CN105178960A CN201510482440.XA CN201510482440A CN105178960A CN 105178960 A CN105178960 A CN 105178960A CN 201510482440 A CN201510482440 A CN 201510482440A CN 105178960 A CN105178960 A CN 105178960A
Authority
CN
China
Prior art keywords
filling
closed type
ore
closed
partition wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510482440.XA
Other languages
Chinese (zh)
Other versions
CN105178960B (en
Inventor
陈晓青
郭鹏
高彦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
University of Science and Technology Liaoning USTL
Original Assignee
University of Science and Technology Liaoning USTL
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by University of Science and Technology Liaoning USTL filed Critical University of Science and Technology Liaoning USTL
Priority to CN201510482440.XA priority Critical patent/CN105178960B/en
Publication of CN105178960A publication Critical patent/CN105178960A/en
Application granted granted Critical
Publication of CN105178960B publication Critical patent/CN105178960B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

The invention discloses a closed type capping method by upward filling mining. The method is characterized in that after stoping the last layer, four gas vent holes are drilled in four side corners of a roof by use of a drilling machine, and then, partition walls are built at the periphery of a mined-out area for processing the bottom of the mined-out area and the roof to be flat; waterproof materials are paved and pasted on the partition walls at the periphery of the mined-out area, the bottom of the mined-out area and the roof for enclosing the mined-out area into a closed type filling space; by virtue of a filling raise, a filling material is injected into the closed type filling space; when the filling material runs out of the gas vent holes, filling is stopped; and after the closed type filling space is filled up with the filling material, a layer of waterproof materials covers the four gas vent holes and the filling raise, and cement is used for sealing. The closed type capping method prevents water in filling slurry from discharging, and keeps the volume and the shape of the filling slurry; after the filling material is condensed, a completely roof-contacted filling body is formed, so that a filling roof-contact problem is solved. The closed type capping method is simple in process, safe and reliable, simple and easy to perform, and relatively low in cost.

Description

To the closed method for capping of mining with stowing on a kind of
Technical field
The invention belongs to underground mining method technical field, to the closed method for capping of mining with stowing on especially a kind of.
Background technology
The mode that underground mining method is safeguarded by ground pressure is divided into openstope method, filling method and caved stopes three major types.
Mining with stowing artificial supporting mining codes owned by France.In mineral building or nugget, along with the propelling of stope, send into filler to goaf, to carry out underground pressure management, to control country rock avalanche and surface movement, and carry out back production in the obturation formed or under its protection.This law is applicable to exploit the ore body of weak-walled high-grade, rare, precious ore; Earth's surface does not allow to subside, and mining conditions is complicated, as the ore body below water body, trunk railway, key construction and the ore body etc. having freely burning fire danger, and the effective measures of pressing with controlling when being also deep mining.The advantage of filling method is strong adaptability, ore recovery rate is high, the rate of dilution is low, operation is safer, can utilize industrial waste and protection earth's surface etc.
In the method for mining by the way of filling, upward filling method application is very extensive, and mineral building or nugget are divided layering by upward filling method in vertical height, from bottom to top successively back production.In nugget, arrange fill pass, be used for transferring casting resin, sometimes double as fortune equipment of carrying, material, ventilation and pedestrian and use.Often adopt a layering, carried out filling immediately, and in obturation, construct ore chute and pedestrain raise (doubling as drainage sump to use) by the way.Exploitation process is rock drilling, ore caving, ore removal, erection pedestrain raise and mine chute, construction partition wall, filling and bedding fan-shaped pushing etc.At the fan-shaped pushing that each slicing and filling body top equal bedding intensity is larger, the dilution of ore and loss during to reduce ore removal also improve ore removal efficiency.Build partition wall near ore pillar, loose fill and ore pillar are separated, for next step stooping pillaring creates good condition.
Filling mainly contains dry stowing and consolidated fill, and dry stowing refers to and adopts loose waste fill goaf, and consolidated fill is that bottom adopts high cement-sand ratio, and top adopts low cement-sand ratio to carry out consolidated fill.Tight filling is that each uses the technical problem of the mine extensive concern of the method for mining by the way of filling, and it is directly connected to Stope safty.Tight filling amount number with connecing top rate to represent, i.e. the obturation contact area of top board and the ratio of whole top board area.The top rate that connects improving filling is the key technology difficult problem that the method for mining by the way of filling needs to solve, and relevant Tight filling problem fails to be well solved all the time.
There is much research in this respect at present, research filler in the majority, and compared with traditional dry stowing or sand-lime consolidated fill, adopted high-moisture quick-setting cementitious materials to play a role improving in Tight filling effect.But connecing in the practice of top, the slurries that high-water material mixes with water are before rapid hardening, a large amount of free water and free water-clogged slurries are due to infiltration and directly discharge, and are originally full of the liquid level of slurry decline in goaf, cause to connect top and do not go up, obturation solidifies upper back easy-weathering, and filling effect is unsatisfactory.
Summary of the invention
The object of this invention is to provide in one to the closed method for capping of mining with stowing.
The object of the invention is to be realized by following technical proposals.
To the closed method for capping of mining with stowing on a kind of, the method is by nugget horizontal division layering in vertical height, successively back production from bottom to top, often adopt a layering, carry out filling immediately, and ore chute and pedestrain raise (8) is constructed by the way in each slicing and filling body (4), fill pass (6) is arranged in nugget, fill pass (6) is utilized to transfer casting resin and carry fortune equipment, material, personnel and ventilation, exploitation process comprises rock drilling, ore caving, ore removal, construct ore chute and pedestrain raise (8) in addition, partition wall (3), filling and bedding fan-shaped pushing, described partition wall (3) is built near ore pillar, loose fill and ore pillar are separated, it is characterized in that when after back production last layering complete, rig is utilized to get four steam vents (10) at top board (5) four edges, again in goaf surrounding building partition (3), process smooth by bottom goaf with top board (5), at the partition wall (3) of goaf surrounding, with top board (5) above paving waterproofing materials (9) bottom goaf, waterproofing materials is not pasted in steam vent (10) and filling well (6) position, partition wall (3), a closed filling space (7) is surrounded with top board (5) bottom goaf, by fill pass (6), filler is injected closed filling space (7), when filler overflows steam vent (10), stop injecting, after filler fills closed filling space (7), again by four steam vents (10) and fill pass (6) upper covering one deck waterproofing materials, and seal with cement.
Described filler is the mixed solution of high-moisture quick-setting cementitious materials and water; Described waterproofing materials is SBS waterproof roll.
The diameter of described fill pass (6) is 1000-2000mm, and the aperture of steam vent (10) is 60-150mm; Described partition wall (3) thickness is 100-200mm.
The present invention compared with prior art, its significantly beneficial effect be embodied in: last layering goaf surrounding and top, base plate are sticked waterproofing materials by the present invention, make it formation closed filling space, again filler is injected closed filling space, prevent the discharge of water in filling slurries, keep volume and the shape of filling slurries, after condensation of materials to be filled, form the obturation that connects top completely, thus solve Tight filling problem.Present invention process is simple, and safe and reliable, simple, cost is lower.
Accompanying drawing explanation
Fig. 1 be a kind of on to the production face generalized section of the closed method for capping of mining with stowing,
One arranges schematic diagram to top board steam vent in the closed method for capping of mining with stowing and fill pass to Fig. 2.
Number in figure: 1 is adjacent room of not digging up mine; 2 is ore pillar; 3 is partition wall; 4 is each slicing and filling body; 5 is top board; 6 is fill pass; 7 is last layered closed type filling space; 8 is ore chute and pedestrain raise; 9 is waterproofing materials; 10 is steam vent; 11 is adjacent room obturation of having dug up mine; 12 is base plate.
Detailed description of the invention
The present invention is further described below in conjunction with accompanying drawing.
As depicted in figs. 1 and 2, to the closed method for capping of mining with stowing on a kind of, the method is by nugget horizontal division layering in vertical height, successively back production from bottom to top, often adopt a layering, carry out filling immediately, and construct ore chute and pedestrain raise 8 by the way in each slicing and filling body 4, ore chute and pedestrain raise 8 can be used as to be used with drainage sump.In nugget, arrange fill pass 6, be used for transferring casting resin, sometimes double as fortune equipment of carrying, material, ventilation and pedestrian and use.Exploitation process comprises rock drilling, ore caving, ore removal, constructs ore chute and pedestrain raise 8 in addition, builds partition wall 3, filling and bedding fan-shaped pushing.It is characterized in that when after back production last layering complete, rig is utilized to get four steam vents 10 at top board 5 four edges, again at goaf surrounding building partition 3, process smooth by bottom goaf with top board 5, at goaf surrounding partition wall 3, with paving waterproofing materials 9 on top board 5 bottom goaf, waterproofing materials is not pasted in steam vent 10 and fill pass 6 position, partition wall 3, base plate 12 and top board 5 surround a closed filling space 7, by fill pass 6, filler is injected closed filling space 7, when filler overflows steam vent 10, stop injecting, after filler fills closed filling space 7, one deck waterproofing materials is covered again by four steam vents 10 and fill pass 6, and seal with cement.Described filler is the mixed solution of ZKD high water filling material and water; Described waterproofing materials is SBS waterproof roll; The diameter of described fill pass 6 is 1000-2000mm, and the aperture d of steam vent 10 is 60-150mm; Described partition wall) thickness is 100-200mm.

Claims (3)

1. on one kind to the closed method for capping of mining with stowing, the method is by nugget horizontal division layering in vertical height, successively back production from bottom to top, often adopt a layering, carry out filling immediately, and ore chute and pedestrain raise (8) is constructed by the way in each slicing and filling body (4), fill pass (6) is arranged in nugget, fill pass (6) is utilized to transfer casting resin and carry fortune equipment, material, personnel and ventilation, exploitation process comprises rock drilling, ore caving, ore removal, construct ore chute and pedestrain raise (8) in addition, partition wall (3), filling and bedding fan-shaped pushing, described partition wall (3) is built near ore pillar, loose fill and ore pillar are separated, it is characterized in that when after back production last layering complete, rig is utilized to get four steam vents (10) at top board (5) four edges, again in goaf surrounding building partition (3), process smooth by bottom goaf with top board (5), at the partition wall (3) of goaf surrounding, with top board (5) above paving waterproofing materials (9) bottom goaf, partition wall (3), a closed filling space (7) is surrounded with top board (5) bottom goaf, by fill pass (6), filler is injected closed filling space (7), when filler overflows steam vent (10), stop injecting, after filler fills closed filling space (7), again by four steam vents (10) and fill pass (6) upper covering one deck waterproofing materials, and seal with cement.
2. in one according to claim 1 to the closed method for capping of mining with stowing, it is characterized in that described filler is the mixed solution of high-moisture quick-setting cementitious materials and water; Described waterproofing materials is SBS waterproof roll.
3. in one according to claim 1 to the closed method for capping of mining with stowing, it is characterized in that the diameter of described fill pass (6) is 1000-2000mm, the aperture of steam vent (10) is 60-150mm; Described partition wall (3) thickness is 100-200mm.
CN201510482440.XA 2015-08-07 2015-08-07 To the closed method for capping of mining with stowing in one kind Expired - Fee Related CN105178960B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510482440.XA CN105178960B (en) 2015-08-07 2015-08-07 To the closed method for capping of mining with stowing in one kind

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510482440.XA CN105178960B (en) 2015-08-07 2015-08-07 To the closed method for capping of mining with stowing in one kind

Publications (2)

Publication Number Publication Date
CN105178960A true CN105178960A (en) 2015-12-23
CN105178960B CN105178960B (en) 2017-05-31

Family

ID=54901315

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510482440.XA Expired - Fee Related CN105178960B (en) 2015-08-07 2015-08-07 To the closed method for capping of mining with stowing in one kind

Country Status (1)

Country Link
CN (1) CN105178960B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109931063A (en) * 2019-04-25 2019-06-25 马钢集团矿业有限公司 To substep alternating expression filling mining method in one kind
CN113202553A (en) * 2021-05-28 2021-08-03 鞍钢集团矿业有限公司 Method for cementing and supporting roof pillar of ore room by upward filling mining method

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20010006304A1 (en) * 1999-12-17 2001-07-05 Cutting Edge Technology Pty Ltd Method of mining
CN101806226A (en) * 2010-03-19 2010-08-18 中国矿业大学 Mined out space dam-type filling method
CN102392644A (en) * 2010-11-30 2012-03-28 淄博市王庄煤矿 Stripped fluid expansion filling mining method for below middle thick coal seam
RU2471069C1 (en) * 2011-04-20 2012-12-27 Учреждение Российской академии наук Институт проблем комплексного освоения недр Российской академии наук (УРАН ИПКОН РАН) Method for underground mining of sloping and inclined ore bodies in cryolite zone
CN103557002A (en) * 2013-11-21 2014-02-05 武汉科技大学 Panel mechanized centralized ore-pass upward horizontal cut-and-filling stoping method
CN203476390U (en) * 2013-09-12 2014-03-12 徐刚 High-water filling bag for coal mine
CN203783631U (en) * 2013-12-10 2014-08-20 中国矿业大学 Flexible filling bag for opposite-pulling anchoring rod penetrating
CN104453901A (en) * 2014-12-08 2015-03-25 广西大学 Sublevel open-stoping mining method with subsequent backfilling for long-hole caving in thin ore bodies
CN104727820A (en) * 2015-04-07 2015-06-24 长沙有色冶金设计研究院有限公司 Two-step sublevel open-stop and delayed filling mining method
CN104747190A (en) * 2015-04-02 2015-07-01 广西大学 Thin ore-body mechanized highly-layering continuous mining method

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20010006304A1 (en) * 1999-12-17 2001-07-05 Cutting Edge Technology Pty Ltd Method of mining
CN101806226A (en) * 2010-03-19 2010-08-18 中国矿业大学 Mined out space dam-type filling method
CN102392644A (en) * 2010-11-30 2012-03-28 淄博市王庄煤矿 Stripped fluid expansion filling mining method for below middle thick coal seam
RU2471069C1 (en) * 2011-04-20 2012-12-27 Учреждение Российской академии наук Институт проблем комплексного освоения недр Российской академии наук (УРАН ИПКОН РАН) Method for underground mining of sloping and inclined ore bodies in cryolite zone
CN203476390U (en) * 2013-09-12 2014-03-12 徐刚 High-water filling bag for coal mine
CN103557002A (en) * 2013-11-21 2014-02-05 武汉科技大学 Panel mechanized centralized ore-pass upward horizontal cut-and-filling stoping method
CN203783631U (en) * 2013-12-10 2014-08-20 中国矿业大学 Flexible filling bag for opposite-pulling anchoring rod penetrating
CN104453901A (en) * 2014-12-08 2015-03-25 广西大学 Sublevel open-stoping mining method with subsequent backfilling for long-hole caving in thin ore bodies
CN104747190A (en) * 2015-04-02 2015-07-01 广西大学 Thin ore-body mechanized highly-layering continuous mining method
CN104727820A (en) * 2015-04-07 2015-06-24 长沙有色冶金设计研究院有限公司 Two-step sublevel open-stop and delayed filling mining method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109931063A (en) * 2019-04-25 2019-06-25 马钢集团矿业有限公司 To substep alternating expression filling mining method in one kind
CN109931063B (en) * 2019-04-25 2020-07-24 安徽马钢矿业资源集团有限公司 Upward step-by-step staggered filling mining method
CN113202553A (en) * 2021-05-28 2021-08-03 鞍钢集团矿业有限公司 Method for cementing and supporting roof pillar of ore room by upward filling mining method
CN113202553B (en) * 2021-05-28 2024-01-12 鞍钢集团矿业有限公司 Method for cementing and supporting roof column of ore room by upward filling mining method

Also Published As

Publication number Publication date
CN105178960B (en) 2017-05-31

Similar Documents

Publication Publication Date Title
CN110242301B (en) Two-step grouting modification water-retention coal mining method for roof aquifer
CN107237651B (en) A kind of multi-level grouting water-tight reinforcement means of coal mine underground reservoir and reservoir dam
CN103291325B (en) The preventing control method of Coal-mining Above Confined-water floor strata gushing water
CN110409359B (en) Segmented construction method for bottom reservoir of inner-drainage open pit
CN103967493B (en) A kind of slight slope and thin ore body ore pillar mining codes
WO2014090108A1 (en) Solid-filling coal mining method with two pre-excavated tunnels for advancing
CN203452793U (en) Room structure of shallow-hole shrinkage mining method for mining near-surface thick, large and more oblique ore body
CN103147792B (en) Drift type coal mining filling method
CN104564137B (en) Handling method and device for double-medium stacked supporting and hard top plate type mined-out area
CN112593853A (en) Construction method for coal mine waste filling and water-reducing mining
CN109973095B (en) Method for reconstructing underground water storage space in coal mine solid filling mining
CN113653492B (en) Method for preventing rock burst in filling mining
CN106545361A (en) A kind of mine down-hole high permeability filling counterfort and its construction method
CN103061767B (en) Lower to horizontal slice Dry-placed fill mining
CN102619514B (en) Top-filled pillarless cornice end-wall sublevel caving method extraction technique
CN102619515B (en) Top-filled high-end-wall pillarless sublevel caving method extraction technique
CN116163730A (en) Method for mining and sealing carbon dioxide by bidirectional forward filling of thin coal layer drilling machine
CN112412461B (en) Open-pit mine end slope coal filling mining process method
CN105178960B (en) To the closed method for capping of mining with stowing in one kind
CN105041318A (en) Method for sealed type empty field mining subsequent filling
CN102619516A (en) Top-filled pillarless vertical end-wall sublevel caving method extraction technique
CN105927225A (en) Full-seam extraction method for stoping bottom layering of shallow extremely thick loose coal seam
CN108397196B (en) A kind of gently inclined orebody open air trestle mining methods based on lattice guest's artificial ore pillar
CN102619519B (en) Ore drawing technique for controlling fluidity of ore rocks via pillarless vertical end-wall sublevel caving method
CN115898400A (en) Efficient clean comprehensive exploitation and utilization method for deep coal and associated resources thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170531

Termination date: 20190807