CN105183644B - A kind of multitask integrated automation test system and method - Google Patents

A kind of multitask integrated automation test system and method Download PDF

Info

Publication number
CN105183644B
CN105183644B CN201510515954.0A CN201510515954A CN105183644B CN 105183644 B CN105183644 B CN 105183644B CN 201510515954 A CN201510515954 A CN 201510515954A CN 105183644 B CN105183644 B CN 105183644B
Authority
CN
China
Prior art keywords
test
server
task
client
version
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510515954.0A
Other languages
Chinese (zh)
Other versions
CN105183644A (en
Inventor
卞云鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Guoxin artificial intelligence Co.,Ltd.
Original Assignee
Shanghai Feixun Data Communication Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Feixun Data Communication Technology Co Ltd filed Critical Shanghai Feixun Data Communication Technology Co Ltd
Priority to CN201510515954.0A priority Critical patent/CN105183644B/en
Publication of CN105183644A publication Critical patent/CN105183644A/en
Application granted granted Critical
Publication of CN105183644B publication Critical patent/CN105183644B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Debugging And Monitoring (AREA)
  • Computer And Data Communications (AREA)

Abstract

The invention discloses a kind of multitask integrated automation test system and method, multitask integrated automation test system, including:One role management unit, to set up a plurality of tasks, the corresponding code of each task is compiled to generate corresponding software version, a plurality of tasks are performed, and export;One version server, connects role management unit, to store software version;One test lead, connects version server, to download corresponding software version;One test server, connects role management unit and test lead respectively, to be tested accordingly according to the corresponding software version of a plurality of task control test leads download received.Multitask integrated automation test system can create multiple tasks by role management unit and task is managed, and can carry out concurrent test to multiple tasks by test server, improve testing efficiency.

Description

A kind of multitask integrated automation test system and method
Technical field
The present invention relates to automatization testing technique, more particularly to a kind of multitask integrated automation test system and method.
Background technology
The existing automatic test based on Robot Framework frameworks is mostly local test, is generally using Jenkins The task of man-to-man task, i.e., one fixes one test client of correspondence, can so cause a test client to have a lot Free time, cause the wasting of resources;If two task same test clients of correspondence, second task will be waited until It could be carried out after the completion of first task, and it is idle condition that at this moment may have another test client, so as to cause resource Distribution is uneven, and influences testing efficiency.
The content of the invention
For existing automatic test exist above mentioned problem, now provide one kind aim at can Multi-task Concurrency survey Examination, and idle test client is randomly choosed, the multitask integrated automation test system being rationally allocated to resource and side Method.
Concrete technical scheme is as follows:
A kind of multitask integrated automation test system, including:
One role management unit, to set up a plurality of tasks, by the corresponding code of each task be compiled with Corresponding software version is generated, a plurality of tasks are performed, and export;
One version server, connects the role management unit, to store the software version;
One test lead, connects the version server, to download corresponding software version;
One test server, connects the role management unit and the test lead respectively, to according to the institute received Test lead described in a plurality of task controls is stated to download corresponding software version to be tested accordingly.
It is preferred that, the test lead includes:
A plurality of test clients, are connected with the test server and the version server respectively, the test clothes Device be engaged in the test client for each free time of task choosing one, by the test client and the task pair The equipment to be tested connection answered, and the task is sent to the test client;
Each test client is used to be downloaded in the version server accordingly according to the task received Software version, and the software version sent to the equipment to be tested being connected with the test client risen Level, to be tested accordingly.
It is preferred that, the test lead also includes:
One interchanger, connects the test client and the equipment to be tested, to according to the testing service respectively The control of device connects the test client with the corresponding equipment to be tested.
It is preferred that, each test client generates corresponding test report according to test result, and by the test Report is uploaded to the test server, and the test report is stored and exported by the test server.
A kind of multitask integrated automation method of testing, applied to above-mentioned multitask integrated automation test system, is carried For version server described in one, to store software version, comprise the steps:
S1. the role management unit sets up a plurality of tasks, by the corresponding code of each task be compiled with Corresponding software version is generated, a plurality of tasks are performed, and export;
S2. the role management unit sends the software version to the version server;
S3. test server according to a plurality of task controls received test lead from the version server Corresponding software version is downloaded to be tested accordingly.
It is preferred that, the step S3 includes:
S31. the test server is described in each task choosing one corresponding free time in the test lead Test client, test client equipment to be tested corresponding with the task is connected, and by the task send to The test client;
S32. each test client is downloaded accordingly according to the task received in the version server Software version, and the software version sent to the equipment to be tested being connected with the test client risen Level, to be tested accordingly.
It is preferred that, having performed the step S32 also includes:
S33. each test client generates corresponding test report according to test result, and by the test report The test server is uploaded to, the test report is stored and exported by the test server.
It is preferred that, the test server provides title, current operating conditions and the fortune of an association test client The information list of row time started, the step S31 includes:
S311. the test server detects whether to receive the task, if so, performing step S312;If it is not, returning Perform the step S311;
S312. the process that the corresponding subprocess of the task is added in the test server is started in queue;
S313. when performing the sub- progress, judge whether described information list is in the lock state, held if so, returning The row S313;If it is not, performing step S314;
S314. described information list is locked;
S315. a current operating conditions are selected to be in the idle test client from described information list, and By the current operating conditions of the test client labeled as being carrying out task in described information list;
S316. described information list is discharged;
S317. the subprocess passes through the corresponding equipment to be tested of the task with the test client described Interchanger is connected;
S318. the task is sent to the test client.
It is preferred that, the step S33 includes:
S331. after test terminates, test client generates corresponding test report according to test result, and by the test Report is uploaded to the test server;
S332. the corresponding subprocess of the task is added in the test server by the test server Process terminates in queue;
S333. when performing the subprocess, judge whether described information list is in the lock state, held if so, returning The row S333;If it is not, performing step S334;
S334. described information list is locked;
S335. by the current operating conditions of the test client in described information list from being carrying out task flagging For the free time;
S336. described information list is discharged.
It is preferred that, the step S33 also includes:
S3337. the test report is stored and exported by the test server.
The beneficial effect of above-mentioned technical proposal:
In the technical program, multitask integrated automation test system can create multiple tasks simultaneously by role management unit Task is managed, concurrent test can be carried out to multiple tasks by test server, testing efficiency is improved.Multitask collection Multi-task Concurrency test can be carried out by being realized into automated testing method, realize the purpose being rationally allocated to resource.
Brief description of the drawings
Fig. 1 is a kind of module map of embodiment of multitask integrated automation test system of the present invention;
Fig. 2 is the schematic diagram of multitask integrated automation test system of the present invention;
Fig. 3 is the method flow diagram of the first embodiment of multitask integrated automation method of testing of the present invention;
Fig. 4 for multitask integrated automation method of testing of the present invention second in embodiment method flow diagram;
Fig. 5 for multitask integrated automation method of testing of the present invention the 3rd in embodiment method flow diagram;
Fig. 6 for multitask integrated automation method of testing of the present invention the 4th in embodiment method flow diagram.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art obtained on the premise of creative work is not made it is all its His embodiment, belongs to the scope of protection of the invention.
It should be noted that in the case where not conflicting, the embodiment in the present invention and the feature in embodiment can phases Mutually combination.
The invention will be further described with specific embodiment below in conjunction with the accompanying drawings, but not as limiting to the invention.
As shown in figure 1, a kind of multitask integrated automation test system, including:
One role management unit 1, to set up a plurality of tasks, the corresponding code of each task is compiled to generate Corresponding software version, performs a plurality of tasks, and export;
One version server 3, connects role management unit 1, to store software version;
One test lead 4, connects version server 3, to download corresponding software version;
One test server 2, connects role management unit 1 and test lead 4 respectively, to according to a plurality of received Business control test lead 4 downloads corresponding software version to be tested accordingly.
In the present embodiment, the code uploaded daily can be compiled by role management unit 1, after compiling passes through, Nearest software version can be sent to version server 3, process storage.Jenkins softwares are embedded with role management unit 1, By Jenkins softwares can timing multiple tasks are issued to test server 2, test server 2 is more according to what is received Individual task control test lead 4 downloads corresponding software version from version server 3, has configured test environment, starts test.It is logical Concurrent test can be carried out to multiple tasks by crossing test server 2, improve testing efficiency.
Further, can be using the unified configuration for carrying out hardware and environmental variance of python scripts.
In a preferred embodiment, test lead 4 includes:
A plurality of test clients, are connected with test server 2 and version server 3 respectively, test server 2 to for The idle test client of each task choosing one, is home network connection by test client equipment to be tested corresponding with task Connect, and task is sent to test client;
Each test client is used to download corresponding software version in version server 3 according to received task, And software version is sent to the equipment to be tested being connected with test client upgraded, to be tested accordingly.
As shown in Fig. 2 in the present embodiment, each unique equipment to be tested of task correspondence, the correspondence of task 1 is to be tested to be set Standby 1, the correspondence of task 2 equipment 2 ... ... to be tested, task m correspondences equipment m to be tested.Test lead 4 may include n test client End, test client is not corresponding with task, can be attached according to the need for when testing.For example:Task 1 starts to hold OK, the facility information to be tested equipment 1 for example to be tested of test can will be needed, is sent to test server 2;Test server 2 is received To after test assignment, the test client of free time can be randomly choosed from test client, such as test client 2 will be tested Task is sent to test client 2;Test client 2 and tested equipment 1 to be tested are connected to one by test server 2 simultaneously Rise.Test client 2 is connected to after task 1, is connected to equipment 1 to be tested, and test client 2 downloads phase from version server 3 Corresponding newest software version is upgraded into equipment 1 to be tested, has then configured test environment, starts test.
In a preferred embodiment, test lead 4 also includes:
One interchanger, connecting test client and equipment to be tested, will be surveyed to the control according to test server 2 respectively Client is tried to connect with corresponding equipment to be tested.
In the present embodiment, the company of corresponding test client and equipment to be tested is realized by automatically configuring interchanger Connect.
In a preferred embodiment, each test client generates corresponding test report according to test result, and will survey Examination report is uploaded to test server 2, and test report is stored and exported by test server 2.
In the present embodiment, after test terminates, test client generates corresponding test report according to test result, and will Local test report uploads to test server 2 and carries out unified storage management, and test report will be carried by test server 2 Mail send to related personnel.
As shown in figure 3, a kind of multitask integrated automation method of testing, is surveyed applied to above-mentioned multitask integrated automation Test system, to store software version, comprises the steps there is provided a version server:
S1. role management unit sets up a plurality of tasks, the corresponding code of each task is compiled corresponding to generate Software version, perform a plurality of tasks, and export;
S2. role management unit sends software version to version server;
S3. test server is downloaded corresponding soft according to a plurality of task control test leads received from version server Part version to be tested accordingly.
In the present embodiment, the code uploaded daily is compiled by role management unit, can be by after compiling passes through Nearest software version is sent to version server, process storage.Jenkins softwares are embedded with role management unit, are passed through Jenkins softwares can timing multiple tasks are issued to test server, test server is according to the multiple tasks received Control test lead downloads corresponding software version from version server, has configured test environment, starts test.By testing clothes Business device can carry out concurrent test to multiple tasks, improve testing efficiency.
As shown in figure 4, in a preferred embodiment, step S3 includes:
S31. test server is the corresponding idle test client of each task choosing one in test lead, will be tested Client equipment connection to be tested corresponding with task, and task is sent to test client;
S32. each test client downloads corresponding software version according to received task in version server, and Software version is sent to the equipment to be tested being connected with test client and upgraded, to be tested accordingly.
As shown in Fig. 2 in the present embodiment, each unique equipment to be tested of task correspondence, the correspondence of task 1 is to be tested to be set Standby 1, the correspondence of task 2 equipment 2 ... ... to be tested, task m correspondences equipment m to be tested.Test lead 4 may include n test client End, test client is not corresponding with task, can be attached according to the need for when testing.For example:Task 1 starts to hold OK, the facility information to be tested equipment 1 for example to be tested of test can will be needed, is sent to test server 2;Test server 2 is received To after test assignment, the test client of free time can be randomly choosed from test client, such as test client 2 will be tested Task is sent to test client 2;Test client 2 and tested equipment 1 to be tested are connected to one by test server 2 simultaneously Rise.Test client 2 is connected to after task 1, is connected to equipment 1 to be tested, and test client 2 downloads phase from version server 3 Corresponding newest software version is upgraded into equipment 1 to be tested, has then configured test environment, starts test.
In a preferred embodiment, execution of step S32 also includes:
S33. each test client generates corresponding test report according to test result, and test report is uploaded into survey Server is tried, test report is stored and exported by test server.
In the present embodiment, after test terminates, test client generates corresponding test report according to test result, and will Local test report uploads to test server and carries out unified storage management, and test report will be carried by test server Mail is sent to related personnel.
As shown in figure 5, in a preferred embodiment, test server provides a title for associating test client, current Running status and the information list of operation time started, step S31 include:
S311. test server detects whether to receive task, if so, performing step S312;Step is performed if it is not, returning S311;
S312. the process that the corresponding subprocess of task is added in test server is started in queue;
S313. when performing son progress, judge whether information list is in the lock state, S313 is performed if so, returning;If It is no, perform step S314;
S314. locking information list;
S315. a current operating conditions are selected to be in idle test client from information list, and in information table By the current operating conditions of test client labeled as being carrying out task in list;
S316. information list is discharged;
S317. the corresponding equipment to be tested of task is connected by subprocess with test client by interchanger;
S318. task is sent to test client.
In the present embodiment, management to test client is realized using information table unirecord mechanism.Pass through locking The conflict of test client is avoided with the mode of unlocking information list.
When multiple tasks are issued to test server simultaneously, test server is opened a son for each task and entered Journey.Each subprocess is responsible for the test of a equipment to be tested.
Test server detects whether to receive new task, when there is new task, and test server is by new task pair The subprocess answered is added to process and starts queue, waits the pending subprocess, when taking turns the subprocess, first checks that information list is No locking, if being locked out, is waited;If unlocked, first locking information list prevents other subprocess from operating, from information A test client is randomly choosed in idle test client in list, then by this test client labeled as Execution task, discharges information list;Subprocess connects corresponding equipment to be tested and test client by interchanger simultaneously, After parameter has been configured, start test.
As shown in fig. 6, in a preferred embodiment, step S33 includes:
S331. after test terminates, test client generates corresponding test report according to test result, and by test report It is uploaded to test server;
S332. test server terminates the process that the corresponding subprocess of task is added in test server in queue;
S333. when performing subprocess, judge whether information list is in the lock state, S333 is performed if so, returning;If It is no, perform step S334;
S334. locking information list;
S335. it is the free time from task flagging is carrying out by the current operating conditions of the test client in information list;
S336. information list is discharged.
In the present embodiment, the conflict locking with test client being avoided by way of unlocking information list.
After test terminates, test client generates corresponding test report according to test result, and sends to testing service Device, test server terminates the process that the corresponding subprocess of task is added in test server in queue, waits pending, when When can perform corresponding subprocess, first check whether information list locks, if being locked out, wait;If unlocked, first lock Information list, prevents other processes from operating, and corresponding test client in information list is revised as from the task of being carrying out Free time, then discharge information list.
In a preferred embodiment, step S33 also includes:
S3337. test report is stored and exported by test server.
In the present embodiment, after test terminates, test client generates corresponding test report according to test result, and will Local test report uploads to test server and carries out unified storage management, is easy to the later stage to integrate result, is taken by testing Business device sends the mail for carrying test report to related personnel.
The present invention is realized task by the multi-process of test server and performs the relation of multi-to-multi.In test client Start before execution automatic test, the configuration of corresponding hardware and environmental variance etc. can be carried out.By randomly choosing task institute The test client needed, improves the level of resources utilization.The pipe to test client is realized using information table unirecord mechanism Reason.Pass through the conflict for locking with test client being avoided by way of unlocking information list.It present invention can be suitably applied to automation collection Into test, it is easy to the problem of research staff is had found in code in time, automatic test can be carried out using the time at night, so that Improve the utilization ratio of resource.
Preferred embodiments of the present invention are the foregoing is only, embodiments of the present invention and protection model is not thereby limited Enclose, to those skilled in the art, should can appreciate that made by all utilization description of the invention and diagramatic content Scheme obtained by equivalent substitution and obvious change, should be included in protection scope of the present invention.

Claims (8)

1. a kind of multitask integrated automation test system, it is characterised in that including:
One role management unit, to set up a plurality of tasks, the corresponding code of each task is compiled to generate Corresponding software version, performs a plurality of tasks, and export;
One version server, connects the role management unit, to store the software version;
One test lead, connects the version server, to download corresponding software version;
One test server, connects the role management unit and the test lead respectively, to described multiple according to what is received Test lead described in several task controls downloads corresponding software version to be tested accordingly;
The test lead includes:
A plurality of test clients, are connected, the test server with the test server and the version server respectively It is to the test client for each free time of task choosing one, the test client is corresponding with the task Equipment connection to be tested, and the task is sent to the test client;
Each test client is corresponding soft to be downloaded according to the task received in the version server Part version, and the software version is sent to the equipment to be tested being connected with the test client upgraded, with Tested accordingly.
2. multitask integrated automation test system as claimed in claim 1, it is characterised in that the test lead also includes:
One interchanger, connects the test client and the equipment to be tested, to according to the test server respectively Control connects the test client with the corresponding equipment to be tested.
3. multitask integrated automation test system as claimed in claim 1, it is characterised in that each test client Corresponding test report is generated according to test result, and the test report is uploaded to the test server, the test The test report is stored and exported by server.
4. a kind of multitask integrated automation method of testing, applied to the multitask integrated automation as described in claim 1-3 Test system, it is characterised in that version server described in providing one, to store software version, comprises the steps:
S1. the role management unit sets up a plurality of tasks, and the corresponding code of each task is compiled to generate Corresponding software version, performs a plurality of tasks, and export;
S2. the role management unit sends the software version to the version server;
S3. test server test lead according to a plurality of task controls received is downloaded from the version server Corresponding software version to be tested accordingly;
The step S3 includes:
S31. the test server is the corresponding idle test of each task choosing one in the test lead Client, test client equipment to be tested corresponding with the task is connected, and the task is sent to described Test client;
S32. each test client is downloaded in the version server soft accordingly according to the task received Part version, and the software version is sent to the equipment to be tested being connected with the test client upgraded, with Tested accordingly.
5. multitask integrated automation method of testing as claimed in claim 4, it is characterised in that performed the step S32 Also include:
S33. each test client generates corresponding test report according to test result, and the test report is uploaded To the test server, the test report is stored and exported by the test server.
6. multitask integrated automation method of testing as claimed in claim 5, it is characterised in that the test server is provided Title, current operating conditions and the information list for running the time started of the one association test client, the step S31 bags Include:
S311. the test server detects whether to receive the task, if so, performing step S312;Performed if it is not, returning The step S311;
S312. the process that the corresponding subprocess of the task is added in the test server is started in queue;
S313. when performing the subprocess, judge whether described information list is in the lock state, institute is performed if so, returning State S313;If it is not, performing step S314;
S314. described information list is locked;
S315. a current operating conditions are selected to be in the idle test client from described information list, and in institute State the current operating conditions of the test client in information list labeled as being carrying out task;
S316. described information list is discharged;
S317. the subprocess connects the corresponding equipment to be tested of the task with the test client by interchanger Connect;
S318. the task is sent to the test client.
7. multitask integrated automation method of testing as claimed in claim 6, it is characterised in that the step S33 includes:
S331. after test terminates, test client generates corresponding test report according to test result, and by the test report It is uploaded to the test server;
S332. the corresponding subprocess of the task is added to the process in the test server by the test server Terminate in queue;
S333. when performing the subprocess, judge whether described information list is in the lock state, institute is performed if so, returning State S333;If it is not, performing step S334;
S334. described information list is locked;
S335. it is sky from task flagging is carrying out by the current operating conditions of the test client in described information list It is not busy;
S336. described information list is discharged.
8. multitask integrated automation method of testing as claimed in claim 5, it is characterised in that the step S33 also includes:
S3337. the test report is stored and exported by the test server.
CN201510515954.0A 2015-08-20 2015-08-20 A kind of multitask integrated automation test system and method Active CN105183644B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510515954.0A CN105183644B (en) 2015-08-20 2015-08-20 A kind of multitask integrated automation test system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510515954.0A CN105183644B (en) 2015-08-20 2015-08-20 A kind of multitask integrated automation test system and method

Publications (2)

Publication Number Publication Date
CN105183644A CN105183644A (en) 2015-12-23
CN105183644B true CN105183644B (en) 2017-10-24

Family

ID=54905736

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510515954.0A Active CN105183644B (en) 2015-08-20 2015-08-20 A kind of multitask integrated automation test system and method

Country Status (1)

Country Link
CN (1) CN105183644B (en)

Families Citing this family (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105718369A (en) * 2016-01-19 2016-06-29 国家电网公司 Computer software test abnormity processing system and test method
CN105843732B (en) * 2016-03-17 2019-08-02 畅捷通信息技术股份有限公司 Test case distribution method and test case distributor
CN106201882A (en) * 2016-07-13 2016-12-07 浪潮(北京)电子信息产业有限公司 Automated operating system method of testing based on Jenkins and system
CN107783894A (en) * 2016-08-26 2018-03-09 上海计算机软件技术开发中心 A kind of multitask multiple terminals Mobile solution method of testing and its system
CN106502888B (en) * 2016-10-13 2019-03-15 杭州迪普科技股份有限公司 The test method and device of software
CN106991046B (en) * 2017-03-24 2020-10-09 广州酷狗计算机科技有限公司 Application testing method and device
CN108268273A (en) * 2017-04-06 2018-07-10 平安科技(深圳)有限公司 The householder method and terminal of code handoffs
CN107092559A (en) * 2017-04-18 2017-08-25 携程旅游信息技术(上海)有限公司 Test platform middleware, test system and method based on Jmeter
CN107168879B (en) * 2017-05-23 2020-03-10 网易(杭州)网络有限公司 Method and device for generating test report of centralized configuration management system
CN107124333B (en) * 2017-06-13 2019-08-13 烽火通信科技股份有限公司 A kind of network-building method of automatic test environment
CN107463375A (en) * 2017-07-18 2017-12-12 上海斐讯数据通信技术有限公司 A kind of method and system for detecting source code
CN107396392B (en) * 2017-07-26 2020-09-08 深圳市共进电子股份有限公司 Radio frequency index testing method, device, equipment and storage medium of wireless access point
CN107423181A (en) * 2017-07-28 2017-12-01 郑州云海信息技术有限公司 The automated testing method and device of a kind of uniform storage device
CN107807869A (en) * 2017-10-16 2018-03-16 微梦创科网络科技(中国)有限公司 A kind of test system and method for testing
CN108737213B (en) * 2018-05-22 2020-06-09 中国电子科技集团公司第四十一研究所 High-parallelism and high-throughput penetration test system and method based on FPGA
CN109194535A (en) * 2018-07-24 2019-01-11 联宝(合肥)电子科技有限公司 A kind of terminal test system and method
CN109240271A (en) * 2018-10-18 2019-01-18 东南(福建)汽车工业有限公司 A kind of the cloud platform test macro and method of full-vehicle control equipment
CN110213127B (en) * 2019-05-28 2021-07-02 苏州浪潮智能科技有限公司 Automated testing system and method fusing virtualization multitasks
CN110176964B (en) * 2019-06-12 2022-01-21 浙江沁园水处理科技有限公司 Production test system and method of wireless equipment
CN112115013A (en) * 2019-06-21 2020-12-22 昆山纬绩资通有限公司 Test data summarizing system and method thereof
CN111211940A (en) * 2019-12-31 2020-05-29 杭州迪普科技股份有限公司 Internet of things front-end equipment test system
CN113419955B (en) * 2021-06-25 2023-06-02 展讯通信(上海)有限公司 Software version automatic test system, method, medium and equipment

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7885929B2 (en) * 2006-01-03 2011-02-08 Motio, Inc. Continuous integration of business intelligence software
CN101447892B (en) * 2008-11-24 2011-12-28 中兴通讯股份有限公司 Distributed test method, system and test server
CN102799515B (en) * 2011-05-24 2016-01-20 腾讯科技(深圳)有限公司 Applied program testing method and device
WO2013078269A1 (en) * 2011-11-22 2013-05-30 Solano Labs, Inc. System of distributed software quality improvement
CN102981951B (en) * 2012-11-01 2016-03-09 珠海金山网络游戏科技有限公司 Cloud test development platform and cloud test development method

Also Published As

Publication number Publication date
CN105183644A (en) 2015-12-23

Similar Documents

Publication Publication Date Title
CN105183644B (en) A kind of multitask integrated automation test system and method
CN100530015C (en) Satellite automated test frame system
CN104050029B (en) A kind of task scheduling system
CN101329652B (en) Regression test automatic system and method
CN101853182A (en) Task execution method and device based on database
CN101738997B (en) Multithread electric negative control system and control method
CN102540133B (en) Automatic detecting system and method for intelligent grid data collecting terminal
CN107463362A (en) The method and system of lasting deployment based on multiple Jenkins
WO2011060642A1 (en) Automatic test system for distributed comprehensive service and method thereof
CN103440376A (en) Distributed operation mode and centralized operation mode integrated simulation system operation supporting platform based on components
CN107992367B (en) Modbus serial port data processing method
CN109298868A (en) Intelligent dynamic deployment and unloading method for mapping image data processing software
CN109408106A (en) Agile software development continuous integration method and system
CN104516809A (en) Automated testing system and method
CN116339749A (en) Containerized DevOps method, system and equipment capable of performing task scheduling
CN107391155A (en) A kind of packaging method and device
CN113254054A (en) Intelligent contract one-stop development system and method
CN106951357A (en) A kind of server end application issue monitoring method and device based on finger daemon
CN102043669B (en) Workflow concurrency mode control method and device
CN103631594A (en) Asynchronous scheduling method and asynchronous scheduling system for general flow
CN104142833A (en) Equipment dynamic management method for package test production line
CN113849399A (en) Automatic testing system and method for multi-machine cooperative software under multi-localization platform
CN112486657A (en) Task scheduling method and system
CN101217757A (en) A method for the operation of device maintenance
CN108268379B (en) Distributed automatic testing method and device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201124

Address after: Room 10242, No. 260, Jiangshu Road, Xixing street, Binjiang District, Hangzhou City, Zhejiang Province

Patentee after: Hangzhou Jiji Intellectual Property Operation Co., Ltd

Address before: 201616 Shanghai city Songjiang District Sixian Road No. 3666

Patentee before: Phicomm (Shanghai) Co.,Ltd.

TR01 Transfer of patent right

Effective date of registration: 20201217

Address after: 8319 Yanshan Road, Bengbu City, Anhui Province

Patentee after: Bengbu Lichao Information Technology Co.,Ltd.

Address before: Room 10242, No. 260, Jiangshu Road, Xixing street, Binjiang District, Hangzhou City, Zhejiang Province

Patentee before: Hangzhou Jiji Intellectual Property Operation Co., Ltd

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210310

Address after: 313000 room 1019, Xintiandi commercial office, Yishan street, Wuxing District, Huzhou, Zhejiang, China

Patentee after: Huzhou YingLie Intellectual Property Operation Co.,Ltd.

Address before: 8319 Yanshan Road, Bengbu City, Anhui Province

Patentee before: Bengbu Lichao Information Technology Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210713

Address after: 518000 Room 201, building A, No. 1, Qian Wan Road, Qianhai Shenzhen Hong Kong cooperation zone, Shenzhen, Guangdong (Shenzhen Qianhai business secretary Co., Ltd.)

Patentee after: Shenzhen Guoxin artificial intelligence Co.,Ltd.

Address before: 313000 room 1019, Xintiandi commercial office, Yishan street, Wuxing District, Huzhou, Zhejiang, China

Patentee before: Huzhou YingLie Intellectual Property Operation Co.,Ltd.

TR01 Transfer of patent right