外周任意方向受力均匀,也就保证了绝缘杆的竖直状态。The lower end of the insulating rod is provided with an internally threaded hole 58, and the lower end of the insulating rod is screwed with a positioning cone 59 with a tapered lower end. The upper even ring of the insulating rod is provided with three positioning rings 60, and the positioning ring is connected with a positioning rope 61. The positioning rope The lower end is connected with a fixed cone 62 which can be embedded in the ground. When the power line jumper needs to do long-term jumping, or when the construction manpower is insufficient, the positioning cone can be tightened to the lower end of the insulating rod and inserted into the ground, and then the positioning rope is used to connect the positioning of the upper part of the insulating rod. The ring and the fixing cone on the ground and inserting or burying the fixing cone in the ground can keep the insulating rod upright and fixed on the ground, which realizes the function of automatic support or automatic crossing. Because the three positioning rings are evenly arranged on the top of the insulating rod, the three positioning ropes can ensure that the insulating rod is evenly stressed in any direction on the periphery, thus ensuring the vertical state of the insulating rod.
本电力架线跨线器结构合理,体积小,可以快速组装或架设,在地面上就能带电完成对上跨线电缆的跨线、挑线、引线操作,操作简单、无需登高,既避免了登高操作的触点隐患,又解决了登高操作的高空跌落问题,大大提高了工作效率。The power line jumper has a reasonable structure, small size, and can be quickly assembled or erected. It can complete the jumping, picking up, and leading operations of the upper jumping cable with electricity on the ground. The operation is simple and does not require climbing, which avoids The hidden danger of contact points in the operation of ascending heights has also solved the problem of falling from high altitudes in the operation of ascending heights, greatly improving work efficiency.
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410259843.3A CN105226555B (en) | 2014-06-12 | 2014-06-12 | A kind of electric stringing cross-line device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410259843.3A CN105226555B (en) | 2014-06-12 | 2014-06-12 | A kind of electric stringing cross-line device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN105226555A CN105226555A (en) | 2016-01-06 |
| CN105226555B true CN105226555B (en) | 2018-07-20 |
Family
ID=54995347
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201410259843.3A Expired - Fee Related CN105226555B (en) | 2014-06-12 | 2014-06-12 | A kind of electric stringing cross-line device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN105226555B (en) |
Families Citing this family (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105186358B (en) * | 2014-06-12 | 2018-07-20 | 国网山东省电力公司潍坊供电公司 | Electric stringing cross-line device |
| CN105870673B (en) * | 2016-06-16 | 2018-06-08 | 国网江苏省电力有限公司高邮市供电分公司 | A kind of grounding rod for overhead transmission line |
| CN110265846B (en) * | 2019-05-30 | 2024-04-16 | 德诺克智能装备(昆山)有限公司 | Telephone line processing production line |
| CN112072549B (en) * | 2020-09-14 | 2021-09-07 | 国网河南省电力公司温县供电公司 | A power line jumper |
| CN113078581B (en) * | 2021-03-30 | 2023-06-30 | 贵州电网有限责任公司 | Telescopic crossing distribution network line special equipment |
| CN117791419B (en) * | 2023-12-14 | 2024-05-31 | 国网山东省电力公司临沂供电公司 | Cable laying support structure |
Family Cites Families (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2006217703A (en) * | 2005-02-02 | 2006-08-17 | Chugoku Electric Power Co Inc:The | Distribution installation inspecting stick |
| CN202084841U (en) * | 2011-04-22 | 2011-12-21 | 江苏省电力公司泰兴市供电公司 | Portable crossing frame |
| CN203056447U (en) * | 2012-11-30 | 2013-07-10 | 偃师市供电有限公司 | Wire supporting device |
| CN103532042B (en) * | 2013-09-22 | 2016-06-15 | 国家电网公司 | A kind of portable simple crossing frame of power distribution network |
| CN203932820U (en) * | 2014-06-12 | 2014-11-05 | 国网山东省电力公司潍坊供电公司 | A kind of electric stringing cross-line device |
| CN203932819U (en) * | 2014-06-12 | 2014-11-05 | 国网山东省电力公司潍坊供电公司 | Electric stringing cross-line device |
| CN105186358B (en) * | 2014-06-12 | 2018-07-20 | 国网山东省电力公司潍坊供电公司 | Electric stringing cross-line device |
-
2014
- 2014-06-12 CN CN201410259843.3A patent/CN105226555B/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| CN105226555A (en) | 2016-01-06 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105186358B (en) | Electric stringing cross-line device | |
| CN105226555B (en) | A kind of electric stringing cross-line device | |
| CN203932820U (en) | A kind of electric stringing cross-line device | |
| CN207346886U (en) | A kind of Simple telescopic pay off rack | |
| CN205960543U (en) | Cable supporting frame | |
| CN203932819U (en) | Electric stringing cross-line device | |
| CN206072698U (en) | A kind of projector suspension bracket | |
| CN116500309A (en) | An electric power test clamp for electric power detection | |
| CN206521697U (en) | A kind of portable bridge detection means | |
| CN206195318U (en) | Lightning protection device of storage station | |
| CN109488844B (en) | A kind of nameplate collector with good stability | |
| CN208249530U (en) | Bobbin winder device is used in a kind of production of optical cable | |
| CN208485519U (en) | A kind of subway work handling device | |
| CN210744610U (en) | Universal subway communication signal optical cable laying device | |
| CN212648992U (en) | But angle regulation's cable testing bridge | |
| CN210950551U (en) | Auxiliary device for mechanical equipment installation | |
| CN208345497U (en) | A kind of portable threading shaft device | |
| CN208779069U (en) | A kind of total station bracket fixing device | |
| CN107294005A (en) | Rural power transmission of electricity overhead line laying apparatus | |
| CN221192992U (en) | Automatic deviation-correcting hole feeding device | |
| CN114447642B (en) | A multi-axis linkage labor-saving grounding clamp with self-locking mechanism | |
| CN209374871U (en) | Conducting ring band tooling | |
| CN207098542U (en) | A kind of electric power support for being easy to regulation | |
| CN207134732U (en) | A kind of computer network support meanss | |
| CN205753217U (en) | A kind of universal scalable spreading axis paying out machine |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C41 | Transfer of patent application or patent right or utility model | ||
| TA01 | Transfer of patent application right |
Effective date of registration: 20160322 Address after: Weifang City, Shandong province 261041 Dongfeng East Street, No. 295 Applicant after: Liu Weihua Address before: Weifang City, Shandong province 261041 Dongfeng East Street, No. 295 Applicant before: State Grid Shandong Electric Power Company Weifang Power Supply Company Applicant before: State Grid Corporation of China |
|
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C41 | Transfer of patent application or patent right or utility model | ||
| TA01 | Transfer of patent application right |
Effective date of registration: 20160810 Address after: 261021 Weifang Dongfeng West Street, Shandong, No. 425 Applicant after: State Grid Shandong Electric Power Company Weifang Power Supply Company Applicant after: State Grid Corporation of China Address before: Weifang City, Shandong province 261041 Dongfeng East Street, No. 295 Applicant before: Liu Weihua |
|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180720 Termination date: 20210612 |