CN105173445A - Center swivel fully-hydraulic bunker cleaning machine and operating method thereof - Google Patents

Center swivel fully-hydraulic bunker cleaning machine and operating method thereof Download PDF

Info

Publication number
CN105173445A
CN105173445A CN201510582328.3A CN201510582328A CN105173445A CN 105173445 A CN105173445 A CN 105173445A CN 201510582328 A CN201510582328 A CN 201510582328A CN 105173445 A CN105173445 A CN 105173445A
Authority
CN
China
Prior art keywords
hydraulic
main shaft
cylinder barrel
rotary main
coal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510582328.3A
Other languages
Chinese (zh)
Other versions
CN105173445B (en
Inventor
赵继云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201510582328.3A priority Critical patent/CN105173445B/en
Publication of CN105173445A publication Critical patent/CN105173445A/en
Application granted granted Critical
Publication of CN105173445B publication Critical patent/CN105173445B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a center swivel fully-hydraulic bunker cleaning machine and an operating method thereof. The center swivel fully-hydraulic bunker cleaning machine comprises an upper machine frame, a lower machine frame, a rotating mechanism, a rotary main shaft, a suspension device, a counterweight device, a plurality of supporting devices and a plurality of operating devices. The suspension device is fixed to the upper machine frame and suspended in a bunker. The upper machine frame is horizontally and uniformly arranged on the side wall of the bunker in a supported mode through the supporting devices. The center of the upper machine frame is perpendicularly connected with the lower machine frame through the rotary main shaft. The operating devices are arranged on the lower machine frame in the horizontal direction. The rotating mechanism is arranged on the upper machine frame or the rotary main shaft and connected with the lower machine frame in a driving mode, and the operating devices are driven by the rotating mechanism to rotate horizontally through the lower machine frame. According to the center swivel fully-hydraulic bunker cleaning machine and the operating method thereof, the structural characteristics of the bunker are fully utilized and the special environment where the bunker is located is considered, the way that a worker enters the bunker to clean the interior of the bunker is replaced, and bunker cleaning safety is guaranteed.

Description

A kind of all-hydraulic conveyer for emptying warehouse of center steering formula and method of work thereof
Technical field
The present invention relates to the all-hydraulic coal bunker of a kind of center steering formula and amass coal conveyer for emptying warehouse, be mainly applicable to the cleaning work of the long-pending coal of bonding in the inner coal bunker in colliery.
Background technology
Coal bunker is as intermediate storage mean necessary in coal production transport, and raw coal is input and output coal bunker constantly.Owing to containing moisture and other impurity in raw coal, As time goes on, raw coal under high pressure can form one deck dung on bulkhead.This layer of dung makes coal bunker wall surface uneven, not only hinders the flowing of raw coal in coal bunker, but also decreases the available space of coal bunker, reduce production efficiency, so coal bunker will be cleared up regularly.
Traditional coal bunker manner of cleaning up is by labor cleaning, and this manner of cleaning up not only work efficiency is low, and there is the noxious gases such as gas in coal bunker, and level of oxygen is low, and the healthy of cleaning personnel in serious threat.Large stretch of long-pending coal is caving or the Frequent Accidents such as coal bunker wall landslide.
Underground coal bunker cleaning robot (CN200910020011.5) amasss coal cleaning although can be used in Bunker, and efficiency is lower, cannot realize long-pending coal cleaning automation.
Summary of the invention
Goal of the invention: in order to overcome the deficiencies in the prior art, the invention provides the all-hydraulic conveyer for emptying warehouse of a kind of center steering formula, make full use of coal bunker constructional feature and in conjunction with the particular surroundings residing for coal bunker, replace manually enter into coal bunker internal cleaning, ensure coal bunker cleaning safety.
Technical scheme: for achieving the above object, the technical solution used in the present invention is:
The all-hydraulic conveyer for emptying warehouse of a kind of center steering formula, comprise upper spider, lower bearing bracket, swing type mechanism, rotary main shaft, suspension apparatus, counter weight device, bracing or strutting arrangement and equipment, described upper spider being fixed with suspension apparatus is suspended in coal bunker, and described upper spider is supported by some bracing or strutting arrangement horizontal homogeneous and is arranged on coal bunker sidewall; Described upper spider center vertically connects lower bearing bracket by rotary main shaft, and described lower bearing bracket horizontal direction is provided with some equipments; Described upper spider or rotary main shaft are provided with swing type mechanism, and described swing type mechanism drives with lower bearing bracket and is connected, and swing type mechanism drives equipment to horizontally rotate by lower bearing bracket.
Further, described upper spider comprises upper plate, upper bush and upper gusset, and described upper plate is circular flat plate structure, and described upper bush is arranged on upper plate center, and it is firm that described upper bush and upper plate pass through gusset on some well-distributeds; Comprise some upper cylinder barrel permanent seats and upper hydraulic actuating cylinder flange, described upper cylinder barrel permanent seat and upper hydraulic actuating cylinder flange one_to_one corresponding are evenly fixed on upper plate face, and described upper cylinder barrel permanent seat is fixed on outside hydraulic actuating cylinder flange.
Further, described bracing or strutting arrangement comprises support hydraulic pressure oil cylinder, cylinder barrel fixed cap successively by one end to the other end and supports arm head, described support hydraulic pressure oil cylinder is connected with upper hydraulic actuating cylinder flange, described cylinder barrel fixed cap is fixedly connected with upper cylinder barrel permanent seat, the first end of described hold-down arm is connected with the piston rod of support hydraulic pressure oil cylinder, and the other end supports and is arranged on coal bunker sidewall.
Further, described swing type mechanism is fixed on upper spider, comprise motor sleeve and low speed high torque hydraulic motor, described motor sleeve is fixedly installed on upper spider, described low speed high torque hydraulic motor and motor sleeve are fixedly installed, described rotary main shaft is connected by a pair open type gear driving with between low speed high torque hydraulic motor, and described rotary main shaft is connected with lower bearing bracket.
Further, described lower bearing bracket comprises lower shoe, lower sleeve and lower web plate, and described lower shoe is circular flat plate structure, and described lower sleeve is arranged on lower shoe center, and it is firm that described lower sleeve and lower shoe pass through some well-distributed lower web plates; Comprise some lower cylinder barrel permanent seats and lower hydraulic actuating cylinder flange, described lower cylinder barrel permanent seat and lower hydraulic actuating cylinder flange one_to_one corresponding are evenly fixed on lower shoe face, and described lower cylinder barrel permanent seat is fixed on outside lower hydraulic actuating cylinder flange.
Further, described equipment comprises working hydraulic pressure oil cylinder, work cylinder barrel fixed cap and cutterhead successively by one end to the other end, described working hydraulic pressure oil cylinder is connected with lower hydraulic actuating cylinder flange, described work cylinder barrel fixed cap is fixedly connected with lower cylinder barrel permanent seat, described cutterhead one end is connected with the piston rod of working hydraulic pressure oil cylinder, and other end laminating is arranged on coal bunker sidewall.
Further, described rotary main shaft comprises rotary main shaft sleeve, described rotary main shaft sleeve is connected with the lower sleeve of lower bearing bracket, and described rotary main shaft sleeve is connected by a pair open type gear driving with between low speed high torque hydraulic motor.
A method of work for the all-hydraulic conveyer for emptying warehouse of center steering formula, step is as follows:
During operation, the all-hydraulic conveyer for emptying warehouse of center steering formula connects suspension apparatus by down-hole winch, complete machine is placed in coal bunker center, by the camera on equipment, complete machine is transferred to long-pending coal position; Then be positioned at the bracing or strutting arrangement work on upper spider 1, three hydraulic cylinder piston rods stretch out and make support arm head that complete machine is supported on coal bunker inwall; Support after fixing, equipment is started working, and two hydraulic rams stretch back and forth, by cutterhead, long-pending coal are smash pine; After long-pending coal smashes pine, swing type mechanism is started working, and is rotated by the long-pending coal smashing pine and cuts off; After long-pending coal cleans out, by the long-pending coal of camera locking, make complete machine again transfer to next long-pending coal by down-hole winch and clear up.
Beneficial effect: 1) structure is simple, and complete machine overall weight is less, is beneficial to the operation of underground coal mine small space, makes full use of the handling of down-hole car hauler, saves design and manufacture cost.2) replace labor cleaning's coal bunker, improve the safety of coal production, alleviate the labour intensity of workman.3) coal is amassed in mechanical chipping, greatly increases the work efficiency of coal bunker cleaning.
Accompanying drawing explanation
Fig. 1 is the main TV structure schematic diagram of the present invention.
Fig. 2 is the plan structure schematic diagram of Fig. 1.
Fig. 3 is upper spider master of the present invention, structural representation of bowing.
Fig. 4 is lower bearing bracket master of the present invention, structural representation of bowing.
Fig. 5 is swing type mechanism structural representation of the present invention.
Fig. 6 is support device structure schematic diagram of the present invention.
Fig. 7 is equipment structural representation of the present invention.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention is further described.
Be the all-hydraulic conveyer for emptying warehouse of a kind of center steering formula as shown in Figure 1, 2, comprise upper spider 1, lower bearing bracket 11, swing type mechanism 2, rotary main shaft 2-5, suspension apparatus 3, counter weight device 4, bracing or strutting arrangement 5 and equipment 6, described upper spider 1 is fixed with suspension apparatus 3 to be suspended in coal bunker, described upper spider 1 is supported by some bracing or strutting arrangement 5 horizontal homogeneous and is arranged on coal bunker sidewall, in the present invention, comprise three bracing or strutting arrangements 5 in a plane, and 120 °, uniform interval.Described upper spider 1 center vertically connects lower bearing bracket 11 by rotary main shaft 2-5, be parallel to each other between described upper spider 1 and lower bearing bracket 11, described lower bearing bracket 11 horizontal direction is provided with some equipments 6, in the present invention, comprise two equipments 6 in a plane, and 180 °, uniform interval.Described upper spider 1 or rotary main shaft 2-5 are provided with swing type mechanism 2, and described swing type mechanism 2 drives with lower bearing bracket 11 and is connected, and swing type mechanism 2 drives equipment 6 to horizontally rotate by lower bearing bracket 11.
As Fig. 3, described upper spider 1 comprises upper plate 1-1, upper bush 1-2 and upper gusset 1-4, described upper plate 1-1 is circular flat plate structure, described upper bush 1-2 is arranged on upper plate 1-1 center, described upper bush 1-2 and upper plate 1-1 is firm by gusset 1-4 on some well-distributeds, in the present invention, upper gusset 1-4 is three, and is uniformly distributed; Comprise some upper cylinder barrel permanent seat 1-3 and upper hydraulic actuating cylinder flange 1-5, described upper cylinder barrel permanent seat 1-3 and upper hydraulic actuating cylinder flange 1-5 one_to_one corresponding are evenly fixed on upper plate 1-1 face, described upper cylinder barrel permanent seat 1-3 is fixed on outside hydraulic actuating cylinder flange 1-5, in the present invention, upper cylinder barrel permanent seat 1-3 and upper hydraulic actuating cylinder flange 1-5 is three, and is uniformly distributed.
As Fig. 6, described bracing or strutting arrangement 5 comprises support hydraulic pressure oil cylinder 5-1, cylinder barrel fixed cap 5-2 successively by one end to the other end and supports arm head 5-3, described support hydraulic pressure oil cylinder 5-1 one end is connected with upper hydraulic actuating cylinder flange 1-5, described cylinder barrel fixed cap 5-2 and upper cylinder barrel permanent seat 1-3 is connected and fixed support hydraulic pressure oil cylinder 5-1, described support arm head 5-3 one end is connected with the other end piston rod of support hydraulic pressure oil cylinder 5-1, and the other end supports and is arranged on coal bunker sidewall.
As Fig. 4, described lower bearing bracket 11 comprises lower shoe 11-1, lower sleeve 11-2 and lower web plate 11-4, described lower shoe 11-1 is circular flat plate structure, described lower sleeve 11-2 is arranged on lower shoe 11-1 center, described lower sleeve 11-2 and lower shoe 11-1 is firm by some well-distributed lower web plate 11-4, in the present invention, lower web plate 11-4 is three, and is uniformly distributed; Comprise some lower cylinder barrel permanent seat 11-3 and lower hydraulic actuating cylinder flange 11-5, described lower cylinder barrel permanent seat 11-3 and lower hydraulic actuating cylinder flange 11-5 one_to_one corresponding are evenly fixed on lower shoe 11-1 face, described lower cylinder barrel permanent seat 11-3 is fixed on outside lower hydraulic actuating cylinder flange 11-5, in the present invention, lower cylinder barrel permanent seat 11-3 and lower hydraulic actuating cylinder flange 11-5 is three, and is uniformly distributed.
As Fig. 5, embodiment, described swing type mechanism 2 is fixed on upper spider 1, comprise motor sleeve 2-1 and low speed high torque hydraulic motor 2-2, described motor sleeve 2-1 is fixedly installed on upper spider 1, described low speed high torque hydraulic motor 2-2 and motor sleeve 2-1 is fixedly installed, and described rotary main shaft 2-5 is connected by a pair open type gear driving with between low speed high torque hydraulic motor 2-2.Concrete, described rotary main shaft 2-5 comprises rotary main shaft sleeve 2-4, described rotary main shaft sleeve 2-4 is connected with the lower sleeve 11-2 of lower bearing bracket 11, and described rotary main shaft sleeve 2-4 is connected by a pair open type gear driving with between low speed high torque hydraulic motor 2-2.This open type gear driving: comprise miniature gears 2-7 and big gear wheel 2-3, described miniature gears 2-7 is arranged on the output shaft of low speed high torque hydraulic motor 2-2, and described big gear wheel 2-7 is set on rotary main shaft sleeve 2-4.
As Fig. 7, described equipment 6 comprises working hydraulic pressure oil cylinder 6-1, work cylinder barrel fixed cap 6-2 and cutterhead 6-4 successively by one end to the other end, described working hydraulic pressure oil cylinder 6-1 one end is connected with lower hydraulic actuating cylinder flange 11-5, described work cylinder barrel fixed cap 6-2 and lower cylinder barrel permanent seat 11-3 is connected and fixed working hydraulic pressure oil cylinder 6-1, described cutterhead 6-4 one end is connected with the other end piston rod of working hydraulic pressure oil cylinder 6-1 by spring cotter 6-5, and the laminating of the cutterhead 6-4 other end is arranged on coal bunker sidewall.Described slide rail 6-3 is hinged on lower bearing bracket 11.
A method of work for the all-hydraulic conveyer for emptying warehouse of center steering formula, step is as follows:
During operation, the all-hydraulic conveyer for emptying warehouse of center steering formula connects suspension apparatus 3 by down-hole winch, complete machine is placed in coal bunker center, by the camera on equipment 6, complete machine is transferred to long-pending coal position; Then the bracing or strutting arrangement 5 be positioned on upper spider 1 works, and three hydraulic cylinder piston rods stretch out and make support arm head 5-3 that complete machine is supported on coal bunker inwall; Support after fixing, equipment 6 is started working, and two hydraulic rams stretch back and forth, by cutterhead 6-4, long-pending coal are smash pine; After long-pending coal smashes pine, swing type mechanism 2 is started working, and is rotated by the long-pending coal smashing pine and cuts off; After long-pending coal cleans out, by the long-pending coal of camera locking, make complete machine again transfer to next long-pending coal by down-hole winch and clear up.
The above is only the preferred embodiment of the present invention; be noted that for those skilled in the art; under the premise without departing from the principles of the invention, can also make some improvements and modifications, these improvements and modifications also should be considered as protection scope of the present invention.

Claims (8)

1. the all-hydraulic conveyer for emptying warehouse of center steering formula, it is characterized in that: comprise upper spider (1), lower bearing bracket (11), swing type mechanism (2), rotary main shaft (2-5), suspension apparatus (3), counter weight device (4), bracing or strutting arrangement (5) and equipment (6), described upper spider (1) being fixed with suspension apparatus (3) is suspended in coal bunker, and described upper spider (1) is supported by some bracing or strutting arrangements (5) horizontal homogeneous and is arranged on coal bunker sidewall; Described upper spider (1) center vertically connects lower bearing bracket (11) by rotary main shaft (2-5), and described lower bearing bracket (11) horizontal direction is provided with some equipments (6); Described upper spider (1) or rotary main shaft (2-5) are provided with swing type mechanism (2), described swing type mechanism (2) drives with lower bearing bracket (11) and is connected, and swing type mechanism (2) drives equipment (6) to horizontally rotate by lower bearing bracket (11).
2. the all-hydraulic conveyer for emptying warehouse of a kind of center steering formula according to claim 1, it is characterized in that: described upper spider (1) comprises upper plate (1-1), upper bush (1-2) and upper gusset (1-4), described upper plate (1-1) is circular flat plate structure, described upper bush (1-2) is arranged on upper plate (1-1) center, and described upper bush (1-2) is firm by gusset (1-4) on some well-distributeds with upper plate (1-1); Comprise some upper cylinder barrel permanent seats (1-3) and upper hydraulic actuating cylinder flange (1-5), described upper cylinder barrel permanent seat (1-3) and upper hydraulic actuating cylinder flange (1-5) one_to_one corresponding are evenly fixed on upper plate (1-1) face, and described upper cylinder barrel permanent seat (1-3) is fixed on hydraulic actuating cylinder flange (1-5) outside.
3. the all-hydraulic conveyer for emptying warehouse of a kind of center steering formula according to claim 2, it is characterized in that: described bracing or strutting arrangement (5) comprises support hydraulic pressure oil cylinder (5-1) successively by one end to the other end, cylinder barrel fixed cap (5-2) and support arm head (5-3), described support hydraulic pressure oil cylinder (5-1) is connected with upper hydraulic actuating cylinder flange (1-5), described cylinder barrel fixed cap (5-2) is fixedly connected with upper cylinder barrel permanent seat (1-3), described support arm head (5-3) one end is connected with the piston rod of support hydraulic pressure oil cylinder (5-1), the other end supports and is arranged on coal bunker sidewall.
4. the all-hydraulic conveyer for emptying warehouse of a kind of center steering formula according to claim 1, it is characterized in that: described swing type mechanism (2) is fixed on upper spider (1), comprise motor sleeve (2-1) and low speed high torque hydraulic motor (2-2), described motor sleeve (2-1) is fixedly installed on upper spider (1), described low speed high torque hydraulic motor (2-2) and motor sleeve (2-1) are fixedly installed, be connected by a pair open type gear driving between described rotary main shaft (2-5) with low speed high torque hydraulic motor (2-2), described rotary main shaft (2-5) is connected with lower bearing bracket (11).
5. the all-hydraulic conveyer for emptying warehouse of a kind of center steering formula according to claim 1, it is characterized in that: described lower bearing bracket (11) comprises lower shoe (11-1), lower sleeve (11-2) and lower web plate (11-4), described lower shoe (11-1) is circular flat plate structure, described lower sleeve (11-2) is arranged on lower shoe (11-1) center, and described lower sleeve (11-2) is firm by some well-distributed lower web plates (11-4) with lower shoe (11-1); Comprise some lower cylinder barrel permanent seats (11-3) and lower hydraulic actuating cylinder flange (11-5), described lower cylinder barrel permanent seat (11-3) and lower hydraulic actuating cylinder flange (11-5) one_to_one corresponding are evenly fixed on lower shoe (11-1) face, and described lower cylinder barrel permanent seat (11-3) is fixed on lower hydraulic actuating cylinder flange (11-5) outside.
6. the all-hydraulic conveyer for emptying warehouse of a kind of center steering formula according to claim 5, it is characterized in that: described equipment (6) comprises working hydraulic pressure oil cylinder (6-1) successively by one end to the other end, work cylinder barrel fixed cap (6-2) and cutterhead (6-4), described working hydraulic pressure oil cylinder (6-1) is connected with lower hydraulic actuating cylinder flange (11-5), described work cylinder barrel fixed cap (6-2) is fixedly connected with lower cylinder barrel permanent seat (11-3), described cutterhead (6-4) one end is connected with the piston rod of working hydraulic pressure oil cylinder (6-1), other end laminating is arranged on coal bunker sidewall.
7. the all-hydraulic conveyer for emptying warehouse of a kind of center steering formula according to claim 4 or 5, it is characterized in that: described rotary main shaft (2-5) comprises rotary main shaft sleeve (2-4), described rotary main shaft sleeve (2-4) is connected with the lower sleeve (11-2) of lower bearing bracket (11), and described rotary main shaft sleeve (2-4) is connected by a pair open type gear driving with between low speed high torque hydraulic motor (2-2).
8. a method of work for the all-hydraulic conveyer for emptying warehouse of center steering formula, it is characterized in that, step is as follows:
During operation, the all-hydraulic conveyer for emptying warehouse of center steering formula connects suspension apparatus (3) by down-hole winch, complete machine is placed in coal bunker center, by the camera on equipment (6), complete machine is transferred to long-pending coal position;
Then be positioned at bracing or strutting arrangement (5) work on upper spider 1, three hydraulic cylinder piston rods stretch out and make support arm head (5-3) that complete machine is supported on coal bunker inwall;
Support after fixing, equipment (6) is started working, and two hydraulic rams stretch back and forth, by cutterhead (6-4), long-pending coal is smash pine;
After long-pending coal smashes pine, swing type mechanism (2) is started working, and is rotated by the long-pending coal smashing pine and cuts off;
After long-pending coal cleans out, by the long-pending coal of camera locking, make complete machine again transfer to next long-pending coal by down-hole winch and clear up.
CN201510582328.3A 2015-09-14 2015-09-14 A kind of all-hydraulic conveyer for emptying warehouse of center steering formula and its method of work Active CN105173445B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510582328.3A CN105173445B (en) 2015-09-14 2015-09-14 A kind of all-hydraulic conveyer for emptying warehouse of center steering formula and its method of work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510582328.3A CN105173445B (en) 2015-09-14 2015-09-14 A kind of all-hydraulic conveyer for emptying warehouse of center steering formula and its method of work

Publications (2)

Publication Number Publication Date
CN105173445A true CN105173445A (en) 2015-12-23
CN105173445B CN105173445B (en) 2017-10-24

Family

ID=54896018

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510582328.3A Active CN105173445B (en) 2015-09-14 2015-09-14 A kind of all-hydraulic conveyer for emptying warehouse of center steering formula and its method of work

Country Status (1)

Country Link
CN (1) CN105173445B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108438957A (en) * 2018-03-23 2018-08-24 福建工程学院 A kind of unmanned cement library clearing machine of automatic intelligent
CN110589265A (en) * 2019-10-30 2019-12-20 浙江量大智能科技有限公司 Intelligent foot type walking coal bunker cleaning robot
CN110626646A (en) * 2019-10-23 2019-12-31 石河子大学 Hydraulic coal bunker cleaning device
CN110695011A (en) * 2019-09-30 2020-01-17 太原科技大学 Silo inner wall adhesion material cleaning device and cleaning method thereof
CN116532452A (en) * 2023-07-06 2023-08-04 唐山冀东装备工程股份有限公司 Warehouse cleaning robot
CN110626646B (en) * 2019-10-23 2024-04-26 石河子大学 Hydraulic coal bunker cleaning device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3599871A (en) * 1969-07-08 1971-08-17 Goodrich Co B F Jet spray tank cleaner
EP1491463A2 (en) * 2003-06-19 2004-12-29 C&M Manutenzioni Industriali s.n.c. A declogging device for storage silos
CN101497443A (en) * 2008-01-25 2009-08-05 三菱麻铁里亚尔株式会社 Reactor cleaning apparatus
CN101526007A (en) * 2009-03-23 2009-09-09 山东科技大学 Underground coal bunker cleaning robot
CN102673911A (en) * 2012-04-16 2012-09-19 郑州大学 Sectional cleaning and blockage removing device for deep cylinder bin
CN103047866A (en) * 2012-12-15 2013-04-17 大连华锐重工集团股份有限公司 Slag removing machine for ore-smelting furnace

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3599871A (en) * 1969-07-08 1971-08-17 Goodrich Co B F Jet spray tank cleaner
EP1491463A2 (en) * 2003-06-19 2004-12-29 C&M Manutenzioni Industriali s.n.c. A declogging device for storage silos
CN101497443A (en) * 2008-01-25 2009-08-05 三菱麻铁里亚尔株式会社 Reactor cleaning apparatus
CN101526007A (en) * 2009-03-23 2009-09-09 山东科技大学 Underground coal bunker cleaning robot
CN102673911A (en) * 2012-04-16 2012-09-19 郑州大学 Sectional cleaning and blockage removing device for deep cylinder bin
CN103047866A (en) * 2012-12-15 2013-04-17 大连华锐重工集团股份有限公司 Slag removing machine for ore-smelting furnace

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108438957A (en) * 2018-03-23 2018-08-24 福建工程学院 A kind of unmanned cement library clearing machine of automatic intelligent
CN108438957B (en) * 2018-03-23 2024-03-26 福建工程学院 Intelligent full-automatic unmanned cement warehouse cleaning machine
CN110695011A (en) * 2019-09-30 2020-01-17 太原科技大学 Silo inner wall adhesion material cleaning device and cleaning method thereof
CN110626646A (en) * 2019-10-23 2019-12-31 石河子大学 Hydraulic coal bunker cleaning device
CN110626646B (en) * 2019-10-23 2024-04-26 石河子大学 Hydraulic coal bunker cleaning device
CN110589265A (en) * 2019-10-30 2019-12-20 浙江量大智能科技有限公司 Intelligent foot type walking coal bunker cleaning robot
CN116532452A (en) * 2023-07-06 2023-08-04 唐山冀东装备工程股份有限公司 Warehouse cleaning robot

Also Published As

Publication number Publication date
CN105173445B (en) 2017-10-24

Similar Documents

Publication Publication Date Title
CN105173445A (en) Center swivel fully-hydraulic bunker cleaning machine and operating method thereof
CN102134043B (en) Crawler hydraulic support assembling machine
CN203064994U (en) Lifting device for disassembling negative ring segments
CN104444392A (en) C-shaped steel stacking device
CN105173794A (en) Rocker arm type bunker cleaning machine for clearing away accumulated coal in bunker and cleaning method of rocker arm type bunker cleaning machine
CN107447997A (en) Wall-building machine
CN104354683B (en) Can be by the railway wheel of formula band rotating driving device to inspection platform
CN204152434U (en) A kind of transhipment anchor shaft anchor cable six arm drill carriage
CN102874691B (en) Coal mine fully-mechanized mining the middle pan of scraper conveyor hanging apparatus
CN204024469U (en) The all-hydraulic anchor shaft anchor cable drill carriage of six arms that a kind of supporting continuous miner uses
CN203049587U (en) Multifunctional concrete storehouse surface placing boom
CN102730013B (en) Load-bearing large-tonnage automatic lifting movement trolley
CN104196446A (en) Six-arm full hydraulic anchor rod and anchor cable drill carriage used in cooperation with continuous miner
CN204152431U (en) A kind of transhipment anchor shaft anchor cable eight arm drill carriage
CN202670975U (en) Loading platform of mining elevator
CN102729282A (en) Feeding device of pipe cutting machine
CN203359822U (en) Indoor GIS (geographic information system) transport in-place device
CN104495398A (en) C-section steel receiving set
CN103693461A (en) Mine hydraulic rotary unloading platform
CN209740239U (en) Power device of positioning trolley
CN202897867U (en) Middle trough hoisting device of fully-mechanized coal mining scraper conveyer in coal mine
CN206987865U (en) A kind of shifting unwheeling of advance timbering group
CN202645586U (en) Mine car material-taking apparatus with hydraulic drive
CN104070519B (en) A kind of upset lifting manipulator
CN201874612U (en) Belt lifting device on tunneling surface

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Zhao Jiyun

Inventor after: Zhou Weishan

Inventor after: Miao Yunjiang

Inventor after: Ding Haigang

Inventor after: Zhao Liang

Inventor after: Chen Shiqi

Inventor before: Zhao Jiyun

COR Change of bibliographic data
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 221008 Xuzhou Jiangsu Copper Mountain University Road, China University of Mining and Technology Research Institute

Applicant after: China University of Mining & Technology

Address before: 221008 Research Institute, China University of Mining and Technology, Xuzhou University, Jiangsu, China,

Applicant before: China University of Mining & Technology

GR01 Patent grant
GR01 Patent grant