CN105178490A - Double-layer step-by-step laminated construction method of ultrahigh and ultrathick prestressed concrete floor - Google Patents

Double-layer step-by-step laminated construction method of ultrahigh and ultrathick prestressed concrete floor Download PDF

Info

Publication number
CN105178490A
CN105178490A CN201510477354.XA CN201510477354A CN105178490A CN 105178490 A CN105178490 A CN 105178490A CN 201510477354 A CN201510477354 A CN 201510477354A CN 105178490 A CN105178490 A CN 105178490A
Authority
CN
China
Prior art keywords
layer
concrete
superelevation
floor slab
super thick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510477354.XA
Other languages
Chinese (zh)
Inventor
王振兴
黄征
王卫新
曾辉
许龙迪
武士平
孔涛涛
廖忠波
魏燕
安然
彭景祥
张暤
焦晨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING URBAN CONSTRUCTION NORTH CONSTRUCTION Co Ltd
Original Assignee
BEIJING URBAN CONSTRUCTION NORTH CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING URBAN CONSTRUCTION NORTH CONSTRUCTION Co Ltd filed Critical BEIJING URBAN CONSTRUCTION NORTH CONSTRUCTION Co Ltd
Priority to CN201510477354.XA priority Critical patent/CN105178490A/en
Publication of CN105178490A publication Critical patent/CN105178490A/en
Pending legal-status Critical Current

Links

Abstract

The invention belongs to a double-layer step-by-step laminated construction method of an ultrahigh and ultrathick prestressed concrete floor; the use number of support frames and the layer number of lower end bearing load layers are calculated according to half weight of a design thickness of the ultrahigh and ultrathick prestressed concrete floor; and or, according to the use number of the support frames and the layer number of the lower end bearing load layers, the ultrahigh and ultrathick prestressed concrete floor is divided into 2-4 successive cast layers. The construction method is simple, practical, time-saved, labor-saved, low in cost, few in workers, low in use level of the support frames, firm, stable, low in construction cost, fast in construction speed, short in construction period and good in effect.

Description

A kind of superelevation super thick prestressed concrete floor slab double-deck substep superposed type construction method
Technical field
The invention belongs to a kind of superelevation super thick prestressed concrete floor slab double-deck substep superposed type construction method.
Background technology
At present, executive information systems thing often lower floor is commercial facility, and upper strata is house or office facility, due to the difference of its using function, causes the difference of building frame form.This building need arrange change-over panel so that the superstructure load of building is passed to its underpart structure between two kinds of form of structure.This change-over panel often absolute altitude high, from great, be also called superelevation, super thick prestressed concrete floor slab.This change-over panel adopts conventional construction method, the mould bases of at substantial is needed to support, the bracing frame of mould bases even needs directly successively to be supported to change-over panel floor from the sole plate of this building, with the huge load bearing this super thick, super thick concrete floor is built, and any single floor being positioned at change-over panel lower end all cannot bear the overweight load of change-over panel floor, thus bring larger artificial and material cost.To be positioned at the thick change-over panel supporting ten layers, two meters on the ground, if underground commerce facility is 7 Rotating fields, adopt the construction method of integrated support monobloc cast, bracing frame need from sole plate layer, successively install to conversion flaggy, namely the sole plate of 7 layers successively need install to conversion flaggy from underground, thus the overweight load of the thick change-over panel of two meters successively could be passed to the underground of sole plate, thus cause the installation of bracing frame, projects amount huge, expend fund large, employment is many, and speed of application is slow, and the construction period is long.
Summary of the invention
The object of this invention is to provide a kind of superelevation super thick prestressed concrete floor slab double-deck substep superposed type construction method, there is construction method simple and practical, time saving and energy saving, expense is few, and employment is few, and bracing frame consumption is few, firm stable, construction cost is low, and speed of application is fast, the advantage that the construction period is short and effective.
For this reason, method of the present invention comprises the steps:
(1) prepare before construction, according to the half weight of superelevation, super thick prestressed concrete floor slab design thickness, calculate the number of plies of bracing frame quantity used and lower end bearing load number layer, or design superelevation according to the number of plies of bracing frame quantity used and lower end bearing load number layer, super thick prestressed concrete floor slab is divided into the priority cast layer of 2 ~ 4 layers;
(2) according to the load of first watering lower-layer concrete of waiing upon casting concrete of superelevation, super thick prestressed concrete floor slab, bracing frame built by 2 ~ 3 neighbouring floor plates that this waits upon the bearing load layer watering floor lower end, and establishes support shuttering in the bracing frame upper end that this waits upon the floor watering underfloor end layer;
(3) reinforced frame of colligation superelevation, super thick prestressed concrete floor slab is set on the support shuttering of superelevation, super thick prestressed concrete floor slab, and formerly waters in lower-layer concrete the prestressed reinforcement line that this layer is set;
(4) lower-layer concrete is first watered to its design elevation with concrete casting, and make the upper surface of first watering lower-layer concrete be male and fomale(M&F), maintenance is carried out to the concrete of casting, after this layer concrete reaches 70 ~ 78% of design strength, the prestressed reinforcement line in this layer concrete of stretch-draw is to designing pulling force;
(5) formerly water lower-layer concrete to design strength 70 ~ 78% time, formerly water in the absolute altitude of the second step casting concrete layer of lower-layer concrete upper end and second layer prestressed reinforcement line be set;
(6) use concrete casting second step casting concrete layer to its design elevation, the upper surface of second step casting concrete layer is made to be male and fomale(M&F), maintenance is carried out to the concrete of casting, after this layer concrete reaches 70 ~ 78% of design strength, the prestressed reinforcement line in this layer concrete of stretch-draw is to designing pulling force;
(7) gross thickness repeating each layer concrete layer that step (6) is cast to priority reaches the design elevation of superelevation, super thick prestressed concrete floor slab, make superelevation, the upper surface of super thick prestressed concrete floor slab is plane, tear bracing frame and support shuttering open, complete the construction of superelevation, super thick prestressed concrete floor slab.
Described superelevation, super thick prestressed concrete floor slab are divided into the priority cast layer of 2 layers.Described male and fomale(M&F) or be corrugated surface.Described after this layer concrete reaches 75% of design strength, the prestressed reinforcement line in this layer concrete of stretch-draw is to designing pulling force.Described builds bracing frame on the 2 neighbouring floor plates that this waits upon the bearing load layer watering floor lower end.
When described superelevation, super thick prestressed concrete floor slab design thickness are 2m, superelevation, super thick prestressed concrete floor slab are divided into the priority cast layer of 2 layers; When superelevation, super thick prestressed concrete floor slab design thickness are greater than 3m, super thick prestressed concrete floor slab is divided into the priority cast layer of 3 ~ 4 layers.
Said method reaches object of the present invention.
It is simple and practical that the present invention has construction method, time saving and energy saving, and expense is few, and employment is few, and bracing frame consumption is few, firm stable, and construction cost is low, and speed of application is fast, the advantage that the construction period is short and effective.
According to test, the present invention can significantly reduce construction cost and constructor, and decline 70% compared with the construction cost of conventional method, the duration shortens 60%, also has construction quality good, the advantage that efficiency is high.
Accompanying drawing explanation
Fig. 1 is the structural representation first watering lower-layer concrete construction of the present invention.
Fig. 2 is structural representation of the present invention.
Detailed description of the invention
As shown in Figure 1 to Figure 2, a kind of superelevation super thick prestressed concrete floor slab double-deck substep superposed type construction method, the method comprises the steps:
(1) prepare before construction, according to the half weight of superelevation, super thick prestressed concrete floor slab 12 design thickness, calculate the number of plies of bracing frame 5 quantity used and lower end bearing load number layer.Or design superelevation according to the number of plies of bracing frame quantity used and lower end bearing load number layer, super thick prestressed concrete floor slab is divided into the priority cast layer of 2 ~ 4 layers.As: calculate superelevation, super thick prestressed concrete floor slab 12 design thickness half heavily for 2000T, the bearing load of each floor plate in its lower end is respectively 1000T, then need floor in its lower end 2 number of plies as bearing load number layer.According to analogizing, therefore be not repeated.
(2) according to the load of first watering lower-layer concrete 1 of waiing upon casting concrete of superelevation, super thick prestressed concrete floor slab.Bracing frame built by 2 ~ 3 neighbouring floor plates that this waits upon the bearing load layer watering floor lower end, and establishes support shuttering 4 in bracing frame 5 upper end that this waits upon the floor 6 watering underfloor end layer.
(3) reinforced frame 3 of colligation superelevation, super thick prestressed concrete floor slab is set on the support shuttering of superelevation, super thick prestressed concrete floor slab.And formerly water in lower-layer concrete the prestressed reinforcement line 2 that this layer is set.
(4) lower-layer concrete is first watered to its design elevation with concrete casting.And make the upper surface of first watering lower-layer concrete be male and fomale(M&F) 11, with facilitate this layer concrete and on it layer concrete to firmly.Maintenance is carried out to the concrete of casting.After this layer concrete reaches 70 ~ 78% of design strength, the prestressed reinforcement line in this layer concrete of stretch-draw is to designing pulling force.
(5) formerly water lower-layer concrete to design strength 70 ~ 78% time, formerly water in the absolute altitude of the second step casting concrete layer of lower-layer concrete upper end and second layer prestressed reinforcement line 21 be set.
(6) use concrete casting second step casting concrete layer to its design elevation, the upper surface of second step casting concrete layer is made to be male and fomale(M&F), maintenance is carried out to the concrete of casting, after this layer concrete reaches 70 ~ 78% of design strength, the prestressed reinforcement line in this layer concrete of stretch-draw is to designing pulling force;
(7) gross thickness repeating each layer concrete layer that step (6) is cast to priority reaches the design elevation of superelevation, super thick prestressed concrete floor slab 12.Make superelevation, the upper surface of super thick prestressed concrete floor slab is plane, tear bracing frame and support shuttering open, complete the construction of superelevation, super thick prestressed concrete floor slab.
Described superelevation, super thick prestressed concrete floor slab are divided into the priority cast layer of 2 layers.Described male and fomale(M&F) or be corrugated surface.Described after this layer concrete reaches 75% of design strength, the prestressed reinforcement line in this layer concrete of stretch-draw is to designing pulling force.Described builds bracing frame on the 2 neighbouring floor plates that this waits upon the bearing load layer watering floor lower end.
Shown in Fig. 1 to Fig. 2, be superelevation, super thick prestressed concrete floor slab is divided into the priority cast layer of 2 layers.According to the half weight of superelevation, super thick prestressed concrete floor slab 12 design thickness, calculate the number of plies of bracing frame 5 quantity used and lower end bearing load number layer, be usually no more than 2 layers.Bracing frame built by the 2 neighbouring floor plates that this waits upon the bearing load layer watering floor lower end, and establishes support shuttering 4 in bracing frame 5 upper end that this waits upon the floor 6 watering underfloor end layer.The support shuttering of superelevation, super thick prestressed concrete floor slab arranges the reinforced frame of colligation superelevation, super thick prestressed concrete floor slab, and formerly waters in lower-layer concrete the prestressed reinforcement line that this layer is set.Lower-layer concrete is first watered to its design elevation with concrete casting.And make the upper surface of first watering lower-layer concrete be male and fomale(M&F) 11, with facilitate this layer concrete and on it layer concrete to firmly.Maintenance is carried out to the concrete of casting.After this layer concrete reaches 75% of design strength, the prestressed reinforcement line in this layer concrete of stretch-draw is to designing pulling force.Formerly water lower-layer concrete to design strength 75% time, formerly water in the absolute altitude of the second step casting concrete layer of lower-layer concrete upper end and second layer prestressed reinforcement line 21 be set.With concrete casting second step casting concrete layer to the design elevation of superelevation, super thick prestressed concrete floor slab.Make superelevation, the upper surface of super thick prestressed concrete floor slab is plane, carry out maintenance to the concrete of casting, after this layer concrete reaches 75% of design strength, the prestressed reinforcement line in this layer concrete of stretch-draw is to designing pulling force.Tear bracing frame and support shuttering open, complete the construction of superelevation, super thick prestressed concrete floor slab.
When described superelevation, super thick prestressed concrete floor slab design thickness are 2m, superelevation, super thick prestressed concrete floor slab are divided into the priority cast layer of 2 layers; When superelevation, super thick prestressed concrete floor slab design thickness are greater than 3m, super thick prestressed concrete floor slab is divided into the priority cast layer of 3 ~ 4 layers.Therefore be not repeated.
In a word, it is simple and practical that the present invention has construction method, time saving and energy saving, and expense is few, and employment is few, and bracing frame consumption is few, firm stable, and construction cost is low, and speed of application is fast, the advantage that the construction period is short and effective.

Claims (6)

1. a superelevation super thick prestressed concrete floor slab double-deck substep superposed type construction method, is characterized in that: the method comprises the steps,
(1) prepare before construction, according to the half weight of superelevation, super thick prestressed concrete floor slab design thickness, calculate the number of plies of bracing frame quantity used and lower end bearing load number layer, or design superelevation according to the number of plies of bracing frame quantity used and lower end bearing load number layer, super thick prestressed concrete floor slab is divided into the priority cast layer of 2 ~ 4 layers;
(2) according to the load of first watering lower-layer concrete of waiing upon casting concrete of superelevation, super thick prestressed concrete floor slab, bracing frame built by 2 ~ 3 neighbouring floor plates that this waits upon the bearing load layer watering floor lower end, and establishes support shuttering in the bracing frame upper end that this waits upon the floor watering underfloor end layer;
(3) reinforced frame of colligation superelevation, super thick prestressed concrete floor slab is set on the support shuttering of superelevation, super thick prestressed concrete floor slab, and formerly waters in lower-layer concrete the prestressed reinforcement line that this layer is set;
(4) lower-layer concrete is first watered to its design elevation with concrete casting, and make the upper surface of first watering lower-layer concrete be male and fomale(M&F), maintenance is carried out to the concrete of casting, after this layer concrete reaches 70 ~ 78% of design strength, the prestressed reinforcement line in this layer concrete of stretch-draw is to designing pulling force;
(5) formerly water lower-layer concrete to design strength 70 ~ 78% time, formerly water in the absolute altitude of the second step casting concrete layer of lower-layer concrete upper end and second layer prestressed reinforcement line be set;
(6) use concrete casting second step casting concrete layer to its design elevation, the upper surface of second step casting concrete layer is made to be male and fomale(M&F), maintenance is carried out to the concrete of casting, after this layer concrete reaches 70 ~ 78% of design strength, the prestressed reinforcement line in this layer concrete of stretch-draw is to designing pulling force;
(7) gross thickness repeating each layer concrete layer that step (6) is cast to priority reaches the design elevation of superelevation, super thick prestressed concrete floor slab, make superelevation, the upper surface of super thick prestressed concrete floor slab is plane, tear bracing frame and support shuttering open, complete the construction of superelevation, super thick prestressed concrete floor slab.
2. method according to claim 1, is characterized in that: described superelevation, super thick prestressed concrete floor slab are divided into the priority cast layer of 2 layers.
3. method according to claim 1, is characterized in that: described male and fomale(M&F) or for corrugated surface.
4. method according to claim 1, is characterized in that: described after this layer concrete reaches 75% of design strength, the prestressed reinforcement line in this layer concrete of stretch-draw is to designing pulling force.
5. method according to claim 1, is characterized in that: described builds bracing frame on the 2 neighbouring floor plates that this waits upon the bearing load layer watering floor lower end.
6. method according to claim 1, is characterized in that: when described superelevation, super thick prestressed concrete floor slab design thickness are 2m, superelevation, super thick prestressed concrete floor slab are divided into the priority cast layer of 2 layers; When superelevation, super thick prestressed concrete floor slab design thickness are greater than 3m, super thick prestressed concrete floor slab is divided into the priority cast layer of 3 ~ 4 layers.
CN201510477354.XA 2015-08-07 2015-08-07 Double-layer step-by-step laminated construction method of ultrahigh and ultrathick prestressed concrete floor Pending CN105178490A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510477354.XA CN105178490A (en) 2015-08-07 2015-08-07 Double-layer step-by-step laminated construction method of ultrahigh and ultrathick prestressed concrete floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510477354.XA CN105178490A (en) 2015-08-07 2015-08-07 Double-layer step-by-step laminated construction method of ultrahigh and ultrathick prestressed concrete floor

Publications (1)

Publication Number Publication Date
CN105178490A true CN105178490A (en) 2015-12-23

Family

ID=54900874

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510477354.XA Pending CN105178490A (en) 2015-08-07 2015-08-07 Double-layer step-by-step laminated construction method of ultrahigh and ultrathick prestressed concrete floor

Country Status (1)

Country Link
CN (1) CN105178490A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115162618A (en) * 2022-08-01 2022-10-11 中国建筑第八工程局有限公司 High-altitude super-thick prestress conversion plate structure construction reinforcing device and method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07233581A (en) * 1994-02-24 1995-09-05 Hazama Gumi Ltd Precast reinforced concrete board and concrete compond slab method
CN101353912A (en) * 2008-08-28 2009-01-28 温州建设集团公司 Construction method of structure conversion layer concrete girder steel bracket formwork support
CN101725202A (en) * 2008-10-10 2010-06-09 中国二十冶建设有限公司 Superimposed pouring procedure of high-rise building transfer floor beam plate
CN103276894A (en) * 2013-06-04 2013-09-04 河南国基建设集团有限公司 Support system of large-cross-section girder transfer floor of hollow floor system and construction technology
CN103397778A (en) * 2013-04-27 2013-11-20 瑞华建设集团有限公司 Method for constructing high-rise commercial and residential building structure transfer floor
CN104060760A (en) * 2014-06-19 2014-09-24 浙江勤业建工集团有限公司 Layered construction method for oversized concrete beam of structural transfer floor of high-rise building

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07233581A (en) * 1994-02-24 1995-09-05 Hazama Gumi Ltd Precast reinforced concrete board and concrete compond slab method
CN101353912A (en) * 2008-08-28 2009-01-28 温州建设集团公司 Construction method of structure conversion layer concrete girder steel bracket formwork support
CN101725202A (en) * 2008-10-10 2010-06-09 中国二十冶建设有限公司 Superimposed pouring procedure of high-rise building transfer floor beam plate
CN103397778A (en) * 2013-04-27 2013-11-20 瑞华建设集团有限公司 Method for constructing high-rise commercial and residential building structure transfer floor
CN103276894A (en) * 2013-06-04 2013-09-04 河南国基建设集团有限公司 Support system of large-cross-section girder transfer floor of hollow floor system and construction technology
CN104060760A (en) * 2014-06-19 2014-09-24 浙江勤业建工集团有限公司 Layered construction method for oversized concrete beam of structural transfer floor of high-rise building

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
邓磊: "预应力厚板转换层在高层建筑中的应用", 《中国科技信息》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115162618A (en) * 2022-08-01 2022-10-11 中国建筑第八工程局有限公司 High-altitude super-thick prestress conversion plate structure construction reinforcing device and method
CN115162618B (en) * 2022-08-01 2023-10-20 中国建筑第八工程局有限公司 Construction reinforcing device and method for high-altitude super-thick prestressed conversion plate structure

Similar Documents

Publication Publication Date Title
CN104631512B (en) Hang modulus method after-pouring band beam-slab construction method
CN103437291A (en) Integral water tank preloading construction process
CN103147385B (en) Double-spliced extradosed cable-stayed bridge
CN105625566A (en) Fabricated concrete orthogonal-diagonal lattice space grid box type tube-in-tube structure and making method thereof
CN105113537A (en) Vertical support system constructed through reverse construction method and method for vertical support system
CN104712141A (en) Construction method of cast-in-place reinforced concrete dense ribbed beam floor
CN105178352A (en) Bench for prefabricating adjustable T-type beams with non-equal spans and different bottom widths and construction method of bench
CN103452350B (en) Assembling electronic workshop and construction method thereof
CN206438806U (en) A kind of assembled sandstone feed bin and the concrete mixing plant with it
CN103572703A (en) Construction method of outer wrapped concrete obliquely pulling and buckling and ring and section dividing combination method
CN106836600A (en) A kind of reinforcing bar composite floor for power transformation engineering
CN105178490A (en) Double-layer step-by-step laminated construction method of ultrahigh and ultrathick prestressed concrete floor
CN103046740A (en) Large-span moving-door type combined formwork system
CN206220321U (en) A kind of SC systems stiffness hollow core laminated slab
CN107313551A (en) A kind of concrete prefabricated wallboard of steel bar girder and structural system and its construction method
CN206581456U (en) Steel construction wall component with reinforced pipe
CN204849705U (en) Prefabricated staircase well structure in roller compacted concrete dam
CN205188991U (en) Prefabricated assembled steel construction wind turbine foundation
CN205259353U (en) Warehouse in portable increase storage space
CN103590419A (en) Assembled type adjustable high-voltage reactor foundation
CN204435421U (en) A kind of assembling manhole
CN204139190U (en) A kind of Liftable preformed bricks fetal membrane
CN203977742U (en) A kind of combination assembled stair
CN203961015U (en) Super High large span large area assembled integral steel lattice boxlike " bunchy Tong " and " Tong in bunchy Tong " structure
CN103967208B (en) The light steel of Z-section-timber with small diameter combination bearing column and making method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20151223

RJ01 Rejection of invention patent application after publication