CN105178198A - Adjustable formwork for variable cross-section high pier of bridge - Google Patents
Adjustable formwork for variable cross-section high pier of bridge Download PDFInfo
- Publication number
- CN105178198A CN105178198A CN201510643004.6A CN201510643004A CN105178198A CN 105178198 A CN105178198 A CN 105178198A CN 201510643004 A CN201510643004 A CN 201510643004A CN 105178198 A CN105178198 A CN 105178198A
- Authority
- CN
- China
- Prior art keywords
- adjustable
- formwork
- variable cross
- fixed
- bridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The invention discloses an adjustable formwork for a variable cross-section high pier of a bridge. The formwork comprises two fixing formwork bodies which are spaced for a certain distance and are in parallel with each other and perpendicular to the horizontal plane, the outer side face of each fixing formwork body is provided with three or more transverse back ridges in the horizontal direction, the two ends of each transverse back ridge protrude out of the edges at the two sides of the corresponding fixing formwork body by a certain length respectively, and the ends of every two transverse back ridges which are the same in height and located at the same side of the two fixing formwork bodies are connected through a connecting rod; two adjustable formwork bodies are arranged between the two fixing formwork bodies, and the two side edges of each adjustable formwork body are attached to the inner side faces of the two fixing formwork bodies respectively; the two fixing formwork bodies are connected through opposite-pull rods, and each adjustable formwork body is connected with the adjacent connecting rod through adjusting screw rods.
Description
Technical field
The invention belongs to bridge pier pouring construction field, relate to a kind of bridge pier pouring construction template, especially a kind of adjustable form of bridge variable cross-section high pier construction.
Background technology
Normally segmentedly in Bridge High-pier post work progress build, before a sections is built, first installation form, is bolted fixing between the edge of adjacent forms, then build this sections concrete.After a sections has been built, need the template of next sections to dismantle, be installed to a sections and continue construction.When bridge pier cross dimensions is constant, the template of next sections directly can be turned over mould and install to a upper sections.But at present in bridge construction, for reducing engineering cost, also in order to the aesthetic feeling of structure, often bridge pier column is designed to variable cross-section, adopt certain slope ratio (commonly using as 40:1,60:1 or 80:1), pier stud shape is that little bottom, top is large.Common like this construction method is just inapplicable.Because pier stud is more upwards constructed, template needs according to slope than constantly inwardly shrinking, and must be bolted fixing between the edge of adjacent forms, therefore unit in charge of construction has been the pier stud pouring construction of variable cross-section, or need the template of processing multiple cross dimensions, after a sections has been built, need to select the template of appropriate size to install at a upper sections, so just caused template to drop into greatly; Or by the suitable cutting of lower joint template, then be installed to a sections, to adapt to the continuous reduction of upper joint cross dimensions, cause the template after cutting to be difficult to reuse like this, and the seam of template after cutting and connection part of templates is wayward, affects pier stud and builds presentation quality.
Summary of the invention
The object of this invention is to provide a kind of template of applicable variable cross-section high pier construction, reduce the template cost of Bridge High-pier construction, simultaneously easy and simple to handle in work progress, there is the advantages such as controllability, safety be stable.
Technical scheme of the present invention is as follows:
A kind of bridge variable cross-section height pier adjustable form, comprise two block gap certain distances be parallel to each other and with the fixed form of horizontal plane, it is characterized in that: the lateral surface of every block fixed form, establish at least 3 horizontal back cords in the horizontal direction, the two ends of the horizontal back cord of every bar grow described fixed form both sides of the edge certain length respectively, are connected between the end of two horizontal back cords that two fixed form the same side height are identical by connecting rod; Between two fixed forms, near the both sides of the edge of described two fixed forms, be provided with two pieces of adjustable formworks, the dual-side of described adjustable formwork is fitted with the medial surface of two fixed forms respectively; By connecting pull bar between described two fixed forms, adjustable formwork described in every block is connected by adjusting screw with between the connecting rod be adjacent.
The dual-side that the medial surface of above-mentioned adjustable formwork and described fixed form is fitted is equipped with chamfering.
The present invention is applicable to the one-sided variable cross-section pier stud construction of Bridge High-pier, greatly can reduce the template cost of the one-sided variable cross-section pier stud construction of Bridge High-pier, achieve the recycling of template.The present invention adjusts the spacing of two ends adjusting template and connecting rod by adjusting screw, realize the continuous change at pier stud sectional dimension two ends, do not need between template to be bolted, change in this type of engineering construction and template is constantly carried out cutting, with meet that structure section size constantly changes requirement, there is easy and simple to handle, that controllability is strong advantage, improve workmanship and security and stability simultaneously.Because the present invention does not need to carry out to saving template under pier stud the requirement that cutting meets the reduction of upper joint template cross dimensions, therefore the concrete presentation quality of the pier stud corner of casting complete is stable, greatly improves the concrete presentation quality of pier stud.
Accompanying drawing explanation
Fig. 1 is the plan structure schematic diagram of an embodiment of the present invention;
Fig. 2 is fixed form lateral surface schematic diagram of the present invention;
Fig. 3 is adjustable formwork lateral surface schematic diagram of the present invention;
Fig. 4 is the view after the adjustable formwork in Fig. 1 inwardly shrinks.
Detailed description of the invention
As shown in Figure 1, Figure 2, Figure 3 shows, the present invention includes two block gap certain distances be parallel to each other and with the fixed form 1 of horizontal plane, the lateral surface of every block fixed form 1, establish at least 3 horizontal back cords 2 in the horizontal direction, the two ends of the horizontal back cord 2 of every bar grow fixed form both sides of the edge certain length respectively; Connected by connecting rod 3 between the end of two back cords that two fixed form the same side height are identical; Between two fixed forms 1, near the both sides of the edge of two fixed forms, be provided with two pieces of adjustable formworks 4, the dual-side of every block adjustable formwork 4 is fitted with the medial surface of two fixed forms 1 respectively, by connecting pull bar 5 between two fixed forms 1, every block adjustable formwork 4 is connected by adjusting screw 6 with between the connecting rod 3 be adjacent.
For ensureing the presentation quality that pier stud is built, the present invention can all arrange chamfering 7 at the dual-side of described adjustable formwork.
Adjusting screw 6 presets two nuts 8 in connecting rod both sides, after adjustable formwork adjustment puts in place, by nut 8, adjustable formwork is fixed.
When the present invention specifically implements, template can at specialized factory's processing and fabricating.As a kind of specific embodiment, the panel of fixed form and adjustable formwork all adopts the steel plate of 6mm, all establishes horizontal back cord outside fixed form and adjustable formwork.Horizontal back cord adopts 2 × and [channel-section steel and the panel of 10 are welded into integral mold plate, and wherein on fixed form, the two ends of every bar transverse direction back cord grow fixed form both sides of the edge at least 20cm respectively.
Connecting rod adopts 2 × and [channel-section steel of 14, adopts the finish rolling deformed bar of φ 25mm to pull bar, adjusting screw adopts diameter to be the rod iron of 50mm.
Pier stud is divided into contour multiple sections during construction, step pouring from bottom to top, by hand fit's over-form construction.First install first segment template, template uses tower crane lifting, and two fixed forms are reinforced by pull bar, overlap pvc pipe to outside pull bar.After two adjustable formworks are adjusted to predetermined gradient, be connected with connecting rod by adjusting screw, and by the nut 8 that adjusting screw is preset, adjustable formwork fixed, as shown in Figure 1.Then first segment concrete is built.
After first segment has been built, the template of first segment is installed second section template, mounting means is with first segment template.After complete second section concrete to be cast, and when the concrete strength of first segment template reaches requirement, start to turn over mould and carry out Section of three construction.Remove first segment template and template surface is cleaned out, after coating release agent, turned over to rise in second section template with tower crane and installed, the pitch of adjustment adjusting screw, adjustable formwork is made to reach the default gradient of this sections, be fixed and build Section of three concrete, circulation like this is upwards built, and often upwards one saves, adjustable formwork inwardly has contraction to a certain degree according to the slope ratio of design, as shown in Figure 4, thus realize the change of pier stud section, until reach pier stud design height.
Claims (3)
1. a bridge variable cross-section height pier adjustable form, comprise two block gap certain distances be parallel to each other and with the fixed form of horizontal plane, it is characterized in that: the lateral surface of every block fixed form, establish at least 3 horizontal back cords in the horizontal direction, the two ends of the horizontal back cord of every bar grow described fixed form both sides of the edge certain length respectively, are connected between the end of two horizontal back cords that two fixed form the same side height are identical by connecting rod; Between two fixed forms, near the both sides of the edge of described two fixed forms, be provided with two pieces of adjustable formworks, the dual-side of described adjustable formwork is fitted with the medial surface of two fixed forms respectively; By connecting pull bar between described two fixed forms, adjustable formwork described in every block is connected by adjusting screw with between the connecting rod be adjacent.
2. a kind of bridge variable cross-section height pier adjustable form according to claim 1, is characterized in that: described in every bar, the two ends of horizontal back cord grow described fixed form both sides of the edge at least 20cm respectively.
3. a kind of bridge variable cross-section height pier adjustable form according to claim 1, is characterized in that: the dual-side of described adjustable formwork is equipped with chamfering.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510643004.6A CN105178198A (en) | 2015-10-06 | 2015-10-06 | Adjustable formwork for variable cross-section high pier of bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510643004.6A CN105178198A (en) | 2015-10-06 | 2015-10-06 | Adjustable formwork for variable cross-section high pier of bridge |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105178198A true CN105178198A (en) | 2015-12-23 |
Family
ID=54900588
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510643004.6A Pending CN105178198A (en) | 2015-10-06 | 2015-10-06 | Adjustable formwork for variable cross-section high pier of bridge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105178198A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106639312A (en) * | 2016-10-21 | 2017-05-10 | 国网山东省电力公司经济技术研究院 | Adjustable type end portion device of combined large steel formwork used for wall |
CN106939698A (en) * | 2017-04-24 | 2017-07-11 | 西安建筑科技大学 | L-type is marked time mould |
CN109306664A (en) * | 2018-11-05 | 2019-02-05 | 云南建投第三建设有限公司 | A kind of Thin-walled Hollow Pier slide type inner template |
CN114319107A (en) * | 2021-10-20 | 2022-04-12 | 中交路桥华南工程有限公司 | Method for field refitting of concrete formwork |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6282852B1 (en) * | 2000-02-11 | 2001-09-04 | Vernon R. Walcker | Apparatus for installing a door frame |
CN102220742A (en) * | 2011-04-20 | 2011-10-19 | 重庆交通建设(集团)有限责任公司 | Construction method of deformable template of variable cross-section high pier |
CN202187296U (en) * | 2011-07-25 | 2012-04-11 | 中建七局第三建筑有限公司 | Adjustable T beam curb girder template |
US20120286134A1 (en) * | 2009-12-10 | 2012-11-15 | Efrain Rojas Pimienta | Adjustable metal formwork system for concrete structures |
CN204282225U (en) * | 2014-12-03 | 2015-04-22 | 湖南中铁五新钢模有限责任公司 | For the length of side rapid adjustment template of unidirectional closing slope rectangular pier construction |
CN104831921A (en) * | 2015-02-09 | 2015-08-12 | 新八建设集团有限公司 | Ring-shaped hoop used for fixing concrete square column molding plate without opposite-pull rods required |
CN205024601U (en) * | 2015-10-06 | 2016-02-10 | 中交第四公路工程局有限公司 | Template with adjustable high mound of bridge variable cross section |
-
2015
- 2015-10-06 CN CN201510643004.6A patent/CN105178198A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6282852B1 (en) * | 2000-02-11 | 2001-09-04 | Vernon R. Walcker | Apparatus for installing a door frame |
US20120286134A1 (en) * | 2009-12-10 | 2012-11-15 | Efrain Rojas Pimienta | Adjustable metal formwork system for concrete structures |
CN102220742A (en) * | 2011-04-20 | 2011-10-19 | 重庆交通建设(集团)有限责任公司 | Construction method of deformable template of variable cross-section high pier |
CN202187296U (en) * | 2011-07-25 | 2012-04-11 | 中建七局第三建筑有限公司 | Adjustable T beam curb girder template |
CN204282225U (en) * | 2014-12-03 | 2015-04-22 | 湖南中铁五新钢模有限责任公司 | For the length of side rapid adjustment template of unidirectional closing slope rectangular pier construction |
CN104831921A (en) * | 2015-02-09 | 2015-08-12 | 新八建设集团有限公司 | Ring-shaped hoop used for fixing concrete square column molding plate without opposite-pull rods required |
CN205024601U (en) * | 2015-10-06 | 2016-02-10 | 中交第四公路工程局有限公司 | Template with adjustable high mound of bridge variable cross section |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106639312A (en) * | 2016-10-21 | 2017-05-10 | 国网山东省电力公司经济技术研究院 | Adjustable type end portion device of combined large steel formwork used for wall |
CN106939698A (en) * | 2017-04-24 | 2017-07-11 | 西安建筑科技大学 | L-type is marked time mould |
CN106939698B (en) * | 2017-04-24 | 2023-08-11 | 西安建筑科技大学 | L-shaped stepping die |
CN109306664A (en) * | 2018-11-05 | 2019-02-05 | 云南建投第三建设有限公司 | A kind of Thin-walled Hollow Pier slide type inner template |
CN114319107A (en) * | 2021-10-20 | 2022-04-12 | 中交路桥华南工程有限公司 | Method for field refitting of concrete formwork |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105178198A (en) | Adjustable formwork for variable cross-section high pier of bridge | |
CN102966093B (en) | The prefabricated soldier pile of uneven arrangement of reinforcement and forming method thereof and moulding form | |
CN107859058A (en) | A kind of cast-in-place concrete retaining wall anti-incline anti-floating large steel moulding plate device and installation method | |
CN105113787A (en) | Bare-concrete sawtooth-shaped closed type stair steel formwork device | |
CN206581408U (en) | It is a kind of to be constructed by the bolted concrete lamination piece of steel plate | |
CN202627503U (en) | Concrete member template support device at deformation joint | |
CN203546583U (en) | Box-inside horizontal reinforcing device of concrete box-cross-section multi-beam bridge | |
CN205024601U (en) | Template with adjustable high mound of bridge variable cross section | |
CN207228624U (en) | A kind of tool-type shaped rc columns template | |
CN205669313U (en) | A kind of Universal adjustable hangs template system | |
CN206408933U (en) | A kind of adjustable collar tie beam reinforcing member | |
CN110670873B (en) | Support system of steel formwork of ultrahigh large-section concrete column and construction method | |
CN205637578U (en) | Roof beam increase cross -section combination steel form | |
CN203361735U (en) | Sliding mode system with function of efficient adjustment | |
CN203755264U (en) | Pouring forming die of gate pier based on curved overflow face and gate groove of gate pier | |
CN105863261A (en) | Universally-adjustable suspension formwork system | |
CN107419897B (en) | Reinforcing die for windowsill coping template | |
CN103334584B (en) | Template regulating system for sliding form system | |
CN208430432U (en) | A kind of assembled girder steel always spells moulding bed | |
CN214995980U (en) | Template device for synchronous construction of double columns at expansion joint part of frame structure factory building | |
CN205046843U (en) | Reinforcing apparatus's stair template of marking time in middle of installation | |
CN103510703A (en) | Method for constructing concrete arch columns with variable cross-sections | |
CN103437292A (en) | Lifting combination device for bidirectional inclined A-shaped main tower cable-stayed bridge template | |
CN114182616A (en) | Box girder template for road and bridge building | |
CN113997391A (en) | A no inside and outside support integral formwork for prefabricating assembled box culvert |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20151223 |