CN105204135A - 海底管道同步光缆的弃管处理方法及其制备方法 - Google Patents
海底管道同步光缆的弃管处理方法及其制备方法 Download PDFInfo
- Publication number
- CN105204135A CN105204135A CN201510732665.6A CN201510732665A CN105204135A CN 105204135 A CN105204135 A CN 105204135A CN 201510732665 A CN201510732665 A CN 201510732665A CN 105204135 A CN105204135 A CN 105204135A
- Authority
- CN
- China
- Prior art keywords
- optical cable
- cable
- pipe
- guanjiedianchu
- hai
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G02—OPTICS
- G02B—OPTICAL ELEMENTS, SYSTEMS OR APPARATUS
- G02B6/00—Light guides; Structural details of arrangements comprising light guides and other optical elements, e.g. couplings
- G02B6/46—Processes or apparatus adapted for installing or repairing optical fibres or optical cables
- G02B6/50—Underground or underwater installation; Installation through tubing, conduits or ducts
- G02B6/508—Fixation devices in ducts for drawing cables
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Optics & Photonics (AREA)
- Light Guides In General And Applications Therefor (AREA)
Abstract
一种海底管道同步光缆的弃管处理方法中,弃管开始前,在超出海管节点处将光缆截断,并将光缆端部密封,将光缆固定在海管上,弃管时,光缆随海管一同落入海底;在已铺设和未铺设光缆熔接后于海管节点处和海管节点两端分别用了绑带进行固定,然后将光缆熔接点处的光缆护套包覆于发泡层中,从而有效地增加了所述光缆熔接点的轴向强度,保证了所述光缆安全铺设。本发明操作简单、便于实施且省时省力,解决了与海底管道一同铺设的光缆在弃管处理过程中的技术难题。
Description
技术领域
本发明涉及海底油气管道铺设的技术领域,具体说是一种海底管道同步光缆的弃管处理方法。
背景技术
海底蕴藏着大量的油气资源,海底管道(简称海管)作为其油气资源的主要输送形式,已在国内外得到了广泛应用。然而,由于人为因素、环境因素、内部腐蚀等原因,海底管道泄漏事故在国内外时有发生。且泄漏一旦发生,无法第一时间确定泄漏位置和泄漏事件,不仅会造成巨大的经济损失,还会污染海洋环境。
分布式光纤传感技术对温度变化敏感,因此可以通过伴随管道的光缆测量泄漏前后的温度变化来对泄漏进行识别和定位。由于分布式传感技术具有诸多优点,如:本质安全、监测精度高、抗腐蚀能量强等,该技术已在陆地油气管道泄漏监测中得到了有效应用。然而由于海洋环境复杂多变,在管道铺设过程中,时有弃管过程发生,而与海底管道一同铺设的光缆需具有连续性,因此有必要设计一种弃管过程中光缆的处理方法。
发明内容
本发明要解决的技术问题是提供一种海底管道同步光缆的弃管处理方法。
本发明为解决公知技术中存在的技术问题所采取的技术方案是:
本发明的海底管道同步光缆的弃管处理方法,包括以下步骤:
A、弃管开始前,在超出海管节点处将光缆截断,并将光缆端部密封,将光缆固定在海管上,弃管时,光缆随海管一同落入海底;
B、所弃海管与光缆一同回收后,对光缆端部进行处理;
C、将光缆护套穿入已铺设光缆中,并将未铺设光缆与已铺设光缆进行熔接,光缆熔接点在海管节点处;
D、将光缆护套移动至熔接点处,并对光缆护套两端与光缆间进行密封处理;
E、在海管节点处的防腐工作完成后,在海管节点处固定光缆;
F、在海管节点处进行设置发泡层,光缆护套包覆于发泡层中。
本发明还可以采用以下技术措施:
弃管开始前,在至少超出海管节点2米处对光缆进行截断。
所述的光缆护套的内径大于光缆直径,且光缆护套的外径小于发泡层厚度。
步骤E中,在海管节点处设置两条固定光缆的绑带,并在海管节点的两端分别设置一条绑带固定海管节点两侧的光缆。
本发明具有的优点和积极效果是:
本发明的海底管道同步光缆的弃管处理方法中,在已铺设和未铺设光缆熔接后于海管节点处和海管节点两端分别用了绑带进行固定,然后将光缆熔接点处的光缆护套包覆于发泡层中,从而有效地增加了所述光缆熔接点的轴向强度,保证了所述光缆安全铺设。本发明操作简单、便于实施且省时省力,解决了与海底管道一同铺设的光缆在弃管处理过程中的技术难题。
附图说明
图1是本发明的海底管道同步光缆的弃管处理方法中弃管开始前的示意图;
图2是本发明的海底管道同步光缆的弃管处理方法中弃管回收后的示意图。
具体实施方式
以下通过附图和实施例对本发明进行详细说明。
如图1、图2所示,本发明的海底管道同步光缆的弃管处理方法,包括以下步骤:
A、弃管开始前,在超出海管节点5处将光缆2截断,并将光缆端部3密封,将光缆2固定在海管1上,弃管时,光缆随海管一同落入海底;
B、所弃海管1与光缆2一同回收后,对光缆端部3进行处理;
C、将光缆护套7穿入已铺设光缆中,并将未铺设光缆与已铺设光缆进行熔接,光缆熔接点6在海管节点处;
D、将光缆护套移动至熔接点处,并对光缆护套两端与光缆间进行密封处理;
E、在海管节点处的防腐工作完成后,在海管节点处固定光缆;
F、在海管节点处进行设置发泡层,光缆护套包覆于发泡层中。
弃管开始前,在至少超出海管节点2米处对光缆进行截断,从而为光纤的后续熔接留出余量。
光缆护套的内径大于光缆直径,且光缆护套的外径小于发泡层厚度,使光缆护套在发泡层中。
步骤E中,在海管节点处设置两条固定光缆的绑带,并在海管节点的两端分别设置一条绑带固定海管节点两侧的光缆,通过绑带加固光缆与海管,防止光缆在熔接点处断开。
以上所述,仅是本发明的较佳实施例而已,并非对本发明作任何形式上的限制,虽然本发明已以较佳实施例公开如上,然而,并非用以限定本发明,任何熟悉本专业的技术人员,在不脱离本发明技术方案范围内,当然会利用揭示的技术内容作出些许更动或修饰,成为等同变化的等效实施例,但凡是未脱离本发明技术方案的内容,依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化与修饰,均属于本发明技术方案的范围内。
Claims (4)
1.一种海底管道同步光缆的弃管处理方法,包括以下步骤:
A、弃管开始前,在超出海管节点处将光缆截断,并将光缆端部密封,将光缆固定在海管上,弃管时,光缆随海管一同落入海底;
B、所弃海管与光缆一同回收后,对光缆端部进行处理;
C、将光缆护套穿入已铺设光缆中,并将未铺设光缆与已铺设光缆进行熔接,光缆熔接点在海管节点处;
D、将光缆护套移动至熔接点处,并对光缆护套两端与光缆间进行密封处理;
E、在海管节点处的防腐工作完成后,在海管节点处固定光缆;
F、在海管节点处进行设置发泡层,光缆护套包覆于发泡层中。
2.根据权利要求1所述的海底管道同步光缆的弃管处理方法其特征在于:弃管开始前,在至少超出海管节点2米处对光缆进行截断。
3.根据权利要求1或2所述的海底管道同步光缆的弃管处理方法其特征在于:光缆护套的内径大于光缆直径,且光缆护套的外径小于发泡层厚度。
4.根据权利要求3所述的海底管道同步光缆的弃管处理方法其特征在于:步骤E中,在海管节点处设置两条固定光缆的绑带,并在海管节点的两端分别设置一条绑带固定海管节点两侧的光缆。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510732665.6A CN105204135A (zh) | 2015-11-03 | 2015-11-03 | 海底管道同步光缆的弃管处理方法及其制备方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510732665.6A CN105204135A (zh) | 2015-11-03 | 2015-11-03 | 海底管道同步光缆的弃管处理方法及其制备方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105204135A true CN105204135A (zh) | 2015-12-30 |
Family
ID=54951907
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510732665.6A Pending CN105204135A (zh) | 2015-11-03 | 2015-11-03 | 海底管道同步光缆的弃管处理方法及其制备方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105204135A (zh) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2655263Y (zh) * | 2003-08-26 | 2004-11-10 | 江苏中天科技股份有限公司 | 海缆接头盒 |
CN1598634A (zh) * | 2004-08-24 | 2005-03-23 | 江苏中天科技股份有限公司 | 海缆软接头及其连接工艺 |
CN201036074Y (zh) * | 2007-03-29 | 2008-03-12 | 中天日立射频电缆有限公司 | 物理发泡聚乙烯绝缘漏泄电缆 |
CN102713400A (zh) * | 2010-01-18 | 2012-10-03 | 巴斯夫欧洲公司 | 管道连接的硬质泡沫包裹 |
-
2015
- 2015-11-03 CN CN201510732665.6A patent/CN105204135A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2655263Y (zh) * | 2003-08-26 | 2004-11-10 | 江苏中天科技股份有限公司 | 海缆接头盒 |
CN1598634A (zh) * | 2004-08-24 | 2005-03-23 | 江苏中天科技股份有限公司 | 海缆软接头及其连接工艺 |
CN201036074Y (zh) * | 2007-03-29 | 2008-03-12 | 中天日立射频电缆有限公司 | 物理发泡聚乙烯绝缘漏泄电缆 |
CN102713400A (zh) * | 2010-01-18 | 2012-10-03 | 巴斯夫欧洲公司 | 管道连接的硬质泡沫包裹 |
Non-Patent Citations (4)
Title |
---|
中铁电气化局集团有限公司: "《变电工程施工作业操作手册》", 30 December 2014, 中国铁道出版社 * |
曹慧军 等: ""海底管道在线监测技术及水下光纤的应用"", 《石油矿场机械》 * |
李士涛 等: ""海缆伴随管道铺设工艺的可行性"", 《油气田地面工程》 * |
郑国良 等: ""海底管道节点涂敷工艺技术"", 《管道技术与设备》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103926670B (zh) | 一种海底管道泄漏检测光缆的铺设方法 | |
CN103698870B (zh) | 一种用于海底伴管铺缆的光缆固定装置 | |
GB2556478A8 (en) | Single-mode optical fiber having automatic control heat source specifically produced for hydraulic seepage measurement | |
CN102074916A (zh) | 集肤效应电伴热海底管道的铺设方法 | |
CN105204135A (zh) | 海底管道同步光缆的弃管处理方法及其制备方法 | |
CN109667986A (zh) | 海上双层海底管道铺设时作业线内的施工工艺 | |
CN112987210A (zh) | 一种管道风险监测预警用传感光纤单元结构及施工方法 | |
CN106918556A (zh) | 用于卷管工程临界评价的改进型参考应变方法 | |
CN210864435U (zh) | 基坑抢险注浆控温装置 | |
CN205877597U (zh) | 保温管的端部密封连接件及直埋型供热管路 | |
Wu et al. | Stress analysis of shallow sea gas pipelines | |
US2347912A (en) | Method of installing electric cables | |
CN206331810U (zh) | 一种便于铺设的海底电缆 | |
CN112856229B (zh) | 一种燃气管道用夹套管及燃气系统 | |
US20220003336A1 (en) | Method for installing a gas transportation arrangement | |
CN201803003U (zh) | 适用海上油田开发中使用的海底集束管道 | |
CN107153242A (zh) | 一种光纤铺设装置 | |
US11095102B2 (en) | Repurposing pipeline for electrical cable | |
CN203880231U (zh) | 适用于深水海底管道的止屈器 | |
CN109630755A (zh) | 一种带有监测光纤安装覆层的海底管道及安装方法 | |
CN201982894U (zh) | 一种地沟用预制聚氨酯泡沫保温接头 | |
CN203571338U (zh) | 套筒补偿器预制保温装置 | |
CN201934801U (zh) | 一种深海海底集束管道隔离装置 | |
Quenot et al. | From Design, Installation and Commissioning of an Electrically Trace Heated Integrated Production Bundle | |
CN204155628U (zh) | 一种绕包海底电缆 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20151230 |
|
WD01 | Invention patent application deemed withdrawn after publication |