CN105182201B - Generator stator bar state of insulation assessment method based on low-voltage and multi-parameter - Google Patents

Generator stator bar state of insulation assessment method based on low-voltage and multi-parameter Download PDF

Info

Publication number
CN105182201B
CN105182201B CN201510631719.XA CN201510631719A CN105182201B CN 105182201 B CN105182201 B CN 105182201B CN 201510631719 A CN201510631719 A CN 201510631719A CN 105182201 B CN105182201 B CN 105182201B
Authority
CN
China
Prior art keywords
voltage
stator bar
generator stator
insulation
charge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510631719.XA
Other languages
Chinese (zh)
Other versions
CN105182201A (en
Inventor
张征平
冉旺
胡卫
涂小涛
潘剑南
陶柳凤
林德泉
徐展锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of Guangdong Power Grid Co Ltd
Original Assignee
Guangzhou Yueneng Electric Technology Development Co Ltd
Electric Power Research Institute of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Yueneng Electric Technology Development Co Ltd, Electric Power Research Institute of Guangdong Power Grid Co Ltd filed Critical Guangzhou Yueneng Electric Technology Development Co Ltd
Priority to CN201510631719.XA priority Critical patent/CN105182201B/en
Publication of CN105182201A publication Critical patent/CN105182201A/en
Application granted granted Critical
Publication of CN105182201B publication Critical patent/CN105182201B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Tests Of Circuit Breakers, Generators, And Electric Motors (AREA)

Abstract

The invention discloses the generator stator bar state of insulation assessment method based on low-voltage and multi-parameter, including subject generator stator bar dielectric is attached with DC experiment power supply, DC experiment power supply is connected by charge switch and subject generator stator bar dielectric, and discharge switch and subject generator stator bar dielectric are in parallel;Before test, charge switch and discharge switch are in off-state, and subject generator stator bar dielectric thoroughly discharges, and presets maximum charging voltage and charging interval and discharge time;During test, first to being charged to subject generator stator bar dielectric, then discharged, record and occur the voltage peak that maximum voltage value is charge and discharge electric test during this;Generator stator bar state of insulation is tested and assessed according to the voltage peak of each charge and discharge electric test and charging interval.The assessment method is measured using low-voltage, simple to operate, to generator stator bar insulation without destructiveness.

Description

Generator stator bar state of insulation assessment method based on low-voltage and multi-parameter
Technical field
The present invention relates to high voltage electric equipment Condition assessment of insulation field, in particular to the hair based on low-voltage and multi-parameter Stator winding conductor bars in electrical machines state of insulation assessment method.
Background technology
With China's rapid development of economy, power industry is also rapidly progressed, and total amount of installing and generated energy enter one Step increases, and power network scale gradually expands.The state of insulation of high-rating generator is correctly assessed, works out scientific and reasonable fortune Row, repair schedule, be advantageous to safeguard generator operation safety, improve generating efficiency, lift the security reliability of operation of power networks.
The insulation degree of insulating materials is the key factor for the safe operation and service life for determining high-rating generator.Mesh Before, it is mainly resistance to including insulation measurement, dielectric loss measurement, exchange for the traditional experiment of generator stator bar insulation Pressure, DC break down voltage etc..They are reduction generator accident, ensure that safe operation of power system has played positive effect.
But all there is shortcoming and defect for above-mentioned various methods:A partial experiment needs to apply high voltage, high-potting In the presence of the hidden danger that damage is caused to generator stator bar insulation, therefore the company of the foreign countries such as Siemens to scene it is not recommended that put into operation Generator carry out this kind of high-potting;Result of the test information is single, only to a certain of generator stator bar state of insulation Aspect is assessed, such as, shelf depreciation can only find dissociation and local defect in insulant air-gap, but can not send out Existing apparatus insulated general defect, medium loss test mainly reflects apparatus insulated general defect, and local defect is reflected It is insensitive.
When therefore, using conventional method, if the integrality that to be insulated to generator stator bar is assessed, need Multiple different high-pottings are carried out, this has certain destructiveness in itself to generator stator bar insulation, and test process is also In the presence of certain security risk.
The content of the invention
It is an object of the invention to provide the generator stator bar state of insulation assessment method based on low-voltage and multi-parameter, The assessment method is simple to operate, and only generator stator bar, which need to be insulated, applies relatively low voltage, it becomes possible to generator unit stator Bar insulation state accurately test and assess, to generator stator bar insulation without destructiveness.
What the above-mentioned purpose of the present invention was realized by following technical solution:Generator based on low-voltage and multi-parameter is determined Sub-line rod state of insulation assessment method, it is characterised in that the assessment method comprises the following steps:
(1) subject generator stator bar dielectric Cx and DC experiment power supply Ud is attached, DC experiment electricity Source Ud is determined by charge switch K1 and the Cx series connection of subject generator stator bar dielectric, discharge switch K2 and subject generator Sub-line rod dielectric Cx is in parallel;
(2) before being tested, charge switch K1 and discharge switch K2 are in off-state, are tested generator unit stator line Rod dielectric Cx thoroughly discharges, and presets maximum charging voltage UcmaxWith charging interval tc and discharge time td;
(3) when test starts, charge switch K1 is closed, to subject generator stator bar dielectric Cx to preset Good maximum charging voltage UcmaxCharged;
(4) after charging interval tc chargings, charge switch K1 is opened, while discharge switch K2 is closed, to subject Generator stator bar dielectric Cx is discharged;
(5) discharge switch K2 is opened after discharge time td electric discharges again, while using voltage-measuring equipment to subject The voltage at generator stator bar dielectric Cx both ends carries out whole measurement, until being tested generator stator bar dielectric The voltage at Cx both ends is reduced to 0V, and in the process, the voltage at subject generator stator bar dielectric Cx both ends can have one It is individual first to raise the process reduced afterwards, record and occur the voltage peak U that maximum voltage value is charge and discharge electric test during thisRmax
(6) at least ten charge and discharge electric tests and voltage measurement, note are carried out to subject generator stator bar dielectric Cx Record the voltage peak U of each charge and discharge electric testRmaxWith charging interval tc, the electricity of multiple charge and discharge electric test is drawn according to record data Voltage crest value URmaxWith charging interval tc graph of relation;
(7) the voltage peak U of the charge and discharge electric test obtained according to step (6)RmaxWith charging interval tc graph of relation, Generator stator bar state of insulation is tested and assessed.
The assessment method of the present invention, before test starts, according to the situation of generator, it is determined that suitable DC charging voltage, Charging interval and discharge time;When test starts, charge switch is closed first, DC voltage insulate to generator stator bar Medium is charged;After charging after a while, charge switch is disconnected, while discharge switch is closed, to generator Stator bar dielectric is discharged;After the electric discharge of set time, discharge switch is opened, while uses voltage measurement Instrument measures to the voltage at subject generator stator bar dielectric both ends, until subject generator stator bar insulation The voltage at medium both ends is reduced to zero.
The voltage at subject generator stator bar dielectric both ends has one and first raises the process reduced again, therefore meeting There is a voltage peak.By the Insulation test of multiple different discharge and recharge ageings, voltage peak and charging interval are obtained Between relation curve, the curve can reflect the polarization characteristic of generator stator bar dielectric.By to the curve Analysis can makes assessment to generator stator bar state of insulation.
Generator stator bar need to only be insulated in the experiment of the present invention and apply relatively low voltage, to generator stator bar Insulation can be preferably supplemented the conventional method of Condition assessment of insulation without destructiveness.
Low-voltage in the present invention refers to that voltage is less than 3000V voltage.
In the present invention, in the step (2), maximum charging voltage is preset according to subject rated voltage Ucmax, subject rated voltage is higher, then maximum charging voltage UcmaxIt is higher, maximum charging voltage UcmaxValue is in 2000V In the range of~3000V;Charging interval tc set in advance be followed successively by 20ms, 50ms, 100ms, 200ms, 500ms, 1s, 2s, 5s, 10s, 20s, 50s, 100s, 200s, 500s, 1000s, discharge time td are charging interval tc half.
In the present invention, the step (7) concretely comprises the following steps to what generator stator bar state of insulation was tested and assessed:
If the voltage peak U of charge and discharge electric testRmaxIt is in rising trend with charging interval tc graph of relation, do not go out Existing peak value, then judge that the generator stator bar state of insulation is good;
If the voltage peak U of charge and discharge electric testRmaxGraph of relation with charging interval tc is in first to rise to decline again, is gone out An existing peak value, but the time that peak value occurs after 1s, then judge that the generator stator bar state of insulation is good;
If the voltage peak U of charge and discharge electric testRmaxThere are at least two peak values with charging interval tc graph of relation, Then judge that generator stator bar insulation is made moist or the phenomenon of insulation ag(e)ing, peak value occur more in the presence of local, then by The state of insulation for trying generator stator bar insulator is poorer;
If the voltage peak U of charge and discharge electric testRmaxGraph of relation with charging interval tc is in first to rise to decline again, is gone out , there is the time of peak value before 1s in an existing peak value, then can determine whether generator stator bar insulation make moist in the presence of local or The phenomenon of person's insulation ag(e)ing;Peak value time of occurrence is more early, then the state of insulation for being tested generator stator bar insulation is poorer.
In the present invention, the magnitude of voltage of the DC experiment power supply Ud is substantially met existing in the range of 2000V~3000V The test requirements document of motor.
The generator stator bar state of insulation assessment method based on low-voltage and multi-parameter of the present invention, by setting most Big charging voltage and discharge and recharge time, apply the experiment for being adapted to its dielectric feature and insulation system to generator stator bar Voltage, the voltage at generator stator bar dielectric both ends is measured.Carry out multigroup charge and discharge electric test, generation voltage with The polarization curve of time relationship, for generator stator bar Condition assessment of insulation.
The assessment method need to only insulate to generator stator bar applies nondestructive voltage, you can test is generated electricity The multiple parameters of machine stator bar insulation, so as to effectively be assessed generator stator bar state of insulation.To generator Insulation status diagnosed, grasp the running status of generator, to formulate scientific and rational generator operation, maintenance and Renewal plan, to improving generator efficiency and operation of power networks reliability, is all significant.
Compared with prior art, it is of the invention to be tested and assessed based on the generator stator bar state of insulation of low-voltage and multi-parameter Method, generator stator bar need to only be insulated and apply relatively low voltage, to generator stator bar insulation without destructiveness. Test obtains the polarization curve of generator stator bar insulation, and the part to be insulated to generator stator bar is made moist or overall aging State is effectively assessed.Condition assessment of insulation method provided by the invention can damage to such as insulaion resistance, shelf depreciation, medium Traditional methods such as consumption are preferably supplemented.
Brief description of the drawings
The present invention is described in further detail with reference to the accompanying drawings and detailed description:
Fig. 1 is the theory diagram of assessment method of the present invention;
Fig. 2 is voltage waveform view when assessment method of the present invention carries out generator stator bar Insulation test;
Fig. 3 is the voltage peak U of charge and discharge electric test in assessment method embodiment one of the present inventionRmaxWith charging interval tc pass It is curve map;
Fig. 4 is the voltage peak U of charge and discharge electric test in assessment method embodiment two of the present inventionRmaxWith charging interval tc pass It is curve map;
Fig. 5 is the voltage peak U of charge and discharge electric test in assessment method embodiment three of the present inventionRmaxWith charging interval tc pass It is curve map;
Fig. 6 is the voltage peak U of charge and discharge electric test in assessment method example IV of the present inventionRmaxWith charging interval tc pass It is curve map.
The physical meaning of each parameter is in the application:
Ud-DC experiment power supply;Cx-subject generator stator bar dielectric;
K1-charge switch;K2-discharge switch;
Ucmax- maximum charging voltage; URmaxThe voltage peak of-charge and discharge electric test;
Tc-charging interval;Td-discharge time;
tR- recovery time;
Dielectric both ends apply DC voltage, will produce polarization phenomena.Short circuit insulation both ends after voltage are removed, then are insulated Depolarization phenomenon occurs for surface.After the shorting stub for removing two interpolars, process of depolarization is still continuing, the beam constrained by polarization Tie up electric charge and be changed into free charge, and a voltage is produced at insulation both ends, first raise and be reduced to zero again.Recovery time tRAnd charging Certain relation is there are between time tc and discharge time td ", but is difficult to quantify.If tc is constant, td increases, then tRSubtract It is small, if td is far longer than tc, tRLevel off to 0;Therefore regulation tc is more than td in the present invention, typically requires td=tc/2;At this In the case of as defined in invention, generally speaking, tc is bigger, tRIt is bigger.
Embodiment
Embodiment one
As shown in figure 1, the generator stator bar state of insulation assessment method of the invention based on low-voltage and multi-parameter, should Assessment method comprises the following steps:
(1) subject generator stator bar dielectric Cx and DC experiment power supply Ud is attached, DC experiment electricity Source Ud magnitude of voltage is 3000V, and DC experiment power supply Ud passes through charge switch K1 and subject generator stator bar dielectric Cx connects, and discharge switch K2 and subject generator stator bar dielectric Cx are in parallel;
(2) before being tested, charge switch K1 and discharge switch K2 are in off-state, are tested generator unit stator line Rod dielectric Cx thoroughly discharges, and predefines maximum charging voltage UcmaxWith charging interval tc and discharge time td, wherein, most Big charging voltage UcmaxFor 3000V, charging interval tc be followed successively by 20ms, 50ms, 100ms, 200ms, 500ms, 1s, 2s, 5s, 10s, 20s, 50s, 100s, 200s, 500s, 1000s, discharge time td be charging interval tc half, td=tc/2;
(3) when test starts, charge switch K1 is closed, to subject generator stator bar dielectric Cx to preset Good maximum charging voltage UcmaxCharged;
(4) after charging interval tc chargings, charge switch K1 is opened, while discharge switch K2 is closed, to subject Generator stator bar dielectric Cx is discharged;
(5) discharge switch K2 is opened after discharge time td electric discharges again, while using voltage-measuring equipment to subject The voltage at generator stator bar dielectric Cx both ends carries out whole measurement, until being tested generator stator bar dielectric The voltage at Cx both ends is reduced to 0V, and in the process, the voltage at subject generator stator bar dielectric Cx both ends can have one It is individual first to raise the process reduced afterwards, record and occur the voltage peak U that maximum voltage value is charge and discharge electric test during thisRmax
(6) 15 charge and discharge electric tests and voltage measurement are carried out to subject generator stator bar dielectric Cx, recorded The voltage peak U of each charge and discharge electric testRmaxWith charging interval tc, record data is as shown in table 1, according to the record shown in table 1 Data draw the voltage peak U of multiple charge and discharge electric testRmaxWith charging interval tc graph of relation, the graph of relation is as schemed Shown in 3;
Table 1:The voltage peak U of charge and discharge electric test in embodiment oneRmaxWith charging interval tc tables of data
URmax(V) tc URmax(V) tc URmax(V)
20ms 4.25 1s 14.24 50s 37.24
50ms 5.50 2s 16.70 100s 42.25
100ms 6.31 5s 20.13 200s 48.60
200ms 7.74 10s 25.40 500s 57.55
500ms 10.06 20s 31.80 1000s 63.25
(7) the voltage peak U of the charge and discharge electric test obtained according to step (6)RmaxWith charging interval tc graph of relation, Generator stator bar state of insulation is tested and assessed.
As seen from Figure 3, the voltage peak U of charge and discharge electric testRmaxGraph of relation with charging interval tc is in rising , there is not peak value in trend, then judges that the generator stator bar state of insulation is good.
As the conversion of the present embodiment, DC experiment power supply Ud magnitude of voltage can also according to different motors 2000V~ Value in the range of 3000V, for example take 2200V either 2500V or 2600V or 2800V etc..
As the conversion of the present embodiment, maximum charging voltage UcmaxValue can in the range of 2000V~3000V value, For example take 2200V either 2500V or 2600V or 2800V etc.;Maximum is preset according to subject rated voltage Charging voltage Ucmax, subject rated voltage is higher, then maximum charging voltage UcmaxIt is higher, maximum charging voltage UcmaxTake Value is in the range of 2000V~3000V;Charging interval tc set in advance be followed successively by 20ms, 50ms, 100ms, 200ms, 500ms, 1s, 2s, 5s, 10s, 20s, 50s, 100s, 200s, 500s, 1000s, discharge time td are charging interval tc half.
Embodiment two
As shown in figure 1, the generator stator bar state of insulation assessment method of the invention based on low-voltage and multi-parameter, should Assessment method comprises the following steps:
(1) subject generator stator bar dielectric Cx and DC experiment power supply Ud is attached, DC experiment electricity Source Ud magnitude of voltage is 3000V, and DC experiment power supply Ud passes through charge switch K1 and subject generator stator bar dielectric Cx connects, and discharge switch K2 and subject generator stator bar dielectric Cx are in parallel;(explanation:.)
(2) before being tested, charge switch K1 and discharge switch K2 are in off-state, are tested generator unit stator line Rod dielectric Cx thoroughly discharges, and predefines maximum charging voltage UcmaxWith charging interval tc and discharge time td wherein, most Big charging voltage UcmaxFor 3000V, charging interval tc be followed successively by 20ms, 50ms, 100ms, 200ms, 500ms, 1s, 2s, 5s, 10s, 20s, 50s, 100s, 200s, 500s, 1000s, discharge time td be charging interval tc half, td=tc/2;
(3) when test starts, charge switch K1 is closed, to subject generator stator bar dielectric Cx to preset Good maximum charging voltage UcmaxCharged;
(4) after charging interval tc chargings, charge switch K1 is opened, while discharge switch K2 is closed, to subject Generator stator bar dielectric Cx is discharged;
(5) discharge switch K2 is opened after discharge time td electric discharges again, while using voltage-measuring equipment to subject The voltage at generator stator bar dielectric Cx both ends carries out whole measurement, until being tested generator stator bar dielectric The voltage at Cx both ends is reduced to 0V, and in the process, the voltage at subject generator stator bar dielectric Cx both ends can have one It is individual first to raise the process reduced afterwards, record and occur the voltage peak U that maximum voltage value is charge and discharge electric test during thisRmax
(6) 15 charge and discharge electric tests and voltage measurement are carried out to subject generator stator bar dielectric Cx, recorded The voltage peak U of each charge and discharge electric testRmaxWith charging interval tc, record data is as shown in table 2, according to the record shown in table 2 Data draw the voltage peak U of multiple charge and discharge electric testRmaxWith charging interval tc graph of relation, the graph of relation is as schemed Shown in 4;
Table 2:The voltage peak U of charge and discharge electric test in embodiment twoRmaxWith charging interval tc tables of data
tc URmax(V) tc URmax(V) tc URmax(V)
20ms 2.10 1s 7.62 50s 182.00
50ms 2.90 2s 11.74 100s 256.20
100ms 3.16 5s 18.50 200s 243.00
200ms 4.60 10s 36.85 500s 213.00
500ms 5.98 20s 60.24 1000s 102.00
(7) the voltage peak URmax and charging interval tc of the charge and discharge electric test obtained according to step (6) relation curve Figure, tests and assesses to generator stator bar state of insulation.
As seen from Figure 4, the voltage peak U of charge and discharge electric testRmaxWith charging interval tc graph of relation on first Rise and decline again, a peak value occur, but the time that peak value occurs, in 100s, the time of appearance is later, then judges the generator Stator bar state of insulation is good.
It should be noted simultaneously that the if voltage peak U of charge and discharge electric testRmaxWith charging interval tc graph of relation Decline again in first rising, occur a peak value, but peak value occur time after 1s, then judge that the generator stator bar is exhausted Edge is in good condition.
As the conversion of the present embodiment, DC experiment power supply Ud magnitude of voltage can also according to different motors 2000V~ Value in the range of 3000V, for example take 2200V either 2500V or 2600V or 2800V etc..
As the conversion of the present embodiment, maximum charging voltage UcmaxValue can in the range of 2000V~3000V value, For example take 2200V either 2500V or 2600V or 2800V etc.;Maximum is preset according to subject rated voltage Charging voltage Ucmax, subject rated voltage is higher, then maximum charging voltage UcmaxIt is higher, maximum charging voltage UcmaxTake Value is in the range of 2000V~3000V;Charging interval tc set in advance be followed successively by 20ms, 50ms, 100ms, 200ms, 500ms, 1s, 2s, 5s, 10s, 20s, 50s, 100s, 200s, 500s, 1000s, discharge time td are charging interval tc half.
Embodiment three
As shown in figure 1, the generator stator bar state of insulation assessment method of the invention based on low-voltage and multi-parameter, should Assessment method comprises the following steps:
(1) subject generator stator bar dielectric Cx and DC experiment power supply Ud is attached, DC experiment electricity Source Ud magnitude of voltage is 3000V, and DC experiment power supply Ud passes through charge switch K1 and subject generator stator bar dielectric Cx connects, and discharge switch K2 and subject generator stator bar dielectric Cx are in parallel;
(2) before being tested, charge switch K1 and discharge switch K2 are in off-state, are tested generator unit stator line Rod dielectric Cx thoroughly discharges, and predefines maximum charging voltage UcmaxWith charging interval tc and discharge time td wherein, most Big charging voltage UcmaxFor 3000V, charging interval tc be followed successively by 20ms, 50ms, 100ms, 200ms, 500ms, 1s, 2s, 5s, 10s, 20s, 50s, 100s, 200s, 500s, 1000s, discharge time td be charging interval tc half, td=tc/2;
(3) when test starts, charge switch K1 is closed, to subject generator stator bar dielectric Cx to preset Good maximum charging voltage UcmaxCharged;
(4) after charging interval tc chargings, charge switch K1 is opened, while discharge switch K2 is closed, to subject Generator stator bar dielectric Cx is discharged;
(5) discharge switch K2 is opened after discharge time td electric discharges again, while using voltage-measuring equipment to subject The voltage at generator stator bar dielectric Cx both ends carries out whole measurement, until being tested generator stator bar dielectric The voltage at Cx both ends is reduced to 0V, and in the process, the voltage at subject generator stator bar dielectric Cx both ends can have one It is individual first to raise the process reduced afterwards, record and occur the voltage peak U that maximum voltage value is charge and discharge electric test during thisRmax
(6) 15 charge and discharge electric tests and voltage measurement are carried out to subject generator stator bar dielectric Cx, recorded The voltage peak U of each charge and discharge electric testRmaxWith charging interval tc, the voltage of multiple charge and discharge electric test is drawn according to record data Peak value URmaxIt is as shown in Figure 5 with charging interval tc graph of relation, the graph of relation;
(7) the voltage peak U of the charge and discharge electric test obtained according to step (6)RmaxWith charging interval tc graph of relation, Generator stator bar state of insulation is tested and assessed.
As seen from Figure 5, the voltage peak U of charge and discharge electric testRmaxOccur two with charging interval tc graph of relation Individual peak value, then judge that generator stator bar insulation is made moist in the presence of part or the phenomenon of insulation ag(e)ing, peak value appearance are got over More, then the state of insulation for being tested generator stator bar insulator is poorer.
It should be noted simultaneously that the if voltage peak U of charge and discharge electric testRmaxWith charging interval tc graph of relation There are at least two peak values, then judge that generator stator bar insulation is made moist or the phenomenon of insulation ag(e)ing in the presence of local, peak Value occurs more, then the state of insulation for being tested generator stator bar insulator is poorer.
As the conversion of the present embodiment, DC experiment power supply Ud magnitude of voltage can also according to different motors 2000V~ Value in the range of 3000V, for example take 2200V either 2500V or 2600V or 2800V etc..
As the conversion of the present embodiment, maximum charging voltage UcmaxValue can in the range of 2000V~3000V value, For example take 2200V either 2500V or 2600V or 2800V etc.;Maximum is preset according to subject rated voltage Charging voltage Ucmax, subject rated voltage is higher, then maximum charging voltage UcmaxIt is higher, maximum charging voltage UcmaxTake Value is in the range of 2000V~3000V;Charging interval tc set in advance be followed successively by 20ms, 50ms, 100ms, 200ms, 500ms, 1s, 2s, 5s, 10s, 20s, 50s, 100s, 200s, 500s, 1000s, discharge time td are charging interval tc half.
Example IV
As shown in figure 1, the generator stator bar state of insulation assessment method of the invention based on low-voltage and multi-parameter, should Assessment method comprises the following steps:
(1) subject generator stator bar dielectric Cx and DC experiment power supply Ud is attached, DC experiment electricity Source Ud magnitude of voltage is 3000V, and DC experiment power supply Ud passes through charge switch K1 and subject generator stator bar dielectric Cx connects, and discharge switch K2 and subject generator stator bar dielectric Cx are in parallel;
(2) before being tested, charge switch K1 and discharge switch K2 are in off-state, are tested generator unit stator line Rod dielectric Cx thoroughly discharges, and predefines maximum charging voltage UcmaxWith charging interval tc and discharge time td wherein, most Big charging voltage UcmaxFor 3000V, charging interval tc be followed successively by 20ms, 50ms, 100ms, 200ms, 500ms, 1s, 2s, 5s, 10s, 20s, 50s, 100s, 200s, 500s, 1000s, discharge time td be charging interval tc half, td=tc/2;
(3) when test starts, charge switch K1 is closed, to subject generator stator bar dielectric Cx to preset Good maximum charging voltage UcmaxCharged;
(4) after charging interval tc chargings, charge switch K1 is opened, while discharge switch K2 is closed, to subject Generator stator bar dielectric Cx is discharged;
(5) discharge switch K2 is opened after discharge time td electric discharges again, while using voltage-measuring equipment to subject The voltage at generator stator bar dielectric Cx both ends carries out whole measurement, until being tested generator stator bar dielectric The voltage at Cx both ends is reduced to 0V, and in the process, the voltage at subject generator stator bar dielectric Cx both ends can have one It is individual first to raise the process reduced afterwards, record and occur the voltage peak U that maximum voltage value is charge and discharge electric test during thisRmax
(6) 15 charge and discharge electric tests and voltage measurement are carried out to subject generator stator bar dielectric Cx, recorded The voltage peak U of each charge and discharge electric testRmaxWith charging interval tc, the voltage of multiple charge and discharge electric test is drawn according to record data Peak value URmaxIt is as shown in Figure 6 with charging interval tc graph of relation, the graph of relation;
(7) the voltage peak U of the charge and discharge electric test obtained according to step (6)RmaxWith charging interval tc graph of relation, Generator stator bar state of insulation is tested and assessed.
As seen from Figure 6, the voltage peak U of charge and discharge electric testRmaxWith charging interval tc graph of relation on first Rise and decline again, a peak value occur, the time of peak value occur before 1s, peak value occurs relatively early, then can determine whether the generator Stator bar insulation is made moist in the presence of part or the phenomenon of insulation ag(e)ing.Peak value time of occurrence is more early simultaneously, then explanation subject hair The state of insulation of stator winding conductor bars in electrical machines insulation is poorer.
As the conversion of the present embodiment, DC experiment power supply Ud magnitude of voltage can also according to different motors 2000V~ Value in the range of 3000V, for example take 2200V either 2500V or 2600V or 2800V etc..
As the conversion of the present embodiment, maximum charging voltage UcmaxValue can in the range of 2000V~3000V value, For example take 2200V either 2500V or 2600V or 2800V etc.;Maximum is preset according to subject rated voltage Charging voltage Ucmax, subject rated voltage is higher, then maximum charging voltage UcmaxIt is higher, maximum charging voltage UcmaxTake Value is in the range of 2000V~3000V;Charging interval tc set in advance be followed successively by 20ms, 50ms, 100ms, 200ms, 500ms, 1s, 2s, 5s, 10s, 20s, 50s, 100s, 200s, 500s, 1000s, discharge time td are charging interval tc half.
The present invention is not limited to above-mentioned embodiment, according to the above, according to the ordinary technical knowledge of this area And customary means, under the premise of the above-mentioned basic fundamental thought of the present invention is not departed from, the present invention can also make other diversified forms Equivalent modifications, replacement or change, all fall among protection scope of the present invention.

Claims (3)

1. the generator stator bar state of insulation assessment method based on low-voltage and multi-parameter, it is characterised in that the test and appraisal side Method comprises the following steps:
(1) subject generator stator bar dielectric Cx and DC experiment power supply Ud is attached, DC experiment power supply Ud By charge switch K1 and the Cx series connection of subject generator stator bar dielectric, discharge switch K2 and subject generator unit stator line Rod dielectric Cx is in parallel;
(2) before being tested, charge switch K1 and discharge switch K2 are in off-state, and subject generator stator bar is exhausted Edge medium Cx is thoroughly discharged, and maximum charging voltage U is preset according to subject rated voltagecmaxWith charging interval tc With discharge time td;
(3) when test starts, charge switch K1 is closed, to subject generator stator bar dielectric Cx with pre-set Maximum charging voltage UcmaxCharged;
(4) after charging interval tc chargings, charge switch K1 is opened, while discharge switch K2 is closed, subject is generated electricity Machine stator bar insulation medium Cx is discharged;
(5) discharge switch K2 is opened after discharge time td electric discharges again, while subject generated electricity using voltage-measuring equipment The voltage at machine stator bar insulation medium Cx both ends carries out whole measurement, until being tested generator stator bar dielectric Cx two The voltage at end is reduced to 0V, and in the process, the voltage at subject generator stator bar dielectric Cx both ends can have an elder generation The process reduced after rise, record and occur the voltage peak U that maximum voltage value is charge and discharge electric test during thisRmax
(6) at least ten charge and discharge electric tests and voltage measurement is carried out to subject generator stator bar dielectric Cx, record is every The voltage peak U of secondary charge and discharge electric testRmaxWith charging interval tc, the Voltage Peak of multiple charge and discharge electric test is drawn according to record data Value URmaxWith charging interval tc graph of relation;
(7) the voltage peak U of the charge and discharge electric test obtained according to step (6)RmaxWith charging interval tc graph of relation, to hair Stator winding conductor bars in electrical machines state of insulation is tested and assessed, and is concretely comprised the following steps:
If the voltage peak U of charge and discharge electric testRmaxIt is in rising trend with charging interval tc graph of relation, there is not peak Value, then judge that the generator stator bar state of insulation is good;
If the voltage peak U of charge and discharge electric testRmaxGraph of relation with charging interval tc is in first to rise to decline again, occurs one Individual peak value, but peak value occur time after 1s, then judge that the generator stator bar state of insulation is good;
If the voltage peak U of charge and discharge electric testRmaxThere are at least two peak values with charging interval tc graph of relation, then sentence Generator stator bar insulation of breaking is made moist in the presence of part or the phenomenon of insulation ag(e)ing, peak value occur more, then subject hair The state of insulation of stator winding conductor bars in electrical machines insulator is poorer;
If the voltage peak U of charge and discharge electric testRmaxGraph of relation with charging interval tc is in first to rise to decline again, occurs one Individual peak value, there is the time of peak value before 1s, then can determine whether that generator stator bar insulation is made moist or absolutely in the presence of local The phenomenon of edge aging;Peak value time of occurrence is more early, then the state of insulation for being tested generator stator bar insulation is poorer.
2. the generator stator bar state of insulation assessment method according to claim 1 based on low-voltage and multi-parameter, It is characterized in that:In the step (2), maximum charging voltage U is preset according to subject rated voltagecmax, quilt It is higher to try rated voltage, then maximum charging voltage UcmaxIt is higher, maximum charging voltage UcmaxValue is in 2000V~3000V In the range of;Charging interval tc set in advance be followed successively by 20ms, 50ms, 100ms, 200ms, 500ms, 1s, 2s, 5s, 10s, 20s, 50s, 100s, 200s, 500s, 1000s, discharge time td are charging interval tc half.
3. the generator stator bar state of insulation test and appraisal side according to claim 1 or 2 based on low-voltage and multi-parameter Method, it is characterised in that:The magnitude of voltage of the DC experiment power supply Ud is in the range of 2000V~3000V.
CN201510631719.XA 2015-09-28 2015-09-28 Generator stator bar state of insulation assessment method based on low-voltage and multi-parameter Active CN105182201B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510631719.XA CN105182201B (en) 2015-09-28 2015-09-28 Generator stator bar state of insulation assessment method based on low-voltage and multi-parameter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510631719.XA CN105182201B (en) 2015-09-28 2015-09-28 Generator stator bar state of insulation assessment method based on low-voltage and multi-parameter

Publications (2)

Publication Number Publication Date
CN105182201A CN105182201A (en) 2015-12-23
CN105182201B true CN105182201B (en) 2017-11-10

Family

ID=54904412

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510631719.XA Active CN105182201B (en) 2015-09-28 2015-09-28 Generator stator bar state of insulation assessment method based on low-voltage and multi-parameter

Country Status (1)

Country Link
CN (1) CN105182201B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109283445B (en) * 2018-10-24 2021-05-11 中车株洲电力机车有限公司 Insulation detection method and controller of energy storage type rail vehicle charging system
CN111880049B (en) * 2020-05-27 2021-09-10 西安交通大学 Oil paper sleeve damp positioning method based on polarity inversion frequency domain dielectric response
CN111880050B (en) * 2020-05-27 2021-09-10 西安交通大学 Oil paper sleeve damp positioning method based on polarity reversal time domain dielectric response
CN115753913B (en) * 2022-11-18 2024-01-23 南方电网调峰调频发电有限公司检修试验分公司 Method, device, equipment and medium for determining wet degradation of motor stator bar

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3135915A (en) * 1959-09-08 1964-06-02 Gen Electric Method of determining the condition of electrical insulation including the presence of polar materials therein and thereon using d.c. voltage
JPS5345581A (en) * 1976-10-06 1978-04-24 Toshiba Corp Measuring instrument of insulation resistance
SU1636794A1 (en) * 1987-01-08 1991-03-23 Предприятие П/Я Г-4816 Method for measuring capacitor insulation impedance
CN2812021Y (en) * 2005-07-22 2006-08-30 上海希瑞电子设备有限公司 Capacitor measurer
CN103336228A (en) * 2013-06-14 2013-10-02 广东电网公司电力科学研究院 Insulation fault maintenance method and system for generator stator
CN104635066A (en) * 2015-03-10 2015-05-20 李景禄 Intelligent insulation parameter test residual charge detecting and discharging protection method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3135915A (en) * 1959-09-08 1964-06-02 Gen Electric Method of determining the condition of electrical insulation including the presence of polar materials therein and thereon using d.c. voltage
JPS5345581A (en) * 1976-10-06 1978-04-24 Toshiba Corp Measuring instrument of insulation resistance
SU1636794A1 (en) * 1987-01-08 1991-03-23 Предприятие П/Я Г-4816 Method for measuring capacitor insulation impedance
CN2812021Y (en) * 2005-07-22 2006-08-30 上海希瑞电子设备有限公司 Capacitor measurer
CN103336228A (en) * 2013-06-14 2013-10-02 广东电网公司电力科学研究院 Insulation fault maintenance method and system for generator stator
CN104635066A (en) * 2015-03-10 2015-05-20 李景禄 Intelligent insulation parameter test residual charge detecting and discharging protection method

Also Published As

Publication number Publication date
CN105182201A (en) 2015-12-23

Similar Documents

Publication Publication Date Title
CN105182201B (en) Generator stator bar state of insulation assessment method based on low-voltage and multi-parameter
CN103558533B (en) Based on insulation ag(e)ing diagnostic system and the method for 10kV XLPE cable
CN103605054B (en) 10kV twisted polyethylene cable water tree ageing management system
CN206311733U (en) A kind of electricity generator stator coil Condition assessment of insulation device
CN103149517B (en) Oil-immersed equipment insulation ag(e)ing non-destructive testing device based on virtual instrument and method
CN105259489A (en) Extra-high voltage neutral-point-electric-reactor site induction voltage withstanding testing system and method
CN204903702U (en) Send out motor insulation testing arrangement based on return voltage method
CN105259488A (en) 500kV high-voltage parallel electric reactor turn-to-turn insulation performance testing platform
CN202649391U (en) Cable defect simulation test system
CN205027865U (en) Dry -type air -core reactor interturn insulation electrical ageing test system
CN201725007U (en) Portable power frequency insulation test device with functions of voltage waveform analysis and filtration
CN103792262A (en) Power transformer damp detection method based on frequency domain Havriliak-Negami model
CN205139307U (en) 500kV high pressure parallel reactor interturn insulation capability test device
CN107576897A (en) A kind of high-voltage cable insulating burn in test circuit and its method of testing
CN103558516A (en) Method of testing alternating current voltage resistance performance of multi-core cable
CN106501685A (en) For 35kV and following direct current cables insulation wave of oscillation experimental rig and its method
CN216209604U (en) Withstand voltage test circuit of high-voltage fast switch type current limiter
CN116430165A (en) Power grid fault detection device and method
CN104345223B (en) A kind of 6KV voltage transformers and its secondary circuit are powered monitoring method
CN202522537U (en) Insulating tool edge planar defect on-site detection device
WO2021175107A1 (en) Testing method for double-fracture busbar disconnector in 220-kilovolt power transformation combined electrical device
CN109470944A (en) Protect electric equipment fault early warning method
CN103454536A (en) Power transformer test method
CN103018641B (en) Electrolysis direct current system voltage resistance experiment method
CN109174972B (en) Method for diagnosing abnormity of main transmission motor of bar continuous rolling mill

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200417

Address after: 510080 Dongfeng East Road, Dongfeng, Guangdong, Guangzhou, Zhejiang Province, No. 8

Patentee after: Electric Power Research Institute of Guangdong Power Grid Co.,Ltd.

Address before: 510080, No. 8, Qi Gang, Dongfeng East Road, Guangzhou, Guangdong

Co-patentee before: GUANGZHOU YUENENG POWER TECHNOLOGY DEVELOPMENT Co.,Ltd.

Patentee before: Electric Power Research Institute of Guangdong Power Grid Co.,Ltd.