CN105173324B - Plastic tray in shape like Chinese character 'chuan' - Google Patents

Plastic tray in shape like Chinese character 'chuan' Download PDF

Info

Publication number
CN105173324B
CN105173324B CN201510358762.3A CN201510358762A CN105173324B CN 105173324 B CN105173324 B CN 105173324B CN 201510358762 A CN201510358762 A CN 201510358762A CN 105173324 B CN105173324 B CN 105173324B
Authority
CN
China
Prior art keywords
panel
passage
kerve
base plate
inverted draw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510358762.3A
Other languages
Chinese (zh)
Other versions
CN105173324A (en
Inventor
陈爱华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Xin Ding plastic Limited by Share Ltd
Original Assignee
Zhejiang Xinding Plastic Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Xinding Plastic Industry Co Ltd filed Critical Zhejiang Xinding Plastic Industry Co Ltd
Priority to CN201510358762.3A priority Critical patent/CN105173324B/en
Publication of CN105173324A publication Critical patent/CN105173324A/en
Application granted granted Critical
Publication of CN105173324B publication Critical patent/CN105173324B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D19/00Pallets or like platforms, with or without side walls, for supporting loads to be lifted or lowered
    • B65D19/0004Rigid pallets without side walls
    • B65D19/0006Rigid pallets without side walls the load supporting surface being made of a single element
    • B65D19/0008Rigid pallets without side walls the load supporting surface being made of a single element forming a continuous plane contact surface
    • B65D19/001Rigid pallets without side walls the load supporting surface being made of a single element forming a continuous plane contact surface the base surface being made of a single element
    • B65D19/0014Rigid pallets without side walls the load supporting surface being made of a single element forming a continuous plane contact surface the base surface being made of a single element forming discontinuous or non-planar contact surfaces
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D19/00Pallets or like platforms, with or without side walls, for supporting loads to be lifted or lowered
    • B65D19/38Details or accessories
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D2519/00Pallets or like platforms, with or without side walls, for supporting loads to be lifted or lowered
    • B65D2519/00004Details relating to pallets
    • B65D2519/00009Materials
    • B65D2519/00014Materials for the load supporting surface
    • B65D2519/00034Plastic

Abstract

The invention discloses a plastic tray in the shape like the Chinese character 'chuan'. According to the technical scheme, the plastic tray is characterized by comprising a face plate and bottom plates, the bottom plates are inserted in and clamped on the bottom face of the face plate, and first channels for steel bars to penetrate the face plate are arranged at the bottom of the face plate; first bottom grooves are formed in the bottoms of the first channels, and first top grooves penetrating the face plate are formed in the tops of the first channels; the length formed by the first top grooves and the first bottom grooves in the orthographic projection direction is consistent with the length of the first channels, and the first top grooves and the first bottom grooves are staggered or partially overlapped in the orthographic projection direction; all the channels originally embedded in the face plate and used for the steel bars to penetrate are exposed out of the tray through the bottom grooves and the top grooves; and accordingly during producing and machining, a fixed mold and a movable mold can be oppositely inserted from the two sides to carry out injection molding on the channels, the mold cost is saved, and the production time is shortened.

Description

River word plastic pallet
Technical field
The present invention relates to a kind of pallet, more specifically, it relates to a kind of river word plastic pallet.
Background technology
Plastic pallet is applied widely in productive life, can replace the effect of traditional wood pallets, is saved Resource.Now, much in order to improve the structural strength of plastic pallet.Be mostly above panel it is extra plus load onto some footing or Person's base plate, base plate can play a part of support, and for convenience both are fixed, and some are that welding is directly fixed, and some are to pass through What grafting buckle got on.On the other hand, steel bar also can be added in plastic pallet for improving the toughness of plastic pallet and carrying Property.
Existing application number:201120535732.2 patent of invention and Application No.:201020239763.9 invention it is special Profit discloses the structure that steel bar above plastic pallet inserts pallet, in order to ensure plastic pallet it is strong with the overall co-ordination of steel bar Degree, steel bar is that whole piece runs through pallet.Therefore when production is molded the plastic pallet, it is required for being driven using longer oil pump Side pumping rod insertion, in die cavity, draws it out again when the demoulding.Due to present pallet volume it is larger, it is therefore desirable to will Side pumping rod release from the inside needs stroke it is very long, cause structure very huge and oil cylinder length need it is very long, Even two structure lengths for facing to take out are also very long, the cost of production is so considerably increased.
The content of the invention
In view of the shortcomings of the prior art, it is an object of the invention to provide a kind of river word plastic pallet, on pallet The inside that original whole is embedded in panel is exposed to outside by face for the passage that steel bar is passed through by opening up kerve and inverted draw cut, is so existed When production and processing, cover half can save die cost, when reducing production with dynamic model from both sides to inserting passage injection mo(u)lding Between.
For achieving the above object, the invention provides following technical scheme:A kind of river word plastic pallet, including panel and bottom Plate, the base plate is plugged together and is connected on the panel bottom surface, the panel bottom offer for for steel bar through the of panel One passage, the bottom of the first passage is offered through panel to offer the first kerve on the first passage top First inverted draw cut, the first inverted draw cut and the first kerve, first inverted draw cut consistent with first passage length in the length that orthographic projection direction constitutes Misplace or partly overlap in orthographic projection direction portion with the first kerve.
The present invention is further arranged to:Offer on the base plate for steel bar through base plate second channel, described second The bottom of passage offers the second inverted draw cut through panel, the second top to offer the second kerve on the second channel top Groove is consistent with first passage length in the length that orthographic projection direction constitutes with the second kerve, and the second inverted draw cut is just being thrown with the second kerve Shadow direction portion misplaces or partly overlaps.
The present invention is further arranged to:The panel bottom is provided with multiple hollow footing, and the base plate quantity is multiple And base plate is provided with hollow protuberance, base plate plugs together clamping so as to be fixed on panel by protuberance and footing, described First passage runs through the footing, and the second channel runs through the protuberance.
The present invention is further arranged to:The first passage quantity passed through on described each footing is two, and described each is convex It is two to go out the second channel quantity passed through in portion
The present invention is further arranged to:The shrinkage pool of multiple convenient leakages is densely covered with the panel, positioned at middle shrinkage pool For rhombus, the shrinkage pool positioned at edge is ellipse.
The present invention is further arranged to:The panel bottom surface is provided with for the reinforcement of reinforcement structure intensity, and described Reinforcement between one passage and panel outward flange is y-type structure.
Compared with prior art, it is an advantage of the current invention that supplying the inside that original whole is embedded in panel on pallet The passage that steel bar is passed through is exposed to outside by opening up kerve and inverted draw cut, and so when production and processing, cover half can with dynamic model With from both sides to inserting passage injection mo(u)lding.The structure that original side is taken out is changed, this structure only needs to be taken out using very short side Bar is extracted out on pallet side just can be with channel attached through hole, can shorten the length of side pumping rod more than 80%, so makes Side just can be completed with very short oil cylinder to take out, saved cost.And as a rule, when when past side pumping rod once being extracted out Between for 20S or so, it now is possible within 5S, substantially reduce side and find time, production efficiency is improve to a great extent.
Description of the drawings
Fig. 1 is the first structure figure of word plastic pallet embodiment in river of the present invention;
Fig. 2 is the second structure chart of word plastic pallet embodiment in river of the present invention;
Fig. 3 is the structure chart of river word plastic pallet embodiment panel of the present invention;
Fig. 4 is the local structural graph of river word plastic pallet embodiment panel of the present invention;
Fig. 5 is the first structure figure of river word plastic pallet embodiment base plate of the present invention;
Fig. 6 is the second structure chart of river word plastic pallet embodiment base plate of the present invention.
Reference:1st, panel;11st, footing;12nd, shrinkage pool;13rd, reinforcement;2nd, base plate;21st, protuberance;3rd, first leads to Road;31st, the first inverted draw cut;32nd, the first kerve;4th, second channel;41st, the second inverted draw cut;42nd, the second kerve.
Specific embodiment
Word plastic pallet embodiment in river of the present invention is described further referring to figs. 1 to Fig. 6.
A kind of river word plastic pallet, including panel 1 and base plate 2, the bottom of the panel 1 is provided with 9 hollow footing 11, bottom Foot 11 is in 3*3 structure distribution, and 8 footing 11 are evenly distributed on the edge of panel 1, and last footing 11 is located at panel 1 The position at center.The quantity of the base plate 2 is three and each base plate 2 is provided with three hollow protuberances 21, and base plate 2 is by convex Go out portion 21 and footing 11 plugs together clamping so as to be fixed on panel 1, there is block tongue on protuberance 21, and footing 11 is provided with above for card The hole clipping of tongue buckle.Panel 1 is similar square shape, and three pieces of base plates 2 are the rectangle of strip, and three pieces of base plates 2 splice The underground of panel 1, and in the state being parallel to each other.Three protuberances 21 on each piece of base plate 2 are all fastened one by one with footing 11, and three The two of which of individual protuberance 21 is distributed in the two ends of rectangle base plate 2, a centre for being distributed in rectangle base plate 2.
The bottom of the panel 1 offers the first passage 3 for running through panel 1 for steel bar, and the first passage 3 runs through institute State footing 11.The bottom of the first passage 3 offers on the top of the first passage 3 and runs through to offer the first kerve 32 Length and the length of first passage 3 that first inverted draw cut 31 of panel 1, the first inverted draw cut 31 and the first kerve 32 are constituted in orthographic projection direction Unanimously, the first inverted draw cut 31 misplaces substantially with the first kerve 32 in orthographic projection direction, slightly overlaps a little.
As shown in figure 1,24 the first inverted draw cuts 31 are offered on the top of panel 1, because first passage 3 is through footing 11 , therefore, the penetration top for being distributed in first passage 3 and footing 11 of the first inverted draw cut 31.And the first kerve 32 is located at two Between footing 11, by the bottom hollow out of first passage 3 between two footing 11, and because footing 11 is hollow, in footing The bottom of first passage 3 in the middle of 11 also is provided with the first kerve 32, so in orthographic projection direction, the first groove in vertical direction, the One inverted draw cut 31 is in be spaced apart with the first kerve 32 substantially.When injection, the insert on dynamic model and cover half is respectively from both sides Opposite dislocation insertion, the insert dislocation on both sides is plugged together, and is so able to ensure that the injection mo(u)lding of the first inverted draw cut 31 and the first kerve 32. Due to need dynamic model and cover half to inserting, therefore in order to ensure to the gapless inserted, the first inverted draw cut 31 and the first kerve 32 Distribution is that staggeredly, best is also to partially overlap at least in orthographic projection direction, it can be ensured that both sides insert is in the process to inserting It is middle certain clamping occur, it is ensured that the entirety of first passage 3 is unimpeded.
The bottom of the base plate 2 offers the second channel 4 for running through panel 1 for steel bar, and the second channel 4 runs through institute State protuberance 21.The bottom of the second channel 4 offers on the top of the second channel 4 and passes through to offer the second kerve 42 The second inverted draw cut 41 of panel 1 is worn, the second inverted draw cut 41 is grown in the length that orthographic projection direction constitutes with the second kerve 42 with second channel 4 Degree is consistent, and the second inverted draw cut 41 misplaces substantially with the second kerve 42 in orthographic projection direction, slightly overlaps a little.
As shown in fig. 6,8 the second inverted draw cuts 41 are offered in the bottom surface sections of each base plate 2, because second channel 4 is through Protuberance 21, therefore, the penetration top for being distributed in second channel 4 and protuberance 21 of the second inverted draw cut 41.And the second kerve 42 are located between two protuberances 21, by the bottom hollow out of second channel 4 between two protuberances 21, and due to protuberance 21 For hollow, the bottom of second channel 4 in the middle of protuberance 21 also is provided with the second kerve 42, so in orthographic projection direction, second In vertical direction, the second inverted draw cut 41 is in be spaced apart with the second kerve 42 to groove substantially.When injection, on dynamic model and cover half Insert misplace in opposite directions insertion from both sides respectively, the insert dislocation on both sides is plugged together, and is so able to ensure that the second inverted draw cut 41 and second The injection mo(u)lding of inverted draw cut 41.Due to need dynamic model and cover half to inserting, therefore in order to ensure to the gapless inserted, the second inverted draw cut 41 and second the distribution of kerve 42 be that staggeredly, best is also to partially overlap, it can be ensured that both sides at least in orthographic projection direction There is certain clamping during to inserting in insert, it is ensured that the entirety of second channel 4 is unimpeded
Original whole is embedded in passage that the inside of panel 1 passed through for steel bar on pallet by opening up kerve and inverted draw cut Outside is exposed to, so when production and processing, cover half can be from both sides to inserting passage injection mo(u)lding with dynamic model.Change The structure that original side is taken out, this structure only needs to be extracted out on pallet side and channel attached through hole using very short side pumping rod Just can be with, the length of side pumping rod more than 80% can be shortened, so just can complete side using very short oil cylinder and take out, save Cost.And as a rule, the time is 20S or so when past side pumping rod is once extracted out, it now is possible within 5S, significantly Shorten side to find time, production efficiency is improve to a great extent.
The quantity of first passage 3 passed through on described each footing 11 is two, the passed through on described each protuberance 21 The quantity of two passage 4 is two.6 steel bars are just uniformly equipped with such a panel 1, also there are 2 steel bars on a base plate 2, It is this relatively reasonable in structure, stronger support force can be carried, and also the position of steel bar is arranged on footing 11 with casting lug thereon Position, the plastic injection amount of these positions is larger, is to transmit the position of power, therefore can become more after extra insertion steel bar Plus stablize.
The shrinkage pool 12 of multiple convenient leakages is densely covered with the panel 1, is rhombus positioned at middle shrinkage pool 12, positioned at edge Shrinkage pool 12 for ellipse.It is able to ensure that situations such as some of the above liquid of panel 1 occurs certain leakage on shrinkage pool 12, and in Between rhombus be able to ensure that lower discharge is maximized, the power pullled for playing of the needs on edge is larger, if edge For rhombus, deformation thus would tend to occur, causing the service life of plastic pallet reduces, and if using elliptical shape with regard to energy Enough avoid such case, it can be ensured that the stable stress in edge, be difficult deformation.
The bottom surface of the panel 1 is provided with the reinforcement 13 for reinforcement structure intensity, outside the first passage 3 and panel 1 Reinforcement 13 between edge is y-type structure.Although traditional structure of criss-cross reinforcement 13 is with stronger stretch-proof energy Power, but its ability of anti-deformation is very weak, the particularly moment of torsion of direction of rotation.And y-type structure also has on torque direction Have and have more drag than criss-cross structure, the deformation produced by moment of torsion can be resisted so that pallet is more stable effective.
The above is only the preferred embodiment of the present invention, and protection scope of the present invention is not limited merely to above-mentioned enforcement Example, all technical schemes belonged under thinking of the present invention belong to protection scope of the present invention.It should be pointed out that for the art Those of ordinary skill for, some improvements and modifications without departing from the principles of the present invention, these improvements and modifications Should be regarded as protection scope of the present invention.

Claims (6)

1. a kind of river word plastic pallet, including panel and base plate, the base plate is plugged together and is connected on the panel bottom surface, the face Plate bottom offers and, through the first passage of panel, it is characterized in that for for steel bar:The bottom of the first passage is to offer First kerve, offers the first inverted draw cut through panel on the first passage top, the first inverted draw cut is just being thrown with the first kerve The length of shadow direction composition is consistent with first passage length, and the first inverted draw cut and the first kerve misplace or portion in orthographic projection direction portion Divide and overlap.
2. word plastic pallet in river according to claim 1, is characterized in that:Offer on the base plate and run through base plate for steel bar Second channel, the bottom of the second channel is offered through face to offer the second kerve on the second channel top Second inverted draw cut of plate, the second inverted draw cut is consistent with first passage length in the length that orthographic projection direction constitutes with the second kerve, and second Inverted draw cut misplaces or partly overlaps with the second kerve in orthographic projection direction portion.
3. word plastic pallet in river according to claim 2, is characterized in that:The panel bottom is provided with multiple hollow bottoms Foot, the base plate quantity is multiple and base plate is provided with hollow protuberance, and base plate plugs together clamping by protuberance and footing So as to be fixed on panel, the first passage runs through the footing, and the second channel runs through the protuberance.
4. word plastic pallet in river according to claim 3, is characterized in that:The first passage number passed through on each described footing Measure as two, the second channel quantity passed through on described each protuberance is two.
5. word plastic pallet in river according to claim 1, is characterized in that:Multiple convenient leakages are densely covered with the panel Shrinkage pool, is rhombus positioned at middle shrinkage pool, and the shrinkage pool positioned at edge is ellipse.
6. word plastic pallet in river according to claim 1, is characterized in that:The panel bottom surface is provided with for reinforcement structure The reinforcement of intensity, the reinforcement between the first passage and panel outward flange is y-type structure.
CN201510358762.3A 2015-06-25 2015-06-25 Plastic tray in shape like Chinese character 'chuan' Active CN105173324B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510358762.3A CN105173324B (en) 2015-06-25 2015-06-25 Plastic tray in shape like Chinese character 'chuan'

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510358762.3A CN105173324B (en) 2015-06-25 2015-06-25 Plastic tray in shape like Chinese character 'chuan'

Publications (2)

Publication Number Publication Date
CN105173324A CN105173324A (en) 2015-12-23
CN105173324B true CN105173324B (en) 2017-05-17

Family

ID=54895902

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510358762.3A Active CN105173324B (en) 2015-06-25 2015-06-25 Plastic tray in shape like Chinese character 'chuan'

Country Status (1)

Country Link
CN (1) CN105173324B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111361836A (en) * 2020-03-24 2020-07-03 上海鸿研物流技术有限公司 Tray

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW308571B (en) * 1996-10-21 1997-06-21 Cherng-Jia Liou Manufacturing method of pallets made of plastic material
CN203419350U (en) * 2013-08-08 2014-02-05 上海力卡塑料托盘制造有限公司 Grid plastic tray shaped like Chinese character 'chuan'
CN203581540U (en) * 2013-11-21 2014-05-07 深圳市格林美高新技术股份有限公司 Plastic tray
CN203682082U (en) * 2013-12-31 2014-07-02 浙江普耐姆塑业股份有限公司 Gridding Chinese character tian-shaped plastic tray
KR20140114910A (en) * 2013-03-12 2014-09-30 (주)하이텍파츠 Plastic pallet
CN203921475U (en) * 2013-12-31 2014-11-05 浙江普耐姆塑业股份有限公司 Assembled dull and stereotyped river word pallet

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW308571B (en) * 1996-10-21 1997-06-21 Cherng-Jia Liou Manufacturing method of pallets made of plastic material
KR20140114910A (en) * 2013-03-12 2014-09-30 (주)하이텍파츠 Plastic pallet
CN203419350U (en) * 2013-08-08 2014-02-05 上海力卡塑料托盘制造有限公司 Grid plastic tray shaped like Chinese character 'chuan'
CN203581540U (en) * 2013-11-21 2014-05-07 深圳市格林美高新技术股份有限公司 Plastic tray
CN203682082U (en) * 2013-12-31 2014-07-02 浙江普耐姆塑业股份有限公司 Gridding Chinese character tian-shaped plastic tray
CN203921475U (en) * 2013-12-31 2014-11-05 浙江普耐姆塑业股份有限公司 Assembled dull and stereotyped river word pallet

Also Published As

Publication number Publication date
CN105173324A (en) 2015-12-23

Similar Documents

Publication Publication Date Title
CN204323865U (en) A kind of dismountable wood case
CN105173324B (en) Plastic tray in shape like Chinese character 'chuan'
CN207156079U (en) For going out the sectional die of muscle prefabricated components shaping
CN107142925B (en) The production method of steel reinforcement cage and steel reinforcement cage
CN218091823U (en) Terrazzo separating and fixing device
CN206888079U (en) One kind lengthens shock resistance type water tank template
CN205131898U (en) Pallet structure
CN206754789U (en) A kind of structure-reinforced type wood-plastic board
CN209742354U (en) Building templates is moulded to wooden core package
CN203697423U (en) Movable plate of injection molding machine
CN204585994U (en) A kind of plastic-steel structure plate
CN205627972U (en) Regular filler
CN202411415U (en) Magnetic material pressing die
CN206913351U (en) A kind of Recombined bamboo assembly backing plate
CN205951143U (en) A movable insert that is used for putting in mould hardware
CN201633178U (en) Clamp die template structure of injection molding machine
CN209760720U (en) Detachable sand pile shaping device
CN204464342U (en) Backboard and the continuous backboard of composite type
CN209755948U (en) Anti-corrosion fan blade bending mold
CN216515523U (en) Reinforced waterproof drainage plate
CN203129574U (en) Novel hollow plastic building template
CN202241695U (en) Die with multiple slides
CN203420467U (en) Building formwork in which V-shaped reinforcing ribs are arranged
CN210971938U (en) Moulded water tank plate
CN213654229U (en) Adjustable post die special steel clamp

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 318015 Hong Jia Middle Road, Jiaojiang District, Taizhou City, Zhejiang Province, No. 2267

Co-patentee after: Chen Aihua

Patentee after: Zhejiang Xin Ding plastic Limited by Share Ltd

Address before: Taizhou City, Zhejiang province Jiaojiang District Hongjiadu big 318015 Ring Road No. 2

Co-patentee before: Chen Aihua

Patentee before: Zhejiang Xinding Plastic Industry Co., Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Flat plate type III-shaped plastic pallet

Effective date of registration: 20171219

Granted publication date: 20170517

Pledgee: Industrial Commercial Bank of China Ltd Taizhou Jiaojiang branch

Pledgor: Zhejiang Xin Ding plastic Limited by Share Ltd

Registration number: 2017330000313

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20210203

Granted publication date: 20170517

Pledgee: Industrial Commercial Bank of China Ltd. Taizhou Jiaojiang branch

Pledgor: ZHEJIANG XINDING PLASTIC Co.,Ltd.

Registration number: 2017330000313