CN105202297A - Branch pipe connection reinforced joint for high-temperature and high-pressure pipeline with large diameter and preparation method of branch connection reinforced joint - Google Patents

Branch pipe connection reinforced joint for high-temperature and high-pressure pipeline with large diameter and preparation method of branch connection reinforced joint Download PDF

Info

Publication number
CN105202297A
CN105202297A CN201510576551.7A CN201510576551A CN105202297A CN 105202297 A CN105202297 A CN 105202297A CN 201510576551 A CN201510576551 A CN 201510576551A CN 105202297 A CN105202297 A CN 105202297A
Authority
CN
China
Prior art keywords
arm
stiffened plate
branch pipe
pipe
supervisor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510576551.7A
Other languages
Chinese (zh)
Inventor
葛家琪
张曼生
张国军
王树
张奇铭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Aviation Planning and Design Institute Group Co Ltd
Original Assignee
China Aviation Planning and Design Institute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Aviation Planning and Design Institute Group Co Ltd filed Critical China Aviation Planning and Design Institute Group Co Ltd
Priority to CN201510576551.7A priority Critical patent/CN105202297A/en
Publication of CN105202297A publication Critical patent/CN105202297A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L41/00Branching pipes; Joining pipes to walls
    • F16L41/08Joining pipes to walls or pipes, the joined pipe axis being perpendicular to the plane of the wall or to the axis of another pipe
    • F16L41/082Non-disconnectible joints, e.g. soldered, adhesive or caulked joints
    • F16L41/084Soldered joints

Abstract

The invention provides a branch pipe connection reinforced joint for a high-temperature and high-pressure pipeline with a large diameter. The reinforced joint comprises a main pipe and a branch pipe which are in T-shaped connection, wherein the main pipe and the branch pipe are perpendicularly welded, the main pipe is in sleeve connection with a main pipe casing at the joint, the branch pipe is in sleeve connection with a branch pipe casing at the joint, an annular stiffening plate is connected onto the circumference of the branch pipe at the joint in a sleeving manner, and radial stiffening plates are clamped between the annular stiffening plate of the branch pipe and the main pipe casing in the direction perpendicular to the diameter of the branch pipe; transverse stiffening plates parallel to an axis of the branch pipe are clamped between the annular stiffening plate of the branch pipe and the main pipe casing and between the adjacent radial stiffening plates. With the adoption of the technology, the stress performance of the branch pipe connection joint of the pipeline is remarkably improved, and the stress level of materials in related line positions is remarkably reduced; the overall deformation of the branch connection joint is effectively controlled; the main pipe weakened by the branch pipe is effectively reinforced.

Description

Arm connection reinforcement node of High Temperature High Pressure large-diameter pipeline and preparation method thereof
Technical field
What the present invention relates to a kind of arm connected node of pipeline adds strong method, particularly a kind of arm connection reinforcement node and preparation method thereof of High Temperature High Pressure large-diameter pipeline.
Background technique
Large-diameter pipeline is widely used in various industrial production and civil engineering, particularly section of tubing not only diameter super large, and in fluids within pipes, pressure is larger.The arm connected node of this type of high pressure pipe system weakens supervisor cross section due to arm, causes arm connected node to need special reinforcement, only cannot meet requirement of strength with the Normal practice of pipeline equal area reinforcement.Cost and construction welding difficulty can be caused again to promote at double according to high-strength arm pedestal.Arm pedestal needs to cast in factory, and cost is very high.Arm pedestal is in order to effectively strengthen arm connected node, and the very large section thickness of needs, to reach intensity and the rigidity requirement of node, materials'use amount is very big.When major diameter arm connected node needs to strengthen, reinforcement stiffened plate way traditionally, needs a lot of stiffened plate, needs larger stiffened plate length and height simultaneously, effectively could strengthen arm connected node intersecting line position, therefore strengthen way and often take very large space.But a lot of pipe-line system cross correlation is complicated, node location limited space, cannot meet tradition and add the demand of competent structure way to space.
Summary of the invention
Arm connection reinforcement node that the object of this invention is to provide a kind of High Temperature High Pressure large-diameter pipeline and preparation method thereof, solve the technical problem of the stress performance of large-diameter pipeline arm connected node; This arm connected node is used to add strong method, effectively can strengthen the rigidity of arm connected node, reduce the distortion under the effect of pipeline branch pipe connected node internal pressure, effectively can improve the ultimate strength of arm connected node simultaneously, overcoming arm punches to the cross section weakening of supervisor, the working stress of obvious reduction arm connected node material, meets working strength requirement.
Arm connection reinforcement node that the object of this invention is to provide a kind of High Temperature High Pressure large-diameter pipeline and preparation method thereof, solve the problem of the reinforcement cost of arm connected node.It is simple that this arm connected node strengthens method construct, only use the steel plate with pipeline same material, Plate Welding node can be directly used at the construction field (site) by applying technology of the present invention, Bu Xu factory casts, construction is simple, common usual thickness steel plate can be used, significantly save material consumption, reduce joint strengthening cost.
Arm connection reinforcement node that the object of this invention is to provide a kind of High Temperature High Pressure large-diameter pipeline and preparation method thereof, solve arm connected node and add the problem that competent structure takes up room.Structure way of the present invention and arm pedestal similar, effectively can strengthen arm connected node in limited little space, spatial adaptation is very capable.
For achieving the above object, first aspect present invention provides a kind of arm connection reinforcement node of High Temperature High Pressure large-diameter pipeline, described reinforcement node comprises supervisor and the arm of T-shaped connection, described supervisor and arm vertical welding, described supervisor is socketed at Nodes and supervisor's sleeve pipe, described arm is socketed at Nodes and arm sleeve pipe, Zhi Guanhuan week described in Nodes is socketed with annular stiffened plate, between arm annular stiffened plate and supervisor's sleeve pipe, is connected with radial stiffened plate perpendicular in arm diametric(al); Arm annular stiffened plate and supervisor sleeve pipe between and between radial stiffened plate, be connected with the lateral stiffening plate being parallel to arm axis.
Second aspect present invention provides a kind of preparation method of arm connection reinforcement node of High Temperature High Pressure large-diameter pipeline, and the preparation method of described reinforcement node comprises the following steps: 1) supervisor's sleeve pipe and pipe-in-pipe are wrapped in respectively and are responsible for and on arm; 2) on arm, distance edge certain distance arranges annular stiffened plate; 3) between arm annular stiffened plate and supervisor, radial stiffened plate is set perpendicular to arm diametric(al), radial stiffened plate is circumferentially evenly arranged at arm, and radial stiffened plate and arm annular stiffened plate, arm, supervisor's contact position are all welded to connect; 4) between radial stiffened plate, arranges the lateral stiffening plate being parallel to arm axis between arm annular stiffened plate and supervisor's sleeve pipe, the intersection line of the annular stiffened plate of lateral stiffening plate and arm, radial stiffened plate, supervisor is all welded to connect.
Compared with prior art the present invention has following characteristics and beneficial effect:
After adopting technology of the present invention, pipeline branch pipe connected node position stress performance obviously improves, and the stress level of pipeline relation line position material obviously declines; The structural strain's of arm connected node is effectively controlled; Effectively strengthened by the supervisor that arm weakens.
Of the present inventionly add strong method and put formation annular girder at branch pipe connecting position, on the arm that cuff is put at branch pipe connecting position, add the rigidity of arm, effectively overcome supervisor weakened by arm after the deformation tendency that expands outwardly in interior pressure of arm.Reinforing function and the arm pedestal of this reinforcement way are similar, but material consumption comparatively arm pedestal significantly reduce, and simple structure, easy to make, easily realize.
Due to working principle of the present invention and arm pedestal similar, the space hold therefore adding competent structure is very little, does not need to add strong method by traditional stiffened plate and uses roomy stiffened plate to take large area space.Therefore arm connected node of the present invention adds strong method can have extensive adaptability as arm pedestal, can in limited space, make pipeline branch pipe connected node effectively be strengthened.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the present invention will be further described in detail.
Fig. 1 is structural representation of the present invention;
Fig. 2 is sectional drawing of the present invention.
Reference character: 1-supervisor, 2-arm, 3-be responsible for sleeve pipe, 4-prop up pipe-in-pipe, 5-arm annular splice,
The radial stiffened plate of 6-arm, 7-lateral stiffening plate.
Embodiment
As shown in Figure 1 and Figure 2,
The invention provides a kind of arm connection reinforcement node of High Temperature High Pressure large-diameter pipeline, described reinforcement node comprises supervisor 1 and the arm 2 of T-shaped connection, described supervisor 1 and arm 2 vertical welding, it is characterized in that: described supervisor 1 is socketed at Nodes and supervisor's sleeve pipe 3, described arm 2 is socketed at Nodes and a pipe-in-pipe 4, arm described in Nodes 2 ring week is socketed with annular stiffened plate 5, between arm annular stiffened plate 5 and supervisor's sleeve pipe 3, is connected with radial stiffened plate 6 perpendicular in arm 2 diametric(al); Arm annular stiffened plate 5 and supervisor sleeve pipe 3 between and between radial stiffened plate 6, be connected with the lateral stiffening plate 7 being parallel to arm 2 axis.
It is according to determining that annular stiffened plate 5 meets material property along the diametric height of arm 2 according to the overall working stress under work operating mode of reinforcement posterior nodal point; It is according to determining that annular stiffened plate thickness meets material property according to the overall working stress under work operating mode of reinforcement posterior nodal point.
Radial stiffened plate is greater than arm 2 annular stiffened plate 5 certain altitude along the height in arm 2 diametric(al), ensures annular stiffened plate and the requirement of radial stiffened plate weld seam; It is according to determining that radial stiffened plate 6 thickness meets material property according to the overall working stress under work operating mode of reinforcement posterior nodal point.
It is according to determining that lateral stiffening plate 7 thickness meets material property according to the overall working stress under work operating mode of reinforcement posterior nodal point.
The invention provides a kind of preparation method of arm connection reinforcement node of High Temperature High Pressure large-diameter pipeline, it is characterized in that: the preparation method of described reinforcement node comprises the following steps:
1) supervisor's sleeve pipe 3 and a pipe-in-pipe 4 are wrapped on supervisor 1 and arm 2 respectively;
2) on arm 2, distance edge certain distance arranges annular stiffened plate 5;
3) between arm annular stiffened plate 5 and supervisor 1, radial stiffened plate 6 is set perpendicular to arm 2 diametric(al), radial stiffened plate 6 is circumferentially evenly arranged at arm 2, radial stiffened plate 6 and arm annular stiffened plate 5, arm 2, is responsible for 1 contact position and is all welded to connect;
4) between radial stiffened plate 6, arranges the lateral stiffening plate 7 being parallel to arm 2 axis between arm annular stiffened plate 5 and supervisor's sleeve pipe 3, lateral stiffening plate 7 and arm annular stiffened plate 5, radial stiffened plate 6, the intersection line of being responsible for 1 are all welded to connect.
Embodiment:
1) on arm, distance threeway intersecting line 200mm position arranges annular stiffened plate together.Stiffened plate is along the diametric height 200mm of arm.Stiffened plate thickness gets a pipe thickness.
2) between arm annular stiffened plate and main pipeline along arm diametric(al) and arrange 6 pieces of radial stiffened plates, radial stiffened plate is circumferentially uniform at arm, and radial stiffened plate and arm annular stiffened plate, arm, supervisor's contact position all use solder design.Radial stiffened plate is greater than arm annular stiffened plate height 50mm along the height in arm diametric(al), radial stiffened plate thickness and arm annular stiffened plate uniform thickness.
3) the lateral stiffening plate of arm axis is parallel at arm annular stiffened plate and radial stiffened plate arranged outside.Lateral stiffening plate and arm annular stiffened plate, radial stiffened plate, supervisor intersection line be all welded to connect.Lateral stiffening plate thickness desirable with arm annular stiffened plate and radial stiffened plate uniform thickness, also can determine according to reinforcement posterior nodal point Overall Analysis result.
4) when pressure is higher in pipeline, can first wrap up sleeve pipe one deck on the arm of node location and supervisor, and then carry out 1 ~ 3 reinforcement way.Only can increase sleeve pipe on arm, also only can increase sleeve pipe on supervisor, also on arm and supervisor, sleeve pipe can be increased simultaneously.When only increasing sleeve pipe on arm, sleeve pipe two ends are connected by fillet weld with arm and supervisor; When only increasing sleeve pipe on being responsible for, sleeve pipe two ends are connected by fillet weld with supervisor; Simultaneously when being responsible for and arm increases sleeve pipe, supervisor sleeve pipe two ends are connected by fillet weld with supervisor, and a pipe-in-pipe is at supervisor intersecting line position and supervisor's sleeve pipe related subgroup, and a pipe-in-pipe the other end is connected with Zhi Guanyong fillet weld.Casing thickness can be determined according to reinforcement posterior nodal point Overall Analysis result.

Claims (2)

1. the arm connection reinforcement node of a High Temperature High Pressure large-diameter pipeline, described reinforcement node comprises supervisor (1) and the arm (2) of T-shaped connection, described supervisor (1) and arm (2) vertical welding, it is characterized in that: described supervisor (1) is socketed at Nodes and supervisor's sleeve pipe (3), described arm (2) is socketed at Nodes and a pipe-in-pipe (4), arm described in Nodes (2) ring week is socketed with annular stiffened plate (5)
Radial stiffened plate (6) is being connected with perpendicular in arm (2) diametric(al) between arm annular stiffened plate (5) and supervisor's sleeve pipe (3);
Arm annular stiffened plate (5) with to be responsible between sleeve pipe (3) and between radial stiffened plate (6), to be connected with the lateral stiffening plate (7) being parallel to arm (2) axis.
2. a preparation method for the arm connection reinforcement node of High Temperature High Pressure large-diameter pipeline, is characterized in that: the preparation method of described reinforcement node comprises the following steps:
1) sleeve pipe (3) will be responsible for be wrapped in respectively with pipe-in-pipe (4) and be responsible on (1) and arm (2);
2) annular stiffened plate (5) is set at arm (2) upper distance edge certain distance;
3) between arm annular stiffened plate (5) and supervisor (1), radial stiffened plate (6) is set perpendicular to arm (2) diametric(al), radial stiffened plate (6) is circumferentially evenly arranged at arm (2), radial stiffened plate (6) and arm annular stiffened plate (5), arm (2), is responsible for (1) contact position and is all welded to connect;
4) between radial stiffened plate (6), arranges the lateral stiffening plate (7) being parallel to arm (2) axis between arm annular stiffened plate (5) with supervisor sleeve pipe (3), lateral stiffening plate (7) and arm annular stiffened plate (5), radial stiffened plate (6), the intersection line of being responsible for (1) are all welded to connect.
CN201510576551.7A 2015-09-11 2015-09-11 Branch pipe connection reinforced joint for high-temperature and high-pressure pipeline with large diameter and preparation method of branch connection reinforced joint Pending CN105202297A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510576551.7A CN105202297A (en) 2015-09-11 2015-09-11 Branch pipe connection reinforced joint for high-temperature and high-pressure pipeline with large diameter and preparation method of branch connection reinforced joint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510576551.7A CN105202297A (en) 2015-09-11 2015-09-11 Branch pipe connection reinforced joint for high-temperature and high-pressure pipeline with large diameter and preparation method of branch connection reinforced joint

Publications (1)

Publication Number Publication Date
CN105202297A true CN105202297A (en) 2015-12-30

Family

ID=54950131

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510576551.7A Pending CN105202297A (en) 2015-09-11 2015-09-11 Branch pipe connection reinforced joint for high-temperature and high-pressure pipeline with large diameter and preparation method of branch connection reinforced joint

Country Status (1)

Country Link
CN (1) CN105202297A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110847680A (en) * 2019-11-06 2020-02-28 国网浙江省电力有限公司 Steel pipe tower plane K type intersecting node structure

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2443824B1 (en) * 1974-09-13 1976-02-05 Phoenix Gummiwerke Ag T-shaped rubber pipe branch - by joining vulcanisable, flanged branch section to vulcanisable flanged pipe section and vulcanising
US4702501A (en) * 1985-03-15 1987-10-27 Victaulic Company Of America Retaining collar for an elastomeric seal
CN202937934U (en) * 2012-11-16 2013-05-15 杭州再红力革塑胶有限公司 Reducing tee joint
CN202937933U (en) * 2012-11-16 2013-05-15 杭州再红力革塑胶有限公司 Reducing tee joint
CN203131284U (en) * 2013-03-21 2013-08-14 四川辉利达塑胶科技有限公司 Reinforced tee pipe
CN204420428U (en) * 2015-01-15 2015-06-24 乾通环境科技(苏州)有限公司 A kind of pipe joint and use the pipeline assembly of this pipe joint
CN204493958U (en) * 2015-02-11 2015-07-22 杭州久阳塑胶管业有限公司 A kind of part flow arrangement

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2443824B1 (en) * 1974-09-13 1976-02-05 Phoenix Gummiwerke Ag T-shaped rubber pipe branch - by joining vulcanisable, flanged branch section to vulcanisable flanged pipe section and vulcanising
US4702501A (en) * 1985-03-15 1987-10-27 Victaulic Company Of America Retaining collar for an elastomeric seal
CN202937934U (en) * 2012-11-16 2013-05-15 杭州再红力革塑胶有限公司 Reducing tee joint
CN202937933U (en) * 2012-11-16 2013-05-15 杭州再红力革塑胶有限公司 Reducing tee joint
CN203131284U (en) * 2013-03-21 2013-08-14 四川辉利达塑胶科技有限公司 Reinforced tee pipe
CN204420428U (en) * 2015-01-15 2015-06-24 乾通环境科技(苏州)有限公司 A kind of pipe joint and use the pipeline assembly of this pipe joint
CN204493958U (en) * 2015-02-11 2015-07-22 杭州久阳塑胶管业有限公司 A kind of part flow arrangement

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110847680A (en) * 2019-11-06 2020-02-28 国网浙江省电力有限公司 Steel pipe tower plane K type intersecting node structure

Similar Documents

Publication Publication Date Title
CN103982748B (en) A kind of modified model pipeline stainless steel inner lining restorative procedure
CN105178443A (en) Bolt connecting joint suitable for single-layer latticed shell with rectangular steel pipes
CN103898991A (en) Sleeve-type pipe node
CN102966185B (en) Novel concrete-filled steel tube connection joint and construction method thereof
KR101146829B1 (en) Loose flange-type flared pipe joint and steel pipe joining method using the same
CN105507426A (en) Half-through bracket haunching type compound steel pipe concrete column-steel beam joint
CN203115384U (en) Water supply and drainage pipeline leakage on-line processing device
JP2019512628A (en) Support structure used for wind turbines
CN105202297A (en) Branch pipe connection reinforced joint for high-temperature and high-pressure pipeline with large diameter and preparation method of branch connection reinforced joint
CN201560584U (en) Quick connecting joint capable of being circularly used for pumping and lift-up of cast concrete
US10975990B2 (en) Apparatus and method for strengthening welded-lap joints for steel pipeline
CN104343117A (en) Concrete pipe pile connector
CN102561528B (en) Concrete-filled steel tube connector and construction method thereof
JP2018501111A (en) Fluid conduit element and method for manufacturing a fluid conduit element
CN205776421U (en) Reinforced sound detecting pipe
CN202580423U (en) End metallurgical mechanical double-metal composite T-shaped pipe fitting
CN204852718U (en) But quick assembly disassembly's pipeline connecting device
CN204000649U (en) A kind of concave pipe cuff structure connecting for corrugated steel culvert
JP6415283B2 (en) Steel pipe connection structure and method for forming the same
CN207919734U (en) A kind of concrete filled steel tube transition section structure
CN220099701U (en) Connection structure of large-diameter steel pipe and reinforced concrete box culvert
CN204986035U (en) Confession, fixed festival of return water be anchor block as an organic whole even
RU2658170C1 (en) Coupling for repairing pipelines and method for its installation on defective areas
CN212338544U (en) Strengthening structure for built-in circumferential weld of expansion joint of metal corrugated pipe
CN202925687U (en) Novel steel pipe concrete connection node

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20151230

RJ01 Rejection of invention patent application after publication