CN105195942B - A kind of modularization elevator hoistways frame tooling - Google Patents
A kind of modularization elevator hoistways frame tooling Download PDFInfo
- Publication number
- CN105195942B CN105195942B CN201510636229.9A CN201510636229A CN105195942B CN 105195942 B CN105195942 B CN 105195942B CN 201510636229 A CN201510636229 A CN 201510636229A CN 105195942 B CN105195942 B CN 105195942B
- Authority
- CN
- China
- Prior art keywords
- structural column
- spacing block
- group
- chute
- cross spacing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K37/00—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
- B23K37/04—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
Landscapes
- Physics & Mathematics (AREA)
- Optics & Photonics (AREA)
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
This application discloses a kind of modularization elevator hoistways frame tooling, including bottom plate, bottom plate is respectively used to position structural column longitudinal spacing block group of the two root architecture posts in lengthwise position provided with least two groups, at least two groups are respectively used to position the clamping cylinder group that two root architecture posts are respectively used to clamp two root architecture posts in the structural column cross spacing block group of lateral attitude and at least two groups(1)The positioner part of structural column and Vierendeel girder is that can realize the air cylinder group of Automated condtrol so that the automaticity of frock is improved, and reduces labor strength, improves production efficiency;(2)Structural column is positioned by the structural column longitudinal spacing block group in three directions, structural column cross spacing block group and clamping cylinder group respectively, Vierendeel girder is positioned by the structural column in three directions, positioning cylinder group and limit stop group respectively, structural column and Vierendeel girder there's almost no the possibility of displacement in welding processing, accurate positioning, is consolidated very much.
Description
Technical field
This accomplice belongs to elevator technology field, specifically, is related to a kind of modularization elevator hoistways frame tooling.
Background technology
Elevator is a kind of vertical conveyor using motor as power, equipped with box-like gondola, for tier building multiply people or
Carrying goods, the car of elevator is arranged in the elevator of building, and car is moved up and down in elevator, elevator and car
On door for people pass in and out.
Existing aging blocks install elevator or cottage elevator additional, due to the limitation of floor space, mostly using in stair
Outside installs additional in the elevator with hoistway with steel structure, the elevator of hoistway with steel structure and is provided with hoistway framework, for in-site installation
Convenience and save on-site construction time and cost, the hoistway with steel structure framework of prior art is to be prefabricated into factory by welding
Lifted at the construction field (site) after several frame modules, each frame module includes at least two-strip structure post and perpendicular to knot
Several Vierendeel girders of structure post, several Vierendeel girders are located between two-strip structure post, and direction of the structural column along elevator is set, if
Dry bar Vierendeel girder is fixed between structural column, and car is moved up and down along hoistway framework, existing hoistway framework when factory welds,
Each part is fixed by jacking block first, then carries out weld job, but jacking block fixes insecure, is often sent out in welding process
The problem of raw part disengaging configuration, the problems such as product does not meet linearity after can not welding or welding is caused, and often
Individual jacking block is required for that manually part is withstood or pulled down, and wastes time and energy, cumbersome, inefficiency.
The content of the invention
This accomplice overcomes shortcoming of the prior art there is provided a kind of modularization elevator hoistways frame tooling, and it holds very much
Each relay part to be welded of hoistway framework can easily be fixed, it is time saving and energy saving, the labor intensity of workman is reduced, operating efficiency is high, and
And each positioning parts are accurate, fixation.
In order to solve the above-mentioned technical problem, this accomplice is achieved through the following technical solutions:
A kind of modularization elevator hoistways frame tooling, including bottom plate, bottom plate are respectively used to positioning two provided with least two groups
Root architecture post is in the structural column longitudinal spacing block group of lengthwise position, and at least two groups are respectively used to two root architecture posts of positioning in horizontal position
The structural column cross spacing block group put and at least two groups clamping cylinder groups for being respectively used to clamp two root architecture posts, structural column
The lengthwise position of lateral attitude and structural column is mutually perpendicular to, and clamping cylinder group assembles conjunction with structural column cross spacing block and fixed respectively
The position of structural column;Bottom plate is some provided with some groups of limit stop groups for being respectively used to position some parallel Vierendeel girders
Group is respectively used to coordinate with limit stop group the positioning cylinder group of some Vierendeel girders of positioning.
Further, structural column longitudinal spacing block group, structural column cross spacing block group and limit stop group can be in bottom plates
Upper shift position.
Further, bottom plate is provided with some parallel tracks, structural column longitudinal spacing block group, structural column cross spacing block
Group and limit stop group can be along track shift positions.
Further, the distance between some parallel tracks are equal.
Further, every group of limit stop group includes at least two positive stops being arranged side by side, every group of positioning cylinder group bag
At least two positioning cylinders being arranged side by side are included, positioning cylinder is corresponded with positive stop.
Further, every group of structural column longitudinal spacing block group includes at least one structural column longitudinal spacing block, every group of structural column
Cross spacing block group includes at least two structural column cross spacing blocks being set up in parallel, and every group of clamping cylinder group includes at least two
The clamping cylinder being set up in parallel.
Further, track is the chute of the depression on the inside of bottom plate, structural column longitudinal spacing block, structural column cross spacing block
And positive stop is connected by bolt with chute, one end of bolt is located inside chute, and is blocked by the edge of chute, makes spiral shell
One end of bolt is not departed from out with chute, the other end of bolt through structural column longitudinal spacing block, structural column cross spacing block or
Person's positive stop.
Wherein, positive stop is strip positive stop, and positive stop is across at least two adjacent chutes, corresponding every cunning
Groove, positive stop is equipped with bolt.
Wherein, structural column longitudinal spacing block is the structural column longitudinal spacing block of strip, and structural column longitudinal spacing block is across extremely
Few two adjacent chutes, every chute of correspondence, structural column longitudinal spacing block is equipped with bolt.
Wherein, structural column cross spacing block is the structural column cross spacing block of strip, and structural column cross spacing block is along chute
Extend a distance into, each structural column cross spacing block is provided with least two bolts, and two bolts are respectively positioned on same cunning
In groove.
Compared with prior art, the beneficial effect of this accomplice is:
A kind of modularization elevator hoistways frame tooling, including bottom plate, as the basic part of miscellaneous part, bottom plate is provided with extremely
Few two groups are respectively used to position structural column longitudinal spacing block group of the two root architecture posts in lengthwise position, and at least two groups are respectively used to determine
Two root architecture posts of position are respectively used to clamp two root architecture posts in the structural column cross spacing block group of lateral attitude and at least two groups
Clamping cylinder group, the lateral attitude of structural column and the lengthwise position of structural column be mutually perpendicular to, clamping cylinder group respectively with structure
Post cross spacing block assembles the position for closing fixed structure post, and said modules are used to location structure post;Bottom plate is provided with some groups
It is respectively used to position the limit stop group of some parallel Vierendeel girders, some groups are respectively used to coordinate positioning with limit stop group
The positioning cylinder group of some Vierendeel girders, Vierendeel girder is located between two root architecture posts, and the lateral attitude of Vierendeel girder has structural column true
It is fixed, so Vierendeel girder only needs to set the positioner of positioning lengthwise position, compared with prior art,(1)Structural column and framework
The positioner part of beam is that can realize the air cylinder group of Automated condtrol so that the automaticity of frock is improved, drop
Low labor strength, improves production efficiency;(2)Structural column respectively by the structural column longitudinal spacing block group in three directions,
Structural column cross spacing block group and the positioning of clamping cylinder group, particularly clamping cylinder group, lasting in welding process can be carried
For shoring power, Vierendeel girder is positioned by the structural column in three directions, positioning cylinder group and limit stop group respectively, particularly
Power is shored in positioning cylinder group, offer that can be lasting in welding process, and structural column and Vierendeel girder are hardly deposited in welding processing
In the possibility of displacement, accurate positioning is consolidated very much.
Brief description of the drawings
Accompanying drawing is used for providing further understanding this accomplice, is used to explain this accomplice together with the embodiment of this accomplice,
The limitation to this accomplice is not constituted, in the accompanying drawings:
Fig. 1 is a kind of planar structure schematic diagram of modularization elevator hoistways frame tooling described in this accomplice.
Fig. 1 includes:
10 --- --- structural column longitudinal spacing block, 12 --- structural column cross spacing block, 13 --- clampings of structural column, 11
Cylinder;
20 --- Vierendeel girder, 21 --- positioning cylinder, 22 --- positive stops;
30 --- bottom plate, 31 --- chute, 32 --- bolts;
40 --- block cylinder.
Embodiment
The preferred embodiment of this accomplice is illustrated below in conjunction with accompanying drawing, it will be appreciated that preferred reality described herein
Apply example and be merely to illustrate and explain this accomplice, be not used to limit this accomplice.
As shown in figure 1, a kind of modularization elevator hoistways frame tooling, including bottom plate 30, bottom plate 30 is provided with two groups of difference
For positioning structural column longitudinal spacing block 11 of the two root architecture posts 10 in lengthwise position, two groups are respectively used to position two root architecture posts
10 are respectively used to clamp the clamping cylinder group of two root architecture posts 10 in the structural column cross spacing block 12 of lateral attitude and two groups,
The lateral attitude of structural column 10 and the lengthwise position of structural column 10 are mutually perpendicular to, clamping cylinder group respectively with structural column cross spacing
Block 12 coordinates the position of fixed structure post 10;Bottom plate 30 is respectively used to some parallel Vierendeel girders 20 of positioning provided with 5 groups
Limit stop group, 5 groups are respectively used to coordinate the positioning cylinder group for positioning 5 Vierendeel girders 20 with limit stop group.
As shown in figure 1, every group of limit stop group includes two positive stops 22 being arranged side by side, every group of positioning cylinder group bag
Two positioning cylinders being arranged side by side 21 are included, positioning cylinder 21 is corresponded with positive stop 22.Every group of structural column longitudinal spacing
Block 11 includes a structural column longitudinal spacing block 11, and every group of structural column cross spacing block 12 includes 4 structural columns being set up in parallel
Cross spacing block 12, every group of clamping cylinder group includes 4 clamping cylinders 13 being set up in parallel.As shown in figure 1, structural column is longitudinally limited
Position block 11 can also be set to integrally formed structure with one of which positive stop 22.It is simple in construction, it is easy to processing and manufacturing.
As shown in figure 1, bottom plate 30 is provided with some parallel tracks, structural column longitudinal spacing block 11, structural column are horizontal
Limited block 12 and limit stop group can be along track shift positions.The distance between some parallel tracks are equal.Track
For the chute being recessed to the inner side of bottom plate 30, structural column longitudinal spacing block 11, structural column cross spacing block 12 and positive stop 22
It is connected by bolt 32 with chute, one end of bolt 32 is located inside chute, and is blocked by the edge of chute, makes the one of bolt 32
End is not departed from out with chute, the other end of bolt 32 pass through structural column longitudinal spacing block 11, structural column cross spacing block 12 or
Person's positive stop 22.It is easy to position and dismantles, and structural column longitudinal spacing block 11, structural column cross spacing block 12 and limit after dismounting
Position block 22 is easy to installation next time, positioning without departing from bottom plate 30.
Structural column longitudinal spacing block group, structural column cross spacing block group and limit stop group may be arranged as such as Fig. 1
Shown in the driving positive stop 22 of use block cylinder 40 realize the structure of displacement and spacing purpose.It is all set to cylinder then
Automaticity is higher, and further, but space is limited, it is necessary to set as the case may be in tool base plate 30 for effect.
Positive stop 22 is strip positive stop 22, and positive stop 22 is across at least two adjacent chutes 31, and correspondence is every
Bar chute 31, positive stop 22 is equipped with bolt 32.Structural column longitudinal spacing block 11 is the structural column longitudinal spacing block 11 of strip,
Structural column longitudinal spacing block 11 is across at least two adjacent chutes 31, corresponding every chute 31, structural column longitudinal spacing block 11
It is equipped with bolt 32.Structural column cross spacing block 12 is the structural column cross spacing block 12 of strip, structural column cross spacing block 12
Extended a distance into along chute 31, each structural column cross spacing block 12 is provided with least two bolts 32, and two bolts 32
It is respectively positioned in same chute 31.
The present apparatus can also control the motion of cylinder using computer or PLC, realize a key operation, more convenient and efficient.
Compared with prior art, the beneficial effect of this accomplice is:
A kind of modularization elevator hoistways frame tooling, including bottom plate 30, as the basic part of miscellaneous part, set on bottom plate 30
There are at least two groups to be respectively used to two root architecture posts 10 of positioning in the structural column longitudinal spacing block 11 of lengthwise position, at least two groups difference
For two root architecture posts 10 of positioning clamping two is respectively used in the structural column cross spacing block 12 of lateral attitude and at least two groups
The clamping cylinder group of root architecture post 10, the lateral attitude of structural column 10 and the lengthwise position of structural column 10 are mutually perpendicular to, and clamp gas
Cylinder group coordinates the position of fixed structure post 10 with structural column cross spacing block 12 respectively, and said modules are used to location structure post
10;Bottom plate 30 is provided with some groups of limit stop groups for being respectively used to position some parallel Vierendeel girders 20, some groups of difference
For with limit stop group coordinate positioning some Vierendeel girders 20 positioning cylinder group, Vierendeel girder 20 be located at two root architecture posts 10 it
Between, the lateral attitude of Vierendeel girder 20 has structural column 10 to determine, so Vierendeel girder 20 only needs to set the positioning of positioning lengthwise position
Device, compared with prior art,(1)The positioner part of structural column 10 and Vierendeel girder 20 is that can realize Automated condtrol
Air cylinder group so that the automaticity of frock is improved, reduces labor strength, improves production efficiency;(2)Structural column 10
Positioned respectively by the structural column longitudinal spacing block 11 in three directions, structural column cross spacing block 12 and clamping cylinder group,
Power is shored in particularly clamping cylinder group, offer that can be lasting in welding process, and Vierendeel girder 20 is respectively by three directions
Structural column 10, positioning cylinder group and limit stop group positioning, particularly positioning cylinder group, lasting in welding process can be carried
For shoring power, structural column 10 and Vierendeel girder 20 there's almost no the possibility of displacement in welding processing, accurate positioning, very surely
Gu.
The specific works of this frock are crossed referred to as:1st, the longitudinal spacing block of fixed structure post 10, determines longitudinal position of structural column 10
Put;2nd, according to the distance between two structural columns 10 of length adjustment of Vierendeel girder 20;3rd, structural column cross spacing block 12 is fixed;
4th, cylinder top locking structure post 10 is held out against;5th, positioning cylinder 21 stretches out, posting set a roof beam in place 20 lengthwise position;6th, fixed positive stop
22;7th, weld;8th, withdraw and hold out against cylinder and positioning cylinder 21, take out the frame module processed, complete processing.
Finally it should be noted that:The preferred embodiment of this accomplice is these are only, this accomplice is not limited to, although
This accomplice is described in detail with reference to embodiment, for those skilled in the art, it still can be to foregoing
Technical scheme described in each embodiment is modified, or to which part technical characteristic carry out equivalent substitution, but it is all
Within the spirit and principle of this accomplice, any modification, equivalent substitution and improvements made etc. should be included in the protection of this accomplice
Within the scope of.
Claims (4)
1. a kind of modularization elevator hoistways frame tooling, it is characterised in that:Including bottom plate, the bottom plate is provided with least two components
Structural column longitudinal spacing block group of the two root architecture posts in lengthwise position Yong Yu not be positioned, at least two groups are respectively used to position two root knots
Structure post lateral attitude structural column cross spacing block group, and at least two groups be respectively used to clamp two root architecture posts clamping gas
Cylinder group, the lateral attitude of the structural column and the lengthwise position of the structural column are mutually perpendicular to, the clamping cylinder group respectively with
The structural column cross spacing block assembles the position for closing the fixed structural column;It is fixed that the bottom plate is respectively used to provided with some groups
Position some parallel Vierendeel girders limit stop group, and some groups be respectively used to and the limit stop group coordinate positioning institute
State the positioning cylinder group of some Vierendeel girders, the structural column longitudinal spacing block group, the structural column cross spacing block group, and
The limit stop group can on the bottom plate shift position, the bottom plate is provided with some parallel tracks, the knot
Structure post longitudinal spacing block group, the structural column cross spacing block group, and the limit stop group can be moved along the track
Position, the distance between some parallel tracks are equal, and every group of limit stop group is arranged side by side including at least two
Positive stop, every group of positioning cylinder group include at least two positioning cylinders being arranged side by side, the positioning cylinder with it is described
Positive stop is corresponded;Every group of structural column longitudinal spacing block group includes at least one structural column longitudinal spacing block, every group of structure
Post cross spacing block group includes at least two structural column cross spacing blocks being set up in parallel, and every group of clamping cylinder group includes at least two
The individual clamping cylinder being set up in parallel, the track is the chute of the depression on the inside of bottom plate, the structural column longitudinal spacing block, structure
Post cross spacing block, and positive stop are connected by bolt with the chute, and one end of the bolt is located in the chute
Portion, and blocked by the edge of the chute, the one end and the chute for making the bolt are not departed from out, and other the one of the bolt
Hold through the structural column longitudinal spacing block, structural column cross spacing block or positive stop.
2. a kind of modularization elevator hoistways frame tooling according to claim 1, it is characterised in that:The positive stop is
Strip positive stop, the positive stop is across at least two adjacent chutes, the corresponding every chute, the positive stop
It is equipped with bolt.
3. a kind of modularization elevator hoistways frame tooling according to claim 2, it is characterised in that:The structural column longitudinal direction
Limited block is the structural column longitudinal spacing block of strip, and the structural column longitudinal spacing block is right across at least two adjacent chutes
Should every chute, the structural column longitudinal spacing block is equipped with bolt.
4. a kind of modularization elevator hoistways frame tooling according to claim 2, it is characterised in that:The structural column is horizontal
Limited block is the structural column cross spacing block of strip, and the structural column cross spacing block is extended a distance into along the chute, institute
Each structural column cross spacing block is stated to be respectively positioned in same chute provided with least two bolts, and two bolts.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510636229.9A CN105195942B (en) | 2015-09-30 | 2015-09-30 | A kind of modularization elevator hoistways frame tooling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510636229.9A CN105195942B (en) | 2015-09-30 | 2015-09-30 | A kind of modularization elevator hoistways frame tooling |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105195942A CN105195942A (en) | 2015-12-30 |
CN105195942B true CN105195942B (en) | 2017-08-11 |
Family
ID=54944070
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510636229.9A Active CN105195942B (en) | 2015-09-30 | 2015-09-30 | A kind of modularization elevator hoistways frame tooling |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105195942B (en) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106239015A (en) * | 2016-10-20 | 2016-12-21 | 中核(天津)科技发展有限公司 | The apparatus for welding and positioning of steel structure assembly |
CN107416649B (en) * | 2017-06-15 | 2019-06-07 | 福建快科城建增设电梯股份有限公司 | Modularity elevator method for rapidly mounting |
CN107775252A (en) * | 2017-11-24 | 2018-03-09 | 江西卓尔金属设备集团有限公司 | Rifle cabinet framework welding robot fixture |
CN109014732A (en) * | 2018-09-06 | 2018-12-18 | 浙江天马停车设备有限公司 | Rear cross beam welding mould |
CN109366069A (en) * | 2018-11-28 | 2019-02-22 | 上海宝冶集团有限公司 | A kind of positioning device for the welding of counter force wall base layer support steelframe |
CN110142544B (en) * | 2019-04-08 | 2021-04-13 | 广东凯兴达建筑科技有限公司 | Modular elevator shaft assembly welding process |
CN112427863B (en) * | 2020-11-17 | 2022-07-29 | 扬州市美华电气有限公司 | Positioning tool and positioning method for high-voltage electric appliance top shielding case base |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB8829603D0 (en) * | 1988-12-19 | 1989-02-08 | New Domain Limited | Improvements in or relating to lift shafts |
CN101497157B (en) * | 2009-02-19 | 2011-06-08 | 唐山轨道客车有限责任公司 | Assembly welding device for high-speed motor train set underframe |
CN203649777U (en) * | 2013-11-25 | 2014-06-18 | 重庆工业设备安装集团有限公司 | Pipe gallery / truss assembling welding and supporting device |
CN203998514U (en) * | 2014-05-28 | 2014-12-10 | 江苏润安电梯工程技术服务有限公司 | Modularization elevator hoistways framework |
CN103991773A (en) * | 2014-05-28 | 2014-08-20 | 江苏润安电梯工程技术服务有限公司 | Design and installation method of assembly-type modularized steel structure elevator shaft |
CN204639502U (en) * | 2015-05-05 | 2015-09-16 | 广州安速通建筑工程机械有限公司 | A kind of elevator installation tooling for welding platform |
CN205085578U (en) * | 2015-09-30 | 2016-03-16 | 福建快科城建增设电梯股份有限公司 | Modularization elevator well frame frock |
-
2015
- 2015-09-30 CN CN201510636229.9A patent/CN105195942B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN105195942A (en) | 2015-12-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105195942B (en) | A kind of modularization elevator hoistways frame tooling | |
CN105033448B (en) | Frication stir welding flexibility tool for subway vehicle side wall | |
CN101518784B (en) | Hoisting method of large mill housing under limited hoisting height | |
CN106245919B (en) | A kind of assembled architecture Automated assembly platform | |
CN103437563B (en) | Mounting method for steel skeleton of large steel structure factory building | |
CN102337782B (en) | Lift system for constructing truss platform on top of tall and large space | |
CN205085578U (en) | Modularization elevator well frame frock | |
CN111576691B (en) | Frame type glass curtain wall mounting method and glass curtain wall system | |
CN103145036A (en) | Removing tool and removing method of indoor ultrahigh assembly-type steel structure support system | |
CN105442773A (en) | Technology and construction platform for installing and constructing inner plates of metal roof | |
CN103397782A (en) | Construction method and device for installing connecting beams on frame-type steel structure | |
CN104533097A (en) | Recursive stair type construction method for fabricated multi-layer building | |
CN207160223U (en) | A kind of fulcrum-variable pin joint formula steel girder platform | |
CN117145051A (en) | High-altitude assembly structure of large-span space broken line truss and construction method | |
CN204059904U (en) | A kind of hoistway operation platform being applied to multi-platform operation | |
CN109487827B (en) | Modular processing and binding method for comprehensive pipe gallery steel reinforcement framework | |
CN102913007B (en) | Steel reinforcement processing shed and construction method therefor | |
CN115306435A (en) | Hydropower station air cushion type surge chamber construction comprehensive operation trolley and use method thereof | |
CN204875544U (en) | T type roof beam pterygoid lamina reinforcing bar fetal membrane | |
CN109577634B (en) | Synchronous lifting system | |
CN102505863A (en) | Wireless laser synchronous control device for multi-rail slide construction | |
CN103711147B (en) | The mounting method of ballast water tank water in immersed tube | |
CN208023608U (en) | A kind of post-cast strip can have enough to meet the need steel channel formwork system | |
CN207079894U (en) | Construction of Steel Structure steel platform and device is set up at the top of light shaft | |
CN105314542A (en) | Method for fabricating simple double-track gantry crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A modular elevator shaft frame tooling Effective date of registration: 20220606 Granted publication date: 20170811 Pledgee: Bank of Xiamen Co.,Ltd. Fuzhou branch Pledgor: FUJIAN KUAIKE URBAN CONSTRUCTION ADDITIONAL ELEVATOR CO.,LTD. Registration number: Y2022980005652 |