CN105186414B - 大电流母排过壁装置 - Google Patents
大电流母排过壁装置 Download PDFInfo
- Publication number
- CN105186414B CN105186414B CN201510510269.9A CN201510510269A CN105186414B CN 105186414 B CN105186414 B CN 105186414B CN 201510510269 A CN201510510269 A CN 201510510269A CN 105186414 B CN105186414 B CN 105186414B
- Authority
- CN
- China
- Prior art keywords
- nut
- top plate
- busbar
- sleeve pipe
- interior
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
- Floor Finish (AREA)
Abstract
本发明大电流母排过壁装置主要用于大电流母排穿过钢筋混凝土墙壁使用。它主要由套管(1),上下左右4个夹具(2),圆环套(3)组成;上下左右4个夹具(2)均由上丝杆(6),螺母(7),下丝杆(8),顶板(9)组成,上丝杆(6)和下丝杆(8)均有外螺纹且互为反向丝扣,螺母(7)有内螺纹;圆环套(3)套在套管(1)内,夹具(2)的上丝杆(6)的一端与圆环套(3)的内壁固定,另一端拧进螺母(7)内,夹具(2)的下丝杆(8)一端拧进螺母(7)内,另一端与顶板(9)固定,分别拧动上下左右4个螺母(7),使上下左右4个夹具(2)的顶板(9)向上或向下、向左或向右移动,从而将母排(4)固定并夹紧。
Description
技术领域
本发明主要用于大电流母排穿过钢筋混凝土墙壁使用。
背景技术
我国目前大电流母排穿过钢筋混凝土墙壁普遍采用的方法是:先将钢筋混凝土墙壁上预留方形洞口,母排与用电设备端连接后,再将母排穿过钢筋混凝土墙与另一个房间的用电设备相连,这样当母排穿过钢筋混凝土墙的预留方形洞口时,会产生不同的位置误差,也就是说,母排不会正好处于方形洞口的正中心,再将若干个绝缘塞块塞入母排与洞口之间的空隙内,将母排固定,绝缘塞块需要现场加工成不同的尺寸,以满足母排在洞口不同位置的需要,费工耗时,极不方便。
发明内容
本发明解决了上述问题,它主要由套管(1),上下左右4个夹具(2),圆环套(3)组成;上下左右4个夹具(2)均由上丝杆(6),螺母(7),下丝杆(8),顶板(9)组成,上丝杆(6)和下丝杆(8)均有外螺纹且互为反向丝扣,螺母(7)有内螺纹;套管(1)预埋在钢筋混凝土墙(5)上,形成穿墙圆孔,圆环套(3)套在套管(1)内,夹具(2)的上丝杆(6)的一端与圆环套(3)的内壁固定,另一端拧进螺母(7)内,夹具(2)的下丝杆(8)一端拧进螺母(7)内,另一端与顶板(9)固定,由于上丝杆(6)和下丝杆(8)的外螺纹互为反向丝扣,故分别拧动上下左右4个螺母(7)时,会使上下夹具(2)的顶板(9)向上或向下移动,同样可以使左右夹具(2)的顶板(9)向左或向右移动,从而可以根据母排(4)在套管(1)内的不同位置将母排(4)固定并夹紧;当然夹具(2)的上丝杆(6)、螺母(7)、下丝杆(8)、顶板(9)是由绝缘材料制造的;当母排(4)在套管(1)内固定后,将套管(1)的前后洞口用模板封堵,用常规方法注入绝缘浆液,当绝缘浆液固化后,拆除模板即可。
附图说明
附图标记说明:1-套管,2-夹具,3-圆环套,4-母排,5-钢筋混凝土墙,6-上丝杆,7-螺母,8-下丝杆,9-顶板。
图1是本发明横向剖面图。
图2是本发明纵向剖面图。
图3是本发明夹具(2)的大样图。
图4是本发明圆环套(3)与4个夹具(2)的组合图。
具体实施方式
下面结合附图说明本发明的具体实施方式。
参见图1、图2,当钢筋混凝土墙浇筑时,预先将套管(1)埋设在钢筋混凝土墙上,当钢筋混凝土墙施工完并达到强度后,会形成圆形穿墙孔洞,再在套管(1)的前后端安装两个圆环套(3),此时上下左右4个夹具(2)已预先安装在圆环套(3)内;再将母排(4)穿过套管(1),由于母排(4)与用电设备的安装误差,在穿过套管(1)时会产生位置误差,不会置于套管(1)的正中心,参见图3、图4,由于上丝杆(6)和下丝杆(8)的外螺纹互为反向丝扣,故分别拧动上下左右4个螺母(7),使上下夹具(2)的顶板(9)向上或向下移动,同样使左右夹具(2)的顶板(9)向左或向右移动将母排(4)固定并夹紧;当母排(4)在套管(1)内固定后,将套管(1)的前后洞口用模板封堵,用常规方法注入绝缘浆液,当绝缘浆液固化后,拆除模板即可。
Claims (1)
1.大电流母排过壁装置,其特征是:它主要由套管(1),上下左右4个夹具(2),圆环套(3)组成;上下左右4个夹具(2)均由上丝杆(6),螺母(7),下丝杆(8),顶板(9)组成,上丝杆(6)和下丝杆(8)均有外螺纹且互为反向丝扣,螺母(7)有内螺纹;套管(1)预埋在钢筋混凝土墙(5)上,形成穿墙圆孔,圆环套(3)套在套管(1)内,夹具(2)的上丝杆(6)的一端与圆环套(3)的内壁固定,另一端拧进螺母(7)内,夹具(2)的下丝杆(8)的一端拧进螺母(7)内,另一端与顶板(9)固定,由于上丝杆(6)和下丝杆(8)的外螺纹互为反向丝扣,故分别拧动上下左右4个螺母(7)时,会使上下夹具(2)的顶板(9)向上或者向下移动,同样可以使左右夹具(2)的顶板(9)向左或者向右移动,从而根据母排(4)在套管(1)内的不同位置将母排(4)固定并夹紧;当然夹具(2)的上丝杆(6)、螺母(7)、下丝杆(8)、顶板(9)是由绝缘材料制造的。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510510269.9A CN105186414B (zh) | 2015-08-20 | 2015-08-20 | 大电流母排过壁装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510510269.9A CN105186414B (zh) | 2015-08-20 | 2015-08-20 | 大电流母排过壁装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105186414A CN105186414A (zh) | 2015-12-23 |
CN105186414B true CN105186414B (zh) | 2018-02-13 |
Family
ID=54908338
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510510269.9A Active CN105186414B (zh) | 2015-08-20 | 2015-08-20 | 大电流母排过壁装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105186414B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106655031B (zh) * | 2017-01-18 | 2018-06-15 | 威立雅环保设备江苏有限公司 | 一种电缆绝缘体橡塑预埋件 |
CN113193524B (zh) * | 2021-06-07 | 2022-05-20 | 宝亨新电气(集团)有限公司 | 一种组合式母线槽及其组装方法 |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102008046658B4 (de) * | 2008-09-10 | 2012-08-30 | Phoenix Contact Gmbh & Co. Kg | Kabeldurchführung |
CN202217984U (zh) * | 2011-09-26 | 2012-05-09 | 施果 | 带调层套的套管接线盒 |
CN102832572A (zh) * | 2012-09-25 | 2012-12-19 | 宁夏天净元光电力有限公司 | 电缆井口撑臂滑车 |
CN203466513U (zh) * | 2013-08-26 | 2014-03-05 | 国家电网公司 | 输变电线路电线固定装置 |
-
2015
- 2015-08-20 CN CN201510510269.9A patent/CN105186414B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN105186414A (zh) | 2015-12-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206585287U (zh) | 一种电线固定装置 | |
CN204602932U (zh) | 多弧度弯管机 | |
CN105186414B (zh) | 大电流母排过壁装置 | |
CN204456799U (zh) | 一种建筑装修工程用新型墙砖铺贴整平装置 | |
CN203129563U (zh) | 一种万向可调式脚手架连墙件 | |
CN203373980U (zh) | 组合式保温模板紧固件 | |
CN105019647A (zh) | 可伸缩套管 | |
CN205070330U (zh) | 多层电缆固定夹具 | |
CN203097027U (zh) | 一种墙板固定器 | |
CN202767117U (zh) | 用于预留注浆孔道注浆补漏施工方法的膨胀胶塞 | |
CN109099219B (zh) | 不锈钢穿墙管连接装置及连接方法 | |
CN202251296U (zh) | 新型膨胀螺丝 | |
CN203514803U (zh) | 建筑墙体模板的夹紧装置 | |
CN203808513U (zh) | 可调节便拆卸的夹墙钢模板 | |
CN103267191A (zh) | 一种软管快速连接装置 | |
CN103206083B (zh) | 双墙夹缝模板支撑器 | |
CN203176539U (zh) | 一种隧道大截面电缆的弧形支架 | |
CN105987228A (zh) | 夹式滑动支座 | |
CN106522535B (zh) | 一种连接牢固的脚手架顶撑 | |
CN206685827U (zh) | 一种预制可调高度屋面电气线管及桥架的支座装置 | |
CN205051270U (zh) | 旋转可调式电缆支架 | |
CN202611015U (zh) | 骑缝自锁式安装墙体 | |
CN203924408U (zh) | 一种保温连接件 | |
CN205004456U (zh) | 电梯施工现场快速可靠接地连接工装 | |
CN204645678U (zh) | 转角连接件 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |