CN105159223A - Operation method for intelligent control system of whole scaffold - Google Patents
Operation method for intelligent control system of whole scaffold Download PDFInfo
- Publication number
- CN105159223A CN105159223A CN201510384424.7A CN201510384424A CN105159223A CN 105159223 A CN105159223 A CN 105159223A CN 201510384424 A CN201510384424 A CN 201510384424A CN 105159223 A CN105159223 A CN 105159223A
- Authority
- CN
- China
- Prior art keywords
- plc
- lifting
- seat
- plane
- height
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/04—Programme control other than numerical control, i.e. in sequence controllers or logic controllers
- G05B19/05—Programmable logic controllers, e.g. simulating logic interconnections of signals according to ladder diagrams or function charts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/10—Plc systems
- G05B2219/16—Plc to applications
- G05B2219/163—Domotique, domestic, home control, automation, smart, intelligent house
Abstract
The invention discloses an operation method for an intelligent control system of a whole scaffold. A lifting machine drives a gear mechanism to rotate, and a rotating speed sensor transmits rotating speed pulses. A collection counter collects and counts the rotating speed pulses, and transmits the rotating speed pulses to a PLC. After the PLC receives the pulse number, the PLC converts the pulse number into a lifting height according to a set coefficient, compares the lifting height with a set height, and automatically controls the lifting machine at a position to stop after the height reaches the set height. During lifting, the PLC compares the heights of all positions, calculates the lifting height difference among all positions, controls the operation state of the lifting machine at the position with the biggest difference, and achieves the synchronous lifting of all positions. The method is convenient to operate, is good in working safety, and is good in control performance.
Description
Technical field
The present invention relates to a kind of method of operating of integral-scaffold control system.
Background technology
The elevating control of framing scaffold is the problem that this area needs to solve always, exists for a long time and controls easily to occur the problems such as adjustable height difference between instability, each seat in the plane.
Summary of the invention
The method of operating of the integral-scaffold intelligent control system that the object of the present invention is to provide a kind of control performance good.
Technical solution of the present invention is:
A kind of method of operating of integral-scaffold intelligent control system, it is characterized in that: described integral-scaffold intelligent control system comprises the lifting motor of each seat in the plane, lifting motor is connected with driving circuit by electrothermal relay, contactor, driving circuit is connected with PLC, PLC is connected with speed probe, and speed probe is the sensor measuring the transmission gear rotating speed that lifting motor drives; PLC is connected with control panel; Lifting motor driven gear mechanism rotates, speed probe sends tacho-pulse, acquisition counter device collects this pulse signal, count and send PLC to, after PLC receives umber of pulse, according to the coefficient of setting, convert umber of pulse to adjustable height, and compare with setting height, after reaching setting height, automatically control this seat in the plane lifting motor stop; In lifting process, the height of PLC to each seat in the plane compares, and calculates the adjustable height difference between each seat in the plane, and when maximum difference exceeds permissible value, PLC controls the seat in the plane lifting motor running status of maximum difference, realizes synchronization lifting between each seat in the plane.
The present invention is easy to operate, and work safety, control performance are good.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the invention will be further described.
Fig. 1 is the Control system architecture schematic diagram of one embodiment of the invention.
Embodiment
A method of operating for integral-scaffold intelligent control system, described integral-scaffold intelligent control system comprises the lifting motor 1 of each seat in the plane; Lifting motor is connected with driving circuit 4 by electrothermal relay 2, contactor 3, and driving circuit is connected with PLC 5, and PLC is connected with speed probe 6, and speed probe is the sensor measuring the transmission gear rotating speed that lifting motor drives; PLC is connected with control panel 7; Lifting motor driven gear mechanism 8 rotates, speed probe sends tacho-pulse, acquisition counter device collects this pulse signal, count and send PLC to, after PLC receives umber of pulse, according to the coefficient of setting, convert umber of pulse to adjustable height, and compare with setting height, after reaching setting height, automatically control this seat in the plane lifting motor stop; In lifting process, the height of PLC to each seat in the plane compares, and calculates the adjustable height difference between each seat in the plane, and when maximum difference exceeds permissible value, PLC controls the seat in the plane lifting motor running status of maximum difference, realizes synchronization lifting between each seat in the plane.
Claims (1)
1. the method for operating of an integral-scaffold intelligent control system, it is characterized in that: described integral-scaffold intelligent control system comprises the lifting motor of each seat in the plane, lifting motor is connected with driving circuit by electrothermal relay, contactor, driving circuit is connected with PLC, PLC is connected with speed probe, and speed probe is the sensor measuring the transmission gear rotating speed that lifting motor drives; PLC is connected with control panel; Lifting motor driven gear mechanism rotates, speed probe sends tacho-pulse, acquisition counter device collects this pulse signal, count and send PLC to, after PLC receives umber of pulse, according to the coefficient of setting, convert umber of pulse to adjustable height, and compare with setting height, after reaching setting height, automatically control this seat in the plane lifting motor stop; In lifting process, the height of PLC to each seat in the plane compares, and calculates the adjustable height difference between each seat in the plane, and when maximum difference exceeds permissible value, PLC controls the seat in the plane lifting motor running status of maximum difference, realizes synchronization lifting between each seat in the plane.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510384424.7A CN105159223A (en) | 2015-06-30 | 2015-06-30 | Operation method for intelligent control system of whole scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510384424.7A CN105159223A (en) | 2015-06-30 | 2015-06-30 | Operation method for intelligent control system of whole scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105159223A true CN105159223A (en) | 2015-12-16 |
Family
ID=54800110
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510384424.7A Pending CN105159223A (en) | 2015-06-30 | 2015-06-30 | Operation method for intelligent control system of whole scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105159223A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110161907A (en) * | 2019-05-14 | 2019-08-23 | 山西航天清华装备有限责任公司 | A kind of promotion frame control system and its control method based on direct current generator push rod |
CN111042509A (en) * | 2019-12-27 | 2020-04-21 | 上海建工集团股份有限公司 | Intelligent support device and method for integral steel platform formwork |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10331416A (en) * | 1997-05-30 | 1998-12-15 | Nihon Bisoh Co Ltd | Controller for gondola |
CN201156211Y (en) * | 2008-02-22 | 2008-11-26 | 贺昌义 | Load synchronous control system for lift framing scaffold |
KR20100066979A (en) * | 2008-12-10 | 2010-06-18 | (주)케이.아이.기술 | Construction lift and control method thereof |
CN101845884A (en) * | 2010-05-21 | 2010-09-29 | 四川华山建筑有限公司 | Synchronous lifting control method of attached lifting scaffold |
CN102777024A (en) * | 2012-08-14 | 2012-11-14 | 俞彬 | Digital and intelligent lifting control device |
-
2015
- 2015-06-30 CN CN201510384424.7A patent/CN105159223A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10331416A (en) * | 1997-05-30 | 1998-12-15 | Nihon Bisoh Co Ltd | Controller for gondola |
CN201156211Y (en) * | 2008-02-22 | 2008-11-26 | 贺昌义 | Load synchronous control system for lift framing scaffold |
KR20100066979A (en) * | 2008-12-10 | 2010-06-18 | (주)케이.아이.기술 | Construction lift and control method thereof |
CN101845884A (en) * | 2010-05-21 | 2010-09-29 | 四川华山建筑有限公司 | Synchronous lifting control method of attached lifting scaffold |
CN102777024A (en) * | 2012-08-14 | 2012-11-14 | 俞彬 | Digital and intelligent lifting control device |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110161907A (en) * | 2019-05-14 | 2019-08-23 | 山西航天清华装备有限责任公司 | A kind of promotion frame control system and its control method based on direct current generator push rod |
CN111042509A (en) * | 2019-12-27 | 2020-04-21 | 上海建工集团股份有限公司 | Intelligent support device and method for integral steel platform formwork |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205176665U (en) | Accurate controlling means of rotary platform | |
CN103253576B (en) | Elevator car speed monitored control system | |
CN105159223A (en) | Operation method for intelligent control system of whole scaffold | |
JP2012072770A (en) | Control method, device therefor and drive means for driving double-acting pump of reciprocating linear-motion mechanism | |
CN107942244A (en) | New energy automobile motor stall fault detection method | |
CN103697133B (en) | A kind of lifting device speed reducer | |
CN102555256A (en) | Hydraulic machine system and method for releasing load thereof | |
CN102728884A (en) | Positioning and zero setting method and device for high-speed rotating flying shear blade | |
CN203104344U (en) | Multi-motor synchronous control system in production equipment | |
CN104452620A (en) | Automatic barrier machine with functions of direct transmission and position detection | |
CN104929357A (en) | Intelligent scaffold anti-falling electric wave interference preventing method | |
CN205170097U (en) | Because protection device of encoder on car assembly interior trim lift | |
CN204325965U (en) | The automatic rail machine that a kind of direct-drive and position are detected | |
CN202754663U (en) | Lifting device | |
CN103569898A (en) | Gear transmission lifting device of moving machine | |
CN102777024A (en) | Digital and intelligent lifting control device | |
CN203419736U (en) | Capping machine system | |
CN207618813U (en) | Traction machine torque measures experimental rig | |
CN203949833U (en) | Sclerometer adds off-load lifting bi-directional drive mechanism | |
CN214359931U (en) | Electronic limiting device for automatically adjusting amplitude limiting of tower crane | |
CN203699770U (en) | Automatic control system for plastic drainage plate insertion device | |
CN220419847U (en) | Single-slow-drive accurate control device and mill | |
CN202704916U (en) | Digital intelligent lifting control device | |
CN201528303U (en) | Motor synchronization control device in steel cord equipment | |
CN116832941A (en) | Single-slow-drive device control system of mill and InCS intelligent control method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20151216 |