CN106951357A - A kind of server end application issue monitoring method and device based on finger daemon - Google Patents
A kind of server end application issue monitoring method and device based on finger daemon Download PDFInfo
- Publication number
- CN106951357A CN106951357A CN201710325012.5A CN201710325012A CN106951357A CN 106951357 A CN106951357 A CN 106951357A CN 201710325012 A CN201710325012 A CN 201710325012A CN 106951357 A CN106951357 A CN 106951357A
- Authority
- CN
- China
- Prior art keywords
- project
- finger daemon
- issue
- monitoring
- maven
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/30—Monitoring
- G06F11/3089—Monitoring arrangements determined by the means or processing involved in sensing the monitored data, e.g. interfaces, connectors, sensors, probes, agents
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/44—Arrangements for executing specific programs
- G06F9/445—Program loading or initiating
- G06F9/44505—Configuring for program initiating, e.g. using registry, configuration files
Abstract
Server end application issue and monitoring method based on finger daemon, 1) after the pre-release project of server end is compiled, it is uploaded in compressed package form in long-range maven storehouses;The rule defined simultaneously according to finger daemon works out the activation bit of the project;2) when the project is currently needed for issuing on the server, the activation bit of the project is submitted into finger daemon, the lasting monitoring after flow and issue is issued by finger daemon item controlled;Wherein, activation bit is provided with jar packet forms;3) finger daemon migrates the project of currently assigned issue according to activation bit and deployment configuration file from maven warehouses, and project is built according to maven configuration standards;4) finger daemon extracts item reduction bag, issue of the project implementation in server according to the configuration parameter of pre- issue project;5) finger daemon is according to enabled instruction, to announced project implementation start-up operation, and is persistently monitored for the running situation of project example in each terminal.
Description
Technical field
The present invention relates to server system O&M field, and in particular to a kind of server end application hair based on finger daemon
Cloth monitoring method and device.
Background technology
Finger daemon (operation program), that is, the Daemon processes generally said.It is independently of control terminal and cycle
Perform certain task or wait the event of pending some generations to property.The most of server processes of linux are exactly to use finger daemon
Realize, such as web services.Finger daemon usually starts when System guides load, and is terminated when system is closed.Finger daemon
Maximum the characteristics of is to operate in backstage, connectionless with terminal, unless in particular cases, user can not operate finger daemon.
In Linux, the interface that each system is exchanged with user referred to as terminal, each process brought into operation from this terminal
This terminal can be depended on, this terminal is known as the control terminal of these processes, when control terminal is closed, entered accordingly
Cheng Douhui is closed automatically.But finger daemon can but break through this limitation, it starts running from being performed, until whole system
Just exited during closing.It is not affected if it is desired to allowing some process because of user or terminal or other ground changes, then just must
This process must be become a finger daemon
With flourishing for Internet technology, in order to meet the demand that client is continually changing, internet system is increasingly
Many presents following situation:
(1) frequently release cycle:Being continually changing for user's request, promotes internet system to constantly update, issue is new
Version.Frequently iteration undoubtedly increases workload to maintenance work.Traditional published method process " compiling → configuration file modification
→ issue → startup ";Because each link is required for operation maintenance personnel to participate in, promote us to operation maintenance personnel Context aware on line
Requirements at the higher level are proposed in terms of degree and fineness.In addition at present increasing internet system implement to dispose more, many editions
This deployment, fully relying on operation maintenance personnel and being managed will become very difficult.
(2) fault discovery promptness:Internet era, the access of user has been not limited to certain time period, or certain
One place.At any time, the system failure can all cause immeasurable consequence to the access of user, how understand problem in time
And timely respond to solve to turn into key.Most systems can customize alarm monitoring according to service conditions, but in face of a plurality of production
Product line, repeating customization monitoring and warning function will waste and much exploit natural resources.And provide one it is general, timely and peace
Full monitoring alarm function will be greatly enhanced system operating efficiency, and reduce cost.
Among larger Internet firm, O&M can be related to different types of project issue, such as web projects
Issue, the issue of serviceization project, the issue of infrastructure service, different projects are developed by different team, may provided not
Same deployment scheme, this can be undoubtedly one and expend very much workload and chaotic method for the O&M of centralization.
On existing technical problem, patent " one kind application dissemination method and system " (number of accepting
CN201410601878.0 a solution) is proposed, the invention provides a kind of application dissemination method and system, specific steps:
Step 1:Obtain the application that completes, will using being translated, obtain at least one be respectively applied to different system platform,
The application to be released of different frames type;Step 2:According to releasing news and target scope of release for user input, obtain into ginseng
Message;Step 3:According to entering to join message, different types of application to be released is issued respectively in target scope of release;Step
Rapid 4:Application to be released is tested in target scope of release, when test passes through, step 5 is performed, otherwise, step is performed
1;Step 5:When testing is complete, distribution platform will be applied using being published to.The invention is for answering that same technology platform makes
With multiple provinces can be published to simultaneously;In administrative center, pc on-line testings can be carried out to the application of issue;Greatly shorten
The Review Cycle of application, reduces the cost of making;Realize the transparent introducing of business interface.However, the invention is only pin
To special applications scene, universality and versatility are not had, effectively management can not be monitored to having issued to apply.
The content of the invention
To solve the limitation of prior art, it is an object of the present invention to provide a kind of server end application based on finger daemon
Issue and monitoring method, the present invention are also resided in, and the progress of project and monitoring project example is issued by finger daemon, and are fully tied
Maven establishment of item characteristic is closed, makes pre-release any project compiled in nonproductive environment and is sent to after packing long-range
Maven warehouses, Maven warehouses are exactly the place for placing all jar files (WAR, ZIP, POM etc.), and all Maven projects can
The dependence JAR required for oneself is obtained from same Maven warehouses, disk resource is saved.It is all in Maven warehouses
JAR has the coordinate of their own, and the coordinate tells its group ID of Maven, component ID, version;By finger daemon control and execution
Migration of certain project in maven warehouses, build and externally issue by standard;Project example implementation status after issue is by guarding
Sequence lasts, dynamically obtain monitoring data, in the way of unified interface to be provided, reduction monitoring system and project example between
Complexity, reduces the manual participation of operation maintenance personnel, realizes the standardization and convenient extension of issue and monitoring, effectively support O&M work
That makees is timely and efficient;
The technical scheme is that:A kind of server end application issue and monitoring method based on finger daemon, specifically
Step has:
Step 1:After the pre-release project of server end is compiled, it is uploaded in compressed package form in long-range maven storehouses;Together
When the rule that is defined according to finger daemon work out the activation bit of the project, the activation bit includes:Project configuration description text
Part, the driving implementation rule based on finger daemon, the maven scripts of project build;
It is pre-defined descriptive file that the project configuration, which describes file, and form is xml, have recorded project by
All kinds of parameters that maven warehouses need to be configured when being sent to server, include the configuration ginseng of finger daemon operational factor and project itself
Number;
Especially, project configuration describe file only be responsible for parameter is described, without to parameter assignment, the assignment of parameter
Action is revested when submitting finger daemon to be issued.
The driving implementation rule based on finger daemon, is substantially that can be known for pre-release project by finger daemon
Other interface, including the script path of project initiation, project stop script path, the probe port of project, the plug-in unit of project
Catalogue etc.;By above-mentioned interface, finger daemon can be managed to project issue and start and stop;
The maven scripts of the project build are applied to build project script according to maven configuration modes, including specify
The Item version that need to be migrated from maven warehouses, technical routine is built in server in assigned catalogue, and specified needs are replaced
Configuration file, project authority;
Step 2:When the project is currently needed for issuing on the server, the activation bit of the project is submitted to guard into
Journey, the lasting monitoring after flow and issue is issued by finger daemon item controlled;Wherein, activation bit is provided with jar packet forms.
Step 3:Finger daemon migrates currently assigned hair according to activation bit and deployment configuration file from maven warehouses
The project of cloth, builds project according to maven configuration standards, specifically includes:
Step 3-1:Finger daemon receives Item drive information jar bags, by parsing activation bit jar bags, extracts item
Mesh configuration describing document, the driving based on finger daemon are realized, the maven scripts of project build;
Step 3-4:Finger daemon describes the content of file according to project configuration, extracts the relevant item issue being pre-configured with
Parameter and finger daemon operational factor, build can be recognized by maven project issue configuration file i.e. profile files
(profile files do an explanation);
Step 3-5:Finger daemon migrates pre- issue project according to the maven scripts of project build from maven warehouses
In compressed package to specified publisher server in assigned catalogue;It is in combination with maven scripts and project issue configuration file
Profile files, form the configuration parameter of final pre- issue project, so far, by using maven warehouses, project build is finished;
Step 4:Finger daemon extracts item reduction bag, project implementation is in service according to the configuration parameter of pre- issue project
Issue in device;
Step 5:Finger daemon is according to enabled instruction, to announced project implementation start-up operation, and in each machine
The running situation of project example implements lasting monitoring, specifically has:
Step 5-1:The finger daemon of machine where monitoring system to the project example for needing to monitor initiates monitoring request;
Step 5-2:Finger daemon receives the request that monitoring application is initiated, and judges that request needs which project reality be sent to
Confirm in example, the project example then managed from finger daemon, and monitoring interface is provided to finger daemon, pass through the monitoring interface
Forward the monitoring request of project example;
Step 5-3:Project example receives finger daemon forwarding to monitor request, is obtained according to request content and is responsible for monitoring
Plug-in unit, obtains the data for needing to monitor.
Step 5-4:The monitoring data got is returned to finger daemon by example;
Step 5-5:The monitoring data received is returned to monitoring system by finger daemon;
Especially, during project example is monitored, finger daemon is acting as the role of a data forwarding, in prison
Between control application and example, an external unified interface is act as, reducing monitoring application needs to safeguard between example
The complexity of relation;
Beneficial effects of the present invention:
(1) present invention controls the progress of issue project and monitoring project example by finger daemon, and fully combines maven
Establishment of item characteristic, the published method of variety classes project is obtained unification, reduce the manual participation of operation maintenance personnel, effectively branch
Support the timely and efficient of maintenance work;
(2) present invention is realized after project issue, by finger daemon by providing monitoring interface, persistently monitors projects real
The operation of example, reduces the monitor mode complexity brought by different monitoring demand, improves the monitoring efficiency of project example;
Brief description of the drawings
Fig. 1 is the server end application delivery system structural representation based on finger daemon in the embodiment of the present invention;
Fig. 2 be traditional server application issue (above) and based on Maven warehouses server application issue comparison diagram (under
Figure);
Fig. 3 is a kind of server end application issue schematic flow sheet based on finger daemon in the embodiment of the present invention;
Fig. 4 is a kind of application example monitoring structure schematic diagram based on finger daemon in the embodiment of the present invention;
Fig. 5 is a kind of monitoring flow chart based on finger daemon in the embodiment of the present invention.
Specific embodiment
For the object, technical solutions and advantages of the present invention are more clearly understood, below to a kind of in the embodiment of the present invention
Some involved terms do simplicity of explanation in server end application issue monitoring method based on finger daemon:
It is pre-defined descriptive file that the project configuration, which describes file, and form is xml, have recorded project by
All kinds of parameters that maven warehouses need to be configured when being sent to server, include the configuration ginseng of finger daemon operational factor and project itself
Number;
The driving based on finger daemon is realized, can substantially be recognized for pre-release project by finger daemon
Interface, including the script path of project initiation, project stop script path, the probe port of project, the plug-in unit catalogue of project
Deng.By above-mentioned interface, finger daemon can be managed to project issue and start and stop;
The maven scripts of the project build are applied to build project script according to maven configuration modes, including specify
The Item version that need to be migrated from maven warehouses, technical routine is built in server in assigned catalogue, and specified needs are replaced
Configuration file, project authority;
For the technical scheme that those skilled in the art can be better understood from present application example, below in conjunction with the accompanying drawings
Technical scheme in implementing to the application is described further.
Fig. 1 is the server end application delivery system structural representation based on finger daemon in the embodiment of the present invention, specifically
Including:Interface layer 101, distribution module 102, configuration module 103, instance management module 104, machine monitors module 105, example prison
Control module 106;Finger daemon is communicated by interface layer 101 with applications, and distribution module is used to receive and handle from interface layer
The content of transmission;Have recorded all items example managed by finger daemon in example module 104, and control example issue,
Start and stop;The configuration information of the configuration information of finger daemon and its project example managed is managed by configuration module 103;
Finger daemon is responsible for being monitored the system information of machine, such as CPU, internal memory, magnetic by disposing machine monitors module 105
Disk etc.;To obtain multiple types machine monitors
Finger daemon is by deployment examples monitoring module 106, and the project example for managing it provides monitoring;
Card module is the dynamic loading function that the Classloader mechanism based on java is realized, the function can be not
In the case of redirecting finger daemon, additional correlation module is loaded, it is only necessary to which correlation module is provided in the form of jar bags.
Fig. 2 is that traditional server application issue flow and the server application based on finger daemon issue flow comparison diagram,
Traditional project is issued after compiled server compiling, is sent directly to production server and is issued, whole process needs fortune
Dimension personnel participate in control;And the issue of disparity items needs to configure different published methods, the monitoring of disparity items also has not
With configuration;In the server application issuing process based on finger daemon of the present invention, any one project (such as web project
Issue, the issue of serviceization project, the issue of infrastructure service) it is compiled after, first by finger daemon control by after compiling should
With being sent to Maven warehouses, then by finger daemon control and perform the production service that migration of the project in maven warehouses is specified
Device, and built and externally issue according to configuration file finished item, the project example implementation status after issue is held by finger daemon
Continuously, monitoring data is dynamically obtained, in the way of unified interface to be provided, the complexity between reduction monitoring system and project example
Degree, reduces the standardization and convenient extension of the manual participation of operation maintenance personnel, realization issue and monitoring, effective support maintenance work
In time and efficiently;
Fig. 3 is a kind of server end application issue schematic flow sheet based on finger daemon in the embodiment of the present invention, is passed through
Finger daemon issues the progress of project and monitoring project example, and fully combines maven establishment of item characteristic, makes pre-release
Any project in nonproductive environment it is compiled and packing after be sent to long-range maven warehouses, by finger daemon control and perform should
Migration of the project in maven warehouses, build and externally issue by standard, specific steps include:
Step 301:After pre-release project is compiled, it is uploaded to and is disposed in long-range maven storehouses in compressed package form,
The deployment information in maven warehouses is recorded, deployment configuration file is formed;The rule defined simultaneously according to finger daemon works out the project
Activation bit, the activation bit includes:Project profile, the driving implementation rule based on finger daemon, project build
Maven scripts.
Especially, project configuration describe file only be responsible for parameter is described, without to parameter assignment, the assignment of parameter
Action is revested when submitting finger daemon to be issued.
Step 302:When project is currently needed for issuing on the server, the activation bit of the project is submitted to guard into
Journey, the lasting monitoring after flow and issue is issued by finger daemon item controlled;Wherein, activation bit is provided with jar packet forms;
Step 303::Finger daemon receives Item drive information jar bags, by parsing activation bit jar bags, extracts item
Mesh configuration describing document, the driving based on finger daemon are realized, the maven scripts of project build;
Step 304:Finger daemon describes the content of file according to project configuration, extracts the relevant item issue being pre-configured with
Parameter and finger daemon operational factor, build can be recognized by maven project issue configuration file i.e. profile files
(profile files are used for the collection of configuration information for defining relevant item);
Step 305:Finger daemon migrates pre- issue project according to the maven scripts of project build from maven warehouses
In compressed package to specified publisher server in assigned catalogue;It is in combination with maven scripts and project issue configuration file
Profile files, form the configuration parameter of final pre- issue project, so far, by using maven warehouses, project build is finished;
Step 306:Finger daemon extracts item reduction bag, project implementation is in clothes according to the configuration parameter of pre- issue project
The issue being engaged in device;
Step 307:Finger daemon is according to enabled instruction, to announced project implementation start-up operation;
Fig. 4 is a kind of application example monitoring structure schematic diagram based on finger daemon, finger daemon in the embodiment of the present invention
Parsing monitoring data is not undertaken, the role of monitoring data forwarding is only undertaken, and is responsible for receiving the monitoring request that monitoring system is sent, and
Project example is given in monitoring request, the monitoring data most got at last from project example returns to monitoring system;
During the monitoring to project example, finger daemon is to provide interface (heartbeat monitor interface or self-defined prison
Control interface) form, receive project example transmission monitoring data;
Fig. 5 is a kind of monitoring flow chart based on finger daemon in the embodiment of the present invention, and finger daemon is uniformly connect with providing
The form of mouth, the monitoring relation between maintenance monitoring system and project example, specific steps include:
Step 501:The finger daemon of machine where monitoring system to the project example for needing to monitor initiates monitoring request;
Step 502:Finger daemon receives the request that monitoring application is initiated, and judges that request needs which project reality be sent to
Confirm in example, the project example then managed from finger daemon, and monitoring interface is provided to finger daemon, pass through the monitoring interface
Forward the monitoring request of project example;
Step 503:Project example receives finger daemon forwarding to monitor request, is obtained according to request content and is responsible for monitoring
Plug-in unit, obtains the data for needing to monitor.
Step 504:The monitoring data got is returned to finger daemon by example;
Step 505:The monitoring data received is returned to monitoring system by finger daemon;
Especially, during project example is monitored, finger daemon is acting as the role of a data forwarding, in prison
Between control application and example, an external unified interface is act as, reducing monitoring application needs to safeguard between example
The complexity of relation.
Claims (2)
1. a kind of server end application issue and monitoring method based on finger daemon, it is characterized in that concretely comprising the following steps:
Step 1:After the pre-release project of server end is compiled, it is uploaded in compressed package form in long-range maven storehouses;Press simultaneously
The activation bit of the project is worked out according to the rule that finger daemon is defined, the activation bit includes:Project configuration describes file, base
The maven scripts of driving implementation rule, project build in finger daemon;
It is pre-defined descriptive file that the project configuration, which describes file, and form is xml, have recorded project by maven storehouses
All kinds of parameters that storehouse need to be configured when being sent to server, include the configuration parameter of finger daemon operational factor and project itself;
The driving implementation rule based on finger daemon, can substantially be recognized for pre-release project by finger daemon
Interface, including the script path of project initiation, project stop script path, the probe port of project, the plug-in unit catalogue of project
Deng;By above-mentioned interface, finger daemon can be managed to project issue and start and stop;
The maven scripts of the project build are applied to build project script according to maven configuration modes, including specify need to be from
The Item version migrated in maven warehouses, technical routine is built in server in assigned catalogue, specified to need what is be replaced to match somebody with somebody
Put file, project authority;
Step 2:When the project is currently needed for issuing on the server, the activation bit of the project is submitted into finger daemon,
Lasting monitoring after flow and issue is issued by finger daemon item controlled;Wherein, activation bit is provided with jar packet forms;
Step 3:Finger daemon migrates currently assigned issue according to activation bit and deployment configuration file from maven warehouses
Project, builds project according to maven configuration standards, specifically includes:
Step 3-1:Finger daemon receives Item drive information jar bags, and by parsing activation bit jar bags, extraction project is matched somebody with somebody
Put description file, the driving realization based on finger daemon, the maven scripts of project build;
Step 3-4:Finger daemon describes the content of file according to project configuration, extracts the ginseng for the relevant item issue being pre-configured with
Number and finger daemon operational factor, build the project issue configuration file i.e. profile files that can be recognized by maven;
Step 3-5:Finger daemon migrates the compression of pre- issue project according to the maven scripts of project build from maven warehouses
Bag is into assigned catalogue in specified publisher server;It is profile texts in combination with maven scripts and project issue configuration file
Part, forms the configuration parameter of final pre- issue project, so far, by using maven warehouses, project build is finished;
Step 4:Finger daemon extracts item reduction bag, project implementation is in server according to the configuration parameter of pre- issue project
Issue;
Step 5:Finger daemon is according to enabled instruction, to announced project implementation start-up operation, and for each machine(Terminal)
The running situation of interior project example implements lasting monitoring, specifically has:
Step 5-1:Machine where monitoring system to the project example for needing to monitor(Terminal)Finger daemon initiate monitoring request;
Step 5-2:Finger daemon receives the request that monitoring system application is initiated, and judges that request needs which project reality be sent to
Confirm in example, the project example then managed from finger daemon, and monitoring interface is provided to finger daemon, pass through the monitoring interface
Forward the monitoring request of project example;
Step 5-3:Project example receives finger daemon forwarding to monitor request, is obtained according to request content and is responsible for inserting for monitoring
Part, obtains the data for needing to monitor;
Step 5-4:The monitoring data got is returned to finger daemon by project example;
Step 5-5:The monitoring data received is returned to monitoring system by finger daemon.
2. server end application issue according to claim 1 and monitoring method, it is characterized in that in monitoring project example
During, finger daemon is acting as the role of a data forwarding, between monitoring application and example, act as one externally
Unified interface, reduce monitoring application need safeguard and example between relation complexity;
Server end application issue according to claim 1 and monitoring method, it is characterized in that project configuration describes file only
Parameter is described, assigned again when submitting finger daemon to be issued without the assignment action to parameter assignment, parameter
Give.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710325012.5A CN106951357B (en) | 2017-05-10 | 2017-05-10 | A kind of server end application publication monitoring method and device based on finger daemon |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710325012.5A CN106951357B (en) | 2017-05-10 | 2017-05-10 | A kind of server end application publication monitoring method and device based on finger daemon |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106951357A true CN106951357A (en) | 2017-07-14 |
CN106951357B CN106951357B (en) | 2018-06-15 |
Family
ID=59479057
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710325012.5A Active CN106951357B (en) | 2017-05-10 | 2017-05-10 | A kind of server end application publication monitoring method and device based on finger daemon |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106951357B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108334410A (en) * | 2018-01-26 | 2018-07-27 | 福建星瑞格软件有限公司 | A kind of distributed application program client light weight method and computer equipment |
CN108628632A (en) * | 2018-03-20 | 2018-10-09 | 车音智能科技有限公司 | A kind of packaging method and device |
CN110324209A (en) * | 2019-08-02 | 2019-10-11 | 泰康保险集团股份有限公司 | Micro services system monitoring method, apparatus, electronic equipment and computer-readable medium |
CN110968357A (en) * | 2018-09-30 | 2020-04-07 | 北京国双科技有限公司 | Method and device for packaging maven item, storage medium and processor |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080137121A1 (en) * | 2006-12-06 | 2008-06-12 | Sharp Laboratories Of America, Inc. | System and method for securely accessing downloaded print job resources |
CN102185900A (en) * | 2011-04-18 | 2011-09-14 | 北京新媒传信科技有限公司 | Application service platform system and method for developing application services |
CN104331287A (en) * | 2014-10-31 | 2015-02-04 | 北京思特奇信息技术股份有限公司 | Method and system for releasing applications |
CN104731580A (en) * | 2015-01-12 | 2015-06-24 | 上海新炬网络信息技术有限公司 | Automation operation and maintenance system based on Karaf and ActiveMQ and implement method thereof |
-
2017
- 2017-05-10 CN CN201710325012.5A patent/CN106951357B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080137121A1 (en) * | 2006-12-06 | 2008-06-12 | Sharp Laboratories Of America, Inc. | System and method for securely accessing downloaded print job resources |
CN102185900A (en) * | 2011-04-18 | 2011-09-14 | 北京新媒传信科技有限公司 | Application service platform system and method for developing application services |
CN104331287A (en) * | 2014-10-31 | 2015-02-04 | 北京思特奇信息技术股份有限公司 | Method and system for releasing applications |
CN104731580A (en) * | 2015-01-12 | 2015-06-24 | 上海新炬网络信息技术有限公司 | Automation operation and maintenance system based on Karaf and ActiveMQ and implement method thereof |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108334410A (en) * | 2018-01-26 | 2018-07-27 | 福建星瑞格软件有限公司 | A kind of distributed application program client light weight method and computer equipment |
CN108628632A (en) * | 2018-03-20 | 2018-10-09 | 车音智能科技有限公司 | A kind of packaging method and device |
CN108628632B (en) * | 2018-03-20 | 2021-09-10 | 车音智能科技有限公司 | Packing method and device |
CN110968357A (en) * | 2018-09-30 | 2020-04-07 | 北京国双科技有限公司 | Method and device for packaging maven item, storage medium and processor |
CN110968357B (en) * | 2018-09-30 | 2023-04-07 | 北京国双科技有限公司 | Method and device for packaging maven item, storage medium and processor |
CN110324209A (en) * | 2019-08-02 | 2019-10-11 | 泰康保险集团股份有限公司 | Micro services system monitoring method, apparatus, electronic equipment and computer-readable medium |
Also Published As
Publication number | Publication date |
---|---|
CN106951357B (en) | 2018-06-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106951357B (en) | A kind of server end application publication monitoring method and device based on finger daemon | |
CN109933522B (en) | Test method, test system and storage medium for automatic case | |
JP5401922B2 (en) | Virtual system control program, method and apparatus | |
CN105099739B (en) | One kind being based on plug-in type software deployment method, apparatus and application server | |
CN101605056B (en) | J2EE server monitoring device and monitoring method employing same | |
CN103034527B (en) | Hybrid virtualization cloud computing resources optimal control method and system | |
US7020699B2 (en) | Test result analyzer in a distributed processing framework system and methods for implementing the same | |
CN100511156C (en) | Apparatus for compulsively terminating thread blocked on input/output operation and method for the same | |
CN114064152B (en) | Embedded multi-core debugging system based on dynamic loading and debugging method thereof | |
CN112631614B (en) | Application deployment method, device, computer equipment and storage medium | |
CN104834530A (en) | Method for developing POS application program and cloud server | |
US9519537B2 (en) | Apparatus, system and method for application log data processing | |
CN107707687A (en) | A kind of method and apparatus of virtual machine IP address configuration | |
CN106406980B (en) | A kind of dispositions method and device of virtual machine | |
CN111444104A (en) | OpenStack function test method | |
CN112860282A (en) | Upgrading method and device of cluster plug-in and server | |
CN113438107A (en) | Cluster node expansion method, device, equipment and storage medium | |
CN112000567A (en) | Regulation and control software test service method based on cloud platform | |
CN106126283A (en) | A kind of method of product allocation, Apparatus and system | |
EP2908498B1 (en) | Integrated application generating system and method for internet of things terminal | |
CN111966465A (en) | Method, system, equipment and medium for modifying configuration parameters of host machine in real time | |
CN108229147A (en) | A kind of memory detection device and method based on Android virtual containers | |
CN111459510A (en) | Cross-network operating system installation method and device, electronic equipment and medium | |
CN112564979B (en) | Execution method and device of construction task, computer equipment and storage medium | |
CN107438834A (en) | Implementation method, device, electronic equipment and the computer program product of virtual machine function services |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |