CN105184664A - Three-dimensional state evaluation and maintenance strategy of electric transmission and transformation equipment - Google Patents

Three-dimensional state evaluation and maintenance strategy of electric transmission and transformation equipment Download PDF

Info

Publication number
CN105184664A
CN105184664A CN201510466258.5A CN201510466258A CN105184664A CN 105184664 A CN105184664 A CN 105184664A CN 201510466258 A CN201510466258 A CN 201510466258A CN 105184664 A CN105184664 A CN 105184664A
Authority
CN
China
Prior art keywords
power transmission
equipment
transforming equipment
state
environmental factor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510466258.5A
Other languages
Chinese (zh)
Inventor
崔婷
王谦
吴高林
安昌萍
逄凯
鲍明晖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of State Grid Chongqing Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Electric Power Research Institute of State Grid Chongqing Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of State Grid Chongqing Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical Electric Power Research Institute of State Grid Chongqing Electric Power Co Ltd
Priority to CN201510466258.5A priority Critical patent/CN105184664A/en
Publication of CN105184664A publication Critical patent/CN105184664A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention discloses a three-dimensional state evaluation and maintenance strategy of electric transmission and transformation equipment. The strategy comprises: firstly, evaluating the state of the electric transmission and transformation equipment according to existing electric transmission and transformation equipment state evaluation rules; secondly, evaluating the environment of the electric transmission and transformation equipment according to the analytic hierarchy process; thirdly, evaluating the importance of the electric transmission and transformation equipment according to the analytic hierarchy process; and finally, building a three-dimensional evaluation model to obtain a final evaluation result of the state of the electric transmission and transformation equipment. The present invention provides an evaluation algorithm of the importance of the electric transmission and transformation equipment and the influence of the environment on the state of the electric transmission and transformation equipment, the state of the electric transmission and transformation equipment itself, the state of the operating environment and the states of the power network and the social environment may be fully considered, and the thorough evaluation of the equipment maintenance schedule is performed, therefore the rationality of the equipment maintenance schedule is achieved.

Description

Power transmission and transforming equipment three-dimensional state is evaluated and Strategies of Maintenance
Technical field
The present invention relates to equipment state evaluation and Strategies of Maintenance field, particularly a kind of power transmission and transforming equipment three-dimensional state is evaluated and Strategies of Maintenance.
Background technology
Problem is both ways deposited in current power transmission and transformation equipment state evaluation: one is the quantity of state only considering equipment itself, as indexs such as equipment oil leakage, gas leakage, test figure exceed standard.And along with the development of economy of large scale construction and the continuous change of ecologic environment, external environment is on the impact of power transmission and transforming equipment, and equipment self importance all plays an important role to the evaluation that equipment state is final, only consider that the change of equipment oneself state amount accurately can not reflect actual conditions when carrying out state evaluation to equipment.Two is that maintenance suggestion in existing equipment state assessment guidelines does not judge the emergency degree of overhaul of the equipments.Such as, when two equipment are all cited as severe conditions, which equipment should first carry out which equipment of maintenance should after carry out maintenance and do not provide instruction.In view of above-mentioned two problems, the present invention proposes " three-dimensional " equipment state evaluation method simultaneously considering environment three aspect factor residing for equipment state, equipment importance, equipment.
To the evaluation of equipment state, the power transmission and transformation equipment state assessment guidelines that State Grid Corporation of China issues can be relied on.And environment there is no evaluation method at present residing for equipment importance and equipment.Questionnaire exposed installation mainly comprises electric pressure, equipment reliability, maintenance cost etc. for importance, mainly contains acid rain, atmospheric pollution, thunder and lightning, icing etc. to the environmental factor that power transmission and transforming equipment threatens.For considering that self and external environment are on the impact of power transmission and transforming equipment as far as possible, must each factor of scientific evaluation to power transmission and transforming equipment effect, thus objective appraisal is carried out to equipment, make rational power transmission and transforming equipment Strategies of Maintenance, in time power transmission and transforming equipment is safeguarded.Because above-mentioned factor is mostly uncertain index, be difficult to precise quantification, the present invention, on the basis building multi-layer criteria appraisement system, makes every effort to set up multifactor to power transmission and transforming equipment impact assessment model, thus formulates the reference frame that rational power transmission and transforming equipment Strategies of Maintenance provides science.
Summary of the invention
Object of the present invention is just to provide the evaluation of a kind of power transmission and transforming equipment three-dimensional state and Strategies of Maintenance, by proposing based on power transmission and transformation equipment state on the basis of analytical hierarchy process, importance, the power transmission and transformation equipment state overhauling Policy model of environmental factor three dimensions, provide the judge algorithm that power transmission and transforming equipment importance and environment affect the state of power transmission and transforming equipment, take into full account the state of power transmission and transforming equipment self, the state of running environment, the state of electrical network and social environment, comprehensive assessment is carried out to power transmission and transforming equipment turnaround plan, realize the rationality of power transmission and transforming equipment turnaround plan.
The object of the invention is by such technical scheme realize, it includes
1) according to existing power transmission and transformation equipment state assessment guidelines, power transmission and transformation equipment state is evaluated;
2) on analytical hierarchy process basis, environment residing for power transmission and transforming equipment is evaluated;
3) according to analytical hierarchy process, power transmission and transforming equipment importance is evaluated;
4) set up three-dimensional model, obtain power transmission and transformation equipment state final appraisal results and Strategies of Maintenance.
Further, describedly on analytical hierarchy process basis to the detailed process that environment residing for power transmission and transforming equipment is evaluated be:
1-1) set up set of factors U={U 1..., U m, wherein U 1..., U mby the sub-factors composition of many levels, set of factors U, according to the characteristics determined being evaluated objective system, has different Factor system for different objective system features;
1-2) set up fuzzy evaluation collection V={V 1..., V m, ground floor fuzzy evaluation collection: set up the judge collection V of environmental factor to power transmission and transforming equipment influence degree according to required j=(j=1,2,3,4,5) totally 5 grades, respectively corresponding without impact, generally, more seriously, seriously, very serious 5 kinds of situations;
Environmental factor adopts ten point system to mark to the influence degree of power transmission and transforming equipment, and environmental factor corresponding membership function μ (x) the relation expression corresponding to power transmission and transforming equipment influence degree score value x is:
1-2-1) inessential situation V 1:
Wherein, μ 1when () represents that environmental factor is 0≤x≤4 to the scoring of power transmission and transforming equipment influence degree x, environmental factor does not affect power transmission and transforming equipment;
1-2-2) generalized case V 2:
Wherein, μ 2when () represents that the influence degree scoring of environmental factor to power transmission and transforming equipment is 2 < x≤6 x, environmental factor belongs to General Influence situation to power transmission and transforming equipment;
1-2-3) comparatively serious conditions V 3:
Wherein, μ 3when () represents that environmental factor is 4 < x≤8 to the scoring of the influence degree of power transmission and transforming equipment x, environmental factor belongs to power transmission and transforming equipment and comparatively has a strong impact on situation;
1-2-4) serious conditions V 4:
Wherein, μ 4when () represents that the influence degree scoring of environmental factor to power transmission and transforming equipment is 6 < x≤8 x, environmental factor belongs to power transmission and transforming equipment the situation of having a strong impact on;
1-2-5) very serious conditions V 5:
Wherein, μ 5when () represents that environmental factor is 8 < x≤10 to the scoring of the influence degree of power transmission and transforming equipment x, environmental factor belongs to power transmission and transforming equipment and has a strong impact on situation very much;
1-3) determine fuzzy matrix R: determine the relational matrix R=(r of factor U to fuzzy evaluation collection V ij) m × n, wherein r ijrepresent that one of them factor of evaluation bottom i-th sub-factor is to evaluation V jmembership;
1-4) determine the weight A={A of each Hierarchy Evaluation factor 1..., A m, wherein A 1..., A mbe made up of the sub-factor weight of many levels;
1-5) successively carry out fuzzy overall evaluation, final appraisal results are drawn: according to fuzzy data principle by maximum membership grade principle, from the bottom, this layer of each factor weight and fuzzy evaluating matrix are carried out fuzzyly exchange B=A ο R, be the fuzzy evaluating matrix of most last layer again with B, same blurring mapping is carried out to last layer, obtain fuzzy overall evaluation end product, again according to maximum membership grade principle, this result is processed further, obtain final appraisal results, and the evaluation result of power transmission and transforming equipment importance quantized, quantization method is as follows:
By the maximal value b selected by fuzzy overall evaluation jsubstitute into V jcorresponding degree of membership formula μ jx, in (), anti-solution calculates prominence score x corresponding to maximal value j, make R=10x j, in order to measure power transmission and transforming equipment importance.
Further, describedly set up three-dimensional model, the concrete mode obtaining power transmission and transformation equipment state final appraisal results is:
First according to the analysis to power transmission and transformation equipment state, equipment importance, environmental factor three factors, corresponding evaluation result is provided; Wherein, power transmission and transformation equipment state evaluation result R ∈ [0,100], score value higher expression power transmission and transformation equipment state is poorer; Power transmission and transforming equipment Assessment of Important result H ∈ [0,100], score value higher expression power transmission and transforming equipment is more important; Environmental factor is to power transmission and transforming equipment impact assessment result Q ∈ [0,100], and the influence degree of score value higher expression environmental factor to power transmission and transforming equipment is larger;
On the basis of the above, mark in the importance of formulation equipment state and Strategies of Maintenance in conjunction with power transmission and transformation equipment state, importance, environmental factor three aspects, use analytical hierarchy process to calculate the weights W of power transmission and transformation equipment state, importance, environmental factor three aspects r, W h, W q, due to different in the importance of different time phase three aspect factors, then corresponding weight also will recalculate, and to this, set up as drag:
Set up three orthogonal coordinate axis, be respectively R axle, H axle, Q axle, wherein R axle represents power transmission and transforming equipment importance, and it is more important to be worth larger explanation; H axle represents power transmission and transformation equipment state, and it is poorer to be worth larger explanation power transmission and transformation equipment state; Q axle represents environmental factor, and it is larger to be worth the impact of larger explanation environmental factor on power transmission and transforming equipment; The span of R axle, H axle, Q axle forms a rectangular parallelepiped in coordinate axis, rectangular parallelepiped top P point, what represent is that power transmission and transforming equipment is most important, power transmission and transformation state is the poorest, the equipment state that environment has the greatest impact to power transmission and transforming equipment, the pressing degree that this kind of power transmission and transformation equipment state needs repairing is higher, and when formulation state evaluation and Strategies of Maintenance, priority is the highest;
For power transmission and transforming equipment free position A (rW r, hW h, qW q), if its distance P point is nearer, represent that maintenance pressing degree is higher, otherwise, then represent that maintenance pressing degree is lower, wherein initial point o is the point that power transmission and transforming equipment maintenance pressing degree is minimum, the pressing degree that power transmission and transforming equipment needs repairing is represented, for formulation equipment state evaluation and Strategies of Maintenance provide partitioning standards with the space length between A, P:
| A P | = ( 100 - r ) 2 W R 2 + ( 100 - h ) 2 W H 2 + ( 100 - q ) 2 W Q 2
| the value of AP| is less, then represent that the pressing degree that power transmission and transforming equipment needs repairing is higher, otherwise the pressing degree needed repairing is lower.
Owing to have employed technique scheme, the present invention has following advantage:
(1) considered power transmission and transformation equipment state, importance, residing environment three aspect factor, evaluation result is more objective.
(2) utilize analytical hierarchy process, calculate easy, result is clear and definite, and combination of qualitative and quantitative analysis, preferably resolves the quantitative Comprehensive Evaluation Problem that power transmission and transforming equipment is affected by environment.
(3) pressing degree of Strategies of Maintenance is quantized, to the formulation of turnaround plan, there is certain guidance meaning.
Other advantages of the present invention, target and feature will be set forth to a certain extent in the following description, and to a certain extent, based on will be apparent to those skilled in the art to investigating hereafter, or can be instructed from the practice of the present invention.Target of the present invention and other advantages can be realized by instructions below and claims and be obtained.
Accompanying drawing explanation
Accompanying drawing of the present invention is described as follows.
Fig. 1 is process flow diagram of the present invention.
Fig. 2 is by being built three-dimensional model schematic diagram.
Embodiment
Below in conjunction with drawings and Examples, the invention will be further described.
Power transmission and transforming equipment triple assessment and Strategies of Maintenance concrete steps as follows:
1) according to existing power transmission and transformation equipment state assessment guidelines, power transmission and transformation equipment state is evaluated;
2) on analytical hierarchy process basis, environment residing for power transmission and transforming equipment is evaluated;
3) according to analytical hierarchy process, power transmission and transforming equipment importance is evaluated;
4) set up three-dimensional model, obtain power transmission and transformation equipment state final appraisal results and corresponding Strategies of Maintenance.
Describedly on analytical hierarchy process basis to the detailed process that environment residing for power transmission and transforming equipment is evaluated be:
1-1) set up set of factors U={U 1, R, U m, wherein U 1, R, U mby the sub-factors composition of many levels, set of factors U, according to the characteristics determined being evaluated objective system, has different Factor system for different objective system features;
1-2) set up fuzzy evaluation collection V={V 1, R, V m, ground floor fuzzy evaluation collection: set up the judge collection V of environmental factor to power transmission and transforming equipment influence degree according to required j=(j=1,2,3,4,5) totally 5 grades, respectively corresponding without impact, generally, more seriously, seriously, very serious 5 kinds of situations;
Environmental factor adopts ten point system to mark to the influence degree of power transmission and transforming equipment, and environmental factor corresponding membership function μ (x) the relation expression corresponding to power transmission and transforming equipment influence degree score value x is:
1-2-1) inessential situation V 1:
Wherein, μ 1when () represents that environmental factor is 0≤x≤4 to the scoring of power transmission and transforming equipment influence degree x, environmental factor does not affect power transmission and transforming equipment;
1-2-2) generalized case V 2:
Wherein, μ 2when () represents that the influence degree scoring of environmental factor to power transmission and transforming equipment is 2 < x≤6 x, environmental factor belongs to General Influence situation to power transmission and transforming equipment;
1-2-3) comparatively serious conditions V 3:
Wherein, μ 3when () represents that environmental factor is 4 < x≤8 to the scoring of the influence degree of power transmission and transforming equipment x, environmental factor belongs to power transmission and transforming equipment and comparatively has a strong impact on situation;
1-2-4) serious conditions V 4:
Wherein, μ 4when () represents that the influence degree scoring of environmental factor to power transmission and transforming equipment is 6 < x≤8 x, environmental factor belongs to power transmission and transforming equipment the situation of having a strong impact on;
1-2-5) very serious conditions V 5:
Wherein, μ 5when () represents that environmental factor is 8 < x≤10 to the scoring of the influence degree of power transmission and transforming equipment x, environmental factor belongs to power transmission and transforming equipment and has a strong impact on situation very much;
1-3) determine fuzzy matrix R: determine the relational matrix R=(r of factor U to fuzzy evaluation collection V ij) m × n, wherein r ijrepresent that one of them factor of evaluation bottom i-th sub-factor is to evaluation V jmembership;
1-4) determine the weight A={A of each Hierarchy Evaluation factor 1, valency, A m, wherein A 1, valency, A mbe made up of the sub-factor weight of many levels;
1-5) successively carry out fuzzy overall evaluation, final appraisal results are drawn: according to fuzzy data principle by maximum membership grade principle, from the bottom, this layer of each factor weight and fuzzy evaluating matrix are carried out fuzzyly exchange B=A ο R, be the fuzzy evaluating matrix of most last layer again with B, same blurring mapping is carried out to last layer, obtain fuzzy overall evaluation end product, again according to maximum membership grade principle, this result is processed further, obtain final appraisal results, and the evaluation result of power transmission and transforming equipment importance quantized, quantization method is as follows:
By the maximal value b selected by fuzzy overall evaluation jsubstitute into V jcorresponding degree of membership formula μ jx, in (), anti-solution calculates prominence score x corresponding to maximal value j, make R=10x j, in order to measure power transmission and transforming equipment importance.
Describedly set up three-dimensional model, the concrete mode obtaining power transmission and transformation equipment state final appraisal results is:
First according to the analysis to power transmission and transformation equipment state, equipment importance, environmental factor three factors, corresponding evaluation result is provided; Wherein, power transmission and transformation equipment state evaluation result R ∈ [0,100], score value higher expression power transmission and transformation equipment state is poorer; Power transmission and transforming equipment Assessment of Important result H ∈ [0,100], score value higher expression power transmission and transforming equipment is more important; Environmental factor is to power transmission and transforming equipment impact assessment result Q ∈ [0,100], and the influence degree of score value higher expression environmental factor to power transmission and transforming equipment is larger;
On the basis of the above, mark in the importance of formulation equipment state and Strategies of Maintenance in conjunction with power transmission and transformation equipment state, importance, environmental factor three aspects, use analytical hierarchy process to calculate the weights W of power transmission and transformation equipment state, importance, environmental factor three aspects r, W h, W q, due to different in the importance of different time phase three aspect factors, then corresponding weight also will recalculate, and to this, set up as drag:
Set up three orthogonal coordinate axis, be respectively R axle, H axle, Q axle, wherein R axle represents power transmission and transforming equipment importance, and it is more important to be worth larger explanation; H axle represents power transmission and transformation equipment state, and it is poorer to be worth larger explanation power transmission and transformation equipment state; Q axle represents environmental factor, and it is larger to be worth the impact of larger explanation environmental factor on power transmission and transforming equipment; The span of R axle, H axle, Q axle forms a rectangular parallelepiped in coordinate axis, rectangular parallelepiped top P point, what represent is that power transmission and transforming equipment is most important, power transmission and transformation state is the poorest, the equipment state that environment has the greatest impact to power transmission and transforming equipment, the pressing degree that this kind of power transmission and transformation equipment state needs repairing is higher, and when formulation state evaluation and Strategies of Maintenance, priority is the highest;
For power transmission and transforming equipment free position A (rW r, hW h, qW q), if its distance P point is nearer, represent that maintenance pressing degree is higher, otherwise, then represent that maintenance pressing degree is lower, wherein initial point o is the point that power transmission and transforming equipment maintenance pressing degree is minimum, the pressing degree that power transmission and transforming equipment needs repairing is represented, for formulation equipment state evaluation and Strategies of Maintenance provide partitioning standards with the space length between A, P:
| A P | = ( 100 - r ) 2 W R 2 + ( 100 - h ) 2 W H 2 + ( 100 - q ) 2 W Q 2
| the value of AP| is less, then represent that the pressing degree that power transmission and transforming equipment needs repairing is higher, otherwise the pressing degree needed repairing is lower.
The ancient line circuit of wind choosing a 110kV below in conjunction with instantiation is described:
1, equipment state is evaluated:
According to Q/GDW173-2008 " overhead transmission line state evaluation directive/guide ", the ancient line gold utensil distortion of 110kV wind, affect electric property and physical strength, the slippage of part damper, deduct points 40 points, R=40, circuit is in severe conditions.
2, environment residing for equipment is evaluated:
1) set of factors is set up: power transmission and transforming equipment mainly affects by acid rain acid mist, atmospheric pollution, thunder and lightning, icing and social environmental factor in operational management, and above-mentioned each factor also comprises its sub-factor, as shown in table 1.
The environmental index of table 1 power transmission and transforming equipment
2) foundation of fuzzy evaluation collection: due to more multifactor can not quantitative test, therefore the present invention adopts the method establishment environmental factor of qualitative analysis to the fuzzy appraisal set of power transmission and transforming equipment influence degree.Ten point system is adopted to carry out expert analysis mode, if corresponding membership function μ (x) that environmental factor is corresponding to power transmission and transforming equipment influence degree score value x for environmental factor to power transmission and transforming equipment influence degree.
Table 2 power transmission and transforming equipment environmental factor single factor test grade form
3) foundation of fuzzy relation matrix: the present invention takes each Quadratic of the mode of expert analysis mode to acid rain acid mist, filth, thunder and lightning, icing and social environment five first class index to mark, and obtains the fuzzy judgment matrix of five first class index respectively:
As: each factor scores of the ancient line of 110kV wind brings 5 membership functions μ (x) into, obtains acid rain acid mist, filth, thunder and lightning, icing and social environment five fuzzy judgment matrix:
R 1=(r ij) 1×5=(1,0,0,0,0)
R 2=(r ij) 1×5=(1,0,0,0,0)
R 3 = ( r ij ) 3 &times; 5 = 0 0 0.5 0.5 0 0 0 0.5 0.5 0 0 0 0.5 0.5 0
R 4 = ( r i j ) 2 &times; 5 = 1 0 0 0 0 1 0 0 0 0
R 5 = ( r i j ) 3 &times; 5 = 0 0 1 0 0 0.5 0.5 0 0 0 1 0 0 0 0
4) determine the weight of each layer factor of evaluation: according to judge, determine that these five environmental factors of acid rain acid mist, filthy situation, lightening activity situation, icing situation, social environment are on the weight in equipment impact, the ground floor U namely in multi-layer Fuzzy comprehensive evaluation 1, U 2, U 3, U 4, U 5weight A=(a of four factors 1, a 2, a 3, a 4, a 5).Computation process is as follows:
(1) acid rain acid mist, filthy situation, lightening activity situation, icing situation, these five environmental factors of social environment are carried out importance marking and compared, the assignment that significance level evaluates scale adopts 1,3,5,7 proportion quotiety, namely use 1,3,5,7 and reciprocal proportion compared with the importance of two factors, both 1 expressions are of equal importance, 3 represent that the former is more important a little than the latter, 5 represent that the former is more obvious than the latter important, and 7 represent that the former is than the latter and important, thus form judgment matrix.
The important ratio of the filthy situation of table 3, lightening activity situation, icing situation, social environment comparatively
(2) Maximum characteristic root λ is calculated according to above-mentioned judgment matrix maxcorresponding maximal eigenvector required characteristic root is normalized the weight of namely trying to achieve five factors:
A=(a 1,a 2,a 3,a 4,a 5)=(0.1,0.1,0.48,0.05,0.28)
(3) according to appeal method, calculate each two layers of index weights: according to table 4, table 5, table 6, calculate the weight of 5 two layers of indexs respectively, A 1=1; A 2=1; A 3=(0.1,0.26,0.64); A 4=(0.17,0.83); A 5=(0.64,0.26,0.1).
Table 4 is that the sub-factor of lightening activity situation compares
Influence factor Thunderstorm Day Lightning strike density Average thunder and lightning flow valuve
Thunderstorm Day 1 1/5 1/3
Lightning strike density 5 1 5
Average thunder and lightning flow valuve 3 1/5 1
Table 5 is comparisons of the sub-factor of icing situation
Influence factor Icing day Ice covering thickness
Icing day 1 1/5
Ice covering thickness 5 1
Table 6 is comparisons of the sub-factor of social environment
5) fuzzy overall evaluation:
First evaluate sub-factor to the second layer to pass judgment on:
Calculate the evaluation result of acid rain acid mist, filthy situation, lightening activity situation, icing situation, social environment respectively:
B 1=A 1·R 1=[b 11,b 12,b 13,b 14,b 15]
B 2=A 2·R 2=[b 21,b 22,b 23,b 24,b 25]
B 3=A 3·R 3=[b 31,b 32,b 33,b 34,b 35]
B 4=A 4·R 4=[b 41,b 42,b 43,b 44,b 45]
B 5=A 5·R 5=[b 51,b 52,b 53,b 54,b 55]
Second layer evaluation basis is evaluated ground floor:
B = A &CenterDot; R = ( a 1 , a 2 , a 3 , a 4 , a 5 ) B 1 B 2 B 3 B 4 B 5 = &lsqb; b 1 , b 2 , b 3 , b 4 , b 5 &rsqb;
B=(0.3144,0.0364,0.4192,0.025,0)
According to maximum membership grade principle, choose b j=max [b 1, b 2, b 3, b 4, b 5] corresponding to grade V jas the comprehensive evaluation result of environmental factor to this line facility influence degree.In matrix B, maximal value is b 3=0.4192, correspond to V 3, therefore the impact of each environmental factor on circuit is more serious.Survey through actual, the ancient line present position of 110kV wind is comparatively frequent by lightening activity, and load is heavier, and environment is larger on its impact.Anti-solution calculates corresponding prominence score x j.
3, equipment importance is evaluated:
Combined to produce by various kinds of equipment expert and actually determine the following factor affecting equipment importance: main electrical scheme, spacer units, electric pressure, device type, equipment reliability, maintenance of equipment cost, loss of outage.The evaluation method of environment residing for reference device is carried out marking to it and is calculated, and obtains H=51.4.
Table 7 equipment importance factor evaluation
With equipment importance correlative factor Individual scores
Main electrical scheme 3
Spacer units 1
Electric pressure 3
Device type 3
The reliability of equipment 7
Maintenance of equipment cost 4
Loss of outage 6
The each factor of table 8 is to equipment importance impact assessment
4, three-dimensional model evaluation is utilized:
Analytical hierarchy process is utilized to obtain the weight of environment three factors residing for equipment state, equipment importance, equipment: (W r, W h, W q)=(0.64,0.1,0.26), bring weight and R, H, Q tri-values into below formula and obtain final conclusion:
| A P | = ( 100 - r ) 2 W R 2 + ( 100 - h ) 2 W H 2 + ( 100 - q ) 2 W Q 2 = 40.9
What finally illustrate is, above embodiment is only in order to illustrate technical scheme of the present invention and unrestricted, although with reference to preferred embodiment to invention has been detailed description, those of ordinary skill in the art is to be understood that, can modify to technical scheme of the present invention or equivalent replacement, and not departing from aim and the scope of the technical program, it all should be encompassed in the middle of right of the present invention.

Claims (3)

1. power transmission and transforming equipment three-dimensional state is evaluated and a Strategies of Maintenance, and it is characterized in that, concrete mode is as follows:
1) according to existing power transmission and transformation equipment state assessment guidelines, power transmission and transformation equipment state is evaluated;
2) on analytical hierarchy process basis, environment residing for power transmission and transforming equipment is evaluated;
3) according to analytical hierarchy process, power transmission and transforming equipment importance is evaluated;
4) set up three-dimensional model, obtain power transmission and transformation equipment state final appraisal results and Strategies of Maintenance.
2. a kind of power transmission and transforming equipment three-dimensional state as claimed in claim 1 is evaluated and Strategies of Maintenance, it is characterized in that, describedly on analytical hierarchy process basis to the detailed process that environment residing for power transmission and transforming equipment is evaluated is:
1-1) set up set of factors U={U 1..., U m, wherein U 1..., U mby the sub-factors composition of many levels, set of factors U, according to the characteristics determined being evaluated objective system, has different Factor system for different objective system features;
1-2) set up fuzzy evaluation collection V={V 1..., V m, ground floor fuzzy evaluation collection: set up the judge collection V of environmental factor to power transmission and transforming equipment influence degree according to required j=(j=1,2,3,4,5) totally 5 grades, respectively corresponding without impact, generally, more seriously, seriously, very serious 5 kinds of situations;
Environmental factor adopts ten point system to mark to the influence degree of power transmission and transforming equipment, and environmental factor corresponding membership function μ (x) the relation expression corresponding to power transmission and transforming equipment influence degree score value x is:
1-2-1) inessential situation V 1:
Wherein, μ 1when () represents that environmental factor is 0≤x≤4 to the scoring of power transmission and transforming equipment influence degree x, environmental factor does not affect power transmission and transforming equipment;
1-2-2) generalized case V 2:
Wherein, μ 2when () represents that the influence degree scoring of environmental factor to power transmission and transforming equipment is 2 < x≤6 x, environmental factor belongs to General Influence situation to power transmission and transforming equipment;
1-2-3) comparatively serious conditions V 3:
Wherein, μ 3when () represents that environmental factor is 4 < x≤8 to the scoring of the influence degree of power transmission and transforming equipment x, environmental factor belongs to power transmission and transforming equipment and comparatively has a strong impact on situation;
1-2-4) serious conditions V 4:
Wherein, μ 4when () represents that the influence degree scoring of environmental factor to power transmission and transforming equipment is 6 < x≤8 x, environmental factor belongs to power transmission and transforming equipment the situation of having a strong impact on;
1-2-5) very serious conditions V 5:
Wherein, μ 5when () represents that environmental factor is 8 < x≤10 to the scoring of the influence degree of power transmission and transforming equipment x, environmental factor belongs to power transmission and transforming equipment and has a strong impact on situation very much;
1-3) determine fuzzy matrix R: determine the relational matrix R=(r of factor U to fuzzy evaluation collection V ij) m × n, wherein r ijrepresent that one of them factor of evaluation bottom i-th sub-factor is to evaluation V jmembership;
1-4) determine the weight A={A of each Hierarchy Evaluation factor 1..., A m, wherein A 1..., A mbe made up of the sub-factor weight of many levels;
1-5) successively carry out fuzzy overall evaluation, draw final appraisal results by maximum membership grade principle: according to fuzzy data principle, from the bottom, this layer of each factor weight and fuzzy evaluating matrix are carried out fuzzy exchange be the fuzzy evaluating matrix of most last layer again with B, same blurring mapping is carried out to last layer, obtain fuzzy overall evaluation end product, again according to maximum membership grade principle, this result is processed further, obtain final appraisal results, and the evaluation result of power transmission and transforming equipment importance quantized, quantization method is as follows:
By the maximal value b selected by fuzzy overall evaluation jsubstitute into V jcorresponding degree of membership formula μ jx, in (), anti-solution calculates prominence score x corresponding to maximal value j, make R=10x j, in order to measure power transmission and transforming equipment importance.
3. a kind of power transmission and transforming equipment three-dimensional state as claimed in claim 1 is evaluated and Strategies of Maintenance, it is characterized in that, describedly sets up three-dimensional model, and the concrete mode obtaining power transmission and transformation equipment state final appraisal results and Strategies of Maintenance is:
First according to the analysis to power transmission and transformation equipment state, equipment importance, environmental factor three factors, corresponding evaluation result is provided; Wherein, power transmission and transformation equipment state evaluation result R ∈ [0,100], score value higher expression power transmission and transformation equipment state is poorer; Power transmission and transforming equipment Assessment of Important result H ∈ [0,100], score value higher expression power transmission and transforming equipment is more important; Environmental factor is to power transmission and transforming equipment impact assessment result Q ∈ [0,100], and the influence degree of score value higher expression environmental factor to power transmission and transforming equipment is larger;
On the basis of the above, mark in the importance of formulation equipment state and Strategies of Maintenance in conjunction with power transmission and transformation equipment state, importance, environmental factor three aspects, use analytical hierarchy process to calculate the weights W of power transmission and transformation equipment state, importance, environmental factor three aspects r, W h, W q, due to different in the importance of different time phase three aspect factors, then corresponding weight also will recalculate, and to this, set up as drag:
Set up three orthogonal coordinate axis, be respectively R axle, H axle, Q axle, wherein R axle represents power transmission and transforming equipment importance, and it is more important to be worth larger explanation; H axle represents power transmission and transformation equipment state, and it is poorer to be worth larger explanation power transmission and transformation equipment state; Q axle represents environmental factor, and it is larger to be worth the impact of larger explanation environmental factor on power transmission and transforming equipment; The span of R axle, H axle, Q axle forms a rectangular parallelepiped in coordinate axis, rectangular parallelepiped top P point, what represent is that power transmission and transforming equipment is most important, power transmission and transformation state is the poorest, the equipment state that environment has the greatest impact to power transmission and transforming equipment, the pressing degree that this kind of power transmission and transformation equipment state needs repairing is higher, and when formulation state evaluation and Strategies of Maintenance, priority is the highest;
For power transmission and transforming equipment free position A (rW r, hW h, qW q), if its distance P point is nearer, represent that maintenance pressing degree is higher, otherwise, then represent that maintenance pressing degree is lower, wherein initial point o is the point that power transmission and transforming equipment maintenance pressing degree is minimum, the pressing degree that power transmission and transforming equipment needs repairing is represented, for formulation equipment state evaluation and Strategies of Maintenance provide partitioning standards with the space length between A, P:
| A P | = ( 100 - r ) 2 W R 2 + ( 100 - h ) 2 W H 2 + ( 100 - q ) 2 W Q 2
| the value of AP| is less, then represent that the pressing degree that power transmission and transforming equipment needs repairing is higher, otherwise the pressing degree needed repairing is lower.
CN201510466258.5A 2015-07-31 2015-07-31 Three-dimensional state evaluation and maintenance strategy of electric transmission and transformation equipment Pending CN105184664A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510466258.5A CN105184664A (en) 2015-07-31 2015-07-31 Three-dimensional state evaluation and maintenance strategy of electric transmission and transformation equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510466258.5A CN105184664A (en) 2015-07-31 2015-07-31 Three-dimensional state evaluation and maintenance strategy of electric transmission and transformation equipment

Publications (1)

Publication Number Publication Date
CN105184664A true CN105184664A (en) 2015-12-23

Family

ID=54906720

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510466258.5A Pending CN105184664A (en) 2015-07-31 2015-07-31 Three-dimensional state evaluation and maintenance strategy of electric transmission and transformation equipment

Country Status (1)

Country Link
CN (1) CN105184664A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106570644A (en) * 2016-11-04 2017-04-19 国网山东省电力公司电力科学研究院 Power transmission and transformation equipment quantization evaluation method based on statistical tool
CN110675070A (en) * 2019-09-26 2020-01-10 上海博辕信息技术服务有限公司 Intelligent microgrid device criticality analysis method

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104616091A (en) * 2014-11-19 2015-05-13 南昌大学 Analytic hierarchy process based comprehensive analysis method for urban distribution network

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104616091A (en) * 2014-11-19 2015-05-13 南昌大学 Analytic hierarchy process based comprehensive analysis method for urban distribution network

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
马翠等: "输变电设备受环境影响的综合评价模型", 《计算机与数字工程》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106570644A (en) * 2016-11-04 2017-04-19 国网山东省电力公司电力科学研究院 Power transmission and transformation equipment quantization evaluation method based on statistical tool
CN106570644B (en) * 2016-11-04 2020-05-05 国网山东省电力公司电力科学研究院 Statistical tool-based quantitative evaluation method for power transmission and transformation equipment
CN110675070A (en) * 2019-09-26 2020-01-10 上海博辕信息技术服务有限公司 Intelligent microgrid device criticality analysis method
CN110675070B (en) * 2019-09-26 2022-06-24 上海博辕信息技术服务有限公司 Intelligent microgrid device criticality analysis method

Similar Documents

Publication Publication Date Title
CN102184465A (en) Substation energy efficiency evaluating method
CN102479339B (en) Method and system for forecasting short-term wind speed of wind farm based on hybrid neural network
CN104063750B (en) The Forecasting Methodology of the disaster-stricken influence of power system based on the anti-entropy weight of advanced AHP
CN103761690A (en) Evaluation method based on voltage reactive power control system in grid system
CN107909253A (en) Intelligent distribution network scheduling controlling effect evaluation method based on interval based AHP
CN104318482A (en) Comprehensive assessment system and method of smart distribution network
CN110378549B (en) Transmission tower bird damage grade assessment method based on FAHP-entropy weight method
CN103207948B (en) Based on the wind energy turbine set anemometer wind speed missing data interpolating method of wind speed correlativity
CN105956779A (en) Power transformer running state evaluation method and power transformer running state evaluation device
CN104574217A (en) Intelligent power distribution network online risk assessment method
CN106228286A (en) A kind of data analysing method for the assessment of artificial customer service work quality
CN103678865B (en) A kind of sleet causes the probability of malfunction online evaluation method of transmission line malfunction
CN103971175B (en) Short-term load prediction method of multistage substations
CN103996147A (en) Comprehensive evaluation method for power distribution network
CN106446571A (en) Error evaluation method of wind power forecasting
Qiu et al. Spatial-temporal heterogeneity of green development efficiency and its influencing factors in growing metropolitan area: a case study for the Xuzhou metropolitan area
CN105160437A (en) Load model prediction method based on extreme learning machine
CN107274047A (en) A kind of power network method of post project evaluation based on multilevel extension assessment method
CN105447770A (en) Assessment method for applying power grid monitoring data to refined weather forecast
CN105303250A (en) Wind power combination prediction method based on optimal weight coefficient
CN108876114A (en) Consider the power grid efficiency benefit appraisal procedure of new energy access
CN104462718A (en) Method for evaluating economic operation year range of transformer substation
CN110110933A (en) A kind of maintenance circle optimization method of intelligent substation protection system
CN104574211B (en) Forming Electrical Dispatching Command Tickets method for prewarning risk and system based on risk source
CN107203827A (en) A kind of wind turbine forecasting wind speed optimization method based on multiscale analysis

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20151223