CN105203287A - 一种c型管束热交换器抗震试验装置 - Google Patents

一种c型管束热交换器抗震试验装置 Download PDF

Info

Publication number
CN105203287A
CN105203287A CN201510698673.3A CN201510698673A CN105203287A CN 105203287 A CN105203287 A CN 105203287A CN 201510698673 A CN201510698673 A CN 201510698673A CN 105203287 A CN105203287 A CN 105203287A
Authority
CN
China
Prior art keywords
heat exchanger
tube bundle
bundle heat
assembly
type tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510698673.3A
Other languages
English (en)
Inventor
张振华
杨星
李煜
黄庆
徐定耿
曹雄
谭鹏程
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Nuclear Engineering Research and Design Institute Co Ltd
Original Assignee
Shanghai Nuclear Engineering Research and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Nuclear Engineering Research and Design Institute Co Ltd filed Critical Shanghai Nuclear Engineering Research and Design Institute Co Ltd
Priority to CN201510698673.3A priority Critical patent/CN105203287A/zh
Publication of CN105203287A publication Critical patent/CN105203287A/zh
Pending legal-status Critical Current

Links

Abstract

本发明提供一种C型管束热交换器抗震试验装置,包括:地震试验台;支撑架组件;所述支撑架组件设置在所述地震支撑台上,用于支撑C型管束热交换器;支撑壳体组件;所述支撑壳体组件安装在所述支撑架组件上,用于将C型管束热交换器和所述支撑架组件连接在一起;框架组件;所述框架组件设置在所述地震试验台上,位于所述支撑架组件的一侧;所述框架组件和所述支撑架组件配合,对C型管束热交换器支撑。本发明提供一种C型管束热交换器抗震试验装置,具有较广的适用性,可直接用于CAP系列以及300MWe等不同堆型、不同材料的C型管束热交换器及其特殊的支撑条支撑形式的抗震性能验证。

Description

一种C型管束热交换器抗震试验装置
技术领域
本发明涉及核电站关键换热器设备领域,特别涉及一种C型管束热交换器抗震试验装置。
背景技术
非能动余热排出热交换器是AP1000非能动技术中非能动堆芯冷却系统的一个重要安全设备,在瞬态、事故或任何正常热量排出路径丧失时其提供堆芯衰变热排出功能。PRHRHX布置在安全壳内换料水箱(IRWST)内,IRWST是热交换器的热阱。热交换器由C型管束组成,其进出口分别和上部、下部的管板相连,并通过传热管支撑与钢制框架结构相连。
非能动余热排出热交换器是AP1000特有的设备,它与以往热交换器的设计有较大区别,以往的热交换器内部一般由传热管和折流板组成,在过往研究中,通过科研和实践,对一些典型换热器进行试验和有限元验证,各核电设计单位逐步掌握了核二、三级设备的有限元分析技术,并已在核电厂成功应用。而非能动余热排出热交换器由C型管组成,并通过支撑条加以支撑。C型管与支撑条之间有一定的间隙,其相互作用是个复杂的非线性接触问题,使抗震的精确分析相当困难。C型管的简化以及C型管和支撑条的耦合接触很难在计算中精确考虑。
为确保非能动余热排出热交换器及其结构相似的热交换器能在地震载荷下保持其结构和功能完整性,有必要对此类热交换器进行抗震试验。
因此,研制了一套C型管束热交换器抗震试验装置用于抗震试验研究成为了亟待解决的问题。
发明内容
本发明针对现有技术的不足,提出一种C型管束热交换器抗震试验装置。
本发明提供一种C型管束热交换器抗震试验装置。
C型管束热交换器抗震试验装置包括:
地震试验台;
支撑架组件;所述支撑架组件设置在所述地震支撑台上,用于支撑C型管束热交换器;
支撑壳体组件;所述支撑壳体组件安装在所述支撑架组件上,用于将C型管束热交换器和所述支撑架组件连接在一起;
框架组件;所述框架组件设置在所述地震试验台上,位于所述支撑架组件的一侧;所述框架组件和所述支撑架组件配合,对C型管束热交换器支撑。
优选地,所述支撑架组件可拆卸地安装在所述地震试验台上。
优选地,所述支撑架组件由多个第一支撑杆组成。
优选地,所述框架组件可拆卸地安装在所述地震试验台上。
优选地,所述框架组件由多个第二支撑杆组成。
优选地,还包括试验件底座;所述试验件底座设置在所述地震试验台上;所述框架组件通过下部支撑组件与所述试验件底座可拆卸连接。
优选地,还包括管子支撑组件;所述管子支撑组件由多个支撑条组成;多个支撑条相互间隔设置;C型管束热交换器贯穿相邻的支撑条之间的空隙;所述支撑条通过螺栓可拆卸地安装在所述框架组件上。
与现有技术相比,本发明具有以下有益效果:
1、本发明提供一种C型管束热交换器抗震试验装置,具有较广的适用性,可直接用于CAP系列以及300MWe等不同堆型、不同材料的C型管束热交换器及其特殊的支撑条支撑形式的抗震性能验证。
2、符合本发明的C型管束热交换器抗震试验装置,对C型管结构换热器及其特殊支撑条形式的管子支撑进行简化抗震试验模拟,从而验证有限元分析模型和方法的可靠性,继而获得可应用于C型管束热交换器抗震分析和评定的全套方法。
3、利用符合本发明的C型管束热交换器抗震试验装置,采用一定的试验实施方案,可以很好的完成C型管束热交换器模拟体的抗震试验研究,从而获得可应用于先进压水堆C型管束热交换器抗震分析和评定的全套方法。参考的试验内容包括:
a、采用单点随机激振、多点随机激振的方法获得模拟体C型管束整体和单根C型管振动模态以及支承框架的模态。
b、用连续正弦波或白噪声波扫描的方法,搜索模拟体在三正交轴上的自振频率。
c、按提供的楼面地震加速度反应谱,生成人造地震波作为地震振动台面输入信号,按三正交轴方向输入人造地震波进行抗震试验。
d、对其他模拟体零部件在适当部位进行应力测量。
4、符合本发明的C型管束热交换器抗震试验装置,结构简单,制造加工成本较低,能够很好的模拟实际设备的连接和支撑形式,对研究用支撑条支撑的C型管束换热器抗震性能有十分重要的意义,其研究成果可应用于各种类型的C型管束热交换器。
附图说明
图1为符合本发明优选实施例的C型管束热交换器抗震试验装置的示意图。
图2为图1所示结构的正视图。
图3为图1所示结构的侧视图。
图4为图1所示结构的俯视图。
具体实施方式
为使本发明的上述目的、特征和优点能够更加明显易懂,下面结合附图和具体实施方式对本发明作进一步详细的说明。
如图1-4所示,C型管束热交换器抗震试验装置包括:
地震试验台1;
支撑架组件2;所述支撑架组件2设置在所述地震支撑台1上,用于支撑C型管束热交换器3;
支撑壳体组件4;所述支撑壳体组件4安装在所述支撑架组件2上,用于将C型管束热交换器3和所述支撑架组件2连接在一起;
框架组件5;所述框架组件5设置在所述地震试验台1上,位于所述支撑架组件2的一侧;所述框架组件5和所述支撑架组件2配合,对C型管束热交换器3支撑。
优选地,所述支撑架组件2可拆卸地安装在所述地震试验台1上。
优选地,所述支撑架组件2由多个第一支撑杆21组成。
优选地,所述框架组件5可拆卸地安装在所述地震试验台1上。
优选地,所述框架组件5由多个第二支撑杆51组成。
优选地,还包括试验件底座6;所述试验件底座6设置在所述地震试验台1上;所述框架组件5通过下部支撑组件7与所述试验件底座6可拆卸连接。
优选地,还包括管子支撑组件8;所述管子支撑组件8由多个支撑条81组成;多个支撑条81相互间隔设置;C型管束热交换器3贯穿相邻的支撑条81之间的空隙;所述支撑条81通过螺栓可拆卸地安装在所述框架组件5上。
C型管束热交换器抗震试验装置的设计基于如下的技术考虑:
1)高刚度的支撑架组件2模拟装置实际连接中的墙体,支撑架刚度需要达到某一值;
2)C型管子的无支撑间距与装置实际尺寸应较为接近;
3)装置本身的刚度应与实际设备接近;
4)换热管采用不锈钢材料,尺寸和布置可以与实际装置不一致,以方便加工制造为主要考虑;
5)试验件底座6由两块地板组成,分别设置在模拟体设备和支撑架组件底部,两块地板必须保证一定的平面度,使得模拟体能够在地震试验台上安装方便;
6)整个模拟体设备的结构形状应与实际设备具有较高的相似性,尽量做到按比例缩放,关键参数保持与实际一样,如换热管与支撑条的支撑形式、支撑间隙等。
与现有技术相比,本发明具有以下有益效果:
1、本实施例提供一种C型管束热交换器抗震试验装置,具有较广的适用性,可直接用于CAP系列以及300MWe等不同堆型、不同材料的C型管束热交换器及其特殊的支撑条支撑形式的抗震性能验证。
2、符合本实施例的C型管束热交换器抗震试验装置,对C型管结构换热器及其特殊支撑条形式的管子支撑进行简化抗震试验模拟,从而验证有限元分析模型和方法的可靠性,继而获得可应用于C型管束热交换器抗震分析和评定的全套方法。
3、利用符合本实施例的C型管束热交换器抗震试验装置,采用一定的试验实施方案,可以很好的完成C型管束热交换器模拟体的抗震试验研究,从而获得可应用于先进压水堆C型管束热交换器抗震分析和评定的全套方法。参考的试验内容包括:
a、采用单点随机激振、多点随机激振的方法获得模拟体C型管束整体和单根C型管振动模态以及支承框架的模态。
b、用连续正弦波或白噪声波扫描的方法,搜索模拟体在三正交轴上的自振频率。
c、按提供的楼面地震加速度反应谱,生成人造地震波作为地震振动台面输入信号,按三正交轴方向输入人造地震波进行抗震试验。
d、对其他模拟体零部件在适当部位进行应力测量。
4、符合本实施例的C型管束热交换器抗震试验装置,结构简单,制造加工成本较低,能够很好的模拟实际设备的连接和支撑形式,对研究用支撑条支撑的C型管束换热器抗震性能有十分重要的意义,其研究成果可应用于各种类型的C型管束热交换器。
本说明书中各个实施例采用递进的方式描述,每个实施例重点说明的都是与其他实施例的不同之处,各个实施例之间相同相似部分互相参见即可。对于实施例公开的系统而言,由于与实施例公开的方法相对应,所以描述的比较简单,相关之处参见方法部分说明即可。
本领域技术人员可以对每个特定的应用来使用不同方法来实现所描述的功能,但是这种实现不应认为超出本发明的范围。
显然,本领域的技术人员可以对发明进行各种改动和变型而不脱离本发明的精神和范围。这样,倘若本发明的这些修改和变型属于本发明权利要求及其等同技术的范围之内,则本发明也意图包括这些改动和变型在内。

Claims (7)

1.一种C型管束热交换器抗震试验装置,其特征在于,包括:
地震试验台;
支撑架组件;所述支撑架组件设置在所述地震支撑台上,用于支撑C型管束热交换器;
支撑壳体组件;所述支撑壳体组件安装在所述支撑架组件上,用于将C型管束热交换器和所述支撑架组件连接在一起;
框架组件;所述框架组件设置在所述地震试验台上,位于所述支撑架组件的一侧;所述框架组件和所述支撑架组件配合,对C型管束热交换器支撑。
2.如权利要求1所述的C型管束热交换器抗震试验装置,其特征在于,所述支撑架组件可拆卸地安装在所述地震试验台上。
3.如权利要求1所述的C型管束热交换器抗震试验装置,其特征在于,所述支撑架组件由多个第一支撑杆组成。
4.如权利要求1所述的C型管束热交换器抗震试验装置,其特征在于,所述框架组件可拆卸地安装在所述地震试验台上。
5.如权利要求1所述的C型管束热交换器抗震试验装置,其特征在于,所述框架组件由多个第二支撑杆组成。
6.如权利要求1所述的C型管束热交换器抗震试验装置,其特征在于,还包括试验件底座;所述试验件底座设置在所述地震试验台上;所述框架组件通过下部支撑组件与所述试验件底座可拆卸连接。
7.如权利要求1所述的C型管束热交换器抗震试验装置,其特征在于,还包括管子支撑组件;所述管子支撑组件由多个支撑条组成;多个支撑条相互间隔设置;C型管束热交换器贯穿相邻的支撑条之间的空隙;所述支撑条通过螺栓可拆卸地安装在所述框架组件上。
CN201510698673.3A 2015-10-23 2015-10-23 一种c型管束热交换器抗震试验装置 Pending CN105203287A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510698673.3A CN105203287A (zh) 2015-10-23 2015-10-23 一种c型管束热交换器抗震试验装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510698673.3A CN105203287A (zh) 2015-10-23 2015-10-23 一种c型管束热交换器抗震试验装置

Publications (1)

Publication Number Publication Date
CN105203287A true CN105203287A (zh) 2015-12-30

Family

ID=54951085

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510698673.3A Pending CN105203287A (zh) 2015-10-23 2015-10-23 一种c型管束热交换器抗震试验装置

Country Status (1)

Country Link
CN (1) CN105203287A (zh)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1072282A (zh) * 1991-11-08 1993-05-19 西屋电气公司 热交换器
JP2007170919A (ja) * 2005-12-20 2007-07-05 Toshiba Corp 熱交換器の振動測定方法
CN102419245A (zh) * 2011-08-15 2012-04-18 中国航空工业集团公司西安飞机设计研究所 飞机apu成套隔振器的性能测试方法和测试挂架
CN203024614U (zh) * 2012-12-10 2013-06-26 中国核动力研究设计院 一种翅片管热交换器
CN103545000A (zh) * 2013-10-21 2014-01-29 中国核动力研究设计院 二次侧非能动余热排出热交换器模拟装置和模拟方法
CN203550643U (zh) * 2013-06-06 2014-04-16 中广核工程有限公司 核反应堆非能动冷凝器
JP2014137310A (ja) * 2013-01-18 2014-07-28 Mitsubishi Heavy Ind Ltd 伝熱管の振動試験装置
CN104776964A (zh) * 2015-04-15 2015-07-15 中国核动力研究设计院 一种用于堆内构件流致振动试验的模拟支架及其设计方法
CN205333285U (zh) * 2015-10-23 2016-06-22 上海核工程研究设计院 一种c型管束热交换器抗震试验装置

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1072282A (zh) * 1991-11-08 1993-05-19 西屋电气公司 热交换器
JP2007170919A (ja) * 2005-12-20 2007-07-05 Toshiba Corp 熱交換器の振動測定方法
CN102419245A (zh) * 2011-08-15 2012-04-18 中国航空工业集团公司西安飞机设计研究所 飞机apu成套隔振器的性能测试方法和测试挂架
CN203024614U (zh) * 2012-12-10 2013-06-26 中国核动力研究设计院 一种翅片管热交换器
JP2014137310A (ja) * 2013-01-18 2014-07-28 Mitsubishi Heavy Ind Ltd 伝熱管の振動試験装置
CN203550643U (zh) * 2013-06-06 2014-04-16 中广核工程有限公司 核反应堆非能动冷凝器
CN103545000A (zh) * 2013-10-21 2014-01-29 中国核动力研究设计院 二次侧非能动余热排出热交换器模拟装置和模拟方法
CN104776964A (zh) * 2015-04-15 2015-07-15 中国核动力研究设计院 一种用于堆内构件流致振动试验的模拟支架及其设计方法
CN205333285U (zh) * 2015-10-23 2016-06-22 上海核工程研究设计院 一种c型管束热交换器抗震试验装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
黄庆 等: "管式热交换器的动态特性分析方法比较与验证", 《核动力工程》 *

Similar Documents

Publication Publication Date Title
Schaffrath et al. TOPFLOW–a new multipurpose thermalhydraulic test facility for the investigation of steady state and transient two phase flow phenomena
CN102759573B (zh) 基于频率变化的结构损伤定位与损伤程度的评估方法
Zhao et al. FSI effects and seismic performance evaluation of water storage tank of AP1000 subjected to earthquake loading
Kickhofel et al. T-junction cross-flow mixing with thermally driven density stratification
JP2014164323A (ja) 蒸気発生器の耐震評価方法
Wang et al. Analysis of seismic soil-structure interaction for a nuclear power plant (HTR-10)
Smith Assessment of CFD codes used in nuclear reactor safety simulations
CN206431954U (zh) 隔震建筑演示平台
CN205333285U (zh) 一种c型管束热交换器抗震试验装置
CN105203287A (zh) 一种c型管束热交换器抗震试验装置
Lal et al. Mid-height seismic isolation of equipment in nuclear power plants: Numerical simulations and design recommendations
Ozdemir et al. Multi-dimensional boron transport modeling in subchannel approach: Part I. Model selection, implementation and verification of COBRA-TF boron tracking model
Mir et al. Physical and numerical simulations of seismic fluid-structure interaction in advanced nuclear reactors
CN210219244U (zh) 一种建筑支柱用振动检测传感器放置架
Tong et al. Seismic analysis of RCS with finite element model for advanced PWR
Jiang et al. An iterative method based on a 3-DOF model for optimal seismic design of coal-fired thermal power plant
Kim et al. Hydraulic and Structural Analysis Methodology of RVI CVAP in Shin-Kori 4
Lee et al. Investigation into the in-box LOCA consequence and structural integrity of the KO HCCR TBM in ITER
CN104050325A (zh) 一种脉冲萃取柱运行工艺计算机辅助设计系统
Skelton et al. Verification and Validation of Transient Body Force in GOTHIC for Spent Fuel Pool Response to Seismic Events and Other Applications
Wang et al. A Comparative Shaking Table Study on Inelastic Torsion and Torsional Performance of Conventional Thermal Power Plant Main Building and Thermal Power Plant Main Building with the Buckling-Restrained Braces
Jhung et al. Seismic analysis of a steam generator for Gyeongju and Pohang earthquakes
CN208125350U (zh) 用于振动台的剪切箱
Sinha et al. Realistic seismic qualification using the updated finite element model for in-core components of reactors
Ho¨ hne et al. Validation of Trio_U: Numerical Simulations of a ROCOM Buoyancy Driven Test Case

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: No. 29 Hong Cao Road, Xuhui District, Shanghai

Applicant after: Shanghai Nuclear Engineering Research and Design Institute Co.,Ltd.

Address before: No. 29 Hong Cao Road, Xuhui District, Shanghai

Applicant before: SHANGHAI NUCLEAR ENGINEERING RESEARCH & DESIGN INSTITUTE

CB02 Change of applicant information
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20151230

WD01 Invention patent application deemed withdrawn after publication